Loading...
HomeMy WebLinkAboutWPO201900042 Correspondence 2020-10-05® COLLINS ENGINEERING October 1, 2020 Emily Cox Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Spring Hill Village VSMP Amendment #2 (WP0201900042) 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ��434.293.3719 PH 434.293.2813 FX www.coll ns-eng ineeri ng.com Thank you for your comments dated September 29, 2020 on the above referenced project. Below are our responses to your comments on the VSMP plans. Engineering: 1. Wash rack has been shown and labeled at the construction entrance. 2. Updated impervious area calculations have been shown on the cover sheet. 3. Right-of-way diversions have been shown and labeled at the Spring Hill and Gropen entrances on Route 20. Should you have any questions, please feel free to contact Scott Collins at scott@collins-engineering.com. Sincerely, Scott Collins, PE