Loading...
HomeMy WebLinkAboutSDP202000051 Review Comments Final Site Plan and Comps. 2020-10-27Phone 434-296-5832 � OF J� o 0 �GI1JlP4i County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Memorandum To: Kelly Schwieterman From: Paty Satemye, Senior Planner Division: Planning Date: August 21, 2020 Rev. 1: October 27, 2020 Subiect: SDP202000051Valvoline — Final Site Plan Fax 434-972-4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Comments to be addressed with the Final Site Plan submission: 2. A site plan meeting all the requirements of section 32.6 of Chapter 18 of the Code. FINAL: Comment not yet fully addressed. Address comments below. Rev. 1: Comment not vet fully addressed. 9. 132.5.2(k) & 32.5.2(1)]] Private & public easements; Existing and proposed utilities. Address the following: c) If any easements are required an easement plat must be submitted (separate application, fee and submission) and approved prior to the approval of the final site plan. FINAL: Comment not yet fully addressed. An easement plat must be submitted (separate application, fee and submission), reviewed, approved and recorded prior to the approval of the final site plan. Rev. 1: Comment not vet fully addressed. The easement plat has been submitted and is under review. It must be approved and recorded Prior to the approval of the final site plan. 11. 132.5.2.(e), 32.5.2.(p) & 32.6.2(i)] Landscape plan. A landscape plan is required in the final site plan that complies with section 32.7.9. A landscape plan was submitted but requires additional information for the final site plan. Such information should include, but is not limited to, the following: h) Revise the existing conditions sheet to include the required information on the existing trees. FINAL: Comment not yet fully addressed. Address the following: ii. Ensure labels are provided for all existing trees that include all the required information. Rev. 1: Comment not yet fully addressed. Address the following_ a. Two of the existing street trees do not appear to have their species and size labeled. Add labels for these trees. b. Two of the existing street trees have labels, but the labels are obscured by other text or thick linework. Ensure existing tree labels are visible. p) Rev. 1: [New Comment] Revise the calculation for the trees and shrubs in the parking areas to include all 13 provided parking spaces. The two existing spaces are part of the parcel and therefore must be included. 15. [Comment] See the SRC comments from most of the reviewers attached. All SRC reviewer comments must be sufficiently address prior to final site plan approval. FINAL: Comment not yet fully addressed. See attached comments from other reviewers. All reviewer comments must be sufficiently address prior to final site plan approval. Rev. 1: Comment not vet fully addressed. See attached comments from other reviewers. All reviewer comments must be sufficiently address prior to final site plan approval Please contact Paty Satemye in the Planning Division by using psatemyegalbemarle.org or 434-296-5832 ext. 3250 for further information. Review Comments for SDP202000051 Final Site Development Plan Project Name: VALVOLINE -FINIAL Date Completed: Thursday, October 22, 2020 Department/Division/Agency: Review Status: Reviewer: Richard Nelson � ACSA Requested Changes Pape: 1� Countyof Albemarle Printed On: 10/27/ 0020 Review Comments for SDP202000051 Final Site Development Plan Project Name I VALVOLINE -FINIAL Date Completed: Thursday, October 08, 2020 DepartmenUDivisionlAgency: Review Status: Reviewer: Matthew Wentland � CDD Engineering No Objection Page: 1� County of Albemarle Printed On: 10/27 02020 Review Comments for SDP202000051 Final Site Development Plan Project Name I VALVOLINE -FINIAL Date Completed: Tuesday, October 132020 DepartmentlDivision/Agency: Review Status: Reviewer: KhristopherTaggart -1 MDARB Approved Page: 1� County of Albemarle Printed On: 10/27/ 0020