HomeMy WebLinkAboutSDP202000052 Study Traffic Study 2019-07-05EPRpc EPR, PAC. "ENGINEERING S PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902
MEMORANDUM
TO: JUSTIN SHIMP, P.E.
ORGANIZATION: SHIMP ENGINEERING
PHONE NUMBER:
RE: REGENTS SCHOOL SITE TRAFFIC ASSESSMENT
SUPPLEMENT 5—YEAR 2028 RESULTS WITH 320, 360, 400,
440, AND 480 STUDENTS
FROM: BILL WUENSCH, P.E., PTOE;
WEI HE
DATE: JULY 05, 2019
SENDER'S REFERENCE NUMBER:
YOUR REFERENCE NUMBER:
URGENT X FOR YOUR USE PLEASE COMMENT PLEASE REPLY PLEASE RECYCLE
As requested, this document summarizes the year 2028 build scenario AM between 7:15-7:45
AM traffic results with 320, 360, 400, 440, and 480 students. The following provides the
summary tables.
Table 12028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 320 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB Fontaine WB Rte 29 SIB
Overall
EBT/R WBL/T SBL/R
1. Rte 29/Fontaine SIB Movement LOS/Delay A/1.7 A/3.3 D/32.2 B
Approach LOS/Delay A/1.7 A/3.3 D/32.2 13.5
Movement Queue 12 94 348
Table 2 2028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 360 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB Fontaine WB Rte 29 SIB
Overall
EBT/R WBL/T SBL/R
1. Rte 29/Fontaine SIB Movement LOS/Delay A/1.8 A/3.4 E/47.4 c
Approach LOS/Delay A/1.8 A/3.4 E/47.4 18.7
Movement Queue 18 107 460
Table 3 2028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 400 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB Fontaine WB Rte 29 SIB
Overall
EBT/R WBL/T SBL/R
1. Rte 29/Fontaine SIB Movement LOS/Delay A/1.9 A/3.5 F/70.6 D
FApproach LOS/Delayt A/1.9 A/3.5 F/70.6 26.6
ovement Queue 16 118 510
EPRpcEPR, PAC. "ENGINEERING & PLANNING RESOURCES"
902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902
Table 4 2028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 440 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB Fontaine WB Rte 29 SB
Overall
EBT/R WBL/T SBL/R
1. Rte 29/Fontaine SB Movement LOS/Delay A/2.0 A/3.8 F/110.9 E
Approach LOS/Delay A/2.0 A/3.8 F/110.9 39.9
Movement Queue 16 119 561
Table 5 2028 Build Scenario AM between 7:15-7:45 AM Traffic Results (with 480 Students)
Year 2028 Build AM
Movement/Approach
Fontaine EB Fontaine WB Rte 29 SB
Overall
EBT/R WBL/T SBL/R
1. Rte 29/Fontaine SB Movement LOS/Delay A/2.1 A/3.9 F/150.7 F
Approach LOS/Delay A/2.1 A/3.9 F/150.7 51.4
Movement Queue 20 124 564
End of Memorandum
Attachment: SimTraffic Reports
SimTraffic Performance Report
2028 Build AM 320 Students 07/05/2019
1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane
Lane EB
Movements Served TR
Denied Del/Veh (s)
Total Del/Veh (s) 1.7
Total Network Performance
WB SB All
LT LTR
0.3
3.3 32.2 13.5
Denied Del/Veh (s) 0.3
Total DelNeh (s) 14.2
Regents School Study Supplement SimTraffic Report
EPR Page 1
Queuing and Blocking Report
2028 Build AM 320 Students 07/05/2019
Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summ
EB WB
TR LT
12 94
1 33
6 70
708 507
Network wide Queuing Penalty: 0
SB
LTR
348
140
294
520
0
0
Regents School Study Supplement SimTraffic Report
EPR Page 1
SimTraffic Performance Report
2028 Build AM 360 Students 07/05/2019
1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane
Lane EB
Movements Served TR
Denied Del/Veh (s)
Total Del/Veh (s) 1.8
Total Network Performance
WB SB All
LT LTR
0.8
3.4 47.4 18.7
Denied Del/Veh (s) 0.8
Total DelNeh (s) 19.5
Regents School Study Supplement SimTraffic Report
EPR Page 1
Queuing and Blocking Report
2028 Build AM 360 Students 07/05/2019
Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summ
EB WB SB
TR LT LTR
18 107 460
1 35 186
9 76 398
708 507 520
Network wide Queuing Penalty: 0
M
Regents School Study Supplement SimTraffic Report
EPR Page 1
SimTraffic Performance Report
2028 Build AM 400 Students 07/05/2019
1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane
Lane EB WB SB All
Movements Served TR LT LTR
Denied Del/Veh (s) 3.6
Total Del/Veh (s) 1.9 3.5 70.6 26.6
Total Network Performance
Denied Del/Veh (s) 3.6
Total Del/Veh (s) 27.4
Regents School Study Supplement SimTraffic Report
EPR Page 1
Queuing and Blocking Report
2028 Build AM 400 Students 07/05/2019
Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summ
EB WB SB
TR LT LTR
16 118 510
1 36 247
8 81 536
708 507 520
Network wide Queuing Penalty: 0
W
Regents School Study Supplement SimTraffic Report
EPR Page 1
SimTraffic Performance Report
2028 Build AM 440 Students 07/05/2019
1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane
Lane EB
Movements Served TR
Denied Del/Veh (s)
Total Del/Veh (s) 2.0
Total Network Performance
WB SB All
LT LTR
12.4
3.8 110.9 39.9
Denied Del/Veh (s) 12.4
Total DelNeh (s) 40.7
Regents School Study Supplement SimTraffic Report
EPR Page 1
Queuing and Blocking Report
2028 Build AM 440 Students 07/05/2019
Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summ
EB WB SB
TR LT LTR
16 119 561
1 40 356
8 87 639
708 507 520
Network wide Queuing Penalty: 0
27
Regents School Study Supplement SimTraffic Report
EPR Page 1
SimTraffic Performance Report
2028 Build AM 480 Students 07/05/2019
1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane
Lane EB
Movements Served TR
Denied Del/Veh (s)
Total Del/Veh (s) 2.1
Total Network Performance
WB SB All
LT LTR
38.1
3.9 150.7 51.4
Denied Del/Veh (s) 38.1
Total DelNeh (s) 52.2
Regents School Study Supplement SimTraffic Report
EPR Page 1
Queuing and Blocking Report
2028 Build AM 480 Students 07/05/2019
Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summ
EB WB SB
TR LT LTR
20 124 564
1 43 434
9 93 695
708 507 520
Network wide Queuing Penalty: 0