HomeMy WebLinkAboutARB202000024 Review Comments Final Site Plan and Comps. 2020-10-02OF AL8
G�1tCIN'0'
COUNTY OFALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902
Phone (434) 296-5832 Fax (434) 972-4126
October 2, 2020
Scott Collins
Collins Engineering
200 Garrett Street, Ste K
Charlottesville, VA 22902
RE: ARB-2020-24: Spring Hill Village (TMP: 09000-00-00-02800)
Dear Mr. Collins,
We have received revised site plans and architectural plans for the above -noted application that address the
conditions of approval the Architectural Review Board requested at its May 18, 2020 meeting. Additional
comments have been included from the action letter following the July 20rh ARB meeting. The following
revisions are requested to make the proposal consistent with those conditions as well as the Entrance Corridor
design criteria.
20. Revise spacing of the large shade trees along the interior roads to meet the 40' on center minimum
spacing. Add one additional tree to the west side of Berwyn Lane, two trees to the east side of
Berwyn Lane and two trees to the south and west side of Loyola Way.
Rev. 1: Comment not yet fully addressed. Internal street tree placement has been significantly
altered since the last submission. The 40' minimum spacing along interior roads is not being met. It
appears that there are additional opportunities to increase the numbers of trees provided. Address
the following:
i) Add landscape easements where trees are located outside of the right of way and in private lots.
In order to add some of the above trees additional landscape easements will be required and
must be added to the site Dian.
Some lots of note are:...
v.Revise the label in the Utility sheet for the landscape easement within Lots 79 & 80. It is still
labeled as being 5' wide instead of a variable width.
vi.Revise the labels for the landscape easement in Lot 29 to state the saem width of easement.
vii.Ensure all landscape easements shown the site Dian are included in a Dlat and are recorded
rior to site plan approval
Page 1 of 3
29.
31.
all utilities.
3)
4)
zone requirements" note from the plan.
Within 15 days of the date of this letter, please send me a letter (by email is acceptable) indicating whether
you will or will not proceed with these revisions. If you choose not to proceed with these revisions, staff will be
unable to approve your application. If you choose to proceed with the revisions, please forward me one paper
set, as well as digital versions, of revised drawings together with a memo summarizing the revisions you've
made. Your decision to make the revisions will suspend the 60-day review period associated with your original
submittal. However, I expect to complete the review of your revised proposal within 2 weeks of your re -
submittal.
If you have any questions about this action, please contact me as soon as possible. I look forward to receiving
your revisions and completing this review with an approval letter.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Paty Saternye
Senior Planner
psaternye@albemarle.org
cc: Stanley Martin Companies LLC
11710 Plaza America Drive Ste 1100
Reston, VA 20190
File
Page 2 of 3
COUNTY OF ALBEMARLE
Department of Community Development
REVISED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution.
County staff has indicated below what they think will be required as a resubmission of revisions.
If you need to submit additional information, please explain on this form for the benefit of the
intake staff. All plans must be collated and folded to fit into legal size files, in order to be
accepted for submittal.
TO: Paty Saternve DATE:
PROJECT NAME: ARB2020-24 Spring Hill Village Final Site Plan
Submittal Type Requiring Revisions () indicates
Submittal Code
County Project Number
# Copies
Erosion & Sediment Control Plan E&S
Mitigation Plan MP
Waiver Request
Stormwater Management Plan (SWMP)
Road Plan RP
Private Road Request, with private/public comparison
PRR
Private Road Request — Development Area PRR-DA
Preliminary Site Plan PSP
Final Site Plan or amendment FSP
Final Plat FP
Preliminary Plat PP
Easement Plat EP
Boundary Adjustment Plat BAP
Rezoning Plan REZ
Special Use Permit Concept Plan SP-CP
Reduced Concept Plan R-CP
Proffers (P)
Bond Estimate Request BER
Draft Groundwater Management Plan (D-GWMP)
Final Groundwater Management Plan F-GWMP
Aquifer Testing Work Plan (ATWP)
Groundwater Assessment Report GWAR
Architectural Review Board ARB
ARB2020-24
1 + di ital
Other: Please explain
(For staff use only)
Submittal
Code
#
Copies
Distribute To:
Submittal
Code
#
Copies
Distribute To:
ARB
1 +
digital
Paty Saternye
Page 3 of 3