Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SDP201200058 Plan - Approved Minor Amendment 2012-11-26
SITE DATA: ENGINEER: TIMMONS GROUP 919 2ND ST. S.E. CHARLOTTESVILLE, VA 22902 TELEPHONE: 434-295-5624 CONTACT: CRAIG KOTARSKI, P.E. CRAIG.KOTARSKI@TIMMONS.COM TAX MAP PARCEL: TM 061 PARCEL 193 ZONING: R-15 RESIDENTIAL MAGISTERIAL DISTRICT: RIO SOURCE OF BOUNDARY AND TOPOGRAPHY: TIMMONS GROUP 1001 BOULDERS PARKWAY, SUITE 300 RICHMOND, VA 23225 PAUL HUBER, L.S. 804-200-6500 WETLAND IMPACTS: NONE DRAINAGE DISTRICT: MEADOW CREEK WATERSHED NO IMPROVEMENTS SHOWN ON CITY OF CHARLOTTESVILLE PROPERTY HAVE BEEN REVIEW,`_) BY THE COUNTY OF ALBEMARLE OR APPROVED WITH THE COUNTY APPLICATION GENERAL NOTES 1. PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR SHALL CONSULT THE ENGINEER AND VERIFY THE APPROVAL OF THE PLANS BY ALL FEDERAL, STATE AND LOCAL AGENCIES. 2. THE CONTRACTOR SHALL VERIFY THE ELEVATIONS OF ALL POINTS OF CONNECTION OR PROPOSED WORK TO EXISTING CURBS, SANITARY LINES, WATERLINES, ETC, PRIOR TO CONSTRUCTION. 3. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES SHOWN ON PLANS IN AREAS OF CONSTRUCTION PRIOR TO STARTING WORK, CONTACT EINGINEER IMMEDIATELY IF LOCATION OR ELEVATION IS DIFFERENT FROM THAT SHOWN ON PLAN. IF THERE APPEARS TO BE A CONFLICT, AND/OR UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON THIS PLAN, CALL MISS UTILITY OF CENTRAL VIRGINIA AT 1-800-552-7001. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE RELOCATION OF ANY UTILITY WITHIN EXISTING AND/OR PROPOSED RIGHT OF WAY REQUIRED BY THE DEVELOPMENT. MISCELLANEOUS • CONTRACTOR TO CONTACT THE CITY OF CHARLOTTESVILLE TO HAVE THE SCHOOL -OWNED UNDERGROUND UTILITIES LOCATED PRIOR TO START OF CONSTRUCTION. 72 HOUR NOTICE REQUIRED. • ALL EXCESS MATERIALS TO BE REMOVED/DISPOSED OF OFF SITE, BY THE CONTRACTOR AT AN APPROVED AND ACCEPTABLE AREA. PROPOSED MODIFICATIONS TO CHARLOTTESVILLE HIGH SCHOOL'S STADIUM I NEW STADIUM LIGHTING FIXTURES TO BE MOUNTED ON EXISTING LIGHT POLES MINOR SITE 'PLAN A,MENDMENwfl RIO DISTRICT COUNTY OF ALBEMARLE, VIRGINIA 9/17/2012 VICINITY MAP NO SCALE OWNER:. CITY OF CHARLOTTESVILLE PO BOX 911 CHARLOTTESVILLE, VA 22902 CONTACT: TIM BREITENBACH TELEPHONE: 434-970-3519 PROJECT ADDRESS: CHARLOTTESVILLE HIGH SCHOOL 1400 MELBOURNE ROAD CHARLOTCESVILLE, VA 22901-3199 ENGINEER OF RECORD: TIMMONS GROUP 919 2ND STREET, S.E. CHARLOTTESVILLE, VA 22902 CONTACT: CRAIG KOTARSKI, P.E. TELEPHONE: (434) 295-5624 FAX:(434) 295-8317 Sheet Index Sheet Number Sheet Title C0.0 COVER C1.0 OVERALL SITE PLAN EL0.0 EXISTING BOUNDARY LIGHTING PHOTOMETRIC SITE PLAN EC1.1 STADIUM AREA LIGHTING IMPROVEMENTS ELO).1 BOUNDARY LIGHTING PHOTOMETRIC MUSCO DATA m i ga, A Mt.- E AT2d�1t1f.. r Submittal Type Reviewed and Approved by the Community Development Department Date IZ Fite# ,5t7P �o tZ ' 060 5 $ n t i ic#natl►fe ALBEMARLE COUNTY SERVICE AUTHORITY UIRG✓NlA EPARTMENT OF TRANSPORTATION HEALTH DEPAR TMEV T c a E H o � d O E O n F- LU N W U. U Q UU 0> M W to 00 c - 0 W W + U ZWVX #� Z z z c _ '�'—X U) LL4 V O o� a U Uc z U, ° i U)z z E 0*1 w Z) Z) c r-+ a O W 4 W 4 C —+ wWW c = O! M W ti W 3 cu � C4 z Ui ;Q a O _ C L O C L C c LLj _ U O W �\ C S z O tE p \� ,., \ S O > "' c U) > O O a.+ (A DATE 9117112 DRAWN BY C. KOTARSKI DESIGNED BY C. KOTARSKI ® CHECKED BY i J. HASH ® SCALE N/A 4 i • 0 CL -v U3 0 o (� v V c v o a m =Q a �Ir z H � � i-1 > O U w J > A 0 0 c W U P.q U a LL J E Q C � a lU a 0 m CD Q U) H z 0 o g Qa V l c c O r n O V 1 � > .m U h Us a U U "C1 41 a JOB NO. -o 31552 c a SHEET NO. c COXm t a D 0 W 0 U) Z 0 t= 4- 0 4j c m c 0 41 3 0- x 41 41 0 3 0 U P N c 0 U L v v rn c U y C O U 0 m E 0 c .J .N U L > 0 0 3 a> 0 n. L D_ a f GENERAL NOTES 93 `,r /0.93 +O 93 93 1. FOOTCANDLE (FC) MEASUREMENTS OF EXISTING FOOTBALL k 0 93 FIELD LIGHTS TAKEN ON DECEMBER 14, 2011. f0,93 `,.0.93 0.93 +`0 93 2. MEASUREMENT TABLE, PERIMETER AREAS: 0,93 AREA AVG MAX MIN (FC) 0.93 `k �0.93 1 -1.02 � 0 93 +,� North Perimeter 1.07 2.51 0,74 East Perimeter 1,75 3.07 1.21 0.93 +,1 `11 South Perimeter 2.65 3.72 1.30 West Perimeter 0.7 1.2 0.4 (MUSCO) w�+/0.84 �Z - _�h `-. �:+I.Su 1.21 40.84 5� ~`� �. - , .58 0.74 � 4` \~+ 1.86 /+ 1.39 '4.1.30 +/ 0.84 f f � \ +. 14 � � �.\ 2 +�0.84 �`. 2.51 1 1.02 _ `+ 1.39 BOUNDARY NOTES o p 1. North Perimeter P.P.SA29 , - f \� � � 0,93 � (2. East Perimeter \ \ 1.21 3. South Perimeter it �a� ,� �(' �' 4 4. West Perimeter (Musco Measurements) 2rw 2rw Consultants, Inc. 1001Oth Street NE Suite 202 Charlottesville, VA 22902 434-296-2116 1.30 TOP=433.68' { 1.86 0. / \� 2.04 -21 \ f 2.23 Z .4 \ '✓ 2.42 l i ,' W 2.04 t it I U) LU \,� IIt 0.7 it \ \ 11.77 1 Q 4 ; lilt _ ,4 U 6 1 U- 1.86 to 5 V � 1.86 1 sheet title 1.0 Li ! /' SITE -- P.P.SA'% (' 43.07 PLAN 2.79 1 SITE PLAN - - ELU SCALE: 1" = 40'-O" e-file: 1125A-E w fc scale ELOOO of 2 0.00 rf V,,!6 ;sy 9 Plan View Scale 1" =16' 0.00 +0. 0.01 0.01 03 10 0.01 0.00 .' `0.36 / f '0.8,, r r Y l` j 0.15 ri 2.5 Y g/ i 0.03 ,f rl 1 j y3.0 T4:2 2.1 r0.5 0.2 % '0.2 r' l" f .04 }� 6 +4.2 +5.0 +2.5 1.0 +0.9 !0 TO $ 0. 0.16 + +r 0.41 j� r' 4.4'' 4.9 A0 '2.0 1,9 3.0 3.5 2.2 f y f`• ,, f0.40 + 'T ; rr L, + /d %!` 3.1 4.3-` 4.4 2.5 1.9 3.1 5.2 3.8 3r5 ff/ 1 /0.45 yd�f i i +2.1 2.7 2.3 1.6 '2.4 +4.8 "3:9 _.. 219 r f+f ....._.. rf '2.0 i sA0.30 +1.5 `0.8 T0.6 0.9 2.8 74.8 ", 4.4 x ; r , 3 ? l r r �` 2.9 +4 0 .`t 2,1 '0.5 r0.2 T0.5 �2.2 +3 6 +20 /f f - jQ.10 ,r�7 '4.4 r5.0 2.5 0.9 T0.7 0.9 1.4 Jl 0.41 f r ;` +4 4` +4.4 i4.2 +2.1 i 1.7 t2.5 2 9 r1.9 ; 1 i'0.29 lrlJ frr -3 0? 44.1 _ r4.8 r2.8 1.9 'y +2.9 +4.8 +41 2.9 `'I/ I013 �. f 1.9 3.1 23 1.9 2.4 4. 0.04 0,9 r1.0 1.5 +3.4 '5.1 4.0 j ,J mr 41 f fJ r2.1 i 3.7 j4 4 +2t7 f s! it ! ` r3.9 T3.2 t %, + , ! +1.8 +3.4--'' +4.8�s''.,-5.1 +4.4 �'jf f `'33I %'It2'4\ '2.4 f T3.1 :_2:8 r3:9`� }5.2 +4.1 +37 +4.1 1-6.4 44.0 4.0 4.2 i.>._._. << <` 2.6 3.7,.E ^ +6.1 4.0 3.6 4.9 5.6 3.7 i 3 3 $.6 t �y MA 'e '! J _,..4:6.. +4.9 �; ,/ ' �fr j5 ` f y< r5.1 3.7 f 2.8 t1 2.9 f3:8'. 4,2 3.0 3t8' ,r t' 3.9 +3.0 2.7 k 1;� 7 . f • 3 0 +2.1 +1.5 +1 7f / +2.2,r +2.5 +2.4 J! S� i s +1.4 s1.1 +0.5 +1.5 �r +2.3 2`.10'''"`^� � J i ,A� '�, j i 0.7 d.. +2.4 + +0.4 1.5 !f 2.4 T3.1 't f +1.0 2.3 ', +3.5 +3.8 i 12.4 3�8 `4.0 ` } it f 1 S21 '0.4 1 11..6 = 2:fip 1-2.6 4 + 8{ j `3.9 4 ; f +1.9 +3.1 +4 4 ` ` T4.2 NOTE: PLAN ACCOUNTS • PREVIOUSLY" APPROVED SITE LIGHTING. TO ACCOUNT r TOTAL ADDEDMUST BE TO THE FUTURE FIELD LIGHTING FC VALUES AS INDICATED IN DRAWING MLI. FOR EXAMPLE, THE ADDITION OF THE FIELD LIGHTING VALUE -OPBOUNDARY WOULD INCREASE THE MAXIMUM POINT BY 0.1 FC RESULTING IN THE LARGEST COUNTY BOUNDARY MEASUREMENT TO BE r +2.0 1.7 +1.2 0.7 3.3 2.9 3.1 3.2 2.7 25 2.1 1.5 1.9 2:5 _..,... 3 0 3.2 2.7 2.8 +3.5 2:9',. 1.9 +1.2 0.6 0.2 1 .,...,., _-�S2 } " +3.2 0.6 0.9 1.2 2.2 1.9 1 5,�141.7 3.6 3.1 3.1 1.6 0.6 0.1 a r� z T0.7 1.0 +2.5 +2.1 Z'0 +2.6 2,7 +1.1 0.4 10.1 ' ^+1,3 '`, +1.1 70.4 0.6 0.7 1.6 2.1 1.4 T01 `1.3 1.3 1.7 1.9 ., 0.6 2.1 2.5 2.2 1.2 2.5 3.1 9 1.6 0.4 r1.0 0 ., ` z 0.1 0.1 I' .��nw rt (D 0.2 +0.2 0.2 J ` W V7 +0.9 +0.8 40.6 2.2 2.9 2.8 1.9 0,8 E.2 M T0.3 22.7 2.4 2.6 1.5 1.3 ."i-..-..'-.S21.2 1.7 +Lu 1.0 ..aJ 0.3 �'. z +0 3 s +0.3 "0.6 +0.50 ��../. !� W .y 1 ,V t S 4 a Designer �f Date i Nov 14 201�2 Scale j As Indicated t l Drawing No. t EC1.1 a 1 �t VaY f 2 ill" �3 < Y• v Project 3pecf lc Notes: T:a� saluanoeatra�rt�a 61OW12012mawas t rsrni: T-awt Control System Summary Prtjapt Information Project #: 168617 Project Name: Charlottesville High School Soccer Date: 06/18/12 Project Engineer, Justin Van SmIen Sal" Representstive: Steve Wiley Control System Type: Control and Monitoring Communication Type: Digital Cellular Scan: 117 3CG.1 Distribution Panel Location or ID: CHS Soccer Total # of Distribution Panel Locations for Project: 1 Design 'Voltage/Hertz/Phase: 208/60/3 Control Voltage: 120 Equipment Listing DESCRIPTION APPR{)XiMATE SIZE 1 trot and onito Cabbot .24 X 72 E t. �•' , ,, .t r , . r t, -4A ToIRM1 ont p 2 100 AMP .'h�'1,i�>,^.,` I- Y* q,,�'.�«. t�„ f cfLu;.' �...r*."cl=.,'�1=.� t�„'„,, 3.1'^=.4`�,,.� i3":r'.. t YY i � `5. -y"� iMP 'rANT NOTES 1. Please confirm that the design voltage listed above is acrasete her this facility. Design voltage/phass Is defined as the voltege/phase tieing conneolled and utiiizad at spat lighting poles ballast enclosure disconnect. Inaccurate design voliagelphese can result in additional costs and delays. Contact your Musco sales representative to confirm fhls item. 2. In a 3 phase design, all 3 phases are to be run to each pole. When a 3 phase design is used Musco's simple phase luminralitse come pre-wlred to utilizze all 3 phases across the andre fatNliy. 3. One oontsew Is required for each pole. When a pale has multiple dreults, one 1ontarxar is required for each okcult. AL oontectors are UL 100% rated for the patNshed cointinuous load. All cor itactore are 3 pole, 4. if die floting system will be fed from more than one distribution location. additional equipment may be required. Conted your Musco sales represeritative. S. A single control circuit must be supplied per control system, 6. Size overcurrent devices using the full load era'ips column of the Circuit Summary By Zone chart Minimum power factor Is 0.0. NOTE. Refer to Installation Instructions,;ror more details on equipment information and the.inmallation requirements rj°h09�iz Mt�DBptar�raa>*ansuc Control System Summary Charlottesvillia High School Soccer l 166617-166617_SCOA CHO Sower - Pege 4 oif 4 -ZONE SCHEDULE l rtualuaatrwPa Control System Summary Charlottesville High School Soccw 136617 - I M1I SCG.1 �1t :01ae�,s6o sv«b Lt vJ� o CHO Soccer - ,Pie 2 o1 A Ftaeu: T-B➢BD.f j CoWakM.tlnk {' Control andMonitoring S}rst:0m 0'' ital •00I101air I l,. :. Gtuifritity of eqt pmeri# may dtf#er-fi who# is sk ' , t. below) I I I I Dig'i#al.ceilular j {. Transfol7tter° antenna, ,(provided by cu&koirter I I for aonObl vattage 4ff.tan-'.Off I supply ifnot available) keyed;switches E(ectiaCal l distribution I C panel i; (provided:by I' aistame'r`for k ovr3rcurrertt.7 - protectidn .. ! f l Control acid Ad,6t(onat p I Bur a pra•tect(on Manitorlrg Cantrraf and I ` cabinet Monitoring l deulce: � I { cabinet(s) Q 12" z Q , Equipittit3ntgcpund To lighting circuits. To'light'ing circuits 1 I` 1 I; i ! I: I I� I r ( I I I I I I Notes 8, .01taOe and phasing rxer the: notes On Gover page 0, OWd..utate per load and voliage drop { e: Mipimun'1 conduit ivamete� ! { a. 4Yire 4 requires 2" (,O.Ircorinector'ends. to:pass though' I b, Win$ 0 requireG 1" 1?,r connector°ends to pass though) { c All otttercondWt diameters should be per !. p. Refer t¢ Control and Monitoring $ystem Installation Instructions for mitre details orrctqufprrien# tnfcnlrlatfon arid, the I, ,- iTtstagatinh reggiremeryts ) { E: Contact)Nusisa ff riiaximurti wire'.tengili,16m CiniW breaker b Contactor exceeds ueltre in:it ch'art:, { 'IMPORTANT: Camriiunication wfre'(5) must be in.seperate doiidutt'trvrli any AC'potirer wiring (12,a,4,6,7). CdnW(!,4)'md monit46n" • { (7}vtirq must be.iri separats cvnduttfrom'line and load powerwiring (1,2� I lvtusco:supplied>nlre:harnessds'are supptieri in sfaridard O fnGClengtiis: r�zxai►lemnaauseaSsnPa "- - - -. - -. - � - yY(RE 9i SCRIPTItiN 'OF IMPEq, TYr': `WIRE SIk (AWG) MAX WIRE LENGTH (FT} VflRE FROM MLI Gib 1 LINE •POWER' & GROUND 10 CONTACTORS PIOtE'tiA NOTE t3 27 1J0' 2. LoAD f'Av f;R' TO .11G.-HTINGfFtG4l17S tJQiE'.A . Nt1T 9 Nf.A N4 3 0Q iROL f 0MA (DEGidAf0, 20A) 3 12 N/A No LA -4 'OONTf3o1 FORNC.SES -= a! YEs* bLit (R5 ' i8�) i - &+ YES !PI3TRt8.u.[IGN :i�pNEL =- � N/A YEs .7 "SURGE'PROTi~CTJD 0610E M641TRRING' 2 14 A/A No Li ht• Iruature Luminaire Assembly - Luminaire wireway: 2 x 4 inch nominal, Aluminum spill and glare 1/8 inch thick, high strength steel tubing light control visor Stainless steel Horizontal aiming adjustment latch bail Aluminum o (factory set) over -center -Die-cast aluminum mounting plate Left View latch handle - - Die-cast aluminum knuckle -- Mogul lamp socket Geared tilt adjustment Die-cast aluminum lamp cone Teflon centering/sealing ring - Silicone "0" ring seal - -- Joint seal overlap Lamp Die-cast aluminum reflector housing Silicone glass edge seal gasket Silicone "0" ring rim seal -- 3/8 inch activated carbon filter Tempered glass tens Aluminum lens rim _ Stainless steel chain Repositioning stop (factory set) Viton "0" ring seal Knuckle positioning bolt Silicone "0" ring seal Lamp leveling gear drive Vertical aiming adjustmentllock (factory set) Patents issued and pending. C 2005, 2011 Musco Lighting • SIA2 800/825-6030 www.musco.com Iighting@musco.com M a11,801i Fms: T 10-1 !WITCHING §CHgl2ULE Field Type Zones Zonis Description Soccer 1 Soccer Control System Summary Charlottesville High School Sorter 1158817 -1M1 SCG.t CHO Soccer - Page 3 of 4 CONTROL POWER CONSUMPTION 120V Single Phase N VA loading of Musco Supplied Equipment INRUSH: 1986.0 SEALED: 241.0 BALLAsTPOPUTTON9 VOLTAGE. 208v THREE PHASE ,90 Minimum Power Factor BALLAST 'OPERA iNG VOLTAGE 208 220 240 277 347 380 480 1600 Watt Metal Halide Lamp 8.6 7.7 7.6 6.5 5.1 0.0 3.7 Operating line amperage per flxtuns- maximum 1665 Watt Metal Halide Lamp 6.6 5.8 5.8 4.9 4.0 0.0 2.9 operating be ampmap per fixtuna- maximum sotmrJarttrnvatal ausnmr EQUIPMENTT FOR AREAS SHOWN Pole Luminaires CRY LOCATION SIZE GRADE =L>aun�._ mouNnNG HE*Iir-. LAMP QTY1 THIS OTHER GRIDS 4 Si, S3-S4 70' - 70' I 150OW MZ 8 8 0 2 6 - S2, S5 80' 8_0' _- --F- 1500W MZ -- -- - TOTALS _16_ 64 16 64 0 - 0 GENERAL NOTES 1. NEW LIGHTING. BASIS OF DESIGN: MUSCO SPORTS LIGHTING. Smart Lamp, Operating System 1500 Watt Metal Halide limp (Clear) Technical Data sheet Physical Characteristics BulbSize.................................................................................................. BT-66 BulbFinish..................................................................................................Clear Base.................................................................Mogul Screw Position Oriented Maximum Overall Length (MOL)................................................15Ya" (391mm) Light Center Length (LCL).......................... .................................. 9%s" (232mm) Are Tube Lighted Length...............................................................3%e" (84mm) Arc Tube Material........................................................................... Fused Silica Maximum Permissible Bulb Temperature.....................................400°C (752T) Maximum Permissible Base Temperature .................................... 210°C (410T) Photometric Operating Characteristics' System Rated Constant Lumens Over Life 2...................... .................... 134,000 Ordering Information Operating Position...............................................................Arc Tube Horizontal Ordering Code ....................................... LA-30Z-1 Lamp Replacement interval, Hours 3....,......,...............................................5000 ANSI Designation..........................................M48 Correlated Color Temperature (Approximate)., ......................................... 4200K Description.......................................MH1500 MZ CIE Chromaticity Coordinates (Approximate) ....................... ........ x-.370, y-.390 Lamp Type ............................... HiD: Metal Halide Rendering Index nde Color Re ( R a).............................,..............................,.........65-70 Electrical Data Average Lamp Wattage Over Operating Life 2.............................................1450 Warm-up Time to 80% of Output....................................................3-5 Minutes Re -strike Time for Hot Lamp ...........................................10-15 Minutes Lamp Operating Current (Max. rms Amps)...................................................6.0 BallastType........................................................................................ANSI M48 Minimum Starting Temperature..................................................................30°C Footnotes: (1) Operating Characteristics are per the Musco Smart Lamp(TM) Operating System on a commercial ballast with arc tube horizontal. Lamp lumen measurements in accordance with IESNA LM-51-00. Lamp color data in accordance with IESNA LM-5ft-94. Lamp operating cycle of five hours per start to reflect expected field use in the sports fighting Industry. (2) Lamp starts out at a reduced wattage and increases over life to offset lumen loss as lamp ages. Average wattage over life is 1450 watts. (3) Beyond 5,000 hours is the time when constant lumens are no longer maintained by the Smart Lamplm Operating System, Average lamp life before failure is substantially greater than 5,000 hours as tested and defined per IESNA LM-47-01 with live hours per start. 1 02008, 2012 Muse® Sports Lighting, LLC • Patents Issued & Pending. DRAWING ML1: M1USC0 CALC 70 ZERO FC D.1 10.1 At 0.1 9.1 0.1 O.f Al A.1 1., 0.1 Al A, At Aa A., P., 0.l A+ At 0.1 Al 0., 0.1 Al A, 0.1 Al 0.1 A+ A0 l .+ ,al At OA 0.1 A.1 Da A, At At 0.1 A.t .01 0.1 O.t Al Al '01 0.1 At Al O.t At O.t A' At A' 0.1 Al At At At Al Al Al At 'PA 9.1 A, 0.1 P., Al 'Al Al 0.1 At At 0.1 Al 40.1 Al A.1 AI At 0.1 P.1 0.1 Al P1 of A' At Al Da 0.1 10t 0.1 0.1 Al At Al Al .0.1 0.1 At AA At Al Al 0.1 0.1 0., At 4P.1 Al 402 Al At- P2 O2 02 al Al 0.1 0.1 AT Al 0.1 At 0.1 At Al 0.1 0.1 Al 4P2 4)2 4)2 4P2 02 A2 02 92. 92 02 O2 A2 D.1 A.t At At 0.1 P.l A.1 0. A.1 'Al 0.1 A2 .02 A2 A2 A2 02 AJ 03 02 02 D2 02 P. 01 al O.l al 0.1 0., AT D.1 0., At Al 02 02 OJ 4p3 A3 A. 0.3 4).3 A3 DJ AJ 02 Al D3 P. 02 Al Al A, 0.1 0.1 0.1 al 0.1 PA 0.2 02 03 pA PA AA P.5 Ps O.n A,a As As D.a DA AA OJ 02 01 A, Ae R+ 0A 0 e At 0.1 Al A. A2 PJ PA .0.5 06 �A.9 �T �1:T-� �$z J.1 Pe 6 D.5 4 3 2 1 f eQ..r1 159 159� A' A . a2 D A. a Al 0.1 A., p.l A2 DJ Ds Ord Jld^7.4--di'02 Jz.l J J 1 J,.6 Os Da 02 Al A.l µt Al Al O., 0z A3 Os J.6 A JA4 JfiJ J23 .111 J6.2 P9.0 fig 5.3 J6.J J2A J&�6. P.e JS D.6 Al 4P,2 Al Al AA N NORTHWEST At p., 0.1 D2 Ps Ja PO W. OO.r j9.3 J9.] JS.z 09a JS., 6 Je0 Jt.b o0.0 A0A Ja b3 At J_t A5 01 A, 0.1 4)t BOUNDARY BY Al Al Dz P3 A.9 ?J J.e PARKING LOT. .00.8 J.5 0.6 P.9 P.3 Pz A.1 D.+ ,P.l A' A2 P.4 0-1 9.9 A.1 At Pl.4 P).6 0.6 P1.5 P. A)f W.. 4596 PiA 0.. Ala 0 J30 A2 J.0 0.4 D2 P.t P.l At 41.1 A2 0-4 .1.1 .11 Da 29 P21 6 2 PL] Jai Pt1 bs.p 02 Pia AA .52.9 P9.l 6t Ze µ0 :F `:� D.a 4P2 A./ Al Al A.1 02 PA J2 J2 P.6 ,73 5 443 J2f J24 B3 2 023 JLl I4. J55 M J24 AS Af J. AA A2 At At 0.1 P.1 92 PA J2 A3 Aa J2 .5 J2z JO:r Io. J1 Ji 01 0.1 J N.31 21.9 AS J2 J.: AA 02 At A.t A.1 A.1 A2 D.4 J.f P.f P5 jt Jr.3 4 0.0 44.4 072 49. j3.> 47.1 04.4 jag PJ5 06 91.1 .9.1 AO 4.1 PA A2 Al P.1 P.1 A.t 02 0.A J.1 .10 pa .'>7 Asa-- z 511 Jr.l P4J PLi AL2 Da.o Jr.O 1-02'a"'06 326 As 29 1 .1 0A 02 0.1 .1 A.' P.t A2 A3 j.0 PO 10.9 JS PSB Pat J6.> .44.3 Pal J J4.1 P>A ..1 J>2 A6.J 05 J42 A5 ?9 J.0 0J 02 Al JI.t Al A3 04 ?3 J:b 0 AO Pla J1A Jal {°.. D4.5 0.Pa, Jaa JLo Pzb AJ2 I:o .1012 0.6 A2 0.1 P.1 At Al A P2 .0.P.r I� W O.B j5.9 j3.3 H.3 j0.3 018 J0.2 8 JL] J9.8 J4A ?3.] ,25.6.1)w 2�4 '0-7P.3 02 At A, .�. in .�.111333VVV. A, At P.l 02 Da As ).3 `Z4 .11 J5 0.1 Ju X. 9CJ.. A5 4.5 It `.K4 Ja PA Ps Az Al PA al C= rnusm, GREEN GENERATION Li6NiIIW GUARANTEED PERFORMANCE Soccer Charlottesville High School Soccer Charlottesviile,VA Blanket Grid to 0 FC Size: 360' x 225' Grid Spacing = 30.0' x 30.0' Values given at 3.0' above grade Luminaire Type: Green Generation Rated Lamp Life: 5,000 hours Avg Lumens/Lamp: 134,000 CONSTANT ILLUMINATION HORIZONTAL FOOTCANDLES Entire Grid No. of Target Points: 882 Maximum. 85 Minimum: 0 Avg/Mm 187 3_, f ,rMaxlM.1 s.1699 74 UG (Adjacent Pis): 10.7 CV: 2.1 Average Lamp Tilt Factor: 1.000 Number of Luminaires: 64 Avg KW over 5,000: 100.1 Max KW: 108.8 Al 0.1 A� 19 p5 S4 of At 01 OJSo A.5 1� 85, J., JB ?9 0.10.165.: D.3 P2 A .1 Guaranteed Performance: The CONSTANT _.- P.l D.1 P.1 0.1 A2 0.2 0.3 PJ P.4 AA o5 L„ .4 ,,.w., p.3 Pa 01 0-2 Al o.1 o., o.l ILLUMINATION described above is guaranteed for the rated 41.1 A, 0.1 A' 02 A3 0.3 A.3 PJ 0.3 A3 A3 A. 02 P2 A2 At Al P.l Al life of the lamp. 0.1 0.1 0.1 0.2 P2 P2 02 01 4),2 4P2 P2 At 02 A2 A2 Al 02 µt µl Al Al A.' Field Measurements: Averages shall be +/-10% in Al 0.1 Al At Al 1.1 At O2 02 02 4P2 A2 4)2 A2 4P2 02 92 Al P.+ At Al 0.1 0.1 a1 accordance with IESNA RP-6-01 and CIBSE LG4. Individual 0.l Al Al Al o.+ 0.1 P.1 Al A' 0.' Al 0.1 A, A.1 o-1 At A.1 'A' At A.1 A.1 at measurements may vary from computer predictions. At 0.1 0.1 Al P.1 Al it At 0.1 Al At Al 0e 0A Al 01 0.1 0.1 D., Al Electrical System Requirements: Refer to Amperage D.1 Al Al o.t 0.' A' Al At 0.1 D.l P.1 Al At D.1 CA Al Al A' 0-1 A.1 Draw Chart and/or the "Musco Control System Summary" 0-1 Al 0.' Al P., Al a1 a' At Al 0.1 Al 0.1 0.1 O.l 11.1 At At for electrical sizing. p.t 0" Al A' 0.' A.' 10 'Al Al 0.1 Pa 0.1 Al At PA A.+ Installation Requirements: Results assume +/- 3% A.1 A.' Al 19l A.1 A.' A' 0.' At al Al Al nominal voltage at line side of the ballast and structures Al 0.1 Al 0.f Al P.l Al 0.1 located within 3 feet (1m) of design locations. SCALE IN FEET 1 : 200 0. 200' 400' By: Justin Van Soelen File #: 156617_SCG.1 Date: 24-Apr-12 Pole location(s) +dimensions are relative Not to be reproduced in whole or part without the written to 0,0 reference point(s) consent of Musco Lighting. ©1981, 2012 Musco Lighting Print Date (24/Apr/2012) 8l Time (16:30) 2rw Consultants, Inc. 1001Oth Street NE Suite 202 Charlottesville, VA22902 434 296 2116 sheet title MUSCO DATA e-file: 1125-E des drf AMH I BJP z_ N(DN W U) W 0 T� .i U LL 0 fH 0 chk REC proj no. 11125a date 09.14.12 scale revision date sheet EL031 of 2