Loading...
HomeMy WebLinkAboutSUB201900158 Review Comments Road Plan and Comps. 2020-10-12� AI �h �lRGIN�P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage plan review Project title: Spring Hill Village Road Plan Project file number: SUB201900158 amendment 1 Plan preparer: Collins Engineering [scott@collies-engineering.com] Owner or rep.: Stanley Martin Homes[odonnellgp@stanleymartin.com] Date Received: 28 September 2020 Date of comments: 12 October 2020 Scott, We have reviewed the above referenced plans and have the following comments: Engineering (Emily Cox) 1. WPO amendment 2 must be approved before this road plan can be approved. 2. Provide CG-12 on the internal median shown below. ') SCOTTSVILLE ROAD (55 WHY- I 'B.t PG.354 y 3. Ensure all recorded easements are shown with DB&PG and don't say proposed. 4. Ensure there are no trees over storm pipes. 5. Shared use path that is outside of the right-of-way requires an easement. Planning (Daniel Butch) 1. A permit will be required to maintain the 8 ft shared use path on Rt 20 in VDOT's right-of-way and a maintenance agreement stating the developer will take on that responsibility noted on the plans. Planning (Tori Kanellopoulos) 1. See attached comment letter dated 10/02/20. VDOT (Adam Moore) 1. See attached comment letter dated 10/08/2020. Fire Rescue (Shawn Maddox) 1. No objection. ACSA (Jeremy Lynn) Engineering Review Comments Page 2 of 2 1. No objection. GIS (Brian Becker) 1. No objection. ARB (Margaret Maliszewski) 1. Remove the "Location of street trees behind pedestrian walk dictated by VDOT clear zone requirements' note from the plan. 2. Show that frontage tree locations are outside the VDOT clear zone or provide evidence of VDOT approval of proposed frontage tree locations. 3. Site plan and road plan landscaping must match. See forthcoming site plan comments from Paty Saternye. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. If you have any questions or concerns, please contact me either by email (ecox2@albemarle.org) or by phone at 434-296-5832 ext. 3565. Sincerely, Emily Cox, P.E. Civil Engineer II COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street Commissioner Richmond, Virginia 23219 October 08, 2020 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Emily Cox, P.E., Re: Spring Hill Village — Final Road Plan Amendment SUB-2019-00158 Review #6 Dear Ms. Cox: (804) 7862701 Fax: (804) 7862940 The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 4 October 2019, revised 25 September 2020, and offer the following comments. Land use 1. Please use CG-3, and CG-7 curbing and add truncated dome surface in the Island for the ADA crossing. 2. Please provide copy of recorded dedication deed to the Commonwealth. 3. Offset from through pavement edge to face of curb. Offset to be equal to cut shoulder width with an 8' min. Please refer to VDOT's Road Design Manual appendix F-Pg., 17- 49. Section 4, commercial entrance channelization Island options. Figure 2-12. If further information is desired, please contact Adam Moore at 434-422-9782. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. VirginiaDOT.org WE KEEP VIRGINIA MOVING Area Land Use Engineer Charlottesville Residency w «�µ �J County of Albemarle Department of Community Development Memorandum To: Emily Cox — CDD Engineering From: Tori Kanellopoulos - Senior Planner Division: Planning Services Date: October 2, 2020 Subject: SUB201900158 — Spring Hill — Road Plan Amendment dated 09-25-20 This road plan amendment is reviewed per ZMA2020-6, approved 09-16-20 The following are Planning comments for Road Plan submittal SUB201900158: Planning (Tori Kanellopoulos): 1. Advisory comment. Planning review of this Road Plan is for comments specific to Road Plan requirements only. Planning approval of the Road Plan does not constitute subdivision plat or site plan approval; Planning has not reviewed this Road Plan for other requirements such as setbacks, minimum lot size, open space, etc. 2. Advisory comment. Recommend provide comment response letter to expedite review of resubmittal. 3. Advisory comment. An easement plat will be needed to provide public access for the path outside the ROW along Route 20. This will need to include an instrument for maintenance and public access. A template has been sent to the applicant. 4. ZMA202000006, Proffer #4, SR 20 (Scottsville Road). The applicant is responsible to design, bond, and construct the improvements shown on the County -approved engineering drawings titled Spring Hill Village — Application Plan, dated 04-20-20 and last revised on 8-21-20, as prepared by Collins Engineering, for both SR 20 (Scottsville Road) and SR 742 (Avon St Ext). The following proffer requirements are still not met or shown on the Road Plan: a. Include a note that public access will be provided along the shared -use path along Route 20, as the path is mostly outside of the public ROW. Note that the road plan can be approved prior to the easement plat needed for maintenance and public access for the path (but the final site plan must be approved after the plat is approved). 5. 18-32.6, 32.7; 14-302(A)(4)(5) Easements. Distinguish between existing easements (include their Deed Book/Page Number) and proposed easements. 6. 18-32.7.9 Landscaping and utilities. Revise the following tree location adjacent to Dauphin Drive as it is on top of a pipe r 11 x �, )n:i :r 11,11, 7. VDOT requirements and 18-32.7.9 Landscaping and utilities. Note that trees appear to need to be moved back along Route 20 to meet VDOT clearzone requirements. Ensure that revised trees do not conflict with the undergrounded power utilities or any pipes once moved. Please contact Tori Kanellopoulos in the Planning Division at vkanell000ulos aa)albemarle.oro or 434-296-5832 ext. 3270 for further information.