Loading...
HomeMy WebLinkAboutZMA202000007 Study 2020-10-08RAMEY KEMP ASSOCIATES Moving forward. October 6, 2020 Mr. Kevin McDermott, AICP Albemarle County 401 McIntire Road Charlottesville, Virginia 22902 Phone: (434) 296-5832 T 804 217 8560 4343 Cox Road Glen Allen, VA 23060 Reference: Ashwood Boulevard Residential — Revised Traffic Impact Analysis (TIA) Dear Mr. McDermott, Ramey Kemp & Associates, Inc. (RKA) prepared the Traffic Impact Analysis (TIA) for this proposed neighborhood on December 27, 2019. VDOT reviewed the TIA and provided comments in a letter dated July 22, 2020, which are detailed below and following is a brief response to each. VDOT Traffic Engineering 1) Page 1: The counts and collection dates do not match and will be corrected. ■ The traffic count date has been corrected in the revised TIA 2) Page 6: TE recommends 100-ft storage and 100-ft taper for Ashwood @ Archer Ave. The construction of the left turn lane may lead to the closure of the existing median break. TE recommends 200-ft taper to comply with the VDOT access management for turning lane length of taper and storage for US 29 @ RIRO Driveway. ■ RKA agrees with these recommendations, which were included in the original TIA Synchro Files 3) AM and PM existing models do not have the correct existing total split timing, yellow timings, all red timings. Considering this intersection is coordinated with other intersection along US 29, the existing timings need to be used throughout all scenarios. If signal -timing modification is deemed necessary to accommodate the development, the modified signal timings should be added to the recommendation section for review. Furthermore, any signal timing modification to this intersection may require updating the entire coordination system along US 29. Obtain the correct existing timings from VDOT / TOC and update synchro accordingly. ■ The existing VDOT signal timings have been included in this revised analysis for the existing conditions and maintained for the no -build and build conditions. I<Alk rameykemp.com Transportation Consulting that moves us forward. RAMEY KEMP ASSOCIATES Ashwood Boulevard Residential - Revised TIA 1 2 Moving forward. 4) Lost time adjustment is coded incorrectly throughout all scenarios (Existing, No -Build and Build). Use the default value of "0". Side note: VDOT / TE commented in this practice from RKA several times at different occasions. Refer to Synchro guide for information in regards to the lost time adjustment. ■ Lost time has two components — start-up lost time (perception / reaction time when the light turns green, which is 2.0 seconds), and the clearance lost time (the amount of clearance time that is not used by drivers — typically assumed to be 2.0 seconds). This results in a total lost time of 4.0 seconds per phase. Synchro calculates lost time as the clearance time (yellow plus all -red), which is incorrect. The U.S. 29 at Ashwood Boulevard intersection has clearance times of 5.9 to 8.5 seconds per phase. Start-up lost time is fixed at 2.0 seconds, so this means that drivers are not using the last 3.9 to 6.5 seconds of clearance time, which is overly conservative. In Table 2, the LOS results are reported with and without the lost time adjustment. 5) The existing condition has a pedestrian phase, which was not coded into Synchro. Add the pedestrian phase for all scenarios. The pedestrian phase for the crosswalk across the east leg of the intersection has been included in all scenarios. This crosswalk runs with northbound U.S. 29, so it receives plenty of walk time with every cycle, so has no impact to the Synchro analysis. 6) Level of Service Summary tables uses Synchro output values, however, per TOSAM "HCM 2010 should be used for reporting Synchro analyses. If HCM 2010 reports are not generated because of the operation of the intersection, HCM 2000 should be used". Revise all the summary tables to include the HCM values and all attached reports are to be HCM 2010 / HCM 2000 reports. The HCM 2010 reports have been utilized for all unsignalized intersections in the revised TIA. HCM 2000 reports were utilized to report LOS and delay for the signalized intersection because HCM 2010 is unable to analyze U-turns, and the Synchro intersection reports have been included for lane queues. 7) Southbound left -turn lane is coded incorrectly throughout all scenarios (Existing, No -Build, and Build). SBL is coded as a protected permissive; however, SBL is in a protected only mode. Revise Synchro models to match the existing condition of the SBL operation. VDOT TE performed internal analysis for the PM Build model using existing timing. The Synchro queue length is #313-ft. As a result, TE recommends that the SBL storage needs to be extended an additional 150-ft to accommodate the long queue during the PM peak. The southbound left -turn movement has been corrected to protected -only operation, and the applicant has agreed to extend the storage in the southbound left -turn lane from 200 feet to 350 feet. 8) Note that the final plan must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements. ■ Understood Transportation I<AlkConsulting that moves us forward. rameykemp.com RAMEY KEMP ASSOCIATES Ashwood Boulevard Residential - Revised TIA 1 3 Moving forward. Ramey Kemp & Associates, Inc. (RKA) has performed a Traffic Impact Analysis (TIA) for the proposed neighborhood in the northeast quadrant of the U.S. 29 at Ashwood Boulevard intersection. The development plan includes up to 250 apartments and 108 two -over -two (2+2) townhome units with one full -movement driveway on Ashwood Boulevard and one right -in / right -out driveway on U.S. 29. If approved, the neighborhood is expected to be built -out in 2023. Figure 1 shows the site location and study intersections, and Figure 2 shows the preliminary site plan. Based on our TIA scoping meeting with you and VDOT on December 6, the purpose of this letter report is to provide the following: ■ Trip generation calculations ■ Evaluation of turn lane warrants for the proposed site driveways ■ Capacity and queueing analysis of the study intersections Existing Roadway Conditions U.S. 29 (Seminole Trail) is a six -lane Principal Arterial with a current average daily traffic (ADT) volume of approximately 45,000 vehicles per day (vpd), and a posted speed limit of 45 miles per hour (mph) in the vicinity of the site. Ashwood Boulevard is a two-lane collector with a current ADT volume of approximately 5,100 vpd, and a posted speed limit of 35 mph. The existing roadway configuration is shown in Figure 3. Existing Traffic Volumes The AM peak hour (7:00 to 9:00 AM) and PM peak hour (4:00 to 6:00 PM) turning movement counts were conducted by Peggy Malone & Associates, Inc. at the intersection of U.S. 29 at Ashwood Boulevard on December 12, which was during University of Virginia (UVA) exam week, and months before the Covid-19 pandemic. Based on discussion with you at the time, we agreed that traffic counts during UVA exam week were acceptable. In fact, the traffic volumes on U.S. 29 were likely elevated due to holiday shopping at the retail centers on the U.S. 29 corridor. The traffic count data are enclosed, and the existing 2019 volumes are shown in Figure 4. Transportation Consulting that moves us forward. rameykemp.com RAMEY KEMP ASSOCIATES Ashwood Boulevard Residential - Revised TIA 1 4 Moving forwarcl. Approved Development Based on discussion with the County and VDOT, one approved development is included in this TIA. Brookhill is a mixed -use development in the southeast quadrant of the U.S. 29 at Ashwood Boulevard intersection. The approved development trips were based on Figure 12 from the RKA TIA dated February 2016. The trips for the Brookhill neighborhood are shown in Figure 5. Background Traffic Growth The 2019 peak hour traffic volumes were grown by an annual rate of 1.15% for four years to estimate the 2023 peak hour traffic volumes. The grown volumes were combined with the approved development trips to estimate the no -build 2023 volumes, which are shown in Figure 6. Trip Generation The trip generation potential of the proposed neighborhood during a typical weekday, AM peak hour, and PM peak hour was estimated using the methodologies published by the ITE Trap Generation Manual —10`" Edition. Table 1 summarizes the trip generation calculations. Table 1 ITE Trip Generation — Weekday —10t" Edition Weekday Land Use Daily Traffic AM Peak Hour PM Peak Hour (ITE Land Use Code) Size (vpd) (vph) (vph) Enter I Exit Enter FExit Enter T Exit Multifamily Housing — Mid -Rise (221) 375 units 1,021 1,021 35 100 101 64 The development plan includes 358 units, but the analysis is based on the trip potential of 375 units to be conservative. Site Traffic Distribution The following site traffic distribution was applied based on a review of the existing traffic volumes, the adjacent roadway network, and engineering judgement: ■ 67% to / from the south on U. S. 29 ■ 15% to / from the south on Archer Avenue ■ 13% to / from the north on U.S. 29 ■ 5% to / from the east on Ashwood Boulevard Figure 7 shows the site trip distribution, Figure 8 shows the site trip assignment, and Figure 9 shows the projected 2023 build -out peak hour traffic volumes. Transportation 'R'<)k Consulting that moves us forward. rameykemp.com RAMEY KEMP ASSOCIATES Ashwood Boulevard Residential - Revised TIA 1 5 Moving forwarcl. VDOT Turn Lane Warrant Analysis The projected build -out AM and PM peak hour traffic volumes at the proposed site driveways were compared to the turn lane warrants in the Virginia Department of Transportation (VDOT) Access Management Design Standards for Entrances and Intersections. U.S. 29 at Right -in / Right -out Driveway: ■ A northbound right -turn taper on U.S. 29 is barely warranted in the PM peak hour only Ashwood Boulevard at Archer Avenue / Site Driveway: ■ A westbound right -turn lane on Ashwood Boulevard is not warranted ■ An eastbound left -turn lane on Ashwood Boulevard is nearly warranted in the PM peak hour only Figure 10 shows the recommended roadway laneage at the proposed driveways. Intersection Spacing Standards VDOT requires at least 305 feet of separation between partial access driveways on Principal Arterial roadways posted 45 mph. The proposed right -in / right -out driveway on U.S. 29 is approximately 500 feet north of the U.S. 29 at Ashwood Boulevard intersection which exceeds the VDOT minimum spacing standards. Transportation I<AlkConsulting that moves us forward. rameykemp.com RAMEY KEMP ASSOCIATES Ashwood Boulevard Residential - Revised TIA 1 6 Moving forwarcl. Traffic Capacity Analysis Traffic capacity analysis for the study intersections was performed using Synchro 10, which is a comprehensive software package that allows the user to model signalized and unsignalized intersections to determine levels -of - service based on the thresholds specified in the Highway Capacity Manual (HCM) - 6a' Edition. Table 2 summarizes the capacity analysis results for the signalized intersection of U.S. 29 at Ashwood Boulevard, and the Synchro outputs are enclosed for reference. HCM 2010 is unable to analyze U-turn movements, so HCM 2000 methodology was utilized for LOS and delay. Synchro intersection reports are included in the analysis to provide queue lengths, which are not provided with HCM 2000 signalized reports. Table 2 Level -of -Service Summary for U.S. 29 at Ashwood Boulevard AM PEAK HOUR PM PEAK HOUR CONDITION LANE GROUP Lane Lane Queue Overall Lane Lane Queue Overall LOS Delay (ft) LOS LOS Delay (11) LOS (sec) (Delay) (sec) (Dela ) WBL D 50.1 188 E 59.1 88 WBR D 40.7 36 E 55.6 35 Existing (2019) NBU E 57.6 6 B E 65.5 7 B NBT B 11.9 274 B 11.9 449 Traffic Conditions NBR A 8.6 23 (17.7 S0C) A 7.3 30 (12.1 sec) SBL E 58.3 30 E 62.9 91 SBT B 15.1 549 A 7.2 286 WBL D 50.7 221 E 62.4 117 WBR D 39.4 45 D 55.0 47 No -Build (2023) NBU E 58.2 97 C E 63.6 97 C Traffic Conditions NBT B 16.1 314 25.4 sec ( ) B 16.7 511 20.3 ( sec ) NBR B 11.2 24 A 9.5 30 SBL E 72.2 125 F 115.2 302 SBT C 23.9 658 B 11.4 368 Will, D 53.2 257 E 69.2 154 WBR D 38.3 46 D 54.5 48 Build (2023) NBU E 58.2 97 C E 63.6 97 C NBT B 17.8 317 B 16.9 522 Traffic Conditions NBR B 12.4 26 (27.3 SCC) A 9.8 32 (22.7 S0C) SBL E 64.6 136 F 152.9 332 SBT C 25.6 658 B 11.6 368 WBL D 43.0 243 E 55.4 138 Build (2023) WBR C 34.8 43 D 50.6 46 Traffic Conditions NBU D 50.2 93 C E 57.1 94 B With Lost Time NBT NBR B B 15.6 10.9 305 25 (23.8 sec) B A 15.5 9.0 497 31 (18.2 sec) Adjustment SBL D 53.0 113 E 79.7 289 SBT C 23.2 630 B 10.5 349 Capacity analysis indicates that the intersection currently operates at LOS B during the AM and PM peak hours. Under no -build conditions, the intersection is expected to operate at LOS C during the AM and PM peak hours. Under build conditions, the intersection is expected to continue to operate at LOS C during the AM and PM peak hours. Transportation Consulting that moves us forward. rameykemp.com RAMEY KEMP ASSOCIATES Ashwood Boulevard Residential - Revised TIA 1 7 Moving forward. Lost time has two components - start-up lost time (perception / reaction time when the light turns green, which is 2.0 seconds), and the clearance lost time (the amount of clearance time that is not used by drivers - typically assumed to be 2.0 seconds). This gives us a total lost time of 4.0 seconds. With the appropriate lost time adjustment factored into the analysis for build conditions, the intersection is expected to operate at LOS C during the AM peak hour and LOS B during the PM peak hour. The following improvement is recommended to accommodate the site trips: ■ Extend the storage in the southbound left -turn lane on U.S. 29 from 200 feet to 350 feet Table 3 summarizes the capacity analysis results for the intersection of Ashwood Boulevard at Archer Avenue / Site Driveway, and the Synchro outputs are enclosed for reference. HCM 2010 methodology was utilized for this analysis. Table 3 Level -of -Service Summary for Ashwood Boulevard at Archer Avenue / Site Driveway AM PEAK HOUR PM PEAK HOUR CONDITION LANE GROUP Lane Lane Queue Overall Lane Lane Queue Overall LOS Delay (ft) LOS LOS Delay (ftj LOS sec Dela sec (Delay) EBT - EBR - - - - No -Build (2023) WBL2 A 7.6 3 N/A3 A 8.4 3 hl/A3 Traffic Conditions �T - - - NBL' C 15.4 18 B 14.9 15 NBRI A 9.0 3 B 10.4 5 EBL2 A 8.4 3 A 7.7 3 EBT - - - - EBR - - - - Build (2023) WBL2 A 7.6 3 A 8.4 3 N/A 3 N/A 3 Traffic Conditions NBLI C 24.0 30 C 22.3 25 NBT/R' A 9.9 5 B 12.7 8 SBL/T1 C 17.1 5 C 18.8 5 SBRtI B 1 12.2 1 13 1 1 A 9.4 5 1. Level of service for minor approach 2. Level of service for major street left -turn movement 3. HCM methodology does not provide lane group or overall LOS, delay, and queue lengths for major street through movements or right turns at unsignalized intersections. Under no -build conditions, capacity analysis indicates that the minor street left -turn movement is expected to operate with short delays (less than 25 seconds) during the AM and PM peak hours with queue lengths less than one vehicle. Under build conditions, capacity analysis indicates that the minor street left -turn movement is expected to continue to operate with short delays (less than 25 seconds) during the AM and PM peak hour with queue lengths of one vehicle or less. Transportation Consulting that moves us forward. rameykemp.com RAMEY KEMP ASSOCIATES Moving forward. Ashwood Boulevard Residential - Revised TIA 1 8 Table 4 summarizes the capacity analysis results for the intersection of U.S. 29 at Right -in / Right -out Driveway, and the Synchro outputs are enclosed for reference. HCM 2010 methodology was utilized for this analysis. Table 4 Level -of -Service Summary for U.S. 29 at Right -in / Right -out Driveway CONDITION GROUP AM PEAK HOUR PM PEAK HOUR Lane Lane Queue Overall Lane Lane Queue Overall LOS Delay (fr) LOS LOS Delay (ft) LOS (sec) (Delay) (sec) (Delay) WBR' C 19.1 5 D 32.0 5 Build (2023) NBT - - N/A' - N/A2 Traffic Conditions NBR SBT I. Level of service for minor approach 2. HCM methodology does not provide lane group or overall LOS, delay, and queue lengths for major street through movements or right turns at unsignalized intersections. Under build conditions, capacity analysis indicates that the minor street right-tum movement is expected to operate with short delays (less than 25 seconds) during the AM peak hour and with moderate delays (between 25 and 50 seconds) during the PM peak hour, with queue lengths of less than one vehicle. Recommendations Based on the trip generation potential of the proposed neighborhood, the following improvements are recommended: U.S. 29 at Ashwood Boulevard: ■ Extend the storage in the southbound left -turn lane on U.S. 29 from 200 feet to 350 feet Ashwood Boulevard at Archer Avenue / Site Driveway: ■ Construct site driveway with one ingress lane and two egress lanes ■ Construct one eastbound left-tum lane on Ashwood Boulevard with 100 feet of storage U.S. 29 at Right -in / Right -out Driveway: ■ Construct site driveway with one ingress lane and one egress lane ■ Construct one northbound right -turn lane on U.S. 29 with 200 feet of storage Transportation Consulting that moves us forward. rameykemp.com RAMEY KEMP ASSOCIATES Ashwood Boulevard Residential — Revised TIA 1 9 Moving forward We appreciate your attention to this matter. Please contact me at (804) 217-8560 if you have any questions about this report. EALTH O� Sincerely yours, loe�i,/ Ramey Kemp &Associates, Inc. Z Lic. No. �o lo-'--� Carl Hultgren, P.E., PTOE �`9810NA1- State Traffic Engineering Lead 04 Enclosures: Figures, Traffic count data, Synchro output, VDOT turn lane warrant diagrams Copy to: Mr. Adam Moore, P.E., VDOT Mr. Scott Copeland, RST Development, LLC Mr. Alex Mays, RST Development, LLC Ms. Valerie Long, Williams Mullen Mr. Charles Alvis, Williams Mullen Mr. Ryan Yauger, P.E., Bohler Engineering �4 I<Amk rame kemR _com Y ^�Robir�-bn�p r {� �'Or 14, N oa OAP , c 3� m rued p. Q t {j / 1 \tf0 ,. GkreriyBar�k-L-n / \ z I TILIM" Moving lorward. Ashwo Boulevard Preliminary site Ptah Residential Albemarle County, Virginia RAMEY KEMP ASSOCIATES Scale: Not to Scale Figure 2 Moving lorward. Ashwo Boulevard Preliminary site Ptah Residential Albemarle County, Virginia RAMEY KEMP ASSOCIATES Scale: Not to Scale Figure 2 U.S.29 (Seminole Trail) v a � R O O va V} 325' o 325' 5,100 vpd Ashwood 35 mph Boulevard o n r N N U.S. 29 LEGEND (Seminole Trail) Existing Traffic Signal Existing Lane X' Storage (In Feet) Mavingimward. ""'RKAI, Ashwood Boulevard Existing Lane Configuration Residential Albemarle County, Virginia RAMEY KEMP ASSOCIATES Scale: Not to Scale Figure 3 U.S.29 (Seminole Trail) 0 a N � M ^v N 57 (35) r 369 (122) 1 Ashwood Boulevard o � lzi a v 0 N U.S. 29 (Seminole Trait) LEGEND X (I) AM (PM) Peak Hour Moving mreard. Existing (2019) Peak Hour Residential KAI, Ashwo sBoulevard Traffic volumes Albemarle County, Virginia RAMEY KEMP ASSOCIATES Scale: Not to Scale Figure 4 U S. 29 (Seminole Trail) i1w a 30 (27) 46 (41) 25 (42) Ashwood �. , Boulevard In (105) 61 (► �rn t`M 0o v cn 0 129 (116) Br Dr f r- a M N F M f� Ht U.S. 29 (Seminole Trail) Archer Avenue Brookhill I LEGEND AM (PM) Peak Hour Right -in / Right -out Driveway Moving inward. KAI, Ashwood Boulevard Approved Development Trips Residential ""RAlbemarle County, Virginia RAMEY KEMP ASSOCIATES Scale: Not to Scale Figure 5 U S. 29 (Seminole Trail) N w N v N 90 (64) s- 446 (165) 432 (169) 25 (42) Ashwood 1 (311) 95 Boulevard T (105) 61 � N�N v N N N Archer Avenue U.S. 29 (Seminole Trail) LEGEND X (I) AM (PM) Peak Hour Moving lorward. ""'RKAI, Ashwo Boulevard No -Buda fiPeak Hour Residential Trafficc Volumes umes Albemarle County, Virginia RAMEY KEMP ASSOCIATES Scale: Not to Scale Figure 6 U S. 29 (Seminole Trail) 13% 0 M � "00°fo) Site Proposed ` RBtl1 I �o M Proposed Driveway C� (67%) �j lslJ / i 5% Ashwood � f Boulevard f r- 50% 0 N 7 U.S. 29 (Seminole Trail) E Archer Avenue E LEGEND X% (Y%) Entering (Exiting) Trip Distribution Xx Regional Trip Distribution Moving forward. Ashwo Boulevard site Trip Residential Distribution Albemarle County, Virginia RAMEY KEMP ASSOCIATES Scale: Not to Scale Figure 7 U S. 29 (Seminole Trail) s M � I � 10 (6) Site Proposed RMO I f r- M N' O Proposed Driveway a � I �3(2) _ i? v M NII 67 (43) �) h 1(5) 11 �►LT ! Ashwood f � Boulevarc f r- (Sl) t8 Archer Avenue U.S. 29 (Seminole Trail) LEGEND X (Y) AM (PM) Peak Hour Moving inward. .Site Trip KAI, Ashwo Boulevard assignment Residential ""RAlbemarle County, Virginia RAMEY KEMP ASSOCIATES Scale: Not to Scale Figure 8 U S. 29 (Seminole Trail) rn rn I C> 0 N ]0(6) Site Proposed RIRO T (� N ^' u � Proposed v Driveway C3 N v O 1* v v M ` 1 (5 ) 93 (66) e- 446 (165) 499 (z 1z) �J �► zs (4z) t►LT Ashwood Boulevard f �► (51) 18 � � � (' rn (310) 95 b CN (105) 61 N 7 N N Archer Avenue U.S. 29 (Seminole Trail) LEGEND X (Y) AM (PM) Peak Hour Traffic Moving inward. Budd (2023) Peak Hour KAI, Ashwo Boulevard Traffic volumes Residential ""RAlbemarle County, Virginia RAMEY KEMP ASSOCIATES Scale: Not to Scale Figure 9 U S. 29 (Seminole Trail) 11� fffr- 0 0 N O �Y7 w �o °ni M 0 0 ti « W N 325' 325' ll I i1w I Proposed Site RIRO Proposed Driveway I >� Restripe Ashwood Boulevarc i1 f f f 100, T� Restripe N N U.S. 29 (Seminole Trail) Archer Avenue LEGEND Existing Traffic Signal Y Storage (In Feet) .� Existing Lane Recommended Lane Lane to be constructed by Brookhill development Moving lorward. ""RKAI, Ashwo Boulevard Recommended Lane Residential Configuration Albemarle County, Virginia RAMEY KEMP ASSOCIATES Scale: Not to Scale Figure 10 Peggy Malone & Associates, Inc. (888) 247-8602 File Name : US 29 and Ashwood Blvd. AM Site Code : Start Date : 12/12/2019 Page No : 1 Groups Printed- Combined US 29 Ashwood Blvd US 29 Southbound Westbound Northbound $tan T®e Thry Leff r Pods AM. Tram MOM I left Pe& A,. Toml lli TLm left I Peds App. Tend Iw. Total 07:00 AM 381 1 0 382 8 30 0 38 10 255 0 0 265 685 07:15 AM 514 7 0 521 17 44 0 61 16 296 0 0 312 894 07:30 AM 562 3 0 565 15 70 0 85 21 314 0 0 335 985 07:45 AM 570 4 0 574 16 97 0 113 24 352 0 0 376 1063 Total 2027 15 0 2042 56 241 0 297 71 1217 0 0 1288 3627 08:00 AM 519 3 0 122 18 93 0 111 18 308 0 0 326 959 08:15 AM 476 2 0 478 8 109 0 117 15 330 0 0 345 940 08:30 AM 403 4 0 407 16 99 0 115 24 301 1 0 326 948 08:45 AM 454 4 0 459 15 64 0 79 32 297 0 0 329 866 Total 1 1852 13 0 1865 1 57 365 0 422 1 89 1236 1. 0 1326 1 3613 Grand Taal 3179 28 0 3907 113 606 0 719 1 160 2453 1 0 2114 7240 Apprch % 99.3 0.7 0 15.7 94.3 0 6.1 93.9 0 0 Total% 33.6 0.4 0 54 lb 8.4 0 9.9 22 33.9 0 0 36.1 US 29 Southbound Ashwood Blvd Westbound US 29 Northbound Stan Time Torn I left . Total 6t I left I AM. Taw I Rigia T left . Treat Peak Bour Avalysis Prom 07:00 AM to 08:41 AM- Peak 1 of I Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 562 3 565 15 70 85 21 314 0 335 985 07:M 45 A 570 4 574 16 97 113 24 352 0 376 1063 08:00 AM 519 3 5M 18 93 111 18 308 0 326 959 08:15 AM 476 2 478 8 IN 117 15 330 0 345 940 Peggy Malone & Associates, Inc. (888) 247-8602 File Name : US 29 and Ashwood Blvd. PM Site Code : Start Date : 12/12/2019 Page No : 1 Groups Printed- Combined US 29 Ashwood Blvd US 29 Southbound Westbound Northbound $tan T®e Thm Leh Peels I AM. Total mex I Lc6 I Peels . Total Thm Loft Peels App. Total Int. Total 04:00 PM 393 8 0 401 3 37 0 40 43 503 0 0 546 987 04:15 PM 405 9 0 414 15 57 0 72 55 558 1 0 614 1100 04:30 PM 437 13 0 450 14 30 0 44 52 476 0 0 528 1022 04:45 PM 419 8 0 427 9 33 0 42 67 470 0 0 537 1006 Total 1654 38 0 1692 41 157 0 198 217 2007 1 0 2225 4115 05:00 PM 474 15 0 489 9 24 0 33 53 538 0 0 591 1113 05:15 PM 433 19 0 452 7 31 0 38 64 523 0 0 587 1077 05:30 PM 414 11 0 425 10 34 0 44 61 533 0 0 594 1063 05:45 PM 401 12 0 413 7 27 0 34 74 485 0 0 559 1006 Total 1 1722 57 0 1779 1 33 116 0 149 1 252 2079 0 0 2331 1 4259 Grand Taal 3376 95 0 3471 74 273 0 347 469 4086 1 0 4556 8374 Apprch % 97.3 2.7 0 21.3 78.7 0 103 89.7 0 0 Total % 40.3 1.1 0 41.4 0.9 33 0 4.1 5.6 48.8 0 0 54.4 US 29 Southbound Ashwood Blvd Westbound US 29 Northbound Stan Time Tom I left . Total M I Loft I AM. Total I Rigis Trod I Loft Am. Total Peak Boar Analysis From 04.00 PM to M:45 PM - Peak 1 of l Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 419 8 427 9 33 42 67 470 0 537 I/816 05:00 PM 474 15 489 9 24 33 53 538 0 591 1113 05a5 PM 433 19 452 7 31 38 M 523 0 587 1077 Ashwood Boulevard Residential - Albemarle, VA Existing (2019) Conditions 1: U.S. 29 & Ashwood Boulevard Timing Plan: AM Peak Hour f- t f, t t �► j Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations 1) F A fft r ►j W Traffic Volume (vph) 369 57 1 1304 78 12 2127 Future Volume (vph) 369 57 1 1304 78 12 2127 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Lane Util. Factor 0.97 1.00 1.00 0.91 1.00 1.00 0.91 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 Fit Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Said. Flow (prof) 3433 1583 1770 5085 1583 1770 5085 Fit Permitted 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Said. Flow (perm) 3433 1583 1770 5085 1583 1770 5085 Peak -hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Adj. Flow (vph) 397 61 1 1402 84 13 2287 RTOR Reduction (vph) 0 51 0 0 32 0 0 Lane Group Flow (vph) 397 10 1 1402 52 13 2287 Turn Type Prot Perm Prot NA Perm Prot NA Protected Phases 4 5 2 1 6 Permitted Phases 4 2 Actuated Green, G (s) 18.6 18.6 1.2 71.4 71.4 3.0 73.2 Effective Green, g (s) 18.6 18.6 1.2 71.4 71.4 3.0 73.2 Actuated g/C Ratio 0.16 0.16 0.01 0.62 0.62 0.03 0.64 Clearance Time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 555 256 18 3157 982 46 3236 v/s Ratio Prot c0.12 0.00 0.28 c0.01 c0.45 v/s Ratio Perm 0.01 0.03 vlc Ratio 0.72 0.04 0.06 0.44 0.05 0.28 0.71 Uniform Delay, dl 45.7 40.7 56.3 11.4 8.5 54.9 13.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 4.4 0.1 1.3 0.5 0.1 3.4 1.3 Delay (s) 50.1 40.7 57.6 11.9 8.6 58.3 15.1 Level of Service D D E B A E B Approach Delay (s) 48.8 11.7 15.4 Approach LOS D B B Intersection Summa HCM 2000 Control Delay 17.7 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.71 Actuated Cycle Length (s) 115.0 Sum of lost time (s) 22.0 Intersection Capacity Utilization 63.8% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA Existing (2019) Conditions 1: U.S. 29 & Ashwood Boulevard Timing Plan: AM Peak Hour f- t f, t t �► j Lane Group WBL WBR NBU NBT NBR SBL SBT Lane Configurations 1) F A fft if ►j W Traffic Volume (vph) 369 57 1 1304 78 12 2127 Future Volume (vph) 369 57 1 1304 78 12 2127 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 275 200 Storage Lanes 2 1 1 1 1 Taper Length (ft) 100 100 100 Satd. Flow (1 3433 1583 1770 5085 1583 1770 5085 Fit Permitted 0.950 0.950 0.950 Satd. Flow (perm) 3433 1583 1770 5085 1583 1770 5085 Right Turn on Red Yes Yes Satd. Flow (RTOR) 61 84 Link Speed (mph) 35 45 45 Link Distance (R) 454 863 808 Travel Time (s) 8.8 13.1 12.2 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Shared Lane Traffic e/u) Lane Group Flow (vph) 397 61 1 1402 84 13 2287 Turn Type Prot Perm Prot NA Perm Prot NA Protected Phases 4 5 2 1 6 Permitted Phases 4 2 Detector Phase 4 4 5 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 20.0 20.0 5.0 20.0 Minimum Split (s) 16.0 16.0 14.4 49.9 49.9 13.0 28.5 Total Split (s) 32.0 32.0 18.0 67.0 67.0 16.0 65.0 Total Split (%) 27.8% 27.8% 15.7% 58.3% 58.3% 13.9% 56.5% Yellow Time (s) 3.1 3.1 4.0 4.9 4.9 4.1 5.1 All -Red Time (s) 5.4 5.4 3.4 1.0 1.0 3.5 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Lead/Lag Lead Lag Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Recall Mode None None None C-Min C-Min None C-Min Act i Green (s) 18.6 18.6 5.6 76.0 76.0 6.5 79.2 Actuated g/C Ratio 0.16 0.16 0.05 0.66 0.66 0.06 0.69 v/c Ratio 0.72 0.20 0.01 0.42 0.08 0.13 0.65 Control Delay 53.1 11.4 52.0 11.1 2.9 54.0 12.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 53.1 11.4 52.0 11.1 2.9 54.0 12.7 LOS D B D B A D B Approach Delay 47.5 10.7 12.9 Approach LOS D B B Queue Length 50th (ft) 145 0 1 132 0 9 287 Queue Length 95th (ft) 188 36 6 274 23 30 549 Internal Link Dist (ft) 374 783 728 Turn Bay Length (ft) 250 275 200 Base Capacity (vph) 701 372 163 3361 1074 129 3500 Starvation Cap Reductn 0 0 0 0 0 0 0 Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA 1: U.S. 29 & Ashwood Boulevard f- t f, t P �► j Existing (2019) Conditions Timing Plan: AM Peak Hour Lane Group WBL WBR NBU Ni Ni SBL SBT Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.57 0.16 0.01 0.42 0.08 0.10 0.65 Intersection Summa Area Type: Other Cycle Length:115 Actuated Cycle Length: 115 Offset: 47 (41 %), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 80 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.72 Intersection Signal Delay:15.9 Intersection LOS: B Intersection Capacity Utilization 63.8% ICU Level of Service B Analysis Period (min)15 anu rnases: I: U.J. LV & HsnWUUu tluuMMU Synchro 10 Report RKA Page 2 Ashwood Boulevard Residential - Albemarle, VA Existing (2019) Conditions 1: U.S. 29 & Ashwood Boulevard Timing Plan: PM Peak Hour Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations 1) F A W r ►j +++ Traffic Volume (vph) 122 35 1 2064 245 53 1740 Future Volume (vph) 122 35 1 2064 245 53 1740 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Lane Util. Factor 0.97 1.00 1.00 0.91 1.00 1.00 0.91 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 Fit Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Said. Flow (prof) 3433 1583 1770 5085 1583 1770 5085 Fit Permitted 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Said. Flow (perm) 3433 1583 1770 5085 1583 1770 5085 Peak -hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Adj. Flow (vph) 131 38 1 2219 263 57 1871 RTOR Reduction (vph) 0 35 0 0 81 0 0 Lane Group Flow (vph) 131 3 1 2219 182 57 1871 Turn Type Prot Perm Prot NA Perm Prot NA Protected Phases 4 5 2 1 6 Permitted Phases 4 2 Actuated Green, G (s) 10.0 10.0 1.2 89.8 89.8 8.2 96.8 Effective Green, g (s) 10.0 10.0 1.2 89.8 89.8 8.2 96.8 Actuated g/C Ratio 0.08 0.08 0.01 0.69 0.69 0.06 0.74 Clearance Time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 264 121 16 3512 1093 111 3786 v/s Ratio Prot c0.04 0.00 c0.44 c0.03 c0.37 v/s Ratio Perm 0.00 0.11 vlc Ratio 0.50 0.02 0.06 0.63 0.17 0.51 0.49 Uniform Delay, dl 57.6 55.5 63.8 11.0 7.0 59.0 6.7 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 1.5 0.1 1.6 0.9 0.3 4.0 0.5 Delay (s) 59.1 55.6 65.5 11.9 7.3 62.9 7.2 Level of Service E E E B A E A Approach Delay (s) 58.3 11.4 8.8 Approach LOS E B A Intersection Summa HCM 2000 Control Delay 12.1 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.62 Actuated Cycle Length (s) 130.0 Sum of lost time (s) 22.0 Intersection Capacity Utilization 60.4% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA Existing (2019) Conditions 1: U.S. 29 & Ashwood Boulevard Timing Plan: PM Peak Hour Lane Group WBL WBR NBU NBT NBR SBL SBT Lane Configurations 1) F A fft r ►j +++ Traffic Volume (vph) 122 35 1 2064 245 53 1740 Future Volume (vph) 122 35 1 2064 245 53 1740 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 275 200 Storage Lanes 2 1 1 1 1 Taper Length (ft) 100 100 100 Satd. Flow (1 3433 1583 1770 5085 1583 1770 5085 Fit Permitted 0.950 0.950 0.950 Satd. Flow (perm) 3433 1583 1770 5085 1583 1770 5085 Right Turn on Red Yes Yes Satd. Flow (RTOR) 38 263 Link Speed (mph) 35 45 45 Link Distance (R) 454 863 808 Travel Time (s) 8.8 13.1 12.2 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Shared Lane Traffic (%) Lane Group Flow (vph) 131 38 1 2219 263 57 1871 Turn Type Prot Perm Prot NA Perm Prot NA Protected Phases 4 5 2 1 6 Permitted Phases 4 2 Detector Phase 4 4 5 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 20.0 20.0 5.0 20.0 Minimum Split (s) 16.0 16.0 13.0 49.9 49.9 13.0 27.1 Total Split (s) 20.0 20.0 20.0 90.0 90.0 20.0 90.0 Total Split (%) 15.4% 15.4% 15.4% 69.2% 69.2% 15.4% 69.2% Yellow Time (s) 3.1 3.1 4.0 4.9 4.9 4.1 5.1 All -Red Time (s) 5.4 5.4 3.4 1.0 1.0 3.5 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Lead/Lag Lead Lag Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Recall Mode None None None C-Min C-Min None C-Min Act Effct Green (s) 10.0 10.0 5.6 91.4 91.4 9.4 102.8 Actuated g/C Ratio 0.08 0.08 0.04 0.70 0.70 0.07 0.79 v/c Ratio 0.50 0.24 0.01 0.62 0.22 0.45 0.47 Control Delay 64.0 20.5 60.0 12.3 1.4 68.2 5.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 64.0 20.5 60.0 12.3 1.4 68.2 5.5 LOS E C E B A E A Approach Delay 54.2 11.2 7.4 Approach LOS D B A Queue Length 50th (ft) 55 0 1 358 0 47 142 Queue Length 95th (ft) 88 35 7 449 30 91 286 Internal Link Dist (ft) 374 783 728 Turn Bay Length (ft) 250 275 200 Base Capacity (vph) 303 174 171 3573 1190 168 4019 Starvation Cap Reductn 0 0 0 0 0 0 0 Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA 1: U.S. 29 & Ashwood Boulevard f- t f, t P �► j Existing (2019) Conditions Timing Plan: PM Peak Hour Lane Group WBL WBR NBU Ni Ni SBL Si Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.43 0.22 0.01 0.62 0.22 0.34 0.47 Intersection Summa Area Type: Other Cycle Length:130 Actuated Cycle Length:130 Offset: 79 (61 %), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 80 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.62 Intersection Signal Delay:11.2 Intersection LOS: B Intersection Capacity Utilization 60.4% ICU Level of Service B Analysis Period (min)15 anu rnases: I: U.J. L9 61 HsnWUUu tluuMMU Synchro 10 Report RKA Page 2 Ashwood Boulevard Residential - Albemarle, VA No -Build (2023) Conditions 1: U.S. 29 & Ashwood Boulevard Timing Plan: AM Peak Hour f- t f, t t �► j Movement WBL WBR NBU NBT NBR SBL Si Lane Configurations 1) F A fft r ►j +++ Traffic Volume (vph) 432 90 64 1434 82 74 2229 Future Volume (vph) 432 90 64 1434 82 74 2229 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Lane Util. Factor 0.97 1.00 1.00 0.91 1.00 1.00 0.91 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 Fit Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Satd. Flow (prof) 3433 1583 1770 5085 1583 1770 5085 Fit Permitted 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Satd. Flow (perm) 3433 1583 1770 5085 1583 1770 5085 Peak -hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Adj. Flow (vph) 465 97 69 1542 88 80 2397 RTOR Reduction (vph) 0 80 0 0 38 0 0 Lane Group Flow (vph) 465 17 69 1542 50 80 2397 Turn Type Prot Perm Prot NA Perm Prot NA Protected Phases 4 5 2 1 6 Permitted Phases 4 2 Actuated Green, G (s) 20.4 20.4 7.9 65.3 65.3 7.3 64.7 Effective Green, g (s) 20.4 20.4 7.9 65.3 65.3 7.3 64.7 Actuated g/C Ratio 0.18 0.18 0.07 0.57 0.57 0.06 0.56 Clearance Time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 608 280 121 2887 898 112 2860 v/s Ratio Prot c0.14 0.04 0.30 c0.05 c0.47 v/s Ratio Perm 0.01 0.03 vlc Ratio 0.76 0.06 0.57 0.53 0.06 0.71 0.84 Uniform Delay, dl 45.0 39.3 51.9 15.4 11.1 52.8 20.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 5.7 0.1 6.3 0.7 0.1 19.3 3.1 Delay (s) 50.7 39.4 58.2 16.1 11.2 72.2 23.9 Level of Service D D E B B E C Approach Delay (s) 48.8 17.6 25.5 Approach LOS D B C Intersection Summa HCM 2000 Control Delay 25.4 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.81 Actuated Cycle Length (s) 115.0 Sum of lost time (s) 22.0 Intersection Capacity Utilization 77.9% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA No -Build (2023) Conditions 1: U.S. 29 & Ashwood Boulevard Timing Plan: AM Peak Hour f- t f, t t �► j Lane Group WBL WBR NBU NBT NBR SBL SBT Lane Configurations 1) F A fft r ►j +++ Traffic Volume (vph) 432 90 64 1434 82 74 2229 Future Volume (vph) 432 90 64 1434 82 74 2229 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 275 200 Storage Lanes 2 1 1 1 1 Taper Length (ft) 100 100 100 Satd. Flow (1 3433 1583 1770 5085 1583 1770 5085 Fit Permitted 0.950 0.950 0.950 Satd. Flow (perm) 3433 1583 1770 5085 1583 1770 5085 Right Turn on Red Yes Yes Satd. Flow (RTOR) 97 88 Link Speed (mph) 35 45 45 Link Distance (R) 454 863 808 Travel Time (s) 8.8 13.1 12.2 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Shared Lane Traffic e/u) Lane Group Flow (vph) 465 97 69 1542 88 80 2397 Turn Type Prot Perm Prot NA Perm Prot NA Protected Phases 4 5 2 1 6 Permitted Phases 4 2 Detector Phase 4 4 5 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 20.0 20.0 5.0 20.0 Minimum Split (s) 16.0 16.0 13.0 49.9 49.9 13.0 27.1 Total Split (s) 32.0 32.0 18.0 67.0 67.0 16.0 65.0 Total Split (%) 27.8% 27.8% 15.7% 58.3% 58.3% 13.9% 56.5% Yellow Time 1 3.1 3.1 4.0 4.9 4.9 4.1 5.1 All -Red Time (s) 5.4 5.4 3.4 1.0 1.0 3.5 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Lead/Lag Lead Lag Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Recall Mode None None None C-Min C-Min None C-Min Act Effct Green (s) 20.4 20.4 9.1 66.8 66.8 8.7 66.2 Actuated g/C Ratio 0.18 0.18 0.08 0.58 0.58 0.08 0.58 v/c Ratio 0.76 0.27 0.50 0.52 0.09 0.60 0.82 Control Delay 53.6 9.6 62.7 16.5 3.0 70.4 24.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 53.6 9.6 62.7 16.5 3.0 70.4 24.5 LOS D A E B A E C Approach Delay 46.0 17.7 26.0 Approach LOS D B C Queue Length 50th (ft) 170 0 49 267 0 57 536 Queue Length 95th (ft) 221 45 97 314 24 #125 658 Internal Link Dist (ft) 374 783 728 Turn Bay Length (ft) 250 275 200 Base Capacity (vph) 701 400 163 2952 956 139 2928 Starvation Cap Reductn 0 0 0 0 0 0 0 Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA 1: U.S. 29 & Ashwood Boulevard f- t f, t P �► j No -Build (2023) Conditions Timing Plan: AM Peak Hour Lane Group WBL WBR NBU NBT Ni SBL Si Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.66 0.24 0.42 0.52 0.09 0.58 0.82 Intersection Summa Area Type: Other Cycle Length:115 Actuated Cycle Length: 115 Offset: 47 (41 %), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 80 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.82 Intersection Signal Delay: 25.4 Intersection LOS: C Intersection Capacity Utilization 77.9% ICU Level of Service D Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. SDllts and Phases: 1: U.S. 29 & Ashwood Boulevard \*01 I 111 1 • 04 f1 G5 06 183 Synchro 10 Report RKA Page 2 Ashwood Boulevard Residential - Albemarle, VA 2: Archer Avenue & Ashwood Boulevard Intersection Int Delay, s/veh 2.3 No -Build (2023) Conditions Timing Plan: AM Peak Hour Movement EBT EBR WBL WBT NBL Ni Lane Configurations + f I + r Traffic Vol, veh/h 95 61 25 446 76 38 Future Vol, veh/h 95 61 25 446 76 38 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - 200 200 - 0 0 Veh In Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 103 66 27 485 83 41 Major/Minor Majorl Major2 Wort Conflicting Flow All 0 0 169 0 642 103 Stage 1 - - - - 103 - Stage 2 - - 539 - Critical Hdwy 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - 5.42 - Critical Hdwy Sig 2 - - 5.42 - Follow-up Hdwy 2.218 - 3.518 3.318 PotCap-1 Maneuver 1409 - 438 952 Stage 1 - - 921 - Stage 2 - - 585 - Platoon blocked, % Mov Cap-1 Maneuver 1409 - 430 952 Mov Cap-2 Maneuver - - 430 - Stage 1 - - 921 - Stage 2 - - 574 - Approach EB WB NB HCM Control Delay, s 0 0.4 13.3 HCM LOS B Minor Lane/Maior Mvmt NBLn1 Ni EBT EBR WBL WBT Capacity (veh/h) 430 952 - - 1409 - HCM Lane V/C Ratio 0,192 0.043 - - 0.019 - HCM Control Delay (s) 15.4 9 - - 7.6 - HCM Lane LOS C A - - A - HCM 95th %tile O(veh) 0.7 0.1 - - 0.1 - Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA No -Build (2023) Conditions 1: U.S. 29 & Ashwood Boulevard Timing Plan: PM Peak Hour Movement WBL WBR NBU NBT NBR SBL SBT Lane Configurations 1) F A W F ►j +++ Traffic Volume (vph) 169 64 58 2222 256 160 1825 Future Volume (vph) 169 64 58 2222 256 160 1825 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Lane Util. Factor 0.97 1.00 1.00 0.91 1.00 1.00 0.91 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 Fit Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Satd. Flow (prof) 3433 1583 1770 5085 1583 1770 5085 Fit Permitted 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Satd. Flow (perm) 3433 1583 1770 5085 1583 1770 5085 Peak -hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Adj. Flow (vph) 182 69 62 2389 275 172 1962 RTOR Reduction (vph) 0 63 0 0 97 0 0 Lane Group Flow (vph) 182 6 62 2389 178 172 1962 Turn Type Prot Perm Prot NA Perm Prot NA Protected Phases 4 5 2 1 6 Permitted Phases 4 2 Actuated Green, G (s) 10.8 10.8 8.5 84.1 84.1 13.1 88.7 Effective Green, g (s) 10.8 10.8 8.5 84.1 84.1 13.1 88.7 Actuated g/C Ratio 0.08 0.08 0.07 0.65 0.65 0.10 0.68 Clearance Time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 285 131 115 3289 1024 178 3469 v/s Ratio Prot c0.05 0.04 c0.47 c0.10 c0.39 v/s Ratio Perm 0.00 0.11 vlc Ratio 0.64 0.04 0.54 0.73 0.17 0.97 0.57 Uniform Delay, dl 57.7 54.8 58.9 15.3 9.1 58.2 10.7 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 4.6 0.1 4.8 1.4 0.4 57.0 0.7 Delay (s) 62.4 55.0 63.6 16.7 9.5 115.2 11.4 Level of Service E D E B A F B Approach Delay (s) 60.3 17.1 19.7 Approach LOS E B B Intersection Summa HCM 2000 Control Delay 20.3 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.76 Actuated Cycle Length (s) 130.0 Sum of lost time (s) 22.0 Intersection Capacity Utilization 75.0% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA No -Build (2023) Conditions 1: U.S. 29 & Ashwood Boulevard Timing Plan: PM Peak Hour Lane Group WBL WBR NBU NBT NBR SBL SBT Lane Configurations 1) F A W F ►j +?f Traffic Volume (vph) 169 64 58 2222 256 160 1825 Future Volume (vph) 169 64 58 2222 256 160 1825 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 275 200 Storage Lanes 2 1 1 1 1 Taper Length (ft) 100 100 100 Satd. Flow (1 3433 1583 1770 5085 1583 1770 5085 Fit Permitted 0.950 0.950 0.950 Satd. Flow (perm) 3433 1583 1770 5085 1583 1770 5085 Right Turn on Red Yes Yes Satd. Flow (RTOR) 69 275 Link Speed (mph) 35 45 45 Link Distance (R) 454 863 808 Travel Time (s) 8.8 13.1 12.2 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Shared Lane Traffic (%) Lane Group Flow (vph) 182 69 62 2389 275 172 1962 Turn Type Prot Perm Prot NA Perm Prot NA Protected Phases 4 5 2 1 6 Permitted Phases 4 2 Detector Phase 4 4 5 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 20.0 20.0 5.0 20.0 Minimum Split (s) 16.0 16.0 13.0 49.9 49.9 13.0 27.1 Total Split (s) 20.0 20.0 20.0 90.0 90.0 20.0 90.0 Total Split (%) 15.4% 15.4% 15.4% 69.2% 69.2% 15.4% 69.2% Yellow Time 1 3.1 3.1 4.0 4.9 4.9 4.1 5.1 All -Red Time (s) 5.4 5.4 3.4 1.0 1.0 3.5 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Lead/Lag Lead Lag Lag Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Recall Mode None None None C-Min C-Min None C-Min Act Effct Green (s) 10.8 10.8 9.7 84.1 84.1 13.1 90.2 Actuated g/C Ratio 0.08 0.08 0.07 0.65 0.65 0.10 0.69 v/c Ratio 0.64 0.36 0.47 0.73 0.25 0.97 0.56 Control Delay 68.2 17.8 68.8 16.9 1.5 118.2 11.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 68.2 17.8 68.8 16.9 1.5 118.2 11.6 LOS E B E B A F B Approach Delay 54.4 16.6 20.2 Approach LOS D B C Queue Length 50th (ft) 77 0 51 457 0 -153 304 Queue Length 95th (ft) 117 47 97 511 30 #302 368 Internal Link Dist (ft) 374 783 728 Turn Bay Length (ft) 250 275 200 Base Capacity (vph) 303 202 171 3289 1121 177 3528 Starvation Cap Reductn 0 0 0 0 0 0 0 Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA 1: U.S. 29 & Ashwood Boulevard f- t f, t P �► j No -Build (2023) Conditions Timing Plan: PM Peak Hour Lane Group WBL WBR NBU Ni Ni SBL Si Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.60 0.34 0.36 0.73 0.25 0.97 0.56 Intersection Summa Area Type: Other Cycle Length:130 Actuated Cycle Length:130 Offset: 79 (61 %), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 80 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.97 Intersection Signal Delay:19.9 Intersection LOS: B Intersection Capacity Utilization 75.0% ICU Level of Service D Analysis Period (min)15 - Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ano rnases: i s u.a. zv n Hsnwooa rsouievara Synchro 10 Report RKA Page 2 Ashwood Boulevard Residential - Albemarle, VA 2: Archer Avenue & Ashwood Boulevard Intersection Int Delay, s/veh 2.4 No -Build (2023) Conditions Timing Plan: PM Peak Hour Movement EBT EBR WBL WBT NBL Ni Lane Configurations + f I + r Traffic Vol, veh/h 311 105 42 165 68 34 Future Vol, veh/h 311 105 42 165 68 34 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - 200 200 - 0 0 Veh In Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 338 114 46 179 74 37 Major/Minor Majorl Major2 Wort Conflicting Flow Al 0 0 452 0 609 338 Stage 1 - - - - 338 - Stage 2 - - - - 271 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Sig 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1109 - 458 704 Stage 1 - - - - 722 - Stage 2 - - - - 775 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1109 - 439 704 Mov Cap-2 Maneuver - - - - 439 - Stage 1 - - - - 722 - Stage 2 - - - - 743 - Approach EB WB NB HCM Control Delay, s 0 1.7 13.4 HCM LOS B Minor Lane/Maior Mvmt NBLn1 Ni EBT EBR WBL WBT Capacity (veh/h) 439 704 - - 1109 - HCM Lane V/C Ratio 0,168 0.052 - - 0.041 - HCM Control Delay (s) 14.9 10.4 - - 8.4 - HCM Lane LOS B B - - A - HCM 95th %tile O(veh) 0.6 0.2 - - 0.1 - Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA Build (2023) Conditions 1: U.S. 29 & Ashwood Boulevard Timing Plan: AM Peak Hour Movement WBL WBR NBU NBT Ni SBU SBL SBT Lane Configurations 1) F A fft r A ++4 Traffic Volume (vph) 499 93 64 1443 97 2 77 2229 Future Volume (vph) 499 93 64 1443 97 2 77 2229 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Lane Util. Factor 0.97 1.00 1.00 0.91 1.00 1.00 0.91 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 Fit Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Said. Flow (prof) 3433 1583 1770 5085 1583 1770 5085 Fit Permitted 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Said. Flow (perm) 3433 1583 1770 5085 1583 1770 5085 Peak -hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.92 0.93 0.93 Adj. Flow (vph) 537 100 69 1552 104 2 83 2397 RTOR Reduction (vph) 0 81 0 0 47 0 0 0 Lane Group Flow (vph) 537 19 69 1552 57 0 85 2397 Turn Type Prot Perm Prot NA Perm Prot Prot NA Protected Phases 4 5 2 1 1 6 Permitted Phases 4 2 Actuated Green, G (s) 21.8 21.8 7.9 62.9 62.9 8.3 63.3 Effective Green, g (s) 21.8 21.8 7.9 62.9 62.9 8.3 63.3 Actuated g/C Ratio 0.19 0.19 0.07 0.55 0.55 0.07 0.55 Clearance Time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 650 300 121 2781 865 127 2798 v/s Ratio Prot c0.16 0.04 0.31 c0.05 c0.47 v/s Ratio Perm 0.01 0.04 vlc Ratio 0.83 0.06 0.57 0.56 0.07 0.67 0.86 Uniform Delay, dl 44.8 38.2 51.9 17.0 12.2 52.0 22.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 8.5 0.1 6.3 0.8 0.1 12.6 3.6 Delay (s) 53.2 38.3 58.2 17.8 12.4 64.6 25.6 Level of Service D D E B B E C Approach Delay (s) 50.9 19.1 27.0 Approach LOS D B C Intersection Summary HCM 2000 Control Delay 27.3 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.84 Actuated Cycle Length (s) 115.0 Sum of lost time (s) 22.0 Intersection Capacity Utilization 79.8% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA 1: U.S. 29 & Ashwood Boulevard Build (2023) Conditions Timing Plan: AM Peak Hour f f, t /,* " ` 1 Lane Group WBL WBR NBU NBT NBR SBU SBL SBT Lane Configurations 1) F A fft r A ++4 Traffic Volume (vph) 499 93 64 1443 97 2 77 2229 Future Volume (vph) 499 93 64 1443 97 2 77 2229 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 275 350 Storage Lanes 2 1 1 1 1 Taper Length (ft) 100 100 100 Satd. Flow (1 3433 1583 1770 5085 1583 0 1770 5085 Fit Permitted 0.950 0.950 0.950 Satd. Flow (perm) 3433 1583 1770 5085 1583 0 1770 5085 Right Turn on Red Yes Yes Satd. Flow (RTOR) 100 104 Link Speed (mph) 35 45 45 Link Distance (R) 454 863 808 Travel Time (s) 8.8 13.1 12.2 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.92 0.93 0.93 Shared Lane Traffic e/u) Lane Group Flow (vph) 537 100 69 1552 104 0 85 2397 Turn Type Prot Perm Prot NA Perm Prot Prot NA Protected Phases 4 5 2 1 1 6 Permitted Phases 4 2 Detector Phase 4 4 5 2 2 1 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 20.0 20.0 5.0 5.0 20.0 Minimum Split (s) 16.0 16.0 13.0 49.9 49.9 13.0 13.0 27.1 Total Split (s) 32.0 32.0 18.0 67.0 67.0 16.0 16.0 65.0 Total Split (%) 27.8% 27.8% 15.7% 58.3% 58.3% 13.9% 13.9% 56.5% Yellow Time (s) 3.1 3.1 4.0 4.9 4.9 4.1 4.1 5.1 All -Red Time (s) 5.4 5.4 3.4 1.0 1.0 3.5 3.5 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Lead/Lag Lead Lag Lag Lead Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None C-Min C-Min None None C-Min Act Effct Green (s) 21.8 21.8 9.1 62.9 62.9 8.3 64.8 Actuated g/C Ratio 0.19 0.19 0.08 0.55 0.55 0.07 0.56 v/c Ratio 0.83 0.26 0.50 0.56 0.11 0.66 0.84 Control Delay 56.2 9.3 62.7 18.3 2.9 76.6 25.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 56.2 9.3 62.7 18.3 2.9 76.6 25.8 LOS E A E B A E C Approach Delay 48.8 19.1 27.6 Approach LOS D B C Queue Length 50th (ft) 194 0 49 272 0 62 569 Queue Length 95th (ft) 257 46 97 317 26 #136 658 Internal Link Dist (ft) 374 783 728 Turn Bay Length (ft) 250 275 350 Base Capacity (vph) 701 403 163 2779 912 132 2866 Starvation Cap Reductn 0 0 0 0 0 0 0 Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA 1: U.S. 29 & Ashwood Boulevard f- I- +l t /* u` l Build (2023) Conditions Timing Plan: AM Peak Hour Lane Group WBL WBR NBU NBT Ni SBU SBL Si Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.77 0.25 0.42 0.56 0.11 0.64 0.84 Intersection Summa Area Type: Other Cycle Length:115 Actuated Cycle Length: 115 Offset: 47 (41 %), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 80 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 27.4 Intersection LOS: C Intersection Capacity Utilization 79.8% ICU Level of Service D Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. SDllts and Phases: 1: U.S. 29 & Ashwood Boulevard i01 t02!R) • 04 f1 GS 06 183 Synchro 10 Report RKA Page 2 Ashwood Boulevard Residential - Albemarle, VA Build (2023) Conditions 2: Archer Avenue/Proposed Driveway & Ashwood Boulevard Timing Plan: AM Peak Hour Intersection Int Delay, s/veh Movement 4.4 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations ►j + F I j, il, 4 f Traffic Vol, veh/h 18 95 61 25 446 1 76 5 38 5 15 70 Future Vol, veh/h 18 95 61 25 446 1 76 5 38 5 15 70 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 15 0 5 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - None Storage Length 100 - 200 200 - - 0 - - - 0 Veh In Median Storage, # - 0 - - 0 - - 0 - 0 - Grade, % - 0 - - 0 - - 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 20 103 66 27 485 1 83 5 41 5 16 76 Major/Minor Majorl Major2 Minorl Minor2 Conflicting Flow All 486 0 0 169 0 0 734 683 118 754 749 491 Stage 1 - - - - - - 143 143 - 540 540 - Stage 2 - - - - - - 591 540 - 214 209 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Sig 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3,318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1077 - - 1409 - - 336 372 934 326 341 578 Stage 1 - - - - - - B60 779 - 526 521 - Stage 2 - - - - - - 493 521 - 788 729 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1077 - - 1409 - - 271 358 921 295 328 575 Mov Cap-2 Maneuver - - - - - - 271 358 - 295 328 - Stage 1 - - - - - - 844 764 - 516 511 - Stage 2 - - - - - - 404 511 - 723 715 - Approach EB WB NB SB HCM Control Delay, s 0.9 0.4 18.9 13.3 HCM LOS C B Minor Lane/Major Mvmt NBLnl NBLn2 EBL EBT EBR WBL WBT WBR SBLnl SBLn2 Capacity (veh/h) 271 779 1077 - - 1409 - - 319 575 HCM Lane V/C Ratio 0,305 0.06 0.018 - - 0.019 - - 0.068 0.132 HCM Control Delay (s) 24 9.9 8.4 - - 7.6 - - 17.1 12.2 HCM Lane LOS C A A - - A - - C B HCM 95th %tile C(veh) 1.2 0.2 0.1 - - 0.1 - - 0.2 0.5 Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA Build (2023) Conditions 3: U.S. 29 & Proposed RIRO Timing Plan: AM Peak Hour Intersection Int Delay, slveh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 Future Vol, veh/h 0 Conflicting Peds, #/hr 0 Sign Control Stop RT Channelized Storage Length - Veh In Median Storage, # 0 Grade, % 0 Peak Hour Factor 92 Heavy Vehicles, % 2 Mvmt Flow 0 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Sig 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 f +++ 13 1527 13 1527 0 0 Stop Free None 0 0 0 92 92 2 2 14 1660 F +" 11 0 2308 11 0 2308 0 0 0 Free Free Free None - None 200 - - 0 0 92 92 92 2 2 2 12 0 2509 Minorl Majorl 830 0 0 7.14 - 3.92 0 269 0 0 269 0 0 0 Approach WB NB SB HCM Control Delay, s 19.1 0 0 HCM LOS C Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile O(veh) NBT N13RWBLn1 SBT 269 - 0.053 - 19.1 - C 0.2 Synchro 10 Report RKA Page 2 Ashwood Boulevard Residential - Albemarle, VA Build (2023) Conditions 1: U.S. 29 & Ashwood Boulevard Timing Plan: PM Peak Hour Movement WBL WBR NBU NBT NBR SBU SBL SBT Lane Configurations 1) F A W F I+++ Traffic Volume (vph) 212 66 58 2247 298 5 168 1825 Future Volume (vph) 212 66 58 2247 298 5 168 1825 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Lane Util. Factor 0.97 1.00 1.00 0.91 1.00 1.00 0.91 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 Fit Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Said. Flow (prof) 3433 1583 1770 5085 1583 1770 5085 Fit Permitted 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Said. Flow (perm) 3433 1583 1770 5085 1583 1770 5085 Peak -hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.92 0.93 0.93 Adj. Flow (vph) 228 71 62 2416 320 5 181 1962 RTOR Reduction (vph) 0 65 0 0 113 0 0 0 Lane Group Flow (vph) 228 6 62 2416 207 0 186 1962 Turn Type Prot Perm Prot NA Perm Prot Prot NA Protected Phases 4 5 2 1 1 6 Permitted Phases 4 2 Actuated Green, G (s) 11.3 11.3 8.5 84.1 84.1 12.6 88.2 Effective Green, g (s) 11.3 11.3 8.5 84.1 84.1 12.6 88.2 Actuated g/C Ratio 0.09 0.09 0.07 0.65 0.65 0.10 0.68 Clearance Time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 298 137 115 3289 1024 171 3449 v/s Ratio Prot c0.07 0.04 c0.48 c0.11 c0.39 v/s Ratio Perm 0.00 0.13 vlc Ratio 0.77 0.05 0.54 0.73 0.20 1.09 0.57 Uniform Delay, dl 58.1 54.4 58.9 15.4 9.3 58.7 10.9 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 11.1 0.1 4.8 1.5 0.4 94.2 0.7 Delay (s) 69.2 54.5 63.6 16.9 9.8 152.9 11.6 Level of Service E D E B A F B Approach Delay (s) 65.7 17.2 23.9 Approach LOS E B C Intersection Summary HCM 2000 Control Delay 22.7 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.79 Actuated Cycle Length (s) 130.0 Sum of lost time (s) 22.0 Intersection Capacity Utilization 77.4% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA 1: U.S. 29 & Ashwood Boulevard Build (2023) Conditions Timing Plan: PM Peak Hour f f, t /,* " ` 1 Lane Group WBL WBR NBU NBT NBR SBU SBL SBT Lane Configurations 1) F A W r I+++ Traffic Volume (vph) 212 66 58 2247 298 5 168 1825 Future Volume (vph) 212 66 58 2247 298 5 168 1825 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 275 350 Storage Lanes 2 1 1 1 1 Taper Length (ft) 100 100 100 Satd. Flow (1 3433 1583 1770 5085 1583 0 1770 5085 Fit Permitted 0.950 0.950 0.950 Satd. Flow (perm) 3433 1583 1770 5085 1583 0 1770 5085 Right Turn on Red Yes Yes Satd. Flow (RTOR) 71 320 Link Speed (mph) 35 45 45 Link Distance (R) 454 863 808 Travel Time (s) 8.8 13.1 12.2 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.92 0.93 0.93 Shared Lane Traffic (%) Lane Group Flow (vph) 228 71 62 2416 320 0 186 1962 Turn Type Prot Perm Prot NA Perm Prot Prot NA Protected Phases 4 5 2 1 1 6 Permitted Phases 4 2 Detector Phase 4 4 5 2 2 1 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 20.0 20.0 5.0 5.0 20.0 Minimum Split (s) 16.0 16.0 13.0 49.9 49.9 13.0 13.0 27.1 Total Split (s) 20.0 20.0 20.0 90.0 90.0 20.0 20.0 90.0 Total Split (%) 15.4% 15.4% 15.4% 69.2% 69.2% 15.4% 15.4% 69.2% Yellow Time (s) 3.1 3.1 4.0 4.9 4.9 4.1 4.1 5.1 All -Red Time (s) 5.4 5.4 3.4 1.0 1.0 3.5 3.5 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Lead/Lag Lead Lag Lag Lead Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None C-Min C-Min None None C-Min Act Effct Green (s) 11.3 11.3 9.7 84.1 84.1 12.6 89.7 Actuated g/C Ratio 0.09 0.09 0.07 0.65 0.65 0.10 0.69 v/c Ratio 0.77 0.35 0.47 0.73 0.28 1.09 0.56 Control Delay 75.4 17.3 68.8 17.2 1.6 148.0 11.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 75.4 17.3 68.8 17.2 1.6 148.0 11.8 LOS E B E B A F B Approach Delay 61.6 16.5 23.6 Approach LOS E B C Queue Length 50th (ft) 98 0 51 468 0 -178 304 Queue Length 95th (ft) #154 48 97 522 32 #332 368 Internal Link Dist (ft) 374 783 728 Turn Bay Length (ft) 250 275 350 Base Capacity (vph) 303 204 171 3289 1137 171 3510 Starvation Cap Reductn 0 0 0 0 0 0 0 Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA 1: U.S. 29 & Ashwood Boulevard Build (2023) Conditions Timing Plan: PM Peak Hour Lane Group WBL WBR NBU Ni Ni SBU SBL Si Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.75 0.35 0.36 0.73 0.28 1.09 0.56 Intersection Summa Area Type: Other Cycle Length:130 Actuated Cycle Length:130 Offset: 79 (61 %), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 80 Control Type: Actuated -Coordinated Maximum v/c Ratio:1.09 Intersection Signal Delay: 22.0 Intersection LOS: C Intersection Capacity Utilization 77.4% ICU Level of Service D Analysis Period (min)15 - Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ano rnases: i s u.a. zv n Hsnwooa rsouievara Synchro 10 Report RKA Page 2 Ashwood Boulevard Residential - Albemarle, VA Build (2023) Conditions 2: Archer Avenue/Proposed Driveway & Ashwood Boulevard Timing Plan: PM Peak Hour Intersection Int Delay, s/veh 4.2 Movement EBL EBT EBR WBL WBT WEIR NBL NBT Ni SBL SBT Si Lane Configurations ►j + F I j, I y, 4 f Traffic Vol, veh/h 51 310 105 42 165 5 68 15 34 3 10 45 Future Vol, veh/h 51 310 105 42 165 5 68 15 34 3 10 45 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - None Storage Length 100 - 200 200 - - 0 - - - 0 Veh In Median Storage, # - 0 - - 0 - - 0 - 0 - Grade, % - 0 - - 0 - - 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 55 337 114 46 179 5 74 16 37 3 11 49 Major/Minor Majorl Major2 Minorl Minor2 Conflicting Flow Al 184 0 0 451 0 0 751 723 337 805 835 182 Stage 1 - - - - - - 447 447 - 274 274 - Stage 2 - - - - - - 304 276 - 531 561 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Sig 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3,318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1391 - - 1109 - - 327 352 705 301 304 861 Stage 1 - - - - - - 591 573 - 732 683 - Stage 2 - - - - - - 705 682 - 532 510 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1391 - - 1109 - - 281 324 705 258 280 861 Mov Cap-2 Maneuver - - - - - - 281 324 - 258 280 - Stage 1 - - - - 567 550 - 703 655 - Stage 2 - - - - 627 654 - 470 490 - Approach EB WB NB SB HCM Control Delay, s 0.8 1.7 18.3 11.5 HCM LOS C B Minor Lane/Maior Mvmt NBLnl NBLn2 EBL EBT EBR WBL WBT WBR SBLnl SBLn2 Capacity (veh/h) 281 518 1391 - - 1109 - - 275 861 HCM Lane V/C Ratio 0,263 0.103 0.04 - - 0.041 - - 0.051 0.057 HCM Control Delay (s) 22.3 12.7 7.7 - - 8.4 - - 18.8 9.4 HCM Lane LOS C B A - - A - - C A HCM 95th %tile O(veh) 1 0.3 0.1 - - 0.1 - - 0.2 0.2 Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA Build (2023) Conditions 3: U.S. 29 & Proposed RIRO Timing Plan: PM Peak Hour Intersection Int Delay, slveh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 Future Vol, veh/h 0 Conflicting Peds, #/hr 0 Sign Control Stop RT Channelized Storage Length - Veh In Median Storage, # 0 Grade, % 0 Peak Hour Factor 92 Heavy Vehicles, % 2 Mvmt Flow 0 Conflicting Flow Al Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Sig 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 r +++ 8 2288 8 2288 0 0 Stop Free None 0 0 0 92 92 2 2 9 2487 F +" 30 0 1998 30 0 1998 0 0 0 Free Free Free None - None 200 - - 0 0 92 92 92 2 2 2 33 0 2172 Minorl Majorl 1244 0 0 7.14 - 3.92 0 142 0 0 142 0 0 0 Approach WB NB SB HCM Control Delay, s 32 0 0 HCM LOS D Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile O(veh) NBT N13RWBLn1 SBT 142 - 0.061 - 32 - D 0.2 Synchro 10 Report RKA Page 2 Ashwood Boulevard Residential - Albemarle, VA Build (2023) Conditions - Adjusted Lost Time 1: U.S. 29 & Ashwood Boulevard Timing Plan: AM Peak Hour f- t f, t �' 1-4 Movement WBL WBR NBU NBT Ni SBU SBL SBT Lane Configurations 1) F A fft r A ++4 Traffic Volume (vph) 499 93 64 1443 97 2 77 2229 Future Volume (vph) 499 93 64 1443 97 2 77 2229 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 0.97 1.00 1.00 0.91 1.00 1.00 0.91 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 Fit Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Satd. Flow (prof) 3433 1583 1770 5085 1583 1770 5085 Fit Permitted 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Satd. Flow (perm) 3433 1583 1770 5085 1583 1770 5085 Peak -hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.92 0.93 0.93 Adj. Flow (vph) 537 100 69 1552 104 2 83 2397 RTOR Reduction (vph) 0 77 0 0 44 0 0 0 Lane Group Flow (vph) 537 23 69 1552 60 0 85 2397 Turn Type Prot Perm Prot NA Perm Prot Prot NA Protected Phases 4 5 2 1 1 6 Permitted Phases 4 2 Actuated Green, G (s) 21.8 21.8 7.9 64.3 64.3 6.9 63.3 Effective Green, g (s) 26.3 26.3 11.3 66.2 66.2 10.5 65.4 Actuated g/C Ratio 0.23 0.23 0.10 0.58 0.58 0.09 0.57 Clearance Time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 785 362 173 2927 911 161 2891 v/s Ratio Prot c0.16 0.04 0.31 c0.05 c0.47 v/s Ratio Perm 0.01 0.04 vlc Ratio 0.68 0.06 0.40 0.53 0.07 0.53 0.83 Uniform Delay, dl 40.6 34.7 48.7 14.9 10.8 49.9 20.2 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 2.5 0.1 1.5 0.7 0.1 3.1 2.9 Delay (s) 43.0 34.8 50.2 15.6 10.9 53.0 23.2 Level of Service D C D B B D C Approach Delay (s) 41.7 16.7 24.2 Approach LOS D B C Intersection Summary HCM 2000 Control Delay 23.8 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.78 Actuated Cycle Length (s) 115.0 Sum of lost time (s) 15.6 Intersection Capacity Utilization 71.5% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA Build (2023) Conditions - Adjusted Lost Time 1: U.S. 29 & Ashwood Boulevard Timing Plan: AM Peak Hour f f, t /,* ` l Lane Group WBL WBR NBU NBT NBR SBU SBL SBT Lane Configurations 1) F A fft r A ++4 Traffic Volume (vph) 499 93 64 1443 97 2 77 2229 Future Volume (vph) 499 93 64 1443 97 2 77 2229 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 275 350 Storage Lanes 2 1 1 1 1 Taper Length (ft) 100 100 100 Satd. Flow (1 3433 1583 1770 5085 1583 0 1770 5085 Fit Permitted 0.950 0.950 0.950 Satd. Flow (perm) 3433 1583 1770 5085 1583 0 1770 5085 Right Turn on Red Yes Yes Satd. Flow (RTOR) 100 104 Link Speed (mph) 35 45 45 Link Distance (R) 454 863 808 Travel Time (s) 8.8 13.1 12.2 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.92 0.93 0.93 Shared Lane Traffic e/u) Lane Group Flow (vph) 537 100 69 1552 104 0 85 2397 Turn Type Prot Perm Prot NA Perm Prot Prot NA Protected Phases 4 5 2 1 1 6 Permitted Phases 4 2 Detector Phase 4 4 5 2 2 1 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 20.0 20.0 5.0 5.0 20.0 Minimum Split (s) 16.0 16.0 13.0 49.9 49.9 13.0 13.0 27.1 Total Split (s) 32.0 32.0 18.0 67.0 67.0 16.0 16.0 65.0 Total Split (%) 27.8% 27.8% 15.7% 58.3% 58.3% 13.9% 13.9% 56.5% Yellow Time 1 3.1 3.1 4.0 4.9 4.9 4.1 4.1 5.1 All -Red Time (s) 5.4 5.4 3.4 1.0 1.0 3.5 3.5 1.0 Lost Time Adjust (s) -4.5 -4.5 -3.4 -1.9 -1.9 -3.6 -2.1 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None C-Min C-Min None None C-Min Act Effct Green (s) 26.3 26.3 12.5 67.8 67.8 11.8 66.9 Actuated g/C Ratio 0.23 0.23 0.11 0.59 0.59 0.10 0.58 We Ratio 0.68 0.23 0.36 0.52 0.11 0.47 0.81 Control Delay 45.3 8.1 52.5 15.8 2.6 57.6 23.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 45.3 8.1 52.5 15.8 2.6 57.6 23.5 LOS D A D B A E C Approach Delay 39.5 16.5 24.7 Approach LOS D B C Queue Length 50th (ft) 184 0 48 261 0 60 544 Queue Length 95th (ft) 243 43 93 305 25 113 630 Internal Link Dist (ft) 374 783 728 Turn Bay Length (ft) 250 275 350 Base Capacity (vph) 835 461 215 2996 975 186 2959 Starvation Cap Reductn 0 0 0 0 0 0 0 Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA Build (2023) Conditions - Adjusted Lost Time 1: U.S. 29 & Ashwood Boulevard Timing Plan: AM Peak Hour Lane Group WBL WBR NBU Ni Ni SBU SBL Si Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced We Ratio 0.64 0.22 0.32 0.52 0.11 0.46 0.81 Intersection Summa Area Type: Other Cycle Length:115 Actuated Cycle Length: 115 Offset: 47 (41 %), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 80 Control Type: Actuated -Coordinated Maximum We Ratio: 0.81 Intersection Signal Delay: 23.7 Intersection LOS: C Intersection Capacity Utilization 71.5% ICU Level of Service C Analysis Period (min)15 anu rnases: I: U.J. LV 61 HsnWUUu tluuMMU Synchro 10 Report RKA Page 2 Ashwood Boulevard Residential - Albemarle, VA Build (2023) Conditions - Adjusted Lost Time 1: U.S. 29 & Ashwood Boulevard Timing Plan: PM Peak Hour f- t f, t �' 1-4 Movement WBL WBR NBU NBT NBR SBU SBL SBT Lane Configurations 1) F A W r I+++ Traffic Volume (vph) 212 66 58 2247 298 5 168 1825 Future Volume (vph) 212 66 58 2247 298 5 168 1825 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 0.97 1.00 1.00 0.91 1.00 1.00 0.91 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 Fit Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Satd. Flow (prof) 3433 1583 1770 5085 1583 1770 5085 Fit Permitted 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Satd. Flow (perm) 3433 1583 1770 5085 1583 1770 5085 Peak -hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.92 0.93 0.93 Adj. Flow (vph) 228 71 62 2416 320 5 181 1962 RTOR Reduction (vph) 0 62 0 0 108 0 0 0 Lane Group Flow (vph) 228 9 62 2416 212 0 186 1962 Turn Type Prot Perm Prot NA Perm Prot Prot NA Protected Phases 4 5 2 1 1 6 Permitted Phases 4 2 Actuated Green, G (s) 11.2 11.2 8.5 84.1 84.1 12.7 88.3 Effective Green, g (s) 15.7 15.7 11.9 86.0 86.0 16.3 90.4 Actuated g/C Ratio 0.12 0.12 0.09 0.66 0.66 0.13 0.70 Clearance Time (s) 8.5 8.5 7.4 5.9 5.9 7.6 6.1 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 414 191 162 3363 1047 221 3536 v/s Ratio Prot c0.07 0.04 c0.48 c0.11 0.39 v/s Ratio Perm 0.01 0.13 vlc Ratio 0.55 0.04 0.38 0.72 0.20 0.84 0.55 Uniform Delay, dl 53.8 50.5 55.6 14.2 8.6 55.6 9.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 1.6 0.1 1.5 1.4 0.4 24.1 0.6 Delay (s) 55.4 50.6 57.1 15.5 9.0 79.7 10.5 Level of Service E D E B A E B Approach Delay (s) 54.3 15.7 16.4 Approach LOS D B B Intersection Summary HCM 2000 Control Delay 18.2 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.73 Actuated Cycle Length (s) 130.0 Sum of lost time (s) 15.6 Intersection Capacity Utilization 69.0% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA Build (2023) Conditions - Adjusted Lost Time 1: U.S. 29 & Ashwood Boulevard Timing Plan: PM Peak Hour f f, t /,* ` l Lane Group WBL WBR NBU NBT NBR SBU SBL SBT Lane Configurations 1) F A W r I+++ Traffic Volume (vph) 212 66 58 2247 298 5 168 1825 Future Volume (vph) 212 66 58 2247 298 5 168 1825 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 250 275 350 Storage Lanes 2 1 1 1 1 Taper Length (ft) 100 100 100 Satd. Flow (1 3433 1583 1770 5085 1583 0 1770 5085 Fit Permitted 0.950 0.950 0.950 Satd. Flow (perm) 3433 1583 1770 5085 1583 0 1770 5085 Right Turn on Red Yes Yes Satd. Flow (RTOR) 71 320 Link Speed (mph) 35 45 45 Link Distance (R) 454 863 808 Travel Time (s) 8.8 13.1 12.2 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.92 0.93 0.93 Shared Lane Traffic (%) Lane Group Flow (vph) 228 71 62 2416 320 0 186 1962 Turn Type Prot Perm Prot NA Perm Prot Prot NA Protected Phases 4 5 2 1 1 6 Permitted Phases 4 2 Detector Phase 4 4 5 2 2 1 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 20.0 20.0 5.0 5.0 20.0 Minimum Split (s) 16.0 16.0 13.0 49.9 49.9 13.0 13.0 27.1 Total Split (s) 20.0 20.0 20.0 90.0 90.0 20.0 20.0 90.0 Total Split (%) 15.4% 15.4% 15.4% 69.2% 69.2% 15.4% 15.4% 69.2% Yellow Time 1 3.1 3.1 4.0 4.9 4.9 4.1 4.1 5.1 All -Red Time (s) 5.4 5.4 3.4 1.0 1.0 3.5 3.5 1.0 Lost Time Adjust (s) -4.5 -4.5 -3.4 -1.9 -1.9 -3.6 -2.1 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead Lead Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None C-Min C-Min None None C-Min Act Effct Green (s) 15.7 15.7 13.1 86.0 86.0 16.3 91.9 Actuated g/C Ratio 0.12 0.12 0.10 0.66 0.66 0.13 0.71 We Ratio 0.55 0.28 0.35 0.72 0.28 0.84 0.55 Control Delay 59.2 14.4 59.2 15.7 1.5 86.5 10.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 59.2 14.4 59.2 15.7 1.5 86.5 10.6 LOS E B E B A F B Approach Delay 48.6 15.1 17.2 Approach LOS D B B Queue Length 50th (ft) 94 0 49 445 0 156 287 Queue Length 95th (ft) 138 46 94 497 31 #289 349 Internal Link Dist (ft) 374 783 728 Turn Bay Length (ft) 250 275 350 Base Capacity (vph) 422 257 217 3363 1155 221 3594 Starvation Cap Reductn 0 0 0 0 0 0 0 Synchro 10 Report RKA Page 1 Ashwood Boulevard Residential - Albemarle, VA Build (2023) Conditions - Adjusted Lost Time 1: U.S. 29 & Ashwood Boulevard Timing Plan: PM Peak Hour Lane Group WBL WBR NBU Ni Ni SBU SBL Si Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.54 0.28 0.29 0.72 0.28 0.84 0.55 Intersection Summa Area Type: Other Cycle Length:130 Actuated Cycle Length:130 Offset: 79 (61 %), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 80 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay:17.9 Intersection LOS: B Intersection Capacity Utilization 69.0% ICU Level of Service C Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Synchro 10 Report RKA Page 2 F-61 WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAY Nam, = 700 O > W 600 500 O O 400 Z U) 300 a Or 200 O 0 > 100 800 2 700 a w 600 2 500 O � 400 Z 300 a o_ 0 200 0 > 100 v 200 400 600 800 1000 VA ADVANCING VOLUME (VPH) FIGURE 3-5 200 400 600 800 1000 VA ADVANCING VOLUME (VPH) FIGURE 3-6 F-96 120 ¢ 100 0 x S oC W (L 80 U w J U_ W N 60 2 f- F x 0 40 S IL 20 PHV APPROACH TOTAL, VEHICLES PER HOUR )0 Appropriate Radius required at all Intersections and Entrances (Commercial or Private). LEGEND PHV - Peak Hour Volume (also Design Hourly Volume equivalent) Adjustment for Right Turns For posted speeds at or under 45 mph, PHV right turns > 40, and PHV total < 300. Adjusted right turns = PHV Right Turns - 20 If PHV is not known use formula: PHV = ADT x K x D K = the percent of AADT occurring in the peak hour D = the percent of traffic in the peak direction of flow Note: An average of 11 % for K x D will suffice. When right turn facilities are warranted, see Figure 3-1 for design criteria.' FIGURE 3-26 WARRANTS FOR RIGHT TURN TREATMENT (2-LANE HIGHWAY) Rev. 1/15 F-97 oC M O cc W a. W W J U_ x W z z cc cc U x a 120 100 80 IN U41 20 FULL -WIDTH TURN LANE AND TAPER REQUIRED TAPER REQUIRED NO TURN LANES OR TAPERS REQUIRED 200 400 600 800 1000 1200 1400 PHV APPROACH TOTAL, VEHICLES PER HOUR Appropriate Radius required at all Intersections and Entrances (Commercial or Private). LEGEND PHV- - Peak Hour Volume (also Design Hourly Volume equivalent) Adjustment for Right Turns 110RAM iL.TI. m • t.TiiitOEi��a►�8_1�>ti7s7�7 K = the percent of AADT occurring in the peak hour D = the percent of traffic in the peak direction of flow Note: An average of 11 % for K x D will suffice. When right turn facilities are warranted, see Figure 3-1 for design criteria.' FIGURE 3-27 WARRANTS FOR RIGHT TURN TREATMENT (4-LANE HIGHWAY) Rev. 1/15