HomeMy WebLinkAboutSDP202000027 Bond Estimates 2020-10-20Project Name: 29th Place Drive Thru WPO file number: WPO202000018 Erosion and Sediment Control Bond Estimate Item Item Number No. Unit Unit Cost Cost installed stabilization (PS, TS) 0.2 ac. .....-r $375.00 silt fence (SF) 415.0 ft. $2.075.00 Tree Protection (TP) 185.0 ft. . - $925.00 safety fence(SAF) 875.0 ft. $4,375.00 stone inlet protection (IP) 5 ea. ,_-._ $1,000.00 paved construction entrance (CE) 2 ea. $4,000,00 wash rack 2 ea .. �:� a�: $4,000.00 mobilization 1 ea. 5500 CO $500.00 cost sum $17,250.00 contingency $1,725.00. Total $18,980 Lic N • 0402056625 I �/27)20 9/2312020