HomeMy WebLinkAboutWPO201900042 Correspondence 2020-10-05® COLLINS ENGINEERING
October 1, 2020
Emily Cox
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: Spring Hill Village VSMP Amendment #2 (WP0201900042)
200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902
��434.293.3719 PH 434.293.2813 FX
www.coll ns-eng ineeri ng.com
Thank you for your comments dated September 29, 2020 on the above referenced project. Below are our responses to your
comments on the VSMP plans.
Engineering:
1. Wash rack has been shown and labeled at the construction entrance.
2. Updated impervious area calculations have been shown on the cover sheet.
3. Right-of-way diversions have been shown and labeled at the Spring Hill and Gropen entrances on Route 20.
Should you have any questions, please feel free to contact Scott Collins at scott@collins-engineering.com.
Sincerely,
Scott Collins, PE