Loading...
HomeMy WebLinkAboutSUB201900174 Review Comments Road Plan and Comps. 2020-10-15 (2)0 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5532 Fax (434) 972-4126 Road and Drainage plan review Project title: Southwood Redevelopment — Village 1- Road Plans Project file number: SUB201900174 Plan preparer: Timmons [craig.kotarski@timmons.com] Owner or rep.: Southwood Charlottesville LLC [drosensweig@cvillehabitat.org] Date Received: 4 November 2019 (Rev. 1) 9 April 2020 (Rev. 2) 5 June 2020 (Rev. 3) 11 September 2020 Date of comments: 10 January 2020 (Rev. 1) 8 June 2020 (Rev. 2) 16 July 2020 (Rev. 3) 15 October 2020 Craig, We have reviewed the plans and have the following comments: Engineering 1. Provide an easement on the gravel emergency access. (Rev. 1) Comment addressed. 2. Provide a minimum of F between the back of walk and ROW. (Rev. 1) Comment addressed. 3. Remove trees from on top of pipes and beside structures. (Rev. 1) Comment not addressed. The landscape plan still shows several trees on or too close to structures and pipes. It is also difficult to see the proposed structures with the light linework. (Rev. 2) Comment not addressed. (Rev. 3) Comment pending revised utility layout. 4. Include on the plans the Public Road Acceptance Procedure and the As -built Road Plan Policy. (Rev. 1) Comment addressed. Revision 3 Comments 5. The plans will need to be revised per the VSMP plan changes and the utility layout changes. Planning — Tori Kanellopoulos Comments are attached to this email. VDOT — Max Greene Comments sent directly to applicant on 10/2/20 GIS — Brian Becker Critical Issues: Neither New Horizon Drive or the alternate road name New Leaf Drive are acceptable road names. Cardinal Lane is also not acceptable. Engineering Review Comments Page 2 of 3 Comments: The Albemarle County Road Naming and Property Numbering Ordinance and Manual limit the number of road names that can begin with the same word to five, and "New" exceeds the limit. The guidelines also restrict road names that duplicate an existing road name, unless it is a dead-end street with the same name as the road from which it originates. Albemarle County has a Cardinal Drive, so Cardinal Lane is not an acceptable road name here. Margarita Lane, Wardell Crest and Dave Matthews Crest are all acceptable road names and have been placed on the Albemarle County Reserved Road Name List. Please update the site plan with these names or provide this office with additional road names for review. Please update the site plan with these names or provide this office with additional road names for review. Resources: A PDF version of the Ordinance and Manual can be found here: https://www.albemarle.org/upload/images/Forins_Center/Departments/Geographic_Data_Services/Forms /Road_Naming_and_Property_Numbering_Ordinance_and_Manual.pdf Albemarle County Master Road Names Directory: https://Ifweb.albemarle.org/ForTns/RoadNaineindex. The project is still under review by ACSA. Fire Rescue and ARB have no objection. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Engineering Review Comments Page 3 of 3 Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; httD://www.albemarle.ori!/deDtforms.asD?deDartment=cdeni!wDo If you have any questions or concerns, please contact me either by email (mwentland@albemarle.org) or by phone at 434-296-5832 ext. 3458. Sincerely, Matt Wentland, P.E. Civil Engineer II File: SUB201900174 Southwood Village 1 Road Plans review comments rev3 10-15-2o.doc