Erosion and Sediment Control Bond Estimate
Item Item
Number
No. Unit Unit Cost Cost
installed
stabilization (PS, TS)
0.2 ac. .....-r
$375.00
silt fence (SF)
415.0 ft.
$2.075.00
Tree Protection (TP)
185.0 ft. . -
$925.00
safety fence(SAF)
875.0 ft.
$4,375.00
stone inlet protection (IP)
5 ea. ,_-._
$1,000.00
paved construction entrance (CE)
2 ea.
$4,000,00
wash rack
2 ea .. �:� a�:
$4,000.00
mobilization
1 ea. 5500 CO
$500.00
cost sum
$17,250.00
contingency
$1,725.00.
Total $18,980