Loading...
HomeMy WebLinkAboutARB202000090 Action Letter 2020-10-07COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 Phone (434) 296-5832 Fax (434) 972-4126 October 7. 2020 Kevin Schafer Design Develop LLC 418 East Main Street Charlottesville, VA 22902 RE: ARB-2020-90: Aldi at Albemarle Square (TMP 06100-00-00-12300) Dear Mr. Schafer, The Albemarle County Architectural Review Board held a work session on the above noted item at its meeting on Monday, October 5, 2020. The Board unanimously approved the request, pending staff administrative approval of the following amended conditions: 1. Revise the design to eliminate the striped effect of the alternating bays on the west and south elevations. Consider additional detailing and alternate distribution/division of colors to relate better human scale and develop depth and layering. Pay additional attention to the pedestrian experience between Aldi and the rest of the shopping center. The changes illustrated on October 5 sufficiently meet this recommendation. The applicant may consider revising the Rio Road elevation to achieve the "bookend" effect discussed during the meeting. 2. Provide a larger sample of the silver metal panels for review. Consider an alternate color for the metal panels that is more consistent with the neutral shades of the shopping center building and the roof screen. The submitted sample is acceptable. 3. Clarify whether the paint color for the existing CMU is to match the Stanton Blend concrete masonry veneer or the proposed mortar. The applicant has clarified the color is to match the CMU. 4. Revise the window glass note to read, "Window glass meets the following criteria:...." 5. Revise the mechanical screen color to appear more coordinated with the proposed building colors while maintaining a background appearance. Provide pictures of proposed materials next to the existing roof screen. The Board supports maintaining the existing color of the roof screen. 6. Include the standard mechanical equipment note on the drawings. 7. Revise the luminaire schedule to show the total lumens for each LED fixture and to indicate the Top Cover Lens for the wall sconce. Provide a wall sconce cut sheet whose specs match the catalog number provided in the luminaire schedule. 8. Revise the luminaire schedule to identify the color temperature for the wall sconces. Coordinate the color temperature of all fixtures to a single level between 2000 and 3000 K. 9. Add the standard lighting note to the plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." 10. Specify the Top Cover Lens for the wall sconces. Revise the wall sconce location to limit illumination of the wall and maximize illumination of the sidewalk. 11 Device thta rohinet style sign to Gh;;nnel letters The sign design must be submitted for staff review and further consideration. 17 The AOQ Awed to held a oFk sessionOR the arnhitent„ral is Please provide: 1. One set of revised drawings addressing each of these conditions. Include updated revision dates on each drawing. (A digital submittal is acceptable.) 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached 'Revised Application Submittal' form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Chief of Planning/Resource Management 434-296-5832 x3276 mmaliszewski@albemarle.org cc: Rio Partnership c/oO Dumbarton Properties Inc. 10313 West Broad Street Glen Allen, VA 23060 File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information, please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: PROJECT NAME: DATE: Submittal Type Requiring Revisions () indicates Submittal Code County Project Number # Copies Erosion & Sediment Control Plan E&S Mitigation Plan MP Waiver Request WR Stormwater Management Plan SWMP Road Plan RP Private Road Request, with private/public comparison PRR Private Road Request — Development Area (PRR-DA) Preliminary Site Plan PSP Final Site Plan (or amendment) (FSP) Final Plat FP Preliminary Plat (PP) Easement Plat EP Boundary Adjustment Plat BAP Rezoning Plan (REZ) Special Use Permit Concept Plan SP-CP Reduced Concept Plan (R-CP) Proffers P Bond Estimate Request (BER) Draft Groundwater Management Plan D-GWMP Final Groundwater Management Plan F-GWMP Aquifer Testing Work Plan ATWP Groundwater Assessment Report GWAR Architectural Review Board ARB Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 1 Margaret Maliszewski