Loading...
HomeMy WebLinkAboutSDP202000056 Correspondence Minor Amendment 2020-10-09•00000i 608 Preston Avenue P 434.295.5624 T I M M O N S GROUP Suite 200 F 434.295.8317 YOUR VISION ACHIEVED THROUGH OURS. Charlottesville, VA 22903 www.timmons.com October 8, 2020 County of Albemarle Megan Nedostup, AICP — Principal Planner Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Keswick Hall Additions and Site Improvements SDP-2020-56 Minor Site Plan Amendment Dear Ms. Nedostup: The purpose of this Minor Site Plan Amendment is to capture changes to SDP2018-016 Keswick Hall Additions and Site Improvements that were excluded from the previously approved Minor Site Plan Amendment. Changes related on all previous Minor Site Plan Amendments or Letter of Revisions have been excluded from this summary. The following is a summary of changes reflected in the 7/29/2020 Minor Site Plan Amendment submission: • Sheet C0.00: Total Post Development Parking Provided calculation has been revised to reflect an accurate parking count and include the total number of ADA parking spaces within the area of existing parking spaces to remain on the property. The SDP number has been revised and Sheet List Table updated to reflect the sheets included with this submission. • Sheet C1.00: Notes #10 & 11 has been added per previous comments received from Michael Dellinger. • Sheet C2.00: Clarification has been provided to indicate existing parking space counts and the change the Club Drive as noted on C4.00. • Sheet C4.00: The utility connections to the Pool Pavilion have been updated, including the "Connection Detail". The Restaurant Sidewalk Ramp Detail has been added. The number of parking spaces have been modified to accommodate existing trees. The stair connection northwest of the Restaurant has been removed. The courtyard of the Restaurant has been modified. The layout of the pool has been adjusted. • Sheet C4.01: Parking spaces have been modified to accommodate existing trees. Parking spaces nearest the entrance have been removed and the lawn space modified west of the Hall. The sanitary sewer alignment between structures 6 and 5 have been adjusted. Tent anchors have been added to the rear of the Hall building (see note #3). The circular gather space to the east of the retaining wall has been updated to remove the fire pit. A 1" PVC waterline for hose bibs has been added along the read of the hall. A New Guest Wing Drop Off Lane and Hall Entrance Parking Detail have been added. • Sheet C4.02: The alignment of Club Drive has been clouded to reflect the previous reviewed layout dating back to the April 2019 Minor S.P.A. submission. Parking spaces have been modified to accommodate existing trees. A sidewalk south of the ADA spaces near Full Cry Lane has been added. The stair connection northwest of the Restaurant has been removed. The courtyard of the Restaurant has been modified. • Sheet C4.03: The alignment of Club Drive has been clouded to reflect the previous reviewed layout dating back to the April 2019 Minor S.P.A. submission. Parking spaces have been modified CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES to accommodate existing trees. A sidewalk south of the ADA spaces near Full Cry Lane has been added. Parking spaces nearest the entrance have been removed and the lawn space modified west of the Hall. • Sheet C4.04: The loading dock has been modified to match the building drawings. Two concrete pads have been added to doors on the Laundry Building, required by inspection staff during building construction. • Sheet C5.00: Grading associated with the removal of the stairs northwest of the Restaurant has been modified. The courtyard space for the Restaurant has been updated. • Sheet C5.01: Grading associated with the oval lawn space has been modified. • Sheet C5.02: The alignment and grading of Club Drive has been clouded to reflect the previous reviewed layout dating back to the April 2019 Minor S.P.A. submission. Grading associated with the removal of the stairs northwest of the Restaurant has been modified • Sheet C5.03: The alignment and grading of Club Drive has been clouded to reflect the previous reviewed layout dating back to the April 2019 Minor S.P.A. submission. Grading associated with the oval lawn space has been modified. • Sheet C5.04: The loading dock area has been modified to match the building drawings. Grading around the two concrete pads on the west and south side of the laundry building has been updated. • Sheet C5.05: Grading associated with the removal of the stairs northwest of the Restaurant has been modified • Sheet C5.06: Grading associated with the oval lawn space has been modified. • Sheet C5.07: The alignment and grading of Club Drive has been clouded to reflect the previous reviewed layout dating back to the April 2019 Minor S.P.A. submission. Grading associated with the removal of the stairs northwest of the Restaurant has been modified • Sheet C5.08: The alignment and grading of Club Drive has been clouded to reflect the previous reviewed layout dating back to the April 2019 Minor S.P.A. submission. Grading associated with the oval lawn space has been modified. • Sheet C5.09: The loading dock area has been modified to match the building drawings. Grading around the two concrete pads on the west and south side of the laundry building has been updated. • Sheet C7.01: A portion of the "SSWR 6 -1" profile has been updated to reflect modifications to structures 6, 5 and associated pipe. • Sheet 1-1.00: Drawing has been updated to reflect the change in alignment to Club Drive and Oval Lawn space. • Sheet 1-1.01: The materials schedule plan has been updated to match the changes to Club Drive and the Oval Lawn space. • Sheet 1-1.02: This sheet has been added as additional material callouts were required for construction clarification. • Sheet 1-1.10: Club Drive alignment has been adjusted • Sheet 111.111: Club Drive alignment has been adjusted. The Oval Lawn space has been revised. • Sheet L1.12: Detail has been updated to reflect the proposed condition at the Oval Lawn. • Sheet L6.00: Planting has been adjusted to accommodate the change to Club Drive and Oval Lawn space. • Sheet L6.01: The planting schedule has been updated to reflect the adjustment to Club Drive and the Oval lawn space. • Sheet L6.10: Club Drive alignment has been adjusted. • Sheet L6.11: Club Drive alignment has been adjusted. The Oval Lawn space has been revised. • Sheet L6.12: Club Drive alignment has been adjusted. • Sheet L6.13: The Oval Lawn space has been modified and planting adjusted. • Sheet L6.80: Planting details have been updated. • Sheet L6.81: Planting details have been adjusted. • Sheet L6.82: The Landscape Requirements table has been updated to match the changes to the site plan. • Sheet LC_01 through LC_05: Lighting photometric plans have been updated to reflect the updates to Club Drive and the Oval Lawn Space. • Sheet LL_LT1.01 & LL_LT1.02: Site Lighting Plan sheets have been updated to reflect the updates to Club Drive and the Oval Lawn Space • Sheet S441: Sheet has been added to capture the tent anchors as noted on C4.01. If you have any questions or comments, please feel free to give me a call at 704-227-1564. Sincerely, Andrew Allison, P.E. Project Engineer