HomeMy WebLinkAbout20050209actions 1
ACTIONS
Board of Supervisors Meeting of February 9, 2005
February 11, 2005
AGENDA ITEM/ACTION
ASSIGNMENT
1. Call to Order.
· Meeting was called to order at 3:35 p.m. by the
Chairman, Mr. Rooker. All BOS members were
present. Also present were Bob Tuc ker, Larry
Davis, Roxanne White, Tom Foley, Melvin
Breeden and Debi Moyers .
2. Work Session: Business Plan.
· HELD.
3. Recess.
· The Board recessed at 5:50 p.m.
4. Reconvene.
· The Chairman reconvened the meeting at 6:02
p.m. All BOS members were present. Also
present were Bob Tucker, Larry Davis, Wayne
Cilimberg and Debi Moyers .
7. From the Public: Matters Not Listed on the Agenda.
Brian Wheeler:
· Commented on the Rural Areas Plan. Supports
phasing of development rights, increased
funding for the ACE program, and the setting of
goals for number of development rights to be
extinguished. Expressed concerns about
clustering.
Steve Ashby:
· Applauded the recent public funding of Key
West Drive culvert replacement. Petitioned the
Board to provide the funding for transit needs
and extending CTS bus service into the County.
Liz Palmer:
· Spoke about the South Fork Rivanna Reservoir
and the need to examine the sediment issue.
John Martin:
· Concerned about the water supply decision
making process and schedule.
John Foster:
· Updated the Board on the progress related to
establishing the Covesville Historic District.
The State Review Board and the Historic
Resources Board will vote on this nomination
March 16, 2005. Asked the Board to pass a
resolution in favor of the establishment of the
district prior to the State Review Board meeting.
Jeff Werner:
· Represented the Piedmont Environmental
Council. Responded to the discussion held last
week regarding options for the community’s
public water supply.
Jared Lake:
· Asked the County to name Phi Phi Island a
sister island of Albemarle County and the
Charlottesville area.
Clerk: Forward two articles provided to Board
members. Forward comments to Tom
Frederick.
Clerk: Forward comments to Tom Fre derick.
Clerk: Prepare resolution and put on March 2nd
consent agenda.
Clerk: Forward comments to Tom Frederick.
8.2 Amendment of Personnel Policy Manual – Adoption Clerk: Forward signed resolution to Human
2
of resolution establishing Employee Recognition
Policy.
· ADOPTED resolution.
Resources. Copy to County Attorney.
(Attachment 1)
8.3 Barry E. and Tracy M. Meade, Deed of Dedication
Agreement – Rivanna Greenway.
· APPROVED the proposed deed of dedication
and authorized the County Execut ive to sign the
deed on behalf of the County after it has been
approved by the County Attorney with any
necessary changes.
County Attorney ’s Office: Provide Clerk with
copy of document after signed.
(Attachment 2)
9. ZMA-2004-00021. Delta Kappa Epsilon at UVA
(Sign #92).
· APPROVED ZMA-2004-00021, by a vote of
6:0, as proffered and signed by the applicant
dated February 3, 2005.
(Attachment 3)
10. CPA-2004 -0006. Stormwater Master Plan.
· APPROVED CPA-2004 -00 06, by a vote of 6:0,
to amend the Natural Res ources and Cultural
Assets component of the Comprehensive Plan
to incorporate the Stormwater Master Plan, with
the anticipation of eventually adopting a
stormwater financing strategy as part of a
broader approach to funding urban
infrastructure.
(Attachment 4)
11. CPA-2003 -006 Rural Areas Comprehensive Plan
Amendment.
· HELD. Next work session March 2, 2005.
12. From the Board: Matters Not Listed on the Agenda.
David Wyant:
· Asked about the status of Pantops and the
Northern Area Master Plans. Mr. Cilimber g
provided an update.
Sally Thomas:
· Distributed materials from the “Building Safe,
Healthy and Livable Communities” conference
she attended.
Ken Boyd:
· Suggested he or another Board member
contact Butch Davies regarding Route 231/22
truck restriction to reinforce the Board’s
position.
· Asked the status of the proposed Subdivision
Ordinance. Mr. Davis responded a work
session is scheduled for March 2nd with the
public hearing on April 20th.
13. Adjourn.
· The meeting was adjourned at 8:40 p.m.
/djm
Attachment 1 – Employee Recognition Resolution
Attachment 2 – Barry E. and Tracy M. Meade, Deed of Dedication Agreement – Rivanna Greenway
Attachment 3 – Delta Kappa Epsilon at UVA Proffers
Attachment 4 – Stormwater Master Plan
3
ATTACHMENT 1
RESOLUTION
WHEREAS, the County of Albemarle Personnel Policy Manual has been adopted by the Board of
Supervisors; and
WHEREAS, the Board of Supervisors desires to authorize a Total Rewards Program for
Albemarle County employees; and
WHEREAS, the proposed Section P-65, Employee Recognition Program, sets forth the purposes
of the program, recognition criteria and employee eligibility; and
WHEREAS , the Board of Supervisors finds it appropriate to add Section P-65, Employee
Recognition Program, to the Personnel Policy Manual.
NOW, THEREFORE, BE IT RESOLVED THAT the Board of Supervisors of Albemarle County,
Virginia, hereby amends the County of Albemarle Personnel Policy Manual by adding Section P-65,
Employee Recognition Program.
COUNTY OF ALBEMARLE
PERSONNEL POLICY
Section P-65 EMPLOYEE RECOGNITION PROGRAM
A. Purpose
The Board of Supervisors encourages its employees to provide the best possible service to our
customers and citizens. The purpose of this program is to recognize County employees who distinguish
themselves in the performance of their duties and who contribute significantly to the achievement of the
goals and objectives of the County.
B. Program Established
There is hereby established an Employee Recognition Program. Each department is authorized to define
its own recognition standards to reward employees for the following:
1. Providing exceptional customer service
2. Performing above and beyond normal duties and expectations
3. Identifying and/or implementing a means to reduce the costs of providing services
4. Demonstrating excellence in safe work practices
5. Causing improvement in productivity, process, or quality of services
6. Exemplifying County values of Integrity, Innovation, Stewardship and Learning
These departmental standards shall be in writing and approved by Human Resources. Pursuant to
Virginia Code section 15.2-1508, the Board of Supervisors authorizes the payment of monetary bonuses
and other forms of nonmonetary awards to recognize employees who qualify for recognitio n under this
program.
C. Eligibility
All permanent full -time and part -time County classified employees are eligible to participate in this
program.
Adopted: February 9, 2005
4
ATTACHMENT 2
This deed was prepared by the Albemarle County Attorney.
Tax Map 78, Parcel 15C3
This deed is exempt from taxation under Virginia Code §§ 58.1-811(A)(3) and 58.1-811(C)(4).
DEED OF DEDICATION
THIS DEED OF DEDICATION is made this ___ day of ________, 2005 by and between BARRY E.
MEADE and TRACY M. MEADE, Grantors, and the COUNTY OF ALBEMARLE, VIRGINIA, a political
subdivision of the Commonwealth of Virginia, Grantee.
WITNESSETH:
WHEREAS, the Grantors are the owners in fee simple of the real property located in Albemarle
County that is described below and hereinafter referred to as the “Property;”
WHEREAS, the Grantors offer to grant, convey and dedicate the Property to the County for public
use, namely, a public access trail and greenway, including improvements; and
WHEREAS , the Grantee is willing to accept the Grantors’ offer of dedication.
NOW, THEREFORE, in consideration of the mutual premises, the Grantors hereby grant, convey,
and dedicate for public use to the Grantee, its successors and assigns, with GENERAL WARRANTY
AND ENGLISH COVENANTS OF TITLE, the following real property, to wit:
Those certain lands, shown and designated as the 11,268 square foot area of dedication
that is shaded on the plat of Robert W. Coleman, Jr., Residential Surveying Services,
dated January 6, 2004, and entitled “Plat Showing Greenway Dedication Located On
T.M.P. 78-15C3, Albemarle County, Virginia,” a copy of which is attached hereto and to
be recorded with this deed (the “Plat”). Reference is made to the Plat for a more
particular description of the location of the described lands.
The property interest conveyed herein is a portion of that certain parcel of land shown on the Plat
situated on the northeast side of the Rivanna River, being the same parcel conveyed to the Grantors by
deed of record in the office of the Clerk of the Albemarle County Circuit Court at Deed Book 1958, Page
68.
This conveyance is made expressly subject to all restrictions, conditions, rights-of-way and
easements, if any, contained in duly recorded deeds, plats and other instruments constituting constructive
notice in the chain of title to the Property conveyed hereby, insofar as the same affect the Property, which
have not expired by a time limitation contained therein or have not otherwise become ineffective.
The Grantee, acting by and through its County Executive, duly authorized by the Board of
Supervisors of Albemarle County, Virginia, does hereby accept the offer of dedication made by this deed,
as evidenced by the signature below.
WITNESS the following signatures.
GRANTORS: GRANTOR
________________________________
Barry E. Meade
GRANTOR
________________________________
Tracy M. Meade
5
GRANTEE: COUNTY OF ALBEMARLE, VIRGINIA
By:________________________________
Robert W. Tucker, Jr.
County Executive
6
ATTACHMENT 3
Original Proffer YES
Amended Proffer
(Amendment #________)
PROFFER FORM
Date: February 9, 2005
ZMA #ZMA-04-021 DKE Expansion
Tax Map and Parcel Number(s) TMP 76A -0C5
0.22 Acres to be rezoned from NOT ZONED to R-6
Pursuant to Section 33.3 of the Albemarle County Zoning Ordinance, the owner, or its duly
authorized agent, hereby voluntarily proffers the conditions listed below which shall be applied to the
property, if rezoned. These conditions are proffered as a part of the requested rezoning and it is agreed
that: (1) the rezoning itself gives rise to the need for the conditions; and (2) such conditions have a
reasonable relation to the rezoning request.
1) Permitted uses of the property, and or/uses authorized by special use permit, shall include only
the following section(s) of the Albemarle County Zoning Ordinance in effect on February 9, 2005,
a copy of the section(s) being attached hereto and will be in conformity with the site plans
prepared by McKee Carson and the architectural drawings prepared by Dalgliesh, Eichman,
Gilpin & Paxton dated February 1, 2005:
1. Sec. 16.2.1.7.
2) Each outdoor luminaire on the structure containing a lamp that emits three thousand (3,000) or
more maximum lumens shall be a full cutoff luminaire as provided in Albemarle County Zoning
Ordinance Section 4.17, in effect on February 9, 2005, a copy of the section being attached
hereto.
Delta Kappa Epsilon Renovation Limited Partnership February 3, 2005
By the DKE Corporation General Partner
Vice President R. Page Henley Jr.
7
ATTACHMENT 4
Amendment #1 Page 1 - Introduction to the Natural Resources and Cultural Assets Component of
the Comprehensive Plan, 4th Full paragraph
This chapter incorporates as part of the Comprehensive Plan the following freestanding documents: the
Open Space and Critical Resources Plan adopted in 1992, the Historic Preservation Plan adopted in
2000, and the Stormwater Master Plan adopted in 2005.
Included as Appendix A is the detailed Greenways Plan. The Mountain Protection Plan, prepared by the
Mountain Protection Committee in 1996, is Appendix B. The Open Space and Critical Resources Plan,
the Historic Preservation Plan, and the Stormwater Master Plan are located under separate cover.
Amendment #2 Page 28 – Stormwater Management, 1st Full paragraph
Urban and suburban development changes the nature of streams and drainage ways, and can result in
increased flooding, loss of groundwater recharge, and water quality degradation. Pollutants present in
urban and suburban runoff include: sediment, fertilizers, pesticides, heavy metals, bacteriological
contaminants, and grease and oil, among others. Since 1980, the County has required development in an
urban and urbanizing portion of the County known as the "stormwater detention area" to use facilities that
detain storm water. The purpose of these measures is to protect downstream properties from excessive
drainage, erosion, and flooding. In developing the Water Protection Ordinance, the County has been
studied how the storm water program can be enhanced to be more comprehensive, to coordinate
stormwater management within entire drainage basins, to incorporate water quality concerns, and to
improve the design and maintenance of stormwater facilities. The Design Standards Manual further
refines County guidance on these matters.
To this end, the County has recently completed a Stormwater Master Plan for the County’s Development
Areas. The objectives of the Stormwater Master Plan are to (1) provide guidance for land use planning
and neighborhood master planning that is based on the assessment and prioritization of water resources
and (2) promote public and private stormwater solutions that are based on needs and opportunities at the
watershed scale rather than relying solely on a site-by -site approach.
In developing the Stormwater Master Plan, assessments were conducted for streams within the
Development Areas and information on habitat conditions, community values, and problem areas were
gathered. Information from the stre am assessments was utilized to identify High-Value Stream Corridors.
This information is useful for land use and neighborhood planning, for prioritizing County capital projects
for stream improvement, and for guiding the review of development proposals and the implementation of
the Water Protection Ordinance. To further assess stream conditions, selected High-Value Stream
Corridors were monitored for biological integrity by the StreamWatch citizen monitoring program. Stream
Corridor Restoration Projects and Regional Stormwater Control Facilities were then identified. Stream
Corridor Restoration projects would improve existing stream corridors by repairing stream erosion,
enhancing stream buffers, cleaning up dump sites, and repairing infrastructure problems. Regional
Stormwater Facilities are intended to treat areas with high impervious cover, help protect downstream
High -Value Stream Corridors, and be integrated functionally and aesthetically with existing and future
development patterns. The Stormwater Master Plan aims to coordinate various Stormwater
Programmatic Elements and contains Stormwater Actions Lists for each Development Area that includes
prioritized stream restoration projects and prioritized regional facilities to be used in planning Count y
capital watershed improvement projects and in coordinating private development activities.
Amendment #3 Page 30 – List of Strategies
Strategy: Implement the Stormwater Master Plan programs and improvements in accordance with
a funding strategy appr oved by the Board of Supervisors.
Strategy: Amend the Water Protection Ordinance to incorporate stream management
objectives based on stream assessment results, including providing stream buffers
for pocket natural areas and community and private use trails, as designated in the
plan.