Loading...
HomeMy WebLinkAboutSUB202000157 Correspondence 2020-10-14 (2)TIMMONS GROUP September 30, 2020 Tori Kanellopoulos Albemarle County Community Dev. 401 McIntire Rd. Charlottesville, VA 22902 608 Preston Avenue P 434.295.5624 Suite 200 F 434.295.1800 Charlottesville, VA 22903 www.timmons.com RE: Lewis & Clark Drive Ext. —Easement Plat —Plan Review— SUB202000157 -Comment Response Letter Dear Ms. Kanellopoulos: We have reviewed all of your comments from September 9, 2020 and made the necessary revisions. Please find our responses to the comments below in bold lettering. Planning (Tori Kanellopoulos): 1. 14-302(A)(1) Name. Revise name of plat to include 'Lewis and Clark Drive' in the name of the plat. Revised 2. 14-302(A)(4)(5) Easements. The landscaping easement for street trees is not shown on this plat. A portion is shown on associated plat SUB2020000143, however the full easement needs to be shown. Shown and still shown 3. 14-302(A)(5) Public easements/ROW. On Sheet 2 and as a note on Sheet 1, label the new public ROW as 'dedicated to public use'. Revised 4. 14-302(A)(5) Public easements. Note 8 on Sheet 1 indicates there are public drainage easements, however none appear to be shown on the plat. Removed reference 5. 14-302(A)(4)(5) Easements. Show all existing easements (including DB/PG) in this area of the parcel. It appears there is an existing 15' VEPCO easement. Shown 6. 14-302(B)(5) Zoning. Include that TMP 32-18B is in the Entrance Corridor Overlay District. Added ENGINEERING I DESIGN I TECHNOLOGY 7. 14-303(A) Statement of consent to division. The statement of consent to division references drainage easements, however none appear to be shown on the plat. Shown on Plat 8. 14-303(H)(1) Monuments and ties. Include at least two ties to monuments on the exterior boundary of the parcel. Added 9. 14-317 Maintenance documents. Using the attached checklist, indicate where (section #, paragraph #) in the private declaration the requirements of 14-317 are met for landscape maintenance (street trees outside ROW). Ensure all requirements of 14-317 are met. The checklist and private declaration will be sent to the County Attorney's Office for review. The filled -out checklist has been provided with this submission along with a copy of the CCR with highlighted sections corresponding to the checklist. Engineering (John Anderson): 1. See attached review comment letter dated 09-02-20. Reviewed and Addressed VDOT (Adam Moore): 1. Pending. Comments will be forwarded upon receipt. Reviewed and Addressed We have included PDF copies of the plans and calculations for your review. If you have any questions or comments, please feel free to give me a call at 434.295.5624. Sincerely, Paul Huber, LS