HomeMy WebLinkAboutSDP202000052 Study Traffic Study 2019-12-19EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902 E TO: JUSTIN SHIMP, P.E. FROM: BILL WUENSCH, P.E., PTOE; WEI HE ORGANIZATION: SHIMP ENGINEERING DATE: DECEMBER 19, 2019 REVISED APRIL 14, 2020 PHONE NUMBER: SENDER'S REFERENCE NUMBER: RE: REGENTS SCHOOL SITE TRAFFIC ASSESSMENT YOUR REFERENCE NUMBER: SUPPLEMENT -SCHOOL ENROLLMENT THRESHOLD URGENT X FOR YOUR USE PLEASE COMMENT PLEASE REPLY PLEASE RECYCLE The purpose of this memorandum is to summarize a supplemental traffic analysis for the proposed Regents School Site to examine the threshold of the school enrollment that will not result in the delay of any movements at Fontaine Avenue/Route 29 Southbound Ramp intersection greater than 35 seconds in the future year 2028. This analysis assumed the school start time being 7:45 AM and all school trips arriving in the morning between 7:15-7:45 AM to examine the future year 2028 build conditions between 7:15-7:45 AM. Based on the findings in the prior supplement dated July 5th, 2019, the proposed Regents School was tested with an enrollment of approximately 330 students in the future year 2028. The test results indicated that the enrollment of 330 students in the future year 2028 will result in the delay of 35.6 seconds on Route 29 Southbound Ramp approach, and the enrollment of 328 students in the future year 2028 will not result in the delay of any movements at Fontaine Avenue/Route 29 Southbound Ramp intersection greater than 35 seconds in the future year 2028. The following provides a brief summary of the information. Enrollment of 330 Students Trip Generation The trip generation of the proposed Regents School (330 students) was calculated using the same methodology as in the prior Regents School Site Traffic Assessment (10/12/2018) and summarized in Table 1 below. EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902 Table 1 Trip Generation (330 Students) Scenario 2028 AM w/ 330 students 2028 PM w/ 330 students In/Out Inbound Outbound Inbound Outbound Total Trips 142 91 91 142 Traffic Volumes 2028 No Build Traffic Volumes between 7:15-7:45 AM 2028 no build traffic volumes between 7:15-7:45 AM was obtained from a prior supplement 3/6/2019) and illustrated in Figure 1 below. Figure 12028 No Build Traffic Volumes between 7:15-7:45 AM AM 29 SB EBT EBR WBL WBT SBL SBT SBR Total 7:15 4 4 41 4 67 0 0 120 2 2 290 14 Vehicle 7:30 8 2 55 3 78 1 1, 143 It 4 r Total 192 1/2 Hour 12 6 96 7 145 1 1 268 Fontaine Hour 24 12 192 14 290 2 2 536 24 P H F 0.91 Truck 12 1/2 Hour 1 0 0 1 2 1 0 HVP 9% 0% 0% 14% 2% 100% 0% 29 SB Site Trip Distribution and Assignment Trip distribution was also obtained from the prior supplement (3/6/2019) and illustrated in Figure 2 below. It should be noted that 2% of the trips were assumed from/to the local residential area along Buckingham Circle, Reservoir Road, and Foxhaven Farm. Figure 2 Site Trip Distribution AM 29 SB 25% 0 0 73% i r o Fontaine 73% 25% 29 SB EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902 The site trips were assigned to the road network based on the trip generation and the distribution as noted above. The build condition site trips for the future year 2028 (330 students) are summarized and doubled for Synchro traffic analysis purpose as illustrated in Figure 3 below. Figure 3 2028 Site Trips (330 Students) rM 29 5B 4-W r 0 EBT EBR i WBL WBT SBL SBT i i i SBR Total 7:15 26 9 0 42 0 0 14 92 Vehicl 7:30 40 14 0 62 0 0 22 137 e Total 112 Hour 66 23 A 0 ON 229 Hour 132 46 0 208 0 0 72 458 PHF Truck 1/2 Hour 1 0 0 1 0 0 0 HVP 2028 Build Traffic Volumes between 7:15-7:45 AM (330 Students) Combining the background traffic with the site trips as shown, Figure 4 below illustrates the build condition traffic volume calculation (330 students). Figure 4 2028 Build Traffic Volumes between 7:15-7:45 AM (330 Students) AM 29 SB EBT EBR WBL WBT SBL SBT SBR Total 7:15 30 13 41 46 67 0 14 212 74 2 290 ~ 222 Vehicl 7:30 48 16 55 65 78 1 23 285 I L1 r a Total 192 1/2 Hour 78 29 96 111 145 1 37 497 Fontaine Hour 156 58 192 222 290 2 74 994 156 PHF 0.87 Truck 58 1/2 Hour 2 0 0 2 2 1 0 HVP 3% 0% 0% 2% 1% 100% 0% 29 SB 2028 Build Conditions between 7:15-7:45 AM (330 Students) The future year 2028 build conditions between 7:15-7:45 AM (330 students) were analyzed in Synch ro/SimTraffic 9.2. It should be noted that, the same as in the prior Regents School Site Traffic Assessment (10/12/2018) and prior supplements, SimTraffic was utilized for the level of service, delay, and queue analyses. The following Table 2 summarizes the analysis results: EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902 Table 2 2028 Build Conditions between 7:15-7:45 AM (330 Students) Year 2028 Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R I. Rte 29/Fontaine SB Movement LOS/Delay A/1.8 A/3.3 E/35.6 c Approach LOS/Delay A/1.8 A/3.3 E/35.6 15.2 Movement Queue (ft) 9 94 382 Based on the results in Table 2, the enrollment of 330 students in the future year 2028 will result in the delay of 35.6 seconds on Route 29 Southbound Ramp approach. Enrollment of 328 Students Trip Generation The trip generation of the proposed Regents School (328 students) was calculated using the same methodology as in the prior Regents School Site Traffic Assessment (10/12/2018) and summarized in Table 3 below. Table 3 Trip Generation (328 Students) Scenario 2028 AM w/ 328 students 2028 PM w/ 328 students In/Out Inbound Outbound Inbound Outbound Total Trips 141 90 90 141 Traffic Volumes Site Trip Distribution and Assignment The site trips were assigned to the road network based on the trip generation and the distribution as noted above. The build condition site trips for the future year 2028 (328 students) are summarized and doubled for Synchro traffic analysis purpose as illustrated in Figure 5 below. Figure 5 2028 Site Trips (328 Students) AM 29 5B 970 D 0 ~ - 41 4 r Fontain 132 44 7 29 5B EBT EBR WBL WBT SBL SBT SBR Total 7:15 26 9 0 41 0 0 14 90 Vehicl 7:30 40 13 0 62 D 0 21 136 e Total 1/2Hour 66 22 ON 0 ON 226 Hour 132 44 0 206 0 0 70 452 PHF Truck 1/2Hour 1 0 0 1 0 0 0 HVP EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902 2028 Build Traffic Volumes between 7:15-7:45 AM (328 Students) Combining the background traffic with the site trips as shown, Figure 6 below illustrates the build condition traffic volume calculation (328 students). Figure 6 2028 Build Traffic Volumes between 7:15-7:45 AM (328 Students) AM 29 SB EBT EBR WBL WBT SBL SBT SBR Total 7:15 30 13 41 45 67 0 14 210 72 2 290 ~ 220 Vehicl 7:30 48 15 55 65 78 1 22 284 1 L a Total 192 112 Hour 78 28 96 110 145 1 36 494 Fontaine Hour 156 56 192 220 290 2 72 988 156 PHF D.97 56 Truck 1J2 Hour 2 0 D 2 2 1 D HVP 3% D% D% 2% 1% 1DD% D% 2028 Build Conditions between 7:15-7:45 AM (328 Students) The future year 2028 build conditions between 7:15-7:45 AM (328 students) were analyzed in Synch ro/SimTraffic 9.2. It should be noted that, the same as in the prior Regents School Site Traffic Assessment (10/12/2018) and prior supplements, SimTraffic was utilized for the level of service, delay, and queue analyses. The following Table 4 summarizes the analysis results: Table 4 2028 Build Conditions between 7:15-7:45 AM (328 Students) Year 2028 Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/1.8 A/3.3 D/34.9 B Approach LOS/Delay A/1.8 A/3.3 D/34.9 14.8 Movement Queue (ft) 10 91 375 Based on the results in Table 4, the enrollment of 328 students in the future year 2028 will not result in the delay of any movements at Fontaine Avenue/Route 29 Southbound Ramp intersection greater than 35 seconds in the future year 2028. Finding Based on the analysis results above, an enrollment of 328 students is the threshold of the school enrollment that will not result in the delay of any movements at Fontaine Avenue/Route 29 Southbound Ramp intersection greater than 35 seconds in the future year 2028. End of Memorandum EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 1 01, CHARLOTTESVILLE, VA 22902 Attachment: 2028 Build Conditions Between 7:15-7:45 AM (330 Students) SimTraffic Reports 2028 Build Conditions Between 7:15-7:45 AM (328 Students) SimTraffic Reports SimTraffic Performance Report 2028 Build AM 330 Students 12/18/2019 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane Lane EB Movements Served TR Denied DelNeh (s) Total Del/Veh (s) 1.8 Total Network Performance WB SB All LT LTR 0.3 3.3 35.6 15.2 Denied Del/Veh (s) 0.3 Total DelNeh (s) 15.9 Regents School Study Supplement SimTraffic Report EPR Page 1 Queuing and Blocking Report 2028 Build AM 330 Students 12/18/2019 Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summ EB WB SB TR LT LTR 9 94 382 0 34 154 5 74 329 708 507 520 Network wide Queuing Penalty: 0 N 1 Regents School Study Supplement SimTraffic Report EPR Page 1 SimTraffic Performance Report 2028 Build AM 328 Students 12/18/2019 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane Lane EB Movements Served TR Denied Del/Veh (s) Total Del/Veh (s) 1.8 Total Network Performance WB SB All LT LTR 0.3 3.3 34.9 14.8 Denied Del/Veh (s) 0.3 Total DelNeh (s) 15.5 Regents School Study Supplement SimTraffic Report EPR Page 1 Queuing and Blocking Report 2028 Build AM 328 Students 12/18/2019 Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summ EB WB SB TR LT LTR 10 91 375 0 33 150 5 71 320 708 507 520 Network wide Queuing Penalty: 0 N Regents School Study Supplement SimTraffic Report EPR Page 1