HomeMy WebLinkAboutWPO202000037 Bond Estimates 2020-10-15 (3)Project Name: VSMP Plan for Galaxie Farm Subdivision WP0202000037 WPO file number: WP0202000037 TMP(s): 09100-00-00-01500,09100-00-00-00900 Date Estimate Completed: 10-14-2020, K.Rucker Erosion and Sediment Control Bond Estimate Item Item Number 1 stablization (PS, TS) 2 silt fence (SF) 3 safety fence (SAF) 4 diversion (DID, FD, RWD) 5 temporary slope drain (TSD) pipe length -ft 6 Sediment Basin #1 7 earthwork for trap/basin 8 height of dam at toe ft 9 height of fill at faceoft ft 10 length of damft 11 top width 12 (area above transition; 56 sf 13 (total width of dam) 12 ft 14 (height below transitio 2 it 15 (area below transition; 8sf 16 (total fill volume) 237.' 17 length of spillway It 18 width of spillway M It 19 structures for basin 20 riser height 4.5 It 21 riser diameter 48 in 22 barrel length 61 It 23 bane l diameter 24 in 24 25 26 Sediment Trap #1 27 earthwork for trap/basin 28 height of dam at toe 3 It 29 height of fill at face 3 It 30 length of dam 80 It 31 top v L 2 It 32 (area above transition 24 si 33 (total width of dam) 6 ft 34 (height below transitio 0 ft No. Unit Unit Cost Cost (installed) 12.0 acres $5,000.00 $60,000.00 4675.0 ft $5.00 $23,375.00 0.0 It $5.00 $0.00 196o.4ft $13.00 $25,480.00 pipe diameter 0 in $0.00 $0.00 cut at high side ft ft cut at faceoft length of cutft width of cut (area below transitir 108 sf (total width of cut) 66 ft (depth below transit 4 it (area above transitio 116 sf (total cut volume) 630.5 cy (TOAL CY estimate 710 cy $13.00 $9,230.00 (spillway stone tons 0 tons $50.00 $0.00 (riser unit price) $150.00 $675.00 base plate or fdn -cy $200.00 $280 (barrel unit price) $50.00 $3,050.00 barrel collars $200.00 $0 baffle length Mft $50.00 $2,500 cut at high side ft ft cut at faceoft length of cutft width of cut (area below transitir 0 sf (total width of cut) 15 It (depth below transit 2 It 10/15/2020 Project Name: VSMP Plan for Galaxie Farm Subdivision WP0202000037 WPO file number: WP0202000037 TMP(s): 09100-00-00-01500,09100-00-00-00900 Date Estimate Completed: 10-14-2020, K.Rucker Erosion and Sediment Control Bond Estimate Item Item Number 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 6o 61 62 63 64 65 66 67 68 Sediment Trap #2 earthwork for trap/basin (area below transition; (total ill volume) length of spillway width of spillway height of dam al toe height of f ll at face length of dam top width (area above transition; (total width of dam) (height below transitio (area below transition; (total fill volume) length of spillway width of spillway Pump -around diversion for stream crossing silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) - basin 1 length outlet protection (OP) - ph.3 diversion length outlet protection (OP) Dlw!RPbond) length channel (SCC, matted) length check dam depth in channel construction entrance (GE) wash rack paved construction entrance rip -rap, placed depth width survey and layout (price per 0.1 mi.) acres 0 at (area above transiti, 11 sf 71.1 cy (total cut volume) 12.6 cy .ft (TOAL CY estimate 75 cy ft (spillway stone tons 4 tons III cut at high side ft ft cut at faceoft ft ft length of cutft ft width of cut 32 sf (area below transiti( 92 sf 1 o ft (total width of cut) 45 ft 1 ft (depth below transit 7 ft 4 at (area above transiti, 108.5 sf 53.3 cy (total fill volume) 289.6 cy .ft (TOAL CY estimate 307 cy ft (spillway stone tons 8.6 tons No. Unit Unit Cost Cost (installed) $13.00 $975.00 $50.00 $200.00 $13.00 $3,991.00 $50.00 $430.00 250 ft $7.00 $1,750.00 $100.00 $0.00 18 $200.00 $3,600.00 21 ft width 6 ft 1 $567.00 $567.00 220 ft width 4 ft 1 $3,960.00 $3,960.00 O ft width O ft 1 $0.00 $0.00 O ft width O ft 1 $0.00 O ft channel width O ft 0 $0.00 $0.00 2 $2,500.00 $5,000.00 1 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 1 ft length -ft -0 (tons) 0 tons $60.00 $0.00 12 traps and basins �7 $7,500.00 10/15/2020 Project Name: VSMP Plan for Galaxie Farm Subdivision WP0202000037 WPO file number: WP0202000037 TMP(s): 09100-00-00-01500,09100-00-00-00900 Date Estimate Completed: 10-14-2020, K.Rucker Erosion and Sediment Control Bond Estimate Item Item Number 69 mobilization 70 Temporary Access road - CRS access road 71 Temporary Culvert 72 73 74 WP0202000037 Galaxie Farm ESC Bond_est_KRucker-101520.xlsx 75 76 No. Unit Unit Cost (installed) cost sum contingency Total Cost $2,500.00 $500.00 $0.00 $161,063.00 $16,106.30 $177,170 10/15/2020