Loading...
HomeMy WebLinkAboutSDP202000052 Study Traffic Study 2019-06-14EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 MIN TO: JUSTIN SHIMP, P.E. FROM: BILL WUENSCH, P.E., PTOE; WEI HE ORGANIZATION: SHIMP ENGINEERING DATE: JUNE 14, 2019 PHONE NUMBER: SENDER'S REFERENCE NUMBER: RE: REGENTS SCHOOL SITE TRAFFIC ASSESSMENT YOUR REFERENCE NUMBER: SUPPLEMENT —YEAR 2028 WITH 280 STUDENTS URGENT X FOR YOUR USE PLEASE COMMENT PLEASE REPLY PLEASE RECYCLE The purpose of this memorandum is to summarize a supplemental traffic analysis for the proposed Regents School Site to examine the impact of the proposed Regents School with 280 students on Fontaine Avenue/Route 29 Southbound Ramp intersection in the future year 2028. To accomplish the goal, this analysis assumed the school start time being 7:45 AM and all school trips arriving in the morning between 7:15-7:45 AM to examine the future year 2028 build conditions between 7:15-7:45 AM. The proposed Regents School was assumed to have 280 students in the future year 2028. The future year 2028 build conditions between 7:15-7:45 AM were then compared to the future year 2028 no build conditions in the commuter AM peak hour, which was obtained from the prior Regents School Site Traffic Assessment (10/12/2018), which evaluated the impact of the proposed Regents School with 280 students in the future year 2028 during the typical commuter peak hour. The following provides a brief summary of this information. Trip Generation The trip generation of the proposed Regents School with 280 students was calculated using the same methodology as in the prior Regents School Site Traffic Assessment (10/12/2018) and summarized in Table 1 below. Table 1 Trip Generation with 280 Students Scenario 2028 AM w/ 280 students 2028 PM w/ 280 students In/Out Inbound Outbound Inbound Outbound Total Trips 121 77 55 87 EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Traffic Volumes 2028 No Build Traffic Volumes between 7:15-7:45 AM 2028 no build traffic volumes between 7:15-7:45 AM was obtained from a prior supplement 3/6/2019) and illustrated in Figure 1 below. Figure 12028 No Build Traffic Volumes between 7:15-7:45 AM AM 295B EBT EBR WBL WBT 5BL 5BT SBR Total 7:15 4 4 41 4 67 0 0, 120 2 2 290 14 Vehicle 7:30 8 2 55 3 78 1 1, 148 J It r Total 192 1/2 Hour 12 6 96 7 145 1 1 268 Fontaine Hour 24 12 192 14 290 2 2 535 y 24 P H F 0.91 Truck 12 1/2 Hour 1 0 0 1 2 1 0 HVP 9% 0% 0% 14% 2% 100% 0% 29 SB Site Trip Distribution and Assignment Trip distribution was also obtained from the prior supplement (3/6/2019) and illustrated in Figure 2 below. It should be noted that 2% of the trips were assumed from/to the local residential area along Buckingham Circle, Reservoir Road, and Foxhaven Farm. Figure 2 Site Trip Distribution AM 29 SB 25% 0 0 ~ j i L r o Fontaine 73% ~ 25% 29 SB The site trips were assigned to the road network based on the trip generation and the distribution as noted above. The build condition site trips for the future year 2028 with 280 students are summarized and doubled for Synchro traffic analysis purpose as illustrated in Figure 3 below. EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 Figure 3 2028 Site Trips with 280 Students FM 29 SR 0 0 176 r 0 112 39 29 SB EBT ERR WBL WBT SBL SBT SBR Total 7:15 22 8 0 35 0 0 12 77 Vehicl 7:30 34 11 0 53 0 0 18 116 e Total 1/2 Hour 56 19 ON 0 ON 193 Hour 112 38 0 175 0 0 50 386 PHF Truck 1/2 Hour 1 0 0 1 0 0 HVP 2028 Build Traffic Volumes between 7:15-7:45 AM Combining the background traffic with the site trips as shown, Figure 4 below illustrates the build condition traffic volume calculation. Figure 4 2028 Build Traffic Volumes between 7:15-7:45 AM AM 29 SB EBT EBR WBL WBT SBL SBT SBR Total 7:15 26 12 41 39 67 0 12 197 4- 0fit229190 Vehicl 7:30 42 13 55 56 78 1 19 254 j Ilyr a Total 192 1/2 Hour 68 25 96 95 145 1 31 461 Fontaine Hour 136 50 192 190 290 2 52 922 136 PHF 0.87 Truck 5o 1/2 Hour 2 0 2 2 1 HVP 3% 0% 0% 2% 1% 100% 0% 29 SB 2028 Build Conditions between 7:15-7:45 AM The future year 2028 build conditions between 7:15-7:45 AM were analyzed in Synch ro/SimTraffic 9.2. It should be noted that, the same as in the prior Regents School Site Traffic Assessment (10/12/2018) and prior supplements, SimTraffic was utilized for the level of service, delay, and queue analyses. The following Table 2 summarizes the analysis results: Table 2 2028 Build Conditions between 7:15-7:45 AM Year 2028 Build AM Movement/ Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/ R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/1.7 A/3.2 D/27.7 B Approach LOS/Delay A/1.7 A/3.2 D/27.7 12.0 Movement Queue 11 87 350 EPRpc EPR, PAC. "ENGINEERING & PLANNING RESOURCES" 902 E JEFFERSON ST. UNIT 101, CHARLOTTESVILLE, VA 22902 2028 No Build Conditions in Commuter AM Peak Hour The future year 2028 no build conditions traffic analysis results were obtained from the prior Regents School Site Traffic Assessment (10/12/2018) for comparison purpose. The following Table 3 summarizes the analysis results: Table 3 2028 No Build Conditions in Commuter AM Peak Hour Year 2028 No Build AM Movement/Approach Fontaine EB Fontaine WB Rte 29 SB Overall EBT/R WBL/T SBL/R 1. Rte 29/Fontaine SB Movement LOS/Delay A/1.5 A/2.3 E/45.4 D Approach LOS/Delay A/1.5 A/2.3 E/45.4 30.1 Movement Queue 4 57 500 Finding: comparison of 2028 Build Conditions between 7:15-7:45 AM and 2028 No Build Conditions in Commuter AM Peak Hour Comparing analysis results above, the finding of this study effort is — the traffic operation in the future year 2028 build conditions between 7:15-7:45 AM is better than in the future year 2028 no build conditions in commuter AM peak hour: The overall intersection level of service is LOS B in the future year 2028 build conditions between 7:15-7:45 AM, while it is LOS D in the future year 2028 no build conditions in commuter AM peak hour. The overall intersection delay is 12.0-seconds in the future year 2028 build conditions between 7:15-7:45 AM, while it is 30.1-seconds in the future year 2028 no build conditions in commuter AM peak hour. Route 29 southbound ramp delay is 27.7-seconds, which falls at the lower end of LOS D, in the future year 2028 build conditions between 7:15-7:45 AM, while it is 45.4-seconds, which falls at the upper end of LOS E, in the future year 2028 no build conditions in commuter AM peak hour. Route 29 southbound ramp queue is 350 feet in the future year 2028 build conditions between 7:15-7:45 AM, while it is longer than 500 feet in the future year 2028 no build conditions in commuter AM peak hour. End of Memorandum Attachment: 2028 Build Conditions Between 7:15-7:45 AM SimTraffic Reports SimTraffic Performance Report 2028 Build AM 280 Students 06/11/2019 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Performance by lane Lane EB Movements Served TR Denied Del/Veh (s) Total Del/Veh (s) 1.7 Total Network Performance WB SB All LT LTR 0.4 3.2 27.7 12.0 Denied Del/Veh (s) 0.4 Total DelNeh (s) 12.7 Regents School Study Supplement SimTraffic Report EPR Page 1 Queuing and Blocking Report 2028 Build AM 280 Students 06/13/2019 Intersection: 1: Rte 29 SB On-Ramp/Rte 29 SB Off -Ramp & Fontaine Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summ EB WB TR LT 11 87 0 32 5 69 708 507 Network wide Queuing Penalty: 0 SB LTR 350 125 268 520 0 0 Regents School Study Supplement SimTraffic Report EPR Page 1