Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO202000018 Bond Estimates 2020-10-20
Project Name: 29th Place Drive Thru WPO file number: WP0202000018 Erosion and Sediment Control Bond Estimate Item Item Number No. Unit Unit Cost Cost installed stabilization (PS, TS) 0.2 ac. $375.00 sift fence (SF) 415.0 0. $2.075.00 Tree Protection (TP) 185.0 ft. $925.00 safety fence (SAF) 875.0 ft. $4,375.00 stone inlet protection (IP) 5 ea. $1,000.00 paved construction entrance (CE) 2 ea. $4,000.00 wash rack 2 ea. $4,000.00 mobilization i ea. $500.00 cost sum $17,250.00 confingency $1,725.00 Total $18,980 6c. No. 0402056625 x [Z). 17/27�20.?4�; ION 9/23/2020