Loading...
HomeMy WebLinkAboutSDP202000027 Correspondence 2020-10-20BOHLERI Commonwealth of Virginia Department of Transportation 1401 East Broad Street Richmond. VA 23219 Attn: Adam J. Moore, P.E. Dear Mr. Moore: 28 Blackwell Park Lane, Suite 201 Warrenton, VA 20186 o. 540.349.4500 October 20, 2020 Via Electronic Upload Re: SDP-2020-00027 Major Site Plan - 3rd Review Response Proposed Starbucks 1500 Seminole Trail Charlottesville, VA 22901 Albemarle County BE #V194600 Bohler Engineering is pleased to submit on behalf of Federal Realty Investment Trust, the 41h Submission Major Site Plan for the Proposed Starbucks in Charlottesville, Virginia. The following is our comment response letter addressing comments received from your office dated September 18, 2020. Each comment is addressed and responded to as follows: Comment 1: Restriction of movements on Southeastern Berkmar Drive entrance to right in/right out does not appear adequately addressed. Proposed pavement striping and markings do not meet the minimum requirements. Please review "Restricting Left Turn Movements at Commercial Entrances" Appendix F, Page F-97 - VDOT Road Design Manual. Response 1: Per discussion held with reviewer on 9125/2020, the southeastern entrance cannot meet the standard requirements for a right -in, right -out entrance due to existing geometric constraints. As discussed, a "No Left Turn" sign has been added to the landscaped area prior to the entrance and reflective flexible delineators have been added to the striping at this entrance. Please see Sheet C-301. Comment 2: The saw cut area appears too large. The working area to install curb and gutter is 8"-18". The "Saw Cut' area should only be enough to allow for the installation of concrete forms for the new curb/gutter installation. TTC- 5.2 may be adequate for this portion of the project. Please show on plans. Response 2: The saw cut has been reduced to the 8" required to install curb and gutter on Sheet C-301. TTC-5.2 has been added to Sheet C-803 with a note stating that it shall be utilized for curb and gutter installation without lane closure along the SR 29 corridor. w . BohlerE ngineering. com Adam J. Moore BOHLERI Proposed Sts Major Site Plan 3rtl Review Comments October 20, 2020 Page 2 of 2 Comment 3: TTC-16.1 is shown in duplicate and is outdated. Please show TTC 16.2 detail and notes. Response 3: TTC-16.2 has been added to Sheet C-803 with a note stating that it shall only be utilized during the allowable work hours of 10 pm to 6 am for mill & overlay improvements. Comment 4: This office recommends the contractor place concrete from the project side without closing a lane on S.R.29. Allowable work hour restrictions for this portion of S.R. 29 are 10 pm to 6 am (next morning) and an exception to the allowable work hours is doubtful. Response 4: TTC-5.2 has been added with a note stating that it shall be utilized for curb and gutter installation without lane closure along the SR 29 corridor and TTC-16.2 has been added with a note stating that it shall only be utilized during the allowable work hours of 10 pm to 6 am for mill & overlay improvements. Please see Sheet C-803. Comment 5: The "Saw Cut' area appears to be the area for mill and overlay area. Please correct the designation on the plans. Response 5: The saw cut has been reduced to the 8" required to install curb and gutter on Sheet C-301. Comment 6: Please replace the WDOT General Notes" with the Approved AM-E. The VDOT General notes are for subdivision development, not site plan development. Response 6: The VDOT General Notes have been replaced with the Approved AM-E on Sheet C-102. Comment 7: A Traffic Maintenance Plan (TMP) is required to obtain a permit to work within VDOT Right of Way. The TMP shall be prepared by an Advanced Work Zone Certified person, certification card and verification number is required on the TMP submittal. Response 7: Note 3 has been added to Sheet C-803 stating that a TMP shall be prepared by an Advanced Work Zone Certified person prior to work within the VDOT Right of Way. Comment 8: Please provide a comment response letter with each submission after the initial. Response 8: Comment acknowledged. Should you have any questions regarding this project or require additional information, please do not hesitate to contact me at (540) 349-4500. Sincerely, Bohler Engineering /�ME Ryan Yauger, P.E. RY/jb H:\19N194600�Administrative\Letters\201020 Major Site Plan 3rd Review CRL (VDOT).doc www. BohlerE ngineering. corn