HomeMy WebLinkAboutSDP202000052 Study Traffic Study 2019-12-19EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902
E
TO: JUSTIN SHIMP, P.E. FROM: BILL WUENSCH, P.E., PTOE;
WEI HE
ORGANIZATION: SHIMP ENGINEERING DATE: DECEMBER 19, 2019
REVISED APRIL 14, 2020
PHONE NUMBER: SENDER'S REFERENCE NUMBER:
RE: REGENTS SCHOOL SITE TRAFFIC ASSESSMENT YOUR REFERENCE NUMBER:
SUPPLEMENT -SCHOOL ENROLLMENT THRESHOLD
URGENT X FOR YOUR USE PLEASE COMMENT PLEASE REPLY PLEASE RECYCLE
The purpose of this memorandum is to summarize a supplemental traffic analysis for the
proposed Regents School Site to examine the threshold of the school enrollment that will not
result in the delay of any movements at Fontaine Avenue/Route 29 Southbound Ramp
intersection greater than 35 seconds in the future year 2028.
This analysis assumed the school start time being 7:45 AM and all school trips arriving in the
morning between 7:15-7:45 AM to examine the future year 2028 build conditions between
7:15-7:45 AM.
Based on the findings in the prior supplement dated July 5th, 2019, the proposed Regents
School was tested with an enrollment of approximately 330 students in the future year 2028.
The test results indicated that the enrollment of 330 students in the future year 2028 will result
in the delay of 35.6 seconds on Route 29 Southbound Ramp approach, and the enrollment of
328 students in the future year 2028 will not result in the delay of any movements at Fontaine
Avenue/Route 29 Southbound Ramp intersection greater than 35 seconds in the future year
2028.
The following provides a brief summary of the information.
Enrollment of 330 Students
Trip Generation
The trip generation of the proposed Regents School (330 students) was calculated using the
same methodology as in the prior Regents School Site Traffic Assessment (10/12/2018) and
summarized in Table 1 below.
EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902
Table 1 Trip Generation (330 Students)
Scenario 2028 AM w/ 330 students 2028 PM w/ 330 students
In/Out Inbound Outbound Inbound Outbound
Total Trips 142 91 91 142
Traffic Volumes
2028 No Build Traffic Volumes between 7:15-7:45 AM
2028 no build traffic volumes between 7:15-7:45 AM was obtained from a prior supplement
3/6/2019) and illustrated in Figure 1 below.
Figure 12028 No Build Traffic Volumes between 7:15-7:45 AM
AM 29 SB EBT EBR WBL WBT SBL SBT SBR Total
7:15 4 4 41 4 67 0 0 120
2 2 290 14 Vehicle 7:30 8 2 55 3 78 1 1, 143
It 4 r
Total
192 1/2 Hour 12 6 96 7 145 1 1 268
Fontaine Hour 24 12 192 14 290 2 2 536
24 P H F 0.91
Truck
12 1/2 Hour 1 0 0 1 2 1 0
HVP 9% 0% 0% 14% 2% 100% 0%
29 SB
Site Trip Distribution and Assignment
Trip distribution was also obtained from the prior supplement (3/6/2019) and illustrated in
Figure 2 below. It should be noted that 2% of the trips were assumed from/to the local
residential area along Buckingham Circle, Reservoir Road, and Foxhaven Farm.
Figure 2 Site Trip Distribution
AM 29 SB
25% 0 0 73%
i r o
Fontaine
73%
25%
29 SB
EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902
The site trips were assigned to the road network based on the trip generation and the
distribution as noted above. The build condition site trips for the future year 2028 (330
students) are summarized and doubled for Synchro traffic analysis purpose as illustrated in
Figure 3 below.
Figure 3 2028 Site Trips (330 Students)
rM 29 5B
4-W
r 0
EBT EBR
i
WBL WBT SBL SBT
i i i
SBR Total
7:15 26 9 0 42 0 0 14 92
Vehicl 7:30 40 14 0 62 0 0 22 137
e Total
112 Hour 66 23 A 0 ON 229
Hour 132 46 0 208 0 0 72 458
PHF
Truck 1/2 Hour 1 0 0 1 0 0 0
HVP
2028 Build Traffic Volumes between 7:15-7:45 AM (330 Students)
Combining the background traffic with the site trips as shown, Figure 4 below illustrates the
build condition traffic volume calculation (330 students).
Figure 4 2028 Build Traffic Volumes between 7:15-7:45 AM (330 Students)
AM 29 SB EBT EBR WBL WBT SBL SBT SBR Total
7:15 30 13 41 46 67 0 14 212
74 2 290 ~ 222 Vehicl 7:30 48 16 55 65 78 1 23 285
I L1 r
a Total
192 1/2 Hour 78 29 96 111 145 1 37 497
Fontaine Hour 156 58 192 222 290 2 74 994
156 PHF 0.87
Truck
58 1/2 Hour 2 0 0 2 2 1 0
HVP 3% 0% 0% 2% 1% 100% 0%
29 SB
2028 Build Conditions between 7:15-7:45 AM (330 Students)
The future year 2028 build conditions between 7:15-7:45 AM (330 students) were analyzed in
Synch ro/SimTraffic 9.2. It should be noted that, the same as in the prior Regents School Site
Traffic Assessment (10/12/2018) and prior supplements, SimTraffic was utilized for the level of
service, delay, and queue analyses. The following Table 2 summarizes the analysis results:
EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902
Table 2 2028 Build Conditions between 7:15-7:45 AM (330 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB Fontaine WB Rte 29 SB
Overall
EBT/R WBL/T SBL/R
I. Rte 29/Fontaine SB Movement LOS/Delay A/1.8 A/3.3 E/35.6 c
Approach LOS/Delay A/1.8 A/3.3 E/35.6 15.2
Movement Queue (ft) 9 94 382
Based on the results in Table 2, the enrollment of 330 students in the future year 2028 will
result in the delay of 35.6 seconds on Route 29 Southbound Ramp approach.
Enrollment of 328 Students
Trip Generation
The trip generation of the proposed Regents School (328 students) was calculated using the
same methodology as in the prior Regents School Site Traffic Assessment (10/12/2018) and
summarized in Table 3 below.
Table 3 Trip Generation (328 Students)
Scenario 2028 AM w/ 328 students 2028 PM w/ 328 students
In/Out Inbound Outbound Inbound Outbound
Total Trips 141 90 90 141
Traffic Volumes
Site Trip Distribution and Assignment
The site trips were assigned to the road network based on the trip generation and the
distribution as noted above. The build condition site trips for the future year 2028 (328
students) are summarized and doubled for Synchro traffic analysis purpose as illustrated in
Figure 5 below.
Figure 5 2028 Site Trips (328 Students)
AM 29 5B
970 D 0 ~ -
41 4 r
Fontain
132
44 7
29 5B
EBT EBR WBL WBT SBL SBT SBR Total
7:15 26 9 0 41 0 0 14 90
Vehicl 7:30 40 13 0 62 D 0 21 136
e Total
1/2Hour 66 22 ON 0 ON 226
Hour 132 44 0 206 0 0 70 452
PHF
Truck 1/2Hour 1 0 0 1 0 0 0
HVP
EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902
2028 Build Traffic Volumes between 7:15-7:45 AM (328 Students)
Combining the background traffic with the site trips as shown, Figure 6 below illustrates the
build condition traffic volume calculation (328 students).
Figure 6 2028 Build Traffic Volumes between 7:15-7:45 AM (328 Students)
AM 29 SB EBT EBR WBL WBT SBL SBT SBR Total
7:15 30 13 41 45 67 0 14 210
72 2 290 ~ 220 Vehicl 7:30 48 15 55 65 78 1 22 284
1 L
a Total
192 112 Hour 78 28 96 110 145 1 36 494
Fontaine Hour 156 56 192 220 290 2 72 988
156 PHF D.97
56 Truck 1J2 Hour 2 0 D 2 2 1 D
HVP 3% D% D% 2% 1% 1DD% D%
2028 Build Conditions between 7:15-7:45 AM (328 Students)
The future year 2028 build conditions between 7:15-7:45 AM (328 students) were analyzed in
Synch ro/SimTraffic 9.2. It should be noted that, the same as in the prior Regents School Site
Traffic Assessment (10/12/2018) and prior supplements, SimTraffic was utilized for the level of
service, delay, and queue analyses. The following Table 4 summarizes the analysis results:
Table 4 2028 Build Conditions between 7:15-7:45 AM (328 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB Fontaine WB Rte 29 SB
Overall
EBT/R WBL/T SBL/R
1. Rte 29/Fontaine SB Movement LOS/Delay A/1.8 A/3.3 D/34.9 B
Approach LOS/Delay A/1.8 A/3.3 D/34.9 14.8
Movement Queue (ft) 10 91 375
Based on the results in Table 4, the enrollment of 328 students in the future year 2028 will not
result in the delay of any movements at Fontaine Avenue/Route 29 Southbound Ramp
intersection greater than 35 seconds in the future year 2028.
Finding
Based on the analysis results above, an enrollment of 328 students is the threshold of the
school enrollment that will not result in the delay of any movements at Fontaine Avenue/Route
29 Southbound Ramp intersection greater than 35 seconds in the future year 2028.
End of Memorandum
EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902
Attachment:
2028 Build Conditions Between 7:15-7:45 AM (330 Students) SimTraffic Reports
2028 Build Conditions Between 7:15-7:45 AM (328 Students) SimTraffic Reports
SimTraffic Performance Report
2028 Build AM 330 Students 12/18/2019
1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane
Lane EB
Movements Served TR
Denied DelNeh (s)
Total Del/Veh (s) 1.8
Total Network Performance
WB SB All
LT LTR
0.3
3.3 35.6 15.2
Denied Del/Veh (s) 0.3
Total DelNeh (s) 15.9
Regents School Study Supplement SimTraffic Report
EPR Page 1
Queuing and Blocking Report
2028 Build AM 330 Students 12/18/2019
Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summ
EB WB SB
TR LT LTR
9 94 382
0 34 154
5 74 329
708 507 520
Network wide Queuing Penalty: 0
N
1
Regents School Study Supplement SimTraffic Report
EPR Page 1
SimTraffic Performance Report
2028 Build AM 328 Students 12/18/2019
1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane
Lane EB
Movements Served TR
Denied Del/Veh (s)
Total Del/Veh (s) 1.8
Total Network Performance
WB SB All
LT LTR
0.3
3.3 34.9 14.8
Denied Del/Veh (s) 0.3
Total DelNeh (s) 15.5
Regents School Study Supplement SimTraffic Report
EPR Page 1
Queuing and Blocking Report
2028 Build AM 328 Students 12/18/2019
Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summ
EB WB SB
TR LT LTR
10 91 375
0 33 150
5 71 320
708 507 520
Network wide Queuing Penalty: 0
N
Regents School Study Supplement SimTraffic Report