HomeMy WebLinkAboutZMA200200004 Staff Report 2006-06-27o� ark,
`A -,n
� Ry:
* � LjRG1Is�4'
ALBEMARLE COUNTY PLANNING
STAFF REPORT SUMMARY
Project Name: ZMA 02-04 Cascadia
Staff: Sean Dougherty
Planning Commission Public Hearing:
Board of Supervisors Hearing:
June 27, 2006
August 2, 2006
Owners: Robert Hauser Homes, Inc. and
Applicant: The Kessler Group, represented
Church Hill Development, LLC
by Michael Barnes
Acreage: 60.77 Acres
Rezone from: RA Rural Areas and R6
Residential to NMD Neighborhood Model
District
TMP: Tax Map Parcel 62-25; Tax Map 78
Proffers: X
Parcels 59 and 59A; and Tax Map Parcel
78E -H1
By -right use: 37 units if all development
Magisterial District: Rivanna
rights are in tact. 52 with a density bonus.
Requested # of Dwelling Units: up to 330
DA X RA
Proposal: A residential development
Comp. Plan Designation: Neighborhood
with a mixture of housing types at an
Residential with a recommended density of
average of 5.43 dwelling units per acre
3-6 dwelling units per acre with supporting
with up to 20,000 square feet of non-
non-residential services.
residential, neighborhood -service uses.
Character of Property: Hilly and sloping
Use of Surrounding Properties: Fontana
with a mix of open pastures with established
subdivision and Avemore, Darden Towe
and mature woodlands.
Park, Broadus Church, Montessori School
Factors Favorable:
Factors Unfavorable:
- The applicant has provided a generally workable
- The proffers for the Capital Improvements
plan in response to many of the site's constraints
appears insufficient to offset impacts as
which respond well to the Neighborhood Model.
compared to accepted proffers for similar
- The applicant is committing to providing 15% for-
projects.
sale and for -rent affordable housing in a manner
- The applicant's standard for sideyard setbacks
that is acceptable to the Chief of Housing.
on certain lots is narrow and the standard for the
- The applicant has coordinated a suitable
length of retaining walls is excessive.
alignment for an emergency / pedestrian access
to Fontana, including funds to construct a future
vehicular connection, should it be desired.
- The applicant has supplemented the Code of
Development with alternative standards for the
sections of the Zoning and Subdivision ordinance
for which they are requesting waivers.
RECOMMENDATION: Staff recommends approval if the cash proffer is increased or a
specific commitment to completing improvements in Darden Towe Park is made, if the
standard for sideyard setbacks and retaining walls found in the Code of Development is
modified, and with final minor revisions to the proffers and Code of Development.
STAFF PERSON:
PLANNING COMMISSION:
BOARD OF SUPERVISORS:
ZMA 2004-00002 Cascadia
Sean Dougherty
June 27, 2006
August 2, 2006
Petition:
PROJECT: Cascadia, ZMA 2002-00004
PROPOSAL: Rezone 55.71 acres from RA (Rural Areas: agricultural, forestal, and
fishery uses; residential density (0.5 unit/acre) to NMD (Neighborhood Model District -
residential (3 - 34 units/acre) mixed with commercial, service and industrial uses); and
rezone 5.06 acres from R-6 (Residential: 6 units/acre) to NMD to allow for up to 330
dwelling units and 20,000 square feet of non residential in a planned district.
PROFFERS: Yes
EXISTING COMPREHENSIVE PLAN LAND USE/DENSITY: Neighborhood Density
Residential - residential (3-6 units/acre) and supporting uses such as religious
institutions and schools and other small-scale non-residential uses.
ENTRANCE CORRIDOR: Yes
LOCATION: Tax Map 62, Parcel 25, Tax Map 78, Parcels 59 and 59A, and Tax Map
78E, Parcel H1 located along Route 20 North, across from Darden Towe Park, north of
Fontana Drive and south of Broadus Memorial Baptist Church.
MAGISTERIAL DISTRICT: Rivanna
Character of the Area:
The property is located on Route 20 north across from Darden Towe Park, at the
foothills of Pantops Mountain. Uses adjacent to the site include Frost Montessori, the
Fontana Subdivision, Avemore, the Elks Lodge, Wilton Farms, and Pantops Shopping
Center further to the South. The parcels are close to the edge of the Development
Areas, which is located just beyond an unnamed intermittent stream that runs to the
north of the Broadus Memorial Baptist Church property.
By -right Use of the Property
Development potential of the property would allow for 37 units if all development rights
are in tact. With a density bonus, 52 lots would be the maximum number of lots
available.
Specifics of the Proposal:
The applicant has proposed a compact neighborhood with a small non-residential
center (maximum 20,000 sq. ft.) close to Route 20, and a centrally located
neighborhood center, including a clubhouse with a pool. During the March 28, 2006
work session the Commission affirmed that a vehicular connection to Fontana would not
be appropriate at this time. This connection, to the rear of the site is now proposed as
an emergency / pedestrian connection. Toward the front of the property, a pedestrian
pathway (with intermittent stairs and "switchbacks") climbs the grade through a linear
park, intersects the Neighborhood Center (pool and clubhouse) half of the way up the
grade, then terminates in Summit Park. The road design and development plan work
well with the topography, using the structures to mitigate the grade, and a serpentine
vehicular alignment allows for a gentler grade. The project is primarily residential and
includes a number of potential housing types, including single family detached on a
variety of lot sizes, townhouses (primarily alley -loaded), and multifamily buildings,
including a potential senior living facility (See Attachment A, the Location Map;
Attachment B, the Code of Development; Attachment C for Proffers). The project is
proposed to have two vehicular access points: Cascadia Drive and Route 20, Delphi
Drive to Fontana Drive (where traffic signal and pedestrian crosswalk and signal exist).
The application was submitted with proffers. They are summarized as follows:
Proffer 1: For affordable housing, the applicant commits to provide 15%
affordability on a range of unit types, with at least 33% for -sale. The for -sale units
will be in the form of townhouses and condominiums.
Proffer 2: Dedicate 20 -wide strip of land along Route 20 to accommodate future
widening.
Proffer 3: Build and dedicate an emergency / pedestrian connection to the edge
of the Fontana subdivision. Contribute funds to the County for the purposes of
upgrading the connection to provide vehicular access in the future.
Proffer 4: Provides the ability for the Church to make a vehicular connection to
the non-residential portion of Cascadia and provide to the church a residential lot
for purchase that would allow access to church property that is currently
inaccessible.
Proffer 5: Contribution cash to the CIP for schools and other public facilities per
each market -rate dwelling unit as follows: $2,000 for single family, $1000 for
townhouse, and $500 for multifamily. Based on the applicant's proposal, this
would amount to roughly $300,000.
Applicant's Justification for the Request:
The applicant has stated that the development is a compact development on
challenging terrain that creates usable outdoor areas by building into the topography.
The plan provides a series of level pocket parks and coherent, walkable transitions in-
between. Further applicant justification is that the Comprehensive Plan calls for this
area to support Neighborhood Density Residential uses.
Planning and Zoning History:
Tax Map 62, Parcel 25, Tax Map 78, Parcel 59, Tax map 78, Parcel 59A, and Tax Map
78 E, Parcel H1 were all zoned "Agricultural" until 1980. In 1980, these parcels were
given an RA (Rural Areas) zoning classification. Each parcel remains RA, with the
exception of Parcel 78E, Parcel H1 (5.06 acres), which was rezoned to R-6 through
ZMA 94-06, allowing for the development of Fontana.
On February 2, 2006, the applicant held an informational meeting regarding Cascadia
for residents who live near the project, including Fontana, the closest subdivision and
concentration of housing. A Planning Commission public hearing was held on February
28, 2006. A Planning Commission work session was held on March 28, 2006. (See
Attachment D for the February public hearing minutes and Attachment E for the March
work session minutes.)
During the March 28, 2006 work session, the Commission discussed seven primary
topics and offered the applicant feedback and direction for revisions in advance of this
public hearing. Staff's discussion / findings on these topics are underlined in italics as
applicable.
1. The Commission concluded that the proposed development plan adequately
reflects the principles of the Neighborhood Model and conforms to the
Comprehensive Plan designation for land use.
2. The Commission concluded that the density and distribution thereof is
appropriate. The property's relationship with the edge of the Rural Areas was
discussed as a potential consideration for decreased density. However, the
Commission spoke to the need to respect the Comprehensive Plan density range
and the associated goals regarding the Neighborhood Model and density in the
Development Areas.
3. The Commission concluded that the connection to Fontana should be graded
and stubbed out to the on the adjacent property with an emergency and
pedestrian connection. The applicant has responded to this request by proposing
Proffer #3, which commits to engineer the connection, -grade it, provide a sub —
grade to accommodate a future road, and contribute funds to the County to build
the road, should future road improvements in Neighborhood Three make the
connection more viable.
4. The Commission concluded that it was not critical that the church participate in
the rezoning. In Proffer #4, the applicant proposes strategies that would allow the
church to make a vehicular connection to Cascadia and -gain access to a portion
of the church parcel that the church currently cannot access.
5. The Commission concurred that they needed more information regarding proffers
for similar projects to determine whether the applicant's cash proffers are
sufficient. Staff has a aeneral uadate on this which is covered in more detail later
in this report.
6. The Commission suggested that the applicant increase the number of affordable
units to achieve the affordable housing goal. The applicant has responded by
committina to 15% of the total residential lots developed. This 15 % would be a
mix of for -sale and for -rent units.
7. The Commission concurred that the applicant has treated the edge of the Rural
Areas appropriately with respect to the Comprehensive Plan.
Comprehensive Plan:
The Land Use Plan recommends the area for neighborhood density residential at a
density of 3-6 dwelling units per acre. The Cascadia Plan proposes a maximum average
density of 5.4 dwelling units per acre, with the highest density (12.4 dwelling units per
acre) in Block 3 and the lowest density (3.3 dwelling units per acre) in Block 6.
The Land Use Plan also designates that Neighborhood Density Areas will
accommodate small areas of non-residential land uses on the scale of Neighborhood
Service. The overall limit of the non-residential uses (20,000 sq. ft.) and the maximum
size of any one retail or restaurant use limited to 4,000 square feet will keep this portion
of the project at a neighborhood scale.
Conformity with the Neighborhood Model:
Pedestrian
Sidewalks are provided on both sides of all streets, except at
Orientation
two locations, which will require a waiver. Details regarding the
applicant's waiver request are described in the waivers
evaluation (Attachment H). All dwellings and proposed uses are
within a two -minute walk of Cascadia Park, the linear green
space that transects the road system as it meanders up the
grade. The Village Green will create an anchor of activity and
the sort of "place" the Neighborhood Model identifies. Its location
among the densest form of development creates a very
walkable neighborhood, particularly given the uses proposed in
the blocks surrounding the Village Green. From the Village
Green, pedestrian routes are twofold. The applicant proposes a
multi -use trail in the naturalized in the Entry Park and sidewalks
along Delphi Drive leading to Fontana Drive, Darden Towe Park,
existing sidewalks along Route 20, and points east. Additionally,
the connection proposed to Fontana would allow for residents to
walk and bike to existing and proposed neighborhoods.
Neighborhood
Streets will have sidewalks and street trees. The internal street
Friendly Streets and
network, by its winding nature, will decrease speeds. This also
Paths
decreases the overall slope of the roadways, allowing them to
be more walkable. The significant use of on -street parking
proposed will further work to refine the quality of the streets in
the Cascadia Neighborhood. The applicant is requesting a
waiver to use private streets.
Interconnected
The Commission previously affirmed that a full vehicular
Streets and
connection to Fontana would not be appropriate at this time. The
Transportation
applicant has proffered to build an emergency / vehicle
Networks
connection and contribute funds to the County to build the road
in the future. A trail has been provided along the Entry Park to
Broadus Memorial Church, which will support foot traffic. The
applicant has proffered a reservation along that trail to provide
vehicular access between the church and the non-residential
portion of Cascadia.
Parks and Open
The plan provides ample urban -scaled outdoor spaces. Conservation
Space
areas along the in the unnamed intermittent stream are delineated.
Within the development, the applicant is proposing a clubhouse with a
2,000 sq. ft. pool, a small formal Village Green, a naturalized, but
usable Entry Park, three pocket parks and a series formalized spaces
and multi -use trails. Two of the pocket parks will contain a tot lot. The
property's proximity to Darden Towe Park affords this project great
access to a variety of playing fields, trails, and open space. Pedestrian
access is already signaled across Route 20 from Fontana Drive to the
entrance of Darden Towe.
Neighborhood
The plan proposes two neighborhood centers in the form of the pool
Centers
and clubhouse and Village Green with adjacent Non -Residential uses.
The Code contains commitments for features and fixtures in the
Village Green area including thematic lighting, benches, trash cans,
bike racks and furnishings. In addition to these proposed
neighborhood centers, Neighborhood Three also contains Avemore,
Broadus Memorial Baptist Church, the Elk's Lodge, Frost Montessori,
and the Lewis and Clark Exploratory Center.
Buildings and
The applicant proposes a front build -to line (as measured from the
Spaces of
curb) of a minimum of 15 feet and a maximum of 30 feet. This range
Human Scale
results from strong preferences Dominion Power has for the placing
underground electrical service. Staff is believes approving this project
with the proposed range will allow the developer to proceed with the
project with enough flexibility once site planning begins and electrical,
gas, cable, and telephone service designs are approved.
The property's steep incline is a challenge to walkability and human
scale. The rendering from Route 20 illustrated in the Code of
Development shows a system of stairs extending up the grade. The
applicant has committed to constructing stairs of concrete or similar
materials where necessary along the pedestrian connection that
climbs the grade.
Relegated
Relegated parking is considered that which is located behind and to
Parking
the side of buildings by the Neighborhood Model. With that definition,
the plan relegates parking and the Code of Development commits to
this design approach.
Mixture of Uses
The proposal illustrates a mixture of uses. A minimum of 7,000 sq. ft.
and a maximum of 20,000 sq. ft. of non residential development
seems appropriate at this location. The variety of housing types
proposed in Cascadia represents a wide mix.
Mixture of
The proposal provides a wide variety of housing types including single -
Housing Types
family detached, townhouses, multifamily buildings, accessory
and Affordability
apartments, two-family dwellings, and residential space above
commercial. The applicant is proffering to provide 15% of the
maximum allowable dwelling units as affordable housing in for -rent
and for -sale products.
Redevelopment
The property has served as a residence and farm.
Planning that
The Cascadia plan illustrates that changes in terrain will be mitigated
Respects Terrain
with terracing in the form of building splits and walkouts.
ZMA 2002-00005
Cascadiia
Clear Public input from the residents of Key West, those who use Stony
Boundaries with Point Road, and Pantops Masterplan participants indicates that the
the Rural Areas property's frontage on Stony Point Road should work to retain the rural
character of Stony Point Road. Additionally, public input indicates that
the non-residential portion of Cascadia should be hidden from the
Entrance Corridor to the greatest extent possible. The applicant has
committed to a concept plan for the area that the ARB supports and
that works toward the goals stated above. Page 13 of the Code of
Development contains a commitment to "preserve as many existing
trees as possible". Any proposal to disturb these trees will be subject
to the Planning Director's approval as part of an early grading plan or
by the ARB as part of a site plan. It is unlikely the ARB would approve
the removal of all of the trees.
Relevant Neighborhood Three Recommendations from the Comprehensive Plan are as
follows:
• Provide Community level park service to the eastern portion of the Neighborhood by installing
Community park facilities at Darden Towe Park.
The applicant is not proffering anything specific, but rather providing cash proffers for the County's
Capital Improvement Program. This money could be allocated toward these improvements.
• New development and redevelopment along Route 250 East and Route 20 should be desiqned in a
manner that is sensitive to its location within Monticello's viewshed and along designated Entrance
Corridor Roadways. Utilize the voluntary -guidelines outlined in the Neighborhood Three Study for
development within the Monticello viewshed.
The proposal responds to this recommendation and has been vetted by the Architectural Review
Board. The project is not visible from Monticello. As mentioned, a firmer commitment to retaining
trees in the Entry Park would provide greater assurances regarding Entrance Corridor treatment.
• Consider the recommendations of the Neighborhood Three Study for the location of walkways,
streetlights and bicycle facilities.
The proposal includes neighborhood -friendly streets and multiple connections. Standards for the
brightness of streetlights and other forms of lighting are contained in the Code. This will be
enforceable and will allow for efficient lighting of the Cascadia neighborhood. In keeping with the
recommendations the applicant's proposal includes a multi -use trail along Route 20 and sidewalks
parallel to Route 20 on Delphi Drive.
Virginia Byway System
Route 20 is a State designated Virginia Byway. A Virginia Byway is an existing road with relatively
significant aesthetic and cultural values, leading to or lying within an area of historic, natural, or
recreational significance. A Virginia Byway designation does not place any restrictions upon
properties along the Byway. The primary purpose is to give formal recognition to deserving roads and
to further the creation of a system of roads to promote tourism and public appreciation of natural and
historic resources. The General Development Plan illustrates an appropriate response to the Byway.
ZMA 2002-00005
Cascadiia
Staff Comment:
Relationship between the application and the purpose and intent of the requested zoning district
The general development plan conforms to the intent of the Neighborhood Model District.
Anticipated impact on public facilities and services
Roads
The initial traffic study (dated May 8, 2003) performed for this property was updated given the age of
the original study. (See attachment F for an Addendum to the initial traffic study).
Improvements to Route 20 and Fontana and Elks Drive (widening, sidewalks, and traffic signal) were
initially prescribed by VDOT to allow this development. In the past year and a half, these
improvements were completed. VDOT's remaining concern is that the applicant is not proffering
enough toward the project's impacts on the Route 20 and Route 250 intersection and measures
required to improve this intersection. VDOT specifically requested that the applicant's cash proffer be
increased to account for an increase in traffic impact at the Route 20/ 250 intersection. The applicant
has not amended the cash proffer amount, but has combined funds for Cl P and schools (roughly
$300,000) to mitigate impacts to schools, roads and infrastructure, emergency services, and parks.
VDOT does not have a design or budget for improving the 20/250 intersection. The Cascadia
development adds approximately 2,700 trips per day to local roads, with a majority of those trips
passing through the Route 20 and 250 intersection.
Water and Sewer
Water and sewer service is adequate to serve the development. A majority of this property is located
outside of the Albemarle County Service Authority's Jurisdictional Area. Action to extend the
Jurisdictional Area boundary is expected concurrent with Board action on this rezoning. The existing
water pressure at and elevation of 500 feet in the adjacent Fontana subdivision is 3,300 GPM @ 20
PSI. The proposal has been reviewed by Fire and Rescue. This high pressure will safely
accommodate this form of development.
Stormwater management
The applicant has proposed to manage most of the site's stormwater runoff by improving an existing
stormwater pond associated with the Fontana subdivision and new detention ponds that will lie
between Route 20 and the non-residential portion of the development. A conceptual approach for
managing stormwater has been approved by staff. This is a conceptual plan that will not be
engineered until the site planning process.
School, and Fiscal Impacts
Attachment G contains the Fiscal Impact Analysis for the project. The summary of the fiscal analysis
reveals a negative net fiscal impact. This situation is not unusual in that all projects with primarily a
residential component result in a net negative fiscal impact.
Anticipated impact on natural, cultural, and historic resources
Significant areas of Important Woodlands (approximately 10 acres), as identified in the Open Space
Plan will be lost in order to achieve the proposed density. Some of these woodlands, particularly
ZMA 2002-00005
Cascadiia
inside the 50' preservation area along the unnamed tributary that runs behind the property, will be
preserved. During the March 28, 2006 work session, the Commission affirmed the density and
development plan are appropriate for this portion of the Development Areas.
Anticipated impact on nearby and surrounding properties
The Commission affirmed that the connection to Verona Drive in Fontana would establish a
undesirable condition with respect to the width and design of the existing roads in Fontana. Staff
believes the establishment of the emergency and pedestrian connection will allow for these
neighborhoods to be sufficiently linked without adding traffic that would originate in or be distributed
through Cascadia. A 70 -foot setback and a 30 -foot screening buffer are proposed from the property
line of homes in Fontana. Residential zoning district regulations do not require screening between
residential uses. Staff believes the applicant has sufficiently addressed the neighboring residential
properties, given the fact that the uses and form of development in this portion of Cascadia will be
similar to that in Fontana.
Public need and iustification for the cha
The Comprehensive Plan recommends for development within the designated Development Areas
reflects the justification for the zoning change.
Proffers
The proffers are acceptable to the County Attorney with minor revisions. The following discusses the
substance of the proffers.
Proffer 1: Affordable Housing:
The applicants commits to 15% affordability on the maximum number of units constructed within
Cascadia. At least 33% of these would be offered for sale. Up to 33% may be offered as for -rent
accessory units above garages or part of the primary structure, and the remainder would be for -rent
townhouses and condominiums. The applicant proposes a mechanism for ensuring affordable rental
rates on for -rent units that is acceptable to the Chief of Housing.
Proffer 2: Route 20 Dedication:
This proffer allows for a widening of Route 20 North, should that be pursued in the future, dedicates
the land with the first subdivision or site plan, and includes a provision that the applicant will maintain
this area until the road is widened or the County requests in writing for this maintenance to cease. At
present, there are no widening plans for Route 20 to establish whether more right-of-way is needed.
Given this, staff is satisfied with the proposed right-of-way.
Proffer 3: Interconnection:
This proffer establishes the framework and funds for connecting to Verona Drive in Fontana and the
larger system of roads anticipated to connect to Rolkin Road and Route 250 East. However, for now,
the connection will be built as an emergency and pedestrian connection. The proffer establishes a
sub -grade for a future vehicular connection and the funds to construct it. If the funds are not used for
the connection within 10 years of approval of the rezoning, the funds may be used for other
transportation improvements identified in the CIP for Neighborhood Three. The amount of these funds
will not be established until the road is engineered during the site plan stage.
Proffer 4: Church Connections:
This proffer provides a reservation for a private access easement to allow access between Broadus
Church and the non-residential portion of Cascadia. The church would be required to build the
ZMA 2002-0001
Cascadiia
connection. The proffer also offers the first right of refusal on a parcel within Cascadia that the
church could purchase in order to access part of the church property that is currently inaccessible.
The subdivision ordinance could require a connection to this land during the subdivision process in
Block 6. However, given the challenging terrain, proximity to the edge of the Rural Areas, large area
of critical slopes, and that the connection would provide access to less than 10 lots, a connection to
this land may not be required. The applicant has proffered to offer the church the first right of refusal
on the lot that could provide access to the church's land. During the March 28, 2006 work session,
the Commission affirmed that the participation of the church in the rezoning was not critical to the
rezoning. Staff believes that Proffer 2, regarding connections to Fontana and Proffer 4, regarding
connections to the church, provide a reasonable mechanism providing potential future connections.
Proffer 5: Combined CIP and Schools Cash Contribution: This proffer makes a contribution to the
CIP for schools and other public facilities for each market -rate dwelling unit as follows: $2,000 for
single family, $1000 for townhouse, and $500 for multifamily. Based on the applicant's proposal, this
would amount to roughly $300,000 and will be dependent upon the final mix of housing types in
Cascadia.
Capital Improvement Projects
Capital Improvement Projects for which this project increases a need include a fire station in
Neighborhood Three, upgrading the Route 250 and Route 20 intersection (vehicular and pedestrian),
providing pedestrian facilities from the entrance to Darden Towe Park to the interior, and adding
community park facilities (tot lots, basketball court, picnic shelter) to Darden Towe. The estimate for
these improvements totals $440,000.
Cascadia's estimated equitable share of the planned fire station has been estimated at $101,000.
That leaves roughly $200,000 for improvement to the Route 250 and 20, schools, and all other
impacts associated with the development. The applicant has proffered to provide the County with
funds to build the connection to Verona Drive in Fontana or the equivalent amount (to be determined
after the connection is engineered) to be contributed to CIP projects in Neighborhood Three. This
contribution, if not used for a vehicular connection to Fontana, may be used to improve the Route 20
and 250 intersection or any other capital project identified for Neighborhood Three.
Schools
Projects and expenses anticipated for the schools serving Cascadia include construction of a new
auditorium at Monticello High School ($5 million), an energy conservation / lighting upgrade for
Stoney Point Elementary ($147,000), HVAC replacement at Stoney Point Elementary ($265,000), and
general computer upgrades ($1 million). These improvements, though not the sole responsibility of
the applicant, total $6,412,000.
ZMA 2002-00005 10
Cascadiia
Staff believes that, based on its actions on recent residential rezonings, the Board has set an
expectation for offsets to impacts caused by residential developments. Different types and levels of
rezonings will have different impacts. The location of the proposed development also plays into the
amount and type of offsets needed. As such, staff must rely on previous actions of the Board as
guidance to applicants on expectations for off -sets to impacts of new development. The following
table is offered for reference.
Rezoning
# of
Cash Proffer
Units
ZMA 03-12 Stillfried Lane
26
$3000/unit for capital
Townhouses
improvements or affordable
housing programs; no physical
improvements or land for future
public facilities.
ZMA 05-14 Poplar Glen (currently
28
$3200/unit for capital
scheduled for a BOS hearing on July
improvements and $66,000 for
5, 2006)
affordable housing program in lieu
of providing four affordable units;
no physical improvements or land
for future public facilities.
ZMA 04-24 Old Trail Village
2275
$50,000 Cash proffer for park
projects, Cash proffer for schools:
$1000/sfd unit; $500/th unit;
$250/apt.; Cash proffer for public
faculties: $1000/sfd unit; $500/th
unit; $250/mf unit; and physical
improvements including completion
of Western Avenue and dedication
of land for Western Park.
ZMA 05-05 Liberty Hall
43
$3,200 per unit cash proffer for
public facilities; no physical
improvements or land for future
public facilities.
ZMA 02-04 Cascadia (PROPOSED)
330
Cash proffer for schools and other
public facilities: $2,000 /sfd,
$1000/th, $500/mf unit.
Note: sfd = single familty detached, th = townhouse, mfd = multifamily
Proffer Summary
In order to better mitigate the intensity this project adds to this portion of Neighborhood Three, staff
feels the cash proffer should be increased to reflect those accepted with similar recent projects or that
the applicant' commit at least one improvement identified in the CIP for Darden Towe Park
(pedestrian facilities, tot lot, basketball court, or picnic shelter).
Code of Development
ZMA 2002-00005 11
Cascadiia
The Code of Development has been revised to include standards that will substitute for sections of
the Zoning and Subdivision ordinance for which the applicant is requesting a waiver. Attachment H
discusses these waiver requests and Attachment I, a waiver outline, summarizes the request, staff's
recommendation, and any associated conditions. Where necessary, staff has recommended
conditions or alternative standards to be added to the Code so that the waiver can be recommended
for approval.
Prior to resubmitting materials for a public hearing, the Code of Development was reviewed. Staff
offered the applicant recommendations that would allow the Code of Development to be prepared for
PC action. Many of these finer -detail changes were made. However, two issues remain.
Staff recommended the applicant amend the Code of Development, Table D on Page 16. A sideyard
setback of 3' (6' between like structures) is listed for single-family detached lots up to 70' wide. This
would be measured from the property line to closest portion of the structure. Staff recommends that
using this setback on the wider lots, primarily in upper portion of Cascadia, would create an
undesirable condition with respect to the sideyard, front setback, and mass of single family detached
houses permitted to be 38' tall. Staff's recommendation is that the 3' setback only be permitted
on lots up to 60' wide and that a 5'setback be used on lots wider than 60'. Though this may
seem like a small detail, it will have an effect on the massing and character of Cascadia.
In order to resolve issues raised during ARB preliminary review, the applicant was asked to commit to
a maximum height and length for walls not visible from the Entrance Corridor. To address this, the
applicant has committed to not building walls higher than six feet or longer than 300 feet. The design
planner has recommended that continuous walls in lengths greater than 100 feet may be
inappropriate. Staff's concern is that this standard for the length of walls internal to the site is
excessive. This standard would allow for a contiguous 1,800 square feet of wall face without
measures to break up the massing and better balance the feature with the topography. The applicant
has also requested that walls in excess of 6 feet tall or 300 feet long may be approved at the
discretion of the Director of Planning. Staff recommends that walls should be limited to 100' long
and 6' tall and that walls exceeding this length could be permitted at the discretion of the
Planning Director.
WAIVER AND MODIFICATION REQUESTS
The applicant is requesting 23 waivers from the Ordinance (See Attachment H for the waiver analysis
and Attachment I for an outline of staff's recommendation and associated conditions). The requested
waivers are categorized as follows:
Staff supports waiver.
Staff cannot support waiver now, but may (with more information) at the site plan stage.
Staff cannot support waiver at all.
Since the last submission, the applicant has amended the Code of Development to provide
alternative standards for the sections of the Ordinance the waiver is requested. A majority of the
issues with the waivers are resolved. Staff is recommending approval for all but three of the
waivers. The waivers not recommended for approval are as follows:
- Minimum Number of Required Parking Spaces for Scheduled Uses (may recommend at site plan)
- Minimum Design Requirements and Improvements for Parking Areas (may recommend at site plan)
- Waiver from providing sidewalks on both sides of Delphi Lane (staff does not support)
ZMA 2002-00005 12
Cascadiia
SUMMARY
Factors Favorable to this request
The applicant has provided a generally workable plan in response to many of the site's
constraints which respond well to the Neighborhood Model principles.
The applicant is committing to providing 15% for -sale and for -rent affordable housing in a
manner that is acceptable to the Chief of Housing.
The applicant has coordinated a suitable alignment for an emergency / pedestrian access to
Fontana, including funds to construct a vehicular connection in the future, should it be desired.
The applicant has supplemented the Code of Development with alternative standards for the
sections of the Zoning and Subdivision ordinance for which they are requesting waivers.
Factors Unfavorable to this request
The proffers for capital improvement projects appear insufficient to offset impacts as compared
to accepted proffers for other similar projects.
The applicant's standard for sideyard setbacks on certain lots is narrow and the standard for
the length of retaining walls is excessive.
RECOMMENDATION:
Staff recommends approval of the rezoning if the following is provided:
The cash proffer is increased to reflect those accepted with similar recent projects or if a
commitment to provide a specific improvement identified in the CIP for Darden Towe Park is
made (pedestrian facilities, tot lot, basketball court, or picnic shelter)
The Code of Development is revised to conform to staff's recommendation with respect to
sideyard setbacks and standards for retaining walls.
Final minor revisions to the Code of Development and Proffers
Waiver Recommendation:
Staff recommends approval of 20 of the 23 waivers requested. Staff may support two requests at the
site plan stage when more information is known. Staff does not support one waiver request.
ATTACHMENTS
A. Location Map
B. Code of Development
C. Proffers
D. Minutes from February 28, 2006 PC public hearing
E. Minutes from March 28, 2006 PC work session
F. Traffic Study Addendum
G. Fiscal Impact Report
H. Full Waiver Analysis and Recommendations
I. Waiver Check Sheet
ZMA 2002-00005 13
Cascadiia