HomeMy WebLinkAboutWPO201500033 Correspondence 2019-05-02DRAFT VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM
CONSTRUCTION ACTIVITIES
110) REGISTRATION STATEMENT
NEW ISSUANCE ❑
MODIFICATION WITH ACREAGE INCREASE ❑
VAP l OH633
Existing Permit Coverage Number (if appl Hillbrook
1691 Old Brook Rd
Section 1. Operator/Permittee Informati Hilltop Partners LLC
A. Construction Activity Operator (Perm... J ;.j..._ tg for permit coverage and will have
operational control over construction activities to ensure compliance with the general permit. A person with
signatory authority for this operator must sign the certification in Section VI. (per Part III. K. of the VAR30 Permit).
RE -ISSUANCE ❑
FOR OFFICE USE ONLY
ID Number:
Technical Criteria: IIB ❑ IIC ❑
Operator
Nameion :
�� �
O eratorName: / �/ s � LLG
Contact person:
Address:
City, State Zip code:
Phone number:
Primary email:
CC Email:
MODIFICATION WITHOUT ACREAGE INCREASE ❑
po 3ax (1,qS
Gk4"✓w i v1,It11 VA 27-,1 oL
B. Billing Information (leave blank if same as the Operator identified in Section I. A. above). This entity will receive
Annual Permit Maintenance and Permit Modification Fee invoices (if applicable).
Name:
Contact person:
Address:
City, State Zip code:
Phone number:
Primary email:
CC Email:
C. May we transmit correspondence electronically? You must choose YES and include a valid email in order to pay by
credit card and to receive your permit coverage approval letter via email:
YES LJ MO ❑
DEQ 199-DRAFT PAGE 1 18
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT
Section II. Construction Activity Location Information. Project site information.
A. Include a site map showing the location of the existing or proposed land -disturbing. activities, the limits of land
disturbance, construction entrances and all water bodies receiving stormwater discharges from the site.
B. Construction Activity Name:
Address:
City and/or County and Zip code:
Latitude and Longitude
(6-digit decimal degrees):
C. Construction Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees):
(1 ll6' #k
I l%llhreoL G-
G�+rle%esinllc vA ?hut
38'.0i(2el3t . —q?.Lt&DF'gf'
IL
Section Ill. Offsite Support Activity Location Information. List all offsite support activities to be included under this
permit registration. Enter additional areas on a separate page. Offsite areas not included on this registration will need
to obtain coverage under a separate VPDES permit.
A. Offsite Activity Name:
Address:
City and/or County.and Zip code:
Latitude and Longitude
(6-digit decimal degyees):
B. Offsite Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees):
Section IV. Site Information.
N
9/4
A. Acreage totals for all land -disturbing activities to be included under
this permit coverage.
(to the nearest one -hundredth of an acre)
Total land area of development (include the entire
area to be disturbed under the approved Stormwater
Management Plan):
Estimated area to be disturbed (portions with Erosion
and Sediment Control Plan approval only):
I • ti' 1
Offsite estimated area to be disturbed (if applicable):
C. Property owner status:
D. Nature of the construction activity description (i.e.
commercial, industrial, residential, agricultural,
environmental):
B. Estimated Project Dates
(MM/DD/YYYY)
Start date: 5�l/19
Completion date:
FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE IJ
Fee.I d rat t4't
E. Municipal Separate Storm Sewer System (MS4)
name (if discharging to a MS4):
DEQ 199-DRAFT
PAGE 8
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT
F. This construction activity is part of a common plan of development or sale: YES ❑ NO ❑
G. 6'^ Order Hydrologic Unit Code (HUC) and associated Receiving Water Name(s). Include additional HUCs and
receiving waters on a separate page.
HUC RECEIVING WATERBODY(S)
I0209oLoW02o3 I S0-+t',, T-v✓L?-ivcP%Kt l—ivGy
Section V. Other Information.
A. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the
General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting the registration
statement. By signing the registration statement, the operator is certifying that the SWPPP has been prepared.
B. Has an Erosion and Sediment Control Plan been approved for the disturbance in Section IV. A.? YES DprNO ❑
If yes, provide the date of Erosion and Sediment Control Plan approval: I D
C. Land disturbance has commenced: YES 2(NO ❑
D. Stormwater management maintenance agreement included (if applicable): YES ❑ Not Applicable ❑
E. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity
Form. AS&S Entity Name (if different from the Operator identified in Section If. A.):
SEE THE FOLLOWING PAGE FOR SIGNATURE AND CERTIFICATION REQUIREMENTS
AND INFORMATION
DEQ 199-DRAFT PAGE 3 18
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT
Section VI. Certification. This Certification must be signed by a person representing the operator identified in Section 1.
A. and meeting the requirements of 9VAC25-880-70. Part III. K. Please note that operator is defined in 9VAC25-870-10
as follows:
"Operator" means the owner or operator of any facility or octivitysubject to the Act and this chapter. In the context of stormwater
associated with a large or small construction activity, operator means any person associated with a construction project that meets
either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including
the ability to make modifications to those plans and specifications or (i)) the person has day-to-day operational control of those
activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state
permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the
stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from
Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system.
9VAC25-880-70. Part 111. K Signatory Requirements:
I. Registration statement. All registration statements shall be signed as follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer
means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or
any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager
of one or more manufacturing production, or operatingfacilities, provided the manager is authorized to make management
decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term
compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or
actions taken to gather complete and accurate information for state permit application requirements; and where authority
to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official.
For purposes of this chapter, a principal executive officer of a public agency includes: (I) the chief executive officer of the
agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the
agency.
Certification: "I certify under penalty of law that I have read and understand this registration statement and that this
document and all attachments were prepared in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage
the system or those persons directly responsible for gathering the information, the information submitted is to the best
of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting
false information including the possibility of fine and imprisonment for knowing violations."
Printed Name: J 7u f'tcktt"aek
Signature (signed In Ink): �lAAUL
Date:
Submit this form to the VSMP Authority. If DEQ is the VSMP Authority, please send to:
Department of Environmental Quality
Office of Stormwater Management Suite 1400
PO Box 1105
Richmond VA 23218
constructionap@ dea.vi reinia.gov
DEQ 199-DRAFT PAGE 4 18