June 21, 2006
Nathan Morris
Roudabush, Gale & Associates Inc
914 Monticello Road
Charlottesville VA 22906
RE: SUB 2006 -0104 West End at Western Ridge Preliminary Plat
Dear Sir:
Fax (434) 972 -4126
The Planning Commission at its June 6, 2006 meeting approved the appropriateness of the open space for the
above referenced plat with the following conditions:
1. [13.4.1] A conservation plan as specified in section 32.7.9 must be approved by the Zoning & Current
Development Division of the Department of Community Development with a copy of the original
conservation plan and all subsequent revisions to be submitted to the Zoning & Current Development
Division.
2. [14 -317, 18 -4.7] Submittal of covenants or other such instrument which evidences the establishment of an
owners' association and provides for ownership and maintenance of proposed open space. Such document
shall be subject to County Attorney review and approval and shall be in accordance with Section 14 -317 of
the Subdivision Ordinance - Instrument evidencing maintenance of certain improvements.
The preliminary plat is valid for five (5) years from the date it is approved pursuant to Section 14 -228 of
Chapter 14 of the Albemarle County Code, provided that the subdivider submits a final plat for all or a portion
of the property within one (1) year (June 21, 2007) of the approval as provided in section 14 -221, and thereafter
diligently pursues approval of the final plat. After three (3) years (June 21, 2009) following preliminary plat
approval, the agent may, after ninety (90) days' written notice provided by certified mail to the subdivider,
revoke the approval upon a specific finding of facts that the subdivider failed to diligently pursue approval of the
final plat. The failure to officially submit a final plat as provided in section 14 -221 within the one (1) year
period shall render the approval of the preliminary plat null and a new application must be filed and processed.
Please address all of the requirements and conditions listed below and submit eight (8) tentative plat copies to
the Department of Community Development. This letter must be submitted with the tentative plats, as a
checklist, to document that you have addressed all requirements or conditions, or the tentative plat will be
denied.
Erosion and Sediment Control, BMP Stormwater Management, and road plans with the associated applications
and fees must also be submitted with the eight (8) tentative Plats.
Once the tentative plat is submitted and reviewed you will receive comments from all
departments /divisions /agencies that have made comment on the tentative plat. Any further responses
must be made directly to each department /division/agency that has further comment. After all
aforementioned departments /divisions /agencies have granted a tentative approval, you must verify with
the Planner that you may submit the final plat mylar or other media original and any remaining fees to
the Department of Community Development. Assuming that the final plat reflects all tentative approvals,
signing of the plat will occur within four days.
The final plat will be subject to all final plat requirements (Subdivision Ordinance Section 14.206), in addition
to the following conditions.
The Department of Community Development shall not accept submittal of the final plat for signature until
tentative approvals for the following conditions have been obtained. The final plat shall not be signed until the
following conditions are met:
Zoning & Current Development approval to include:
❑ The final plat will be subject to the subdivision requirements required by Section 14 -206 of the
Subdivision Ordinance.
Engineering approval to include:
❑ All items in Design Manual 903B (Final Plat) must be addressed.
Please contact Glen Brooks at 296 -5832 if you have questions or require additional information.
Natural Resources Manager approval to include:
❑ Mitigation will be necessary for the encroachment of the infrastructure road across the stream
buffer. Other construction must be kept out of the buffer, and lot lines should be kept out of the
stream buffer.
Please contact Tamara Ambler at 296 -5832 if you have questions or require additional information.
Albemarle County Service Authority approval to include:
❑ Final approval will not be granted until water meters have been shown on the plat and final
water and sewer construction drawings have been reviewed and approved.
Please contact Gary Whelan at 977 -4511 if you have questions or require additional information.
Fire & Rescue approval to include:
❑ Final verification that adequate fire flow is available. Required fire flow is 2000 GPM @ 20
PSI. Final verification that all portions of all lot frontages are within 400 feet of a fire hydrant
by way of a prepared travel way.
Please contact James Barber at 296 -5833 if you have questions or require additional information.
2
VDOT approval to include:
❑ Approval of all final road and drainage plans.
Please contact John Winn at 293- 0011, Ext.119 if you have questions or require additional information.
Sincerely,
Francis H MacCall
Senior Planner
Zoning & Current Development
File: SUB 2006 -0104
Cc: Owner:
HIGHLANDS WEST L P
P O BOX 6156
CHARLOTTESVILLE VA 22906
Applicant:
KG ASSOCIATES
PO BOX 5207
CHARLOTTESVILLE VA 22905