October 5, 2020
TO: Albemarle County
Community Development
401 McIntire Road
Charlottesville, VA 22902
ATTN: Paty Saternye
Senior Planner
RE: SDP201900069 (Afton Scientific— Minor Site Plan Amendment)
Dear Paty
On behalf of Afton Scientific we offer the following responses and plan revisions to
comments dated August 27, 2020. Our responses are in bold italic text below each
comment.
Poty Saternye — Senior Planner
4. [Comment] ...
C. ...
Rev. 1:...
Rev. 2: Comment not yet fully addressed. On sheet C2.0, the proposed
plan, there appears to be a scaling problem and all of the dimensions are
incorrect. An example is that 9' shows up as 9". This appears to be true
on all of the dimensions, and therefore they need to be revised or
updated to the correct scaling.
Comment noted. See revised plans.
h. ...
Rev. 1:...
b) ...
Rev. 2: Comment not yet fully addressed. A chart has been added
showing the required information. However, the following still needs to
be addressed.
1) Please note that the number and type of "trees" shown in the
Landscape Plan seems to be sufficient to meet the minimums
LINE
GRADE
CIVIL ENGINEERING
1134t' STREET NE, STE. 100
CHARLOTTESVILLE, VA 22902
LINE-GRADE.COM
SDP201900069 (Afton Scientific— Minor Site Plan Amendment)
Comment Response Letter
10/5/20201 Page 2
previously approved in SDP2000-77. The items below are to ensure
chart that is included is accurate and to adjust the "shrubs" as
specified below.
Comment noted.
2) Please see the attached markup of the recently added "Original vs.
Existing Planting Summary" schedule that was included in the
Landscape Plan sheet.
a. Revisions have been shown in red.
Comment noted.
b. This is based upon the SDP2000-77 site plan which has been
previously provided to you and discussed over the phone. It
is not based on the site plan you have been attaching to the
back of the site plan submittal packet, which is an older
approval (1991).
The correct version of the plan is now included with this site
plan submittal and was used for reference with the current
round of comments.
c. Only 17 trees are shown in the Landscape Plan (existing+
proposed) and yet the total number of trees shown in the
"Combined Totals" chart is 46. The combined total cannot be
more than what is shown. If I have misinterpreted the
purpose of this table, please clarify.
Thank you, the first table has been revised to only include
planting materials specified from SDP200077 that were in
fact planted. The second table has been revised to include
both existing trees whose species were not proposed with
SDP200077 and trees currently proposed with this SPA.
d. In the "Approved Site Plan (SDP200077)" portion of the
chart, I interpret the "Total Quantity Currently on Site" to be
trees that are currently existing on site and were also
approved and shown in SDP2000-77. If I am misinterpreting
this, please clarify.
You have interpreted this correctly. As a sidenote, and I am
sure you have noticed, the tabulations shown do not
necessarily mean that the trees were planted in the
locations specified on SDP200077 (for example, the ash
L I N E +
GRADE
CIVIL ENGINEERING
113 4`" STREET NE, STE. 100
CHARLOTTESVILLE, VA 22902
LINE-GRADE.COM
SDP201900069 (Afton Scientific— Minor Site Plan Amendment)
Comment Response Letter
10/5/20201 Page 3
trees along Avon Street are in place of proposed willow
oaks).
e. The canopy calculations are not required for this site plan
because they were not part of the approved site plan this is
amending. IF you wish to continue to show the canopy sizes
please ensure that the "area of canopy" listed for each
species of trees is what canopy of that species ( if 1 1/2"
caliper at time of planting) would be after 10 years of
growth.
Comment noted. Canopy Calculations have been removed.
f. Ensure that all plantings listed in the chart are shown and
labeled in the Landscaping Plan, and if they are existing, they
should also be shown and labeled in the Existing Conditions
sheet. If more plantings exist than are being shown that may
be why some of the numbers do not appear correct.
All existing plantings are shown and labeled. The numbers
in the tables were incorrect but have been fixed.
g. Please revise the # "5" to be a "5" instead of an "S".
This must be a font issue from when the spreadsheet was
copied over. Our spreadsheet clearly shows a number's"
not an "S". This has been fixed.
3) The label for the shrubs along Avon Street Extended does not
yet include their species. They have also not been included in
the landscape schedule. They are required landscaping, since
they are planted in place of the previously approved trees
that were removed. Therefore, their quantity and species
must be included in the Landscape Plan and planting
schedule.
The quantity and species of shrubs planted on the steep
slope along Avon Street Ext, are now included in the
landscape schedule.
4) See comment "viii." Below about shrubs that are required to
mitigate the view of the 9 parking spaces along Avon Court,
and near the monument sign.
Comment noted.
LINE
GRADE
CIVIL ENGINEERING
113 W' STREET NE, STE. 100
CHARLOTTESVILLE, VA 22902
LINE-GRADE.COM
SDP201900069 (Afton Scientific— Minor Site Plan Amendment)
Comment Response Letter
10/5/20201 Page 4
iii. Ensure that all existing or proposed tree or shrub has a label,
for the tree type, that is referenced in the landscape
schedule.
Rev. 1:...
Rev. 2: Comment not yet fully addressed. See comment "ii" above.
Comment noted. Labels have been added to all trees and
shrubs, in particular the labels for the shrubs along Avon Street
Ext. and near the building have been updated to include the
quantity and species of existing shrubs.
viii. In the approved plan there were 3 Japanese Yews and three Red
or Austrian Pines along the Avon Court parcel boundary. These
evergreens were meeting a requirement for mitigation the view
of the parking lot. If they are not to be replanted, then at a
minimum shrub should be planted between Avon Court and the
parking lot at 5' on center and at a height of 12' at time of
planting.
Rev. 1: Comment not yet fully addressed. Although the 4 Japanese
Yews shown on the approved site plan are shown as being replaced
(see below) they do not accomplish the visual mitigation that would
have been provided by evergreen trees between Avon Court and
the parking. Fully address this comment as specified above.
Rev. 2: Comment not yet fully addressed. No shrubs have been
added at the front of the 9 parking spaces facing Avon Court.
Although 5 yews are being replanted the pines (see original
comment above that lists all of the landscaping in the approved site
plan) are not exiting or shown as proposed. Those pines would have
mitigated the view of the parking spaces and cars from Avon Court.
Add a row of shrub, spaced at 5' on center and at a height of 12' at
time of planting, along the front of these 9 parking spaces to
mitigate the view from Avon Court into the parking lot.
L I N E +
Comment noted. There was confusion because we thought the GRADE
added willow oaks to replace the three pines would be sufficient,
but I see that evergreens are preferred. Shrubs have been added as
requested. I assume that 12' was a typo and you mean that the CIVIL ENGINEERING
shrubs should be planted at a 12" minimum height.
113 4 STREET NE, STE. 100
CHARLOTTESVILLE, VA 22902
LINE-GRADE.COM
SDP201900069 (Afton Scientific— Minor Site Plan Amendment)
Comment Response Letter
10/5/20201 Page 5
Rev. 2: Comment not yet fully addressed. The hatching and labels in
the comment above has been added. However, a note in the
"Project Information" area of the cover sheet references "Critical
Slopes". Please revise this note to state "Steep Slopes".
Comment noted. See revised plans.
k. Rev. 1 [NEW COMMENT]: Show the location of all loading
spaces in the site plan. Address the following:
i. Show the spaces including hatching and labels.
Rev. 2: Comment not yet fully addressed. Although there
appear to be two loading spaces, only one is labeled. Please
fully address this comment by providing a label for the
second loading space.
Both loading spaces are now labeled and dimensioned. The
second loading space is under the covered storage area.
Rev. 2: [NEW COMMENT]: Revise the note, pointing to the
front entrance area of the building, on the Landscape Plan that
says, "Dwarf Japanese Holly have been removed per ARB
entrance Corridor approval' to instead say, "Dwarf Japanese
Holly have been removed. ARB entrance Corridor guidelines
are not currently being applied to this section of Avon Street
Extended". The applicant has been allowed to remove those
shrubs. However, it is my understanding that it was not part of
an "approval' but just a revision to the area where the ARB
Entrance Corridor Guidelines are currently being applied. There
was an application (ARB2017-103 Office Renovations- Afton
Scientific) where this was initially being reviewed and may
have been "approved" but it was decided by the County that
the project and approval was not required. Please clarify if
there is other information I am not considering.
The note about the Dwarf Japanese Holly has been revised
per your comment.