HomeMy WebLinkAbout02222013actions 1
ACTIONS
Board of Supervisors Meeting of February 22, 2013
February 22, 2013
AGENDA ITEM/ACTION
ASSIGNMENT
PODCAST
1. Call to Order.
Meeting was called to order at 11:30 a.m., by
the Chair, Ms. Mallek. All BOS members were
present. Also present were Tom Foley, Larry
Davis, Ella Jordan and Travis Morris.
Listen
2. Presentation on County Executive’s FY 2013-2014
Recommended Budget.
RECEIVED.
3. Mountain Valley WPO Exception.
APPROVED, by a vote of 6:0, an exception to
the Water Protection Ordinance to allow a
stream crossing on TM 89-73G5 in Mountain
Valley Subdivision subject to three conditions.
Clerk: Set out conditions of
approval (Attachment 1)
Listen
4. From the Board: Matters not Listed on the
Agenda.
There were none.
Listen
5. Adjourn to February 25, 2013, 6:00 p.m., Lane
Auditorium.
At 1:39 p.m., the Board adjourned until
February 25, 2013.
ewj/tom
Attachment 1 – Conditions of Approval
2
ATTACHMENT 1
CONDITIONS OF APPROVAL
1. Prior to construction of the stream crossing, the property owner must submit a mitigation plan for
the disturbance and the plan must be approved prior to commencing construction. The mitigation
plan shall be revised to include mitigation for the prior disturbances of graded access from
Ambrose Commons Drive and the new stream crossing, with the Program Authority having the
authority to determine if the proposed mitigation plan adequately addresses this impact.
2. Associated with reviewing the mitigation plan, the property owner shall demonstrate to the
Program Authority’s satisfaction that all federal and state permits associated with the stream
disturbance are in place including necessary easements to allow Lot G6 to use this driveway.
3. Associated with reviewing the mitigation plan, the Program Authority shall determine if a revised
Erosion and Sediment Control Plan is needed for compliance with the approved Erosion and
Sediment Control Permit. If a revised plan is needed, no land disturbance associated with the
driveway crossing shall be allowed prior to approval of a revised plan and the permit including
the plan.