HomeMy WebLinkAboutWPO202000028 VSMP - SWPPP 2020-10-22Stormwater Pollution Prevention Plan (SWPPP)
For Construction Activities At:
Project Name: Regents School
Location: Reservoir Road
Adjacent to Trinity Presbyterian Church
Charlottesville, VA 22903
Prepared by:
Shimp Engineering P.C.
Prepared for:
Regents School of Charlottesville, Inc.
SWPPP Preparation Date: 05/07/2020
Revised 10/22/20
(This document is to be made publicly available according to 9VAC25-880-70, Part 11, section D)
CONTENTS:
1. Registration statement
2. Notice of general permit coverage
3. Nature of activity
4. Erosion and Sediment Control Plan.
5. Stormwater Management Plan
6. Pollution Prevention Plan.
7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload
allocation, and exceptional waters.
8. Qualified personnel
9. Signed Certification
10. Delegation of authority.
11. General permit copy
12. Inspection logs
Section 1. Registration statement
VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR OFFICE USE ONLY
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM
ID Number;
CONSTRUCTION ACTIVITIES jVAR10) Technical Criteria: IIB ❑ IIC ❑
REGISTRATION STATEMENT 2019
NEW ISSUANCEX RE -ISSUANCE ❑
MODIFICATION WITH ACREAGE INCREASE ❑ MODIFICATION WITHOUT ACREAGE INCREASE ❑
Existing Permit Coverage Number (if applicable, VARIO## #);
Section I. Operator/Permittee Information.
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have
operational control over construction activities to ensure compliance with the general permit. A person with
signatory authority for this operator must sign the certification in Section VI. (per Part III. K. of the VAR10 Permit).
Construction Activity
Operator Name:
Contact person:
Address:
City, State, Zip Code:
Phone Number:
Primary Email:
CC Email:
Lm;U. -nf �P.\1 w-,e\ bO
HSLA)a13- o,32
Ca ylaf,nt- _
B. Billing Information (leave blank if same as the Operator identified in Section I. A. above). This entity will receive
Annual Permit Maintenance and Permit Modification Fee invoices (if applicable).
Name:
Contact Person:
Address:
City, State Zip Code:
Phone Number:
Primary Email:
CC Email:
C. May we transmit correspondence electronically? You must choose YES and include a valid email in order to pay by
credit card and to receive your permit coverage approval letter via email:
YES K NO ❑
Rev04/2019 PAGE 1 1 7
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
Section if. Construction Activity Location Information. Project site information.
A. Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land
disturbance, construction entrances and all water bodies receiving stormwater discharges from the site.
B• Construction Activity Name: P06U IA4-A CAD � -J X ("Aa, A ItAKhNlI�
Address:
City and/or County and Zip Code:
Latitude and Longitude
(6 digit, decimal degrees format):
�g O zi-O % - I ? S3??3Z
C. Construction Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees): 910 S 5,
Section III. Offslte Support Activity Location Information. List all offsite support activities to be included under this
Permit registration. Enter additional areas on a separate page. Offsite areas not included on this registration may need
to obtain coverage under a separate VPDES permit.
A. Off site Activity Name:
Address:
City and/or County and Zip Code:
Latitude and Longitude
(6-digit, decimal degrees format):
B. Offsite Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees):
Section IV. Site Information.
A. Acreage totals for all land disturbing activities to be included under this
permit coverage. Report to the nearest one -hundredth of an acre.
Total land area of development (including the entire
( Cl . 11
area to be disturbed as approved in the Stormwater
��(
Management Plan):
�'�1 N—
Primary estimated area to be disturbed (portions with
�J
Erosion and Sediment Control Plan approval only):
'%K
Offslte estimated area to be disturbed (if applicable):
C. Property Owner Status:
D. Nature of the Construction Activity Description (i.e.
commercial, Industrial, residential, agricultural,
environmental):
E. Municipal Separate Storm Sewer System (MS4)
name (if discharging to a M54):
e. Estimated Project Dates
(MM/DD/YYYY)
Start date: 11101120
Completion date: 'Dl jb( JUL
FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE K
Rev 04/2019 PAGE 2 1 7
aft
CONSTRUCTION GENERAL PERMIT (VAR30) REGISTRATION STATEMENT 2019
F. Is this construction activity part of a common plan of development or sale? YES ❑ NO K,
G. 6" Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Attach a separate list if needed.
HUC RECEIVING WATERBODY(S)
OZ pg 07—C31t rr,.oL
Section V. Other Information.
A. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the
General VPDES Permit for Discharges of Stormwater from Construction Activities prior t0 submitting the Registration
Statement. By signing the Registration Statement, the operator is certifying that the SWPPP has been prepared.
B. Has an Erosion and Sediment Control Plan been submitted to the VESCP Authority for review? YES ❑ NO ❑
Erosion and Sediment Control Plan Approval Date (for estimated area to be disturbed).:
C. Has land disturbance has commenced? YES ❑ NO A
D. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity
Form. AS&S Entity Name (if different from the Operator identified in Section II. A.):
SEE THE FOLLOWING PAGE FOR SIGNATURE
AND CERTIFICATION REQUIREMENTS AND INFORMATION
Rev 04/2019 PAGE 3 1 7
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
Section VI. Certification. A person representing the operator as identified in Section I. A. and meeting the requirements
of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that
operator is defined in 9VAC25-870-10 as follows:
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater
associated with a large or small construction activity, operator means any person associated with a construction project that meets
either of the following two criteria: N the person has direct operational control over construction plans and specifications, including
the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those
activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state
permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the
stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from
Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system.
9VAC25-880-70. Part III. K. Signatory Requirements. Registration Statement. All Registration Statements shall be signed as follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer
means: N a president secretary, treasurer, or vice president of the corporation in charge of a principal business function, or
any otherperson who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager
of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management
decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term
compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or
actions taken to gather complete and accurate information for state permit application requirements; and where authority
to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official.
For purposes of this chapter, a principal executive officer of a public agency includes: N the chief executive officer of the
agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the
agency.
Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this
document and all attachments were prepared in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage
the system or those persons directly responsible for gathering the information, the information submitted is to the best
of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting
false information including the ibility of fine and impyiso/�ment fo/,i knowing violations."
Printed Name: ,ilizAlsXIRZA ��lJ�l,._.T
Signature (signed in ink):
Date:
Section VII. Submittal Instructions. #mit this form to the Virginia Stormwater Management Program (VSMP)
Authority. If the locality is the VSMP Authority, please send your Registration Statement submittal directly to the
locality; do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities.
If DEQ is the VSMP Authority. please send to:
Department of Environmental Quality
Office of Stormwater Management Suite 1400
PO Box 1105
Richmond VA 23218
construct ioconstruct io n�o@d egvirgini agov@d eg.virgini agov
If the locality is the VSMP Authority, please send to:
ine
Rev 04/2019 PAGE 4 17
Section 2. Notice of general permit coverage
(This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.)
Section 3. Nature of activity
This project proposes a private school with several buildings and recreational areas on what is currently vacant land in
Albemarle County. The total area of disturbance is 8.76 acres.
The following are the proposed management strategies and detailed sequence of construction:
PHASE 1
1. Install construction entrance.
2. Install sediment traps 1, 2, and 3 with associated silt fence.
3. Install diversion dikes.
4. Call County inspector for approval of erosion and sediment control measures.
5. Upon approval, begin mass grading of site.
6. Protect soil stockpiles with silt fence and temporary seeding as necessary.
7. Transport dirt from parking lot area to field area.
PHASE 2
1. Once site is brought to grade, install storm pipe Al-A5 with connections Ma and Ma. Do not install manhole Al in
this phase, instead dig small conveyance channel for pipe Al to outlet to Sediment Trap 2.
2. Place inlet protection on all storm inlets.
3. Bring field to grade.
4. If too much water collects on eastern half of field, pump it to sediment trap 1.
5. Stabilize field area with permanent seeding.
6. Begin water & sanitary installation.
PHASE 3
1. Finish construction of buildings.
2. Install rip rap conveyance channel at outlet of pipe AO prior to pipe installation.
3. Stabilize parking area with base stone.
4. Once parking area is stabilized, install manhole Al and pipes A1-A0, Al-A1x, and all roof and yard drains.
5. Once field is stabilized, install pipes Al d-Al and 34-BO.
6. Keep inlet protection in place until entire site is stabilized.
7. Remove sediment traps, bringing those areas back to original grade. Apply permanent seeding and low
maintenance ground cover where slopes are 3:1 or steeper.
Section 4. Erosion and Sediment Control Plan.
VSMP PLAN
LEGEND
EXISTING
- C
10
NEW
311.5 x >2�
311.5 TC x
311.5 TW xa�
311.5 BW x >2
E777'
X X
-0-
-0-
(
GT
GHU .
ucu
ucu
0
q q
DESCRIPTION
BOUNDARIES
BENCHMARK
SITE PROPERTY LINE
ADJACENT PROPERTY LINE
BUILDING SETBACK
PARKING SETBACK
SITE TEXT
PARKING COUNT
TOPOGRAPHY
INDEX CONTOUR
INTERVAL CONTOUR
SPOT ELEVATION
TOP OF CURB ELEVATION
TOP OF WALL ELEVATION
BOTTOM OF WALL ELEVATION
STREAM
STREAM BUFFER
100 YEAR FLOODPLAIN
BUILDING
BUILDING
RETAINING WALL
STAIRS
EDGE OF PAVEMENT
ROAD CENTERLINE
FRONT OF CURB
BACK OF CURB
CG-12 TRUNCATED DOME
SIDEWALK
BIKE PARKING
HANDICAP ACCESSIBLE AISLE
HANDICAP PARKING
MATERIAL
CONCRETE
RIPRAP
ASPHALT
EC-2 MATTING
EC-3 MATTING
WETLAND
TREELINE
FENCE
UTILITY
UTILITY POLE
GUY WIRE
OVERHEAD UTILITY
UNDERGROUND UTILITY
STORM
STORM MANHOLE
DROP INLET
STORM SEWER
ROOF DRAIN
o AKIITAnv
0
SANITARY MANHOLE
SANITARY SEWER MAIN
S
SANITARY SEWER LATERAL
S
WATER
VV
WATER LINE
W
O
O
WATER METER
0
WATER METER VAULT
FIRE HYDRANT
A
FIRE DEPARTMENT CONNECTION
GAS
GAS LINE
GAS
EASEMENTS
CONSTRUCTION
GRADING
ACCESS
SIGHT DISTANCE
UTILITY
STORMWATER FACILITY MAINTENANCE / SWM
STORMWATER ACCESS
DRAINAGE
SANITARY
WATERLINE
GASLINE
NOTE:
1. THE SIZE
OF THE SYMBOLS MAY
VARY FROM WHAT IS SHOWN.
REGENTS SCHOOL OF CHARLOTTESVILLE
OWNER/DEVELOPER
Regents School of Charlottesville Inc.
3045 Ivy Road
Charlottesville, Virginia 22903
PLAN PREPARATION
Shimp Engineering, P.C.
912 East High Street
Charlottesville, VA 22903
(434)227-5140
ZONING
EC - Entrance Corridor
R1 - Residential
SP201800011 approved on September 18, 2019
permitting a private school use on the site
MAGISTERIAL DISTRICT
Samuel Miller
SOURCE OF TITLE
DB 5237 P 251
DB 660 P 780 (plat)
SETBACKS
Front: 5'
Side: 10'
Rear: 20'
SOURCE OF BOUNDARY AND TOPOGRAPHY
Boundary is based on field survey by:
Dewberry Engineers Inc.
4805 Lake Brook Drive
Glen Allen, Virginia 23060
Provided on 05/11/2018, field verified by Justin Shimp, P.E. 10/22/2019
Topographic survey with two foot (2') contours provided by Quantum Spatial
Topography of four foot (4') contours provided by Albemarle County GIS.
BENCHMARK
Datum for topography is NAVD 88
FLOODZONE
These parcels lie within FEMA flood zones "X" and "A" as defined on FIRM map 51003CO268D, dated February 4, 2005.
RESERVOIR WATERSHED
This site is within the Moores Creek Watershed and the creek shown is a tributary of Moores Creek.
Wetlands have not been identified on these parcels.
This site is not within a watershed of a public water supply.
WATER & SANITARY SERVICES
This project lies within the ACSAjursidictional area for both water and sewer. Access to existing water and sewer service is
available.
COUNTY OF ALBEMARLE
- 0M, [kpanment of Community Development
Construction Record Drawings (As -built) for VSMP
The following is a list of information required on construction record drawings for
stormwater facilities (reference Water Protection Ordinance 17-422). It is preferable that the
construction record drawing be prepared by someone other than the designer. Please dig not
provide design drawings as construction record drawings.
A. A signal and dated professional seal of the preparing engineer or surveyor.
B. The name and address of the firm and individual preparing the drawings on the title sheet.
C. The constructed location of all items associated with each facility, and the inspection records to verify
proper dimensions, materials and installation. The items include, but are not limited to the following:
I. Inspection Records and photographs for pipe trenches and bedding, including underdrains.
2. Video Pipe Inspection for any pipes which an: not accessible or viewable.
3. updated Location with geo-coordinates of all facilities.
4. Verified Drainage Area maps for the drainage area treated, and for drainage to the facilities.
5. Current physical and topographic survey for all earthen structures. Ponds should include a survey
of the pond bottom. Surveys should verify pond volumes are per design_ Corrections may be required
for alterations from the design.
6. Plants, location and type.
7. Plans and profiles for all culverts, Pipes, Risers, Weirs and Drainage Structures - Display the
installed type of drainage structures, culverUpipe size, weirs, materials, inlets or end treatment(s),
inlet and outlet protection, alignment and invert elevations compared to design.
8. Computations: For significant deviations from design, provide scaled computations verifying that
the as -built condition is equivalent or better than design.
9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical
sections and linings.
10. Easements - Show all platted easements with dead book references labeled. Facilities and drainage
must be within platted casements. Provide copies of recorded documents.
11. Guardrail, fences or other safety provisions - display the constructed location of all safety
provisions; fences, guardrail, including the type, length and applied end treatments, compared to
design.
12. Material layers - biofilter media, stone layers, sand layers, keyways and cores must be verified as to
material types and depths. Include inspection reports, poring or test pit reports and materials
certifications. BioGller media must be an approved state mix.
13. Access roads -show location of access roads, surface treatment, drainage, etc, as applicable.
14. Compaction reports are nxluired to verify fill compaction in dams.
15. Manufacturers certifications for proprietary BMP's certifying proper installation and functioning.
EXISTING USE
Vacant Land
PROPOSED USE
Private School (Grades K-12)
LAND USE SCHEDULE
EXISTING Area
%
Building 0 SF
0%
Pavement 0 SF
0%
Sidewalk 0 SF
0%
Undeveloped Area 832,431.6 SF
100.0%
Total= 832,431.6 SF (19.11 ac.)
PROPOSED
Area
%
Building
31,900 SF
3.8%
Pavement
41,363 SF
5.0%
Sidewalk
40,796 SF
4.9%
Undeveloped Area
718,373 SF
86.3%
Total= 832,431.6 SF (19.11 ac.)
LIMITS OF DISTURBANCE
8.76 acres disturbance proposed.
STREAM BUFFER DISTURBANCE
2,136 sf stream buffer disturbance proposed. Mitigation planting required at a 2:1 ratio of disturbance.
2,136 sf x 2 = 4,272 sf
Option 1 a replanting - for every 400 sf unit or fraction thereof, plant one (1) canopy tree measuring 1.5"-2" caliper, one (1)
understory tree measure 0.75"-1.5" caliper, and one (1) small shrub 15"A 8" in height.
is specified on Sheet C11.
4,272 sf / 400 sf = 10.68
Required Mitigation Planting: 11 canopy trees, 11 understory trees, 11 shrubs
Provided Mitigation Planting: 11 canopy trees, 11 understory trees, 11 shrubs
FOREST AND OPEN SPACE / SWM EASEMENT
1) 5.43 acres Forest and Open Space / SWM Easement proposed.
2) The Forest and Open Space Easement is subject to the guidance set forth by DEQ in the Virginia Stormwater
Management Program. The areas will remain undisturbed in a natural, vegetated state, except for activities as approved by
the local program authority, such as forest management, control of invasive species, replanting and revegetating, passive
recreations (e.g. trails), and limited bush -hogging to maintain desired vegetative community (but no more than four times a
year, except as permitted by existing easements and agreements). Further, the construction, installation, relocation, repair,
replacement, operation, and maintenance of new or existing public utility structures and facilities shall be permitted as
described in existing and future utility easements and agreements.
3) No buildings, structures, or permanent roads (public or private) are permitted in SWM Open Space areas, except for
structures and facilities associated with public or private utilities (pipes, valves, manholes, etc.) provided, however, that after
construction, installation repair, replacement, operation, maintenance or removal of such utilities, any disturbed soil shall be
restored to its original condition or an engineered soil mix shall be placed per the design specifications, and the SWM Open
Space area or areas shall be returned to a natural vegetated state.
WP0202000028
TAX MAP 75, PARCEL 66
TAX MAP 76, PARCEL 17
ALBEMARLE COUNTY, VIRGINIA
VICINITY MAPSCALE : 1"=1000'
,;;t Ragged Mountain
Home 1t I
40 rV
Virginia Eagle
Distributing Co Q
SHEETINDEX
C1 COVER
C2 E&SC NARRATIVE
C3 SITE OVERVIEW
C4 E&SC PHASE 1
C5 E&SC PHASE 1
C6 E&SC PHASE 2
C7 E&SC PHASE 2
C8 E&SC PHASE 2
C9 E&SC PHASE 3
C10 E&SC PHASE 3
C11 E&SC PHASE 3 / MITIGATION PLAN
C12 STORM PROFILES
C13 SANITARY PROFILES
C14 E&SC DETAILS
C15 LAND USE MAP
C16 PRE DEVELOPMENT DRAINAGE MAP
C17 POST DEVELOPMENT DRAINAGE MAP
C18 POINTS OF ANALYSIS DRAINAGE MAP
!X
BUCKINGHAM
w
BALMORAL
HEIGHTS
RESERVOIR ROAD
I,
.•-,sson School
AO -SITE
Fontaine Research Park V
ndy Presbyterian
lurch
ArITray r;nlr O
and Gite•mg
.V 11' J- I
IMAGE PROVIDED BY GOOGLE MAPS
SHIMP
ENGINEERING
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
u
Lic.
VSMP PLAN
REGENTS
SCHOOL
r�4f l
I
H
mp a
183
jw�w�
gNG
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2020.05.14
REVISION:
1) 2020.08.03
2) 2020.10.22
FILE NO.
COVER
18.020
C1
PROJECT DESCRIPTION, GENERAL NOTES, EROSION & SEDIMENT CONTROL NOTES, AND SEQUENCE OF CONSTRUCTION
PROJECT DESCRIPTION
THIS PROJECT PROPOSES A PRIVATE SCHOOL WITH SEVERAL BUILDINGS AND
RECREATIONAL AREAS ON WHAT IS CURRENTLY VACANT LAND.
THE TOTAL AREA OF DISTURBANCE IS 8.76 ACRES.
EXISTING SITE CONDITIONS
ALL WORK SHALL BE COMPLETED ON THE SUBJECT PARCELS, ALBEMARLE COUNTY TMP
75-66 & 76-17. ON -SITE SLOPES ARE SOUTHEAST FACING AND AVERAGE 15%. THE SITE IS
CURRENTLY HEAVILY WOODED. STORMWATER FLOWS INTO AN EXISTING STREAM FROM
RAGGED MOUNTAIN RESERVOIR THAT EVENTUALLY LEADS TO MOORES CREEK.
ADJACENT PROPERTIES
THIS PROPERTY IS BORDERED TO THE NORTH BY RESERVOIR ROAD; TO THE EAST BY
TRINITY PRESBYTERIAN CHURCH; TO THE SOUTH BY THE U.S. 29 ENTRANCE RAMP TO
1-64W; AND TO THE WEST BY A VACANT PARCEL OWNED BY CLINTON KISNER.
SOILS
THIS SITE CONTAINS THE FOLLOWING SOIL TYPES BASED ON NRCS SOIL MAPS FOR
ALBEMARLE COUNTY VIRGINIA:
14C - CHESTER LOAM 7-15% SLOPES
19B - MINNIEVILLE LOAM 2-7% SLOPES
19C - MINNIEVILLE LOAM 7-15% SLOPES
19D - MINNIEVILLE LOAM 15-25% SLOPES
77 - DAN RIVER-CODORUS COMPLEX 0-2% SLOPES
OFFSITE AREAS:
EXCESS MATERIAL SHALL BE HAULED TO A SITE WITH AN APPROVED EROSION AND
SEDIMENT CONTROL PLAN. CONTRACTOR SHALL PROVIDE THE LOCATION OF AN
APPROVED WASTE AREA AT THE TIME OF THE PRE -CONSTRUCTION MEETING. THE
LOCATION MUST BE INCLUDED IN THE ON -SITE SWPPP.
CRITICAL AREAS
THERE ARE NO CRITICAL EROSION AREAS ON THE SUBJECT PARCEL.
EROSION & SEDIMENT CONTROLS
1. CONSTRUCTION ENTRANCE: INSTALL AND MAINTAIN A CONSTRUCTION ENTRANCE,
AS NECESSARY, THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.02 AND
CONFORMS WITH THE REQUIREMENTS OF THE EROSION & SEDIMENT CONTROL PLAN.
2. SILT FENCE: INSTALL AND MAINTAIN SILT FENCE THAT MEETS THE
REQUIREMENTS OF STD. AND SPEC. 3.05. THIS SILT FENCE SHALL BE INSTALLED AS
SHOWN ON THE EROSION & SEDIMENT CONTROL PLAN AND ACCOMPANYING DETAILS
FOR THE PURPOSE OF INTERCEPTING SILT -LADEN RUNOFF BEFORE IT IS DISCHARGED
FROM THE SITE. THE SILT FENCE SHALL BE INSPECTED AND MAINTAINED TO ENSURE
CONTINUED PERFORMANCE.
3. TEMPORARY SEDIMENT TRAP: A TEMPORARY SEDIMENT TRAP SHALL BE INSTALLED
PER THE EROSION AND SEDIMENT CONTROL PLAN FOR THE PURPOSE OF DETAINING
SEDIMENT AND SILT WITHIN STORM WATER RUNOFF. THE TRAPS SHALL REMAIN IN
PLACE UNTIL THE SITE IS STABILIZED UNLESS OTHERWISE NOTED ON THE PLAN.
4. TEMPORARY SEEDING: TEMPORARY SEEDING SHALL BE APPLIED TO ALL DENUDED
AREAS WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY OR MAY NOT BE AT
FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS.
TEMPORARY SEEDING SHALL BE APPLIED IN CONFORMANCE WITH STD. AND SPEC. 3.31.
5. PERMANENT SEEDING: ALL DENUDED AREAS SHALL BE SEEDED IN CONFORMANCE
WITH STD. AND SPEC. 3.32. PERMANENT SEEDING SHALL BE APPLIED TO AREAS
DELINEATED ON THESE PLANS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS
REACHED ON ANY PORTION OF THE SITE.
6. DUST CONTROL: CONDUCT DUST CONTROL OPERATIONS NECESSARY TO MET THE
REQUIREMENTS OF STD. & SPEC. 3.39 AS REQUIRED TO CONTROL SURFACE AND
AIRBORNE MOVEMENT OF DUST.
7. INLET PROTECTION: A STONE WEIR SHALL BE INSTALLED AS A SEDIMENT FILTER
LOCATED AT THE PROPOSED DROP INLET. REFER TO DETAILS ON SHEET C11.
8. TEMPORARY DIVERSION: TEMPORARY DIVERSION SHALL BE INSTALLED AS SHOWN ON
THE EROSION AND SEDIMENT CONTROL PLAN AND DETAILS. THE DIVERSIONS SHALL BE
INSTALLED PRIOR TO SIGNIFICANT LAND DISTURBING ACTIVITIES AND SHALL REMAIN IN
PLACE UNTIL THE SITE IS STABILIZED UNLESS OTHERWISE NOTED ON THE PLAN.
MANAGEMENT STRATEGY AND SEQUENCE OF CONSTRUCTION
THE FOLLOWING ARE THE PROPOSED MANAGEMENT STRATEGIES AND DETAILED
SEQUENCE OF CONSTRUCTION:
PHASE 1
1. INSTALL CONSTRUCTION ENTRANCE.
2. INSTALL SEDIMENT TRAPS 1,2, AND 3 WITH ASSOCIATED SILT FENCE.
3. INSTALL DIVERSION DIKES.
4. CALL COUNTY INSPECTOR FOR APPROVAL OF EROSION AND SEDIMENT CONTROL
MEASURES.
5. UPON APPROVAL, BEGIN MASS GRADING OF SITE.
6. PROTECT SOIL STOCKPILES WITH SILT FENCE AND TEMPORARY SEEDING AS
NECESSARY.
7. TRANSPORT DIRT FROM PARKING LOT AREA TO FIELD AREA.
PHASE 2
1. ONCE SITE IS BROUGHT TO GRADE, INSTALL STORM PIPE Al-A5 WITH CONNECTIONS
A3a AND A4a. DO NOT INSTALL MANHOLE Al IN THIS PHASE, INSTEAD DIG SMALL
CONVEYANCE CHANNEL FOR PIPE Al TO OUTLET TO SEDIMENT TRAP 2.
2. PLACE INLET PROTECTION ON ALL STORM INLETS.
3. BRING FIELD TO GRADE.
4. IF TOO MUCH WATER COLLECTS ON EASTERN HALF OF FIELD, PUMP IT TO SEDIMENT
TRAP 1.
5. STABILIZE FIELD AREA WITH PERMANENT SEEDING.
6. BEGIN WATER & SANITARY INSTALLATION.
PHASE 3
1. FINISH CONSTRUCTION OF BUILDINGS.
2. INSTALL RIP RAP CONVEYANCE CHANNEL AT OUTLET OF PIPE AO PRIOR TO PIPE
INSTALLATION.
3. STABILIZE PARKING AREA WITH BASE STONE.
4. ONCE PARKING AREA IS STABILIZED, INSTALL MANHOLE Al AND PIPES A1-A0, Al-A1x,
AND ALL ROOF AND YARD DRAINS.
5. ONCE FIELD IS STABILIZED, INSTALL PIPES A1d-Al AND B4-BO.
6. KEEP INLET PROTECTION IN PLACE UNTIL ENTIRE SITE IS STABILIZED.
7. REMOVE SEDIMENT TRAPS, BRINGING THOSE AREAS BACK TO ORIGINAL GRADE. APPLY
PERMANENT SEEDING AND LOW MAINTENANCE GROUND COVER WHERE SLOPES ARE
3:1 OR STEEPER.
8. INSTALL MITIGATION PLANTING IN DISTURBED STREAM BUFFER AREA PER PLANTING
SCHEDULE.
STORMWATER MANAGEMENT:
THIS SITE CONTAINS TWO DISTINCT DRAINAGE AREAS. RUNOFF FROM EACH DRAINAGE
AREA IS COLLECTED AND ANALYZED AT TWO DIFFERENT POINTS OF ANALYSIS, A & B.
THE RUNOFF TO POA A IS COLLECTED AND PIPED TO A STORMWATER CONVEYANCE
CHANNEL LINED WITH RIP RAP TO OUTLET AT A MANMADE PORTION OF STREAM LEADING
TO MOORES CREEK. AT THIS POINT OF OUTLET, THE DISTURBED AREA FROM THE SITE IS
LESS THAN 1 % OF THE CONTRIBUTING DRAINAGE AREA TO POA A. THEREFORE THIS
DRAINAGE AREA IS IN COMPLIANCE WITH CHANNEL & FLOOD PROTECTION ORDINANCE
9VAC25-870-66 SECTIONS B(1)(A) AND C(3)(A).
RUNOFF TO POA B IS PIPED AND OUTLET TO A NATURAL STREAM LEADING TO MOORES
CREEK. THIS DRAINAGE AREA WAS ANALYZED FOR COMPLIANCE WITH 9VAC25-870-66
SECTION B(3) AND SATISFIES THE ENERGY BALANCE EQUATION WITH A 0.8 IMPROVEMENT
FACTOR. THE POST DEVELOPMENT 10 YEAR, 24 HR PEAK FLOW RATE TO POA B IS LESS
THAN PRE DEVELOPMENT, THEREFORE THIS DRAINAGE AREA IS IN COMPLIANCE WITH
FLOOD PROTECTION REQUIREMENTS OUTLINED IN 9VAC25-870-66 SECTION C(2)(B).
TO SATISFY WATER QUALITY REQUIREMENTS, 5.43 ACRES OF THE PROPERTY WILL BE PUT
UNDER A FOREST AND OPEN SPACE / SWM EASEMENT. NUTRIENT CREDITS WILL BE
PURCHASED IN THE AMOUNT OF 2.79 LBS TO SATISFY THE REMAINING PHOSPHOROUS
REDUCTION REQUIREMENT.
CONSTRUCTION MAINTENANCE
THE FOLLOWING CONSTRUCTION MAINTENANCE PRACTICES SHALL BE FOLLOWED AT THE
SITE.
1. ALL E&S CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT
RAIN EVENT. ALL DEFICIENCIES IDENTIFIED DURING THESE INSPECTIONS SHALL BE
CORRECTED AS SOON AS PRACTICABLE.
2. THE SILT FENCE BARRIER SHALL BE REGULARLY CHECKED FOR UNDERMINING,
DETERIORATION OR SIGNIFICANT EROSION. SEDIMENT SHALL BE REMOVED AFTER
EACH STORM EVENT AND WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF
THE HEIGHT OF THE CONTROL.
3. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL MAINTENANCE
REQUIREMENTS SET FORTH IN THE CURRENT EDITION OF THE VIRGINIA SEDIMENT AND
EROSION CONTROL MANUAL, OTHER APPLICABLE COMMONWEALTH OF VIRGINIA
REGULATIONS AND THE PROJECT SPECIFICATIONS.
4. ALL SEEDED AREAS WILL BE REGULARLY CHECKED TO ENSURE THAT A GOOD STAND
OF GRASS IS MAINTAINED.
5. AREAS WITH RIP -RAP SHOULD BE REGULARLY INSPECTED TO DETERMINE IF HIGH
FLOWS HAVE DAMAGED THESE CONTROLS OR CAUSED EXCESSIVE SEDIMENT
DEPOSITION. ALL AREAS SHALL BE MAINTAINED IN ACCORDANCE WITH THE
REQUIREMENTS OF THIS E&S CONTROL PLAN.
ENVIRONMENTAL CONTROLS
1. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL ENVIRONMENTAL CONTROL
MEASURES SO AS TO COMPLY WITH LOCAL ORDINANCES, STATE AND FEDERAL LAWS
AND REGULATIONS APPLICABLE TO WATER POLLUTION IN WATERS OF THE STATE
AND IN INTERSTATE WATERS.
2. CONTRACTOR SHALL MINIMIZE THE POTENTIAL FOR AIR POLLUTION BY USING
EMISSION -CONTROL EQUIPMENT ON CONTRACTOR OPERATED EQUIPMENT,
SHUTTING DOWN MOTORIZED EQUIPMENT WHEN NOT IN USE, AND ACTIVELY
CONTROLLING DUST EMISSIONS THROUGHOUT THE PROJECT.
EROSION & SEDIMENT CONTROL PERMITTING
1. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE
EROSION AND SEDIMENT CONTROL PERMITS AND MAINTAINING ALL EROSION AND
SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS.
GENERALNOTES
1. THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO THE EXISTING
UNDERGROUND UTILITIES AT OR CONTIGUOUS TO THE SITE ARE BASED ON
INFORMATION AND DATA FURNISHED TO THE OWNER AND ENGINEER BY THE
OWNERS OF SUCH UNDERGROUND FACILITIES OR OTHERS. THE OWNER OR ENGINEER
SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF SUCH
INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR
CONFIRMING THE ACCURACY OF THE DATA, FOR LOCATING ALL UNDERGROUND
UTILITIES, FOR COORDINATION OF THE WORK WITH OWNERS OF SUCH UNDERGROUND
UTILITIES DURING CONSTRUCTION, FOR THE SAFETY AND PROTECTION THEREOF
AND REPAIRING ANY DAMAGE THERETO RESULTING FROM THE WORK. ALL OF THESE
CONDITIONS SHALL BE MET AT NO ADDITIONAL COST TO THE OWNER. THE
CONTRACTOR SHALL CONTACT "MISS UTILITIES" OF VIRGINIA AT 1-800-552-7001 PRIOR
TO THE START OF WORK.
2. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, ETC., THE
CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT
STRUCTURES FROM DAMAGE. REPLACEMENT OF DAMAGED STRUCTURES SHALL BE AT
THE CONTRACTOR'S EXPENSE.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SITE
STRUCTURES FROM DAMAGE AND COORDINATING WORK SO THAT THE OWNER CAN
MAKE NECESSARY ARRANGEMENTS TO MODIFY/PROTECT EXISTING STRUCTURES
FROM DAMAGES.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY OWNERS,
ADJACENT LAND OWNERS WHOSE PROPERTY MAY BE IMPACTED AND THE VIRGINIA
DEPARTMENT OF TRANSPORTATION PRIOR TO COMPLETING ANY OFF -SITE WORK.
5. CONTRACTOR SHALL NOTIFY AND COORDINATE ALL WORK INVOLVING EXISTING
UTILITIES WITH UTILITY OWNERS, AT LEAST 72 HOURS PRIOR TO THE START OF
CONSTRUCTION.
6. CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCIES BETWEEN EXISTING
CONDITIONS AND CONTRACT DOCUMENTS TO THE OWNER AND ENGINEER.
7. CONTRACTOR SHALL SUBMIT FOR THE APPROVAL OF THE OWNER SUBMITTALS OF
ALL SPECIFIED MATERIALS LISTED IN THE PLANS, TO INCLUDE SHOP DRAWINGS,
MANUFACTURER'S SPECIFICATIONS AND LABORATORY REPORTS. THE OWNER'S
APPROVAL OF SUBMITTALS WILL BE GENERAL AND WILL NOT RELIEVE THE THE
CONTRACTOR FROM THE RESPONSIBILITY OF ADHERENCE TO THE CONTRACT AND
FOR ANY ERROR THAT MAY EXIST.
8. FIELD DENSITY TESTS SHALL BE PERFORMED AT A FREQUENCY OF ONE TEST PER LIFT
PER 10,000 SO FT OF MATERIAL PLACED AND COMPACTED TO WITHIN 95 (%) PERCENT
OF STANDARD PROCTOR USING A GRID PATTERN OF 100 FT PER LIFT/OR AS CERTIFIED
BY A LICENSED GEOTECHNICAL ENGINEER.
EROSION & SEDIMENT CONTROL NOTES:
1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE
PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF
LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION.
2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND
MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE
VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS
VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS
THE FIRST STEP IN CLEARING.
4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE
MAINTAINED ON THE SITE AT ALL TIMES.
5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN
INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR
WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION
CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING
AUTHORITY.
6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION
CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS
DETERMINED BY THE PLAN APPROVING AUTHORITY.
7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES
AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT
UNTIL FINAL STABILIZATION IS ACHIEVED.
8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED
FILTERING DEVICE.
9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY
AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR
CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES
SHALL BE MADE IMMEDIATELY.
10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA.
11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL
SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND
OTHER DEBRIS.
12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION
PER ZONING ORDINANCE SECTION 5.1.28.
13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301
OF THE CODE OF ALBEMARLE.
14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT
SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:0013M.
15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT
MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS,
PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY
PUBLIC STREET BECAUSE 0 SLIDES, SINKING, OR COLLAPSE.
16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR
CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE
APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN
REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE
PROPERTY.
17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING
IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO
CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH
AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF
GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE
SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR.
18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING,
AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF,
INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT
1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL
0
BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95 h KENTUCKY 31 OR TALL FESCUE AND
0
0-5 /o PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE
APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY
EROSION CONTROL INSPECTOR.
19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH
RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE
REPAIRED IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET
STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE
RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND
DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE
CLEANED AND REPAIRED IMMEDIATELY.
20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED
WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER
NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR.
21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 YEAR
OF THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17-204G.)
22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE
(9) MONTHS AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. (WATER
PROTECTION ORDINANCE SECTION 17-207B)
MINIMUM STANDARDS (MS):
All applicable Virginia Erosion and Sediment Control Regulations and Minimum Standards shall be
adhered to during all phases of construction. These include, but are not limited to the following:
1. STABILIZATION OF DENUDED AREAS:
Permanent or temporary soil stabilization shall be applied to bare areas within seven days after
final grade is reached on any portion of the site. Temporary soil stabilization shall be applied
within seven days to denuded areas that may not be at final grade, but will remain dormant or
undisturbed for longer than 14 days. Permanent stabilization shall be applied at areas that are to
be left dormant for more than 1 year.
2. STABILIZATION OF SOIL STOCKPILES:
During construction of the project, soil stockpiles shall be stabilized or protected with sediment
trapping measures. The applicant is responsible for temporary protection and permanent
stabilization of all soil stockpiles on site as well as soil intentionally transported from the project
site.
3. PERMANENT VEGETATIVE COVER
A permanent vegetative cover shall be established on denuded areas not otherwise
permanently stabilized. Permanent vegetation shall not be considered established until a ground
cover is achieve that, in the opinion of the county Inspector, is uniform and mature enough to
survive to inhibit erosion.
4. TIMING & STABILIZATION OF SILT TRAPPING MEASURES:
Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to
trap sediment shall be constructed as a first step in any land disturbing activity and shall be made
functional before upslope land disturbance takes place.
5. STABILIZATION OF EARTHEN STRUCTURES:
Stabilization measures shall be applied to earthen structures such as dams, dikes and
diversions immediately after installation.
6. SEDIMENT TRAPS AND BASINS:
A sediment basin shall control surface runoff from disturbed areas that is comprised of flow
from drainage areas greater than or equal to three acres. The sediment basin shall be designed
and constructed to accommodate the anticipated sediment loading for the land disturbing activity.
The outfall device or system device shall take into account the total drainage area flowing through
the disturbed area to be served by the basin.
7. CUT AND FILL SLOPES:
Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion.
Slopes that are found to be eroding excessively within one year of permanent stabilization shall be
provided with additional slope stabilizing measures until the problem is corrected.
8. CONCENTRATED RUN-OFF DOWN CUT OR FILL SLOPES:
Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate
temporary or permanent channel, flume, or slope drain structure.
9. WATER SEEPS FROM A SLOPE FACE:
Whenever water seeps from a slope face, adequate drainage or other protection shall be
provided.
10. STORM SEWER INLET PROTECTION:
All storm sewer inlets that are made operable during construction shall be protected so that
sediment -laden water cannot enter the conveyance system without first being filtered or otherwise
treated to remove sediment.
11. STABILIZATION OF OUTLETS:
Before newly constructed stormwater conveyance channels are made operational, adequate
outlet protection and any required temporary or permanent channel lining shall be installed in both
the conveyance channel and receiving channel.
12. WORK IN LIVE WATERCOURSES:
When work in a live watercourse is performed, precautions shall be taken to minimize
encroachment, control sediment transport and stabilize the work area to the greatest extent
possible during construction. Nonerodible material shall be used for the construction of causeways
and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover
materials.
13. CROSSING ALIVE WATERCOURSE:
When a live watercourse must be crossed by construction vehicles more than twice in any six
month period, a temporary stream crossing constructed of nonerodible materials shall be provided.
14. APPLICABLE REGULATIONS:
All applicable federal, state and local regulations pertaining to working in or crossing live
watercourses shall be met.
15. STABILIZATION OF BED AND BANKS
The bed and banks of a watercourse shall be stabilized immediately after work in the
watercourse is completed.
16. UNDERGROUND UTILITIES:
Underground utilities shall be installed in accordance with the following standards in addition to
other criteria:
a. No more than 500 linear feet of trench may be opened at one time.
b. Excavated material shall be placed on the uphill side of trenches
c. Effluent for dewatering operations shall be filtered or passed through approved sediment
trapping device, or both, and discharged in a manner that does not adversely affect flowing
streams or offsite property.
d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion
and promote stabilization.
e. Restabilization shall be accomplished in accordance with these regulations.
f. Applicable safety regulations shall be complied with.
17. CONSTRUCTION ACCESS ROUTES:
Where construction vehicle access routes intersect paved public roads, provisions shall be
made to minimize the transport of sediment by vehicular tracking onto paved surfaces. Where
sediment is transported on to a public road surface, the road shall be cleaned thoroughly at the
end of each day. Sediment shall be removed by shoveling or sweeping and transported to a
sediment control disposal area. Street washing shall be allowed only after sediment is removed in
this manner. This provision shall apply to individual lots as well as to larger land disturbing
activities.
18. TEMPORARY E&S CONTROL MEASURE REMOVAL:
All temporary erosion and sediment control measures shall be removed within 30 days after
final site stabilization or after temporary measures are no longer needed, unless otherwise
authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting
from the disposition of temporary measures shall be permanently stabilized to prevent further
erosion and sediment.
19. ADEQUACY OF RECEIVING CHANNELS:
Properties and waterways downstream from the development site shall be protected from
sediment deposition, erosion and damage, due to increases in volume, velocity and peak flow
rates of stormwater runoff for the stated frequency storm of 24-hour duration.
SHIMP
ENGINEERIN G12.
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
Lic.
VSMP PLAN
REGENTS
SCHOOL
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2020.05.14
REVISION:
1) 2020.08.03
2) 2020.10.22
FILE NO.
E&SC NARRATIVE
SHEET C2 of C18
18.020
C2
v` F J: v�
\ \_W
IN
IN
1,
IN
It
D.B. 4 -_-
1 T
r I
SE INGLE ENTIA
� �
RLE
�D DICA
PER G.774 --
Y
1
I
V
\ a \ \ I r I
O
\ {
\ i
AVID RR6
P61 l54
TM 5 61
L �.. \ i� ♦♦ A,A / % , ZON : RT 11A
US�: SIN�LE FAiMILY SI T I
F '_� I� 1
CI HA f D SHf�UM
`N 5\ \ y ♦ r i _ DAB. 26S-�6y I
4 c \ \Y , / ' • / ,,'e i SE: SI GLE
�� y v > TMi75-6 _J r
\ R1 RESI ENTIA
1•i�\ \ \ \ A1v11t'f NTIAL � / I
v V i �`
IN
\
\ ' I
a
\ N TO DNN I r
D.E.
4 1 i NEE
CECIL JOHNSON I N/F
rP-S, v __ \ ♦�� !��� UNIVERSITY OF VIRGINIA FOUNDATION
1 SO E R1 RESIDF`7JiiAt - D.B 036 PG. 722 r
\ GLE F MILY ESIDEti TIG TM 76 14 A ' I' L sl,-- , 7QNE R1 RESIDENTIAL D.B. 4170, PG. 689
- S E FAMILY RESIDENTIAL i y =-v_� '_j•/� y '-- �^"�-i -�. _ E SIG!<
N , ZONE: R1TM RESIDENTIAL
v Y--}- _� �� N-45• USE: SINGLE FAMILY RESIDENTIAL
—J_ ,
7
� ,.. -431M1v
NTS SCHOOL 0 CHAELOT E LLE'.INC �/ '�-� v\ _ A\ '��'.��V 1�, � ��,� �= -C�_ 'C!,
D.B 62 7 LT 2 �l -�.a_�
61
SHIMP
1 ch _ \\ '-- ..i -���Z •�w� �y
- ! %% �` _ _ v��� ENGINEERING2.
11 I IN vv - _ - _ - -�-�' ���� [�. LAND PLANNING - PROJECT MANAGEMENT
♦
.� 1 1 � 1 1 r
i
_
�T i
_ - - ___ � i' `, 'i it iLS \ � '\� A � ♦ ♦♦X.
i _
- - - � A \�? \V♦i` � 912 E. HIGH ST. 434227.5140
�\
"; _ - � __-� �---/ - _ - Y '1 I r i ; 1� I � i 1, `� r'rp ��\ '�.. \v �.. �� CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
TS ,OP QISTQRB�I`l
v
� r
I �.
,
IN Ill
it
-
r
_ _ _ _ _- \1 _ - ♦ _ _ \_ ♦♦` .�l �'�- ' of\/-- +t,'�♦ ,_ -- ---- r.. - _ - \� �/ �_.i-` -� , \§29_ ♦\ _ = - -` ` ♦♦♦ \4
IN _
\
Tt-
_
I
I Fl IN'- Y - - -- rl
-
F
.ram - FOREST,AND, -�,e- - l -•;:--
FOREST AND OPEN SPACE x _ - -- _
•.SPA6€ E/kSEivIERJ \` e :• ' i S\♦ \.
\ s \ `y-� \�. ".by..- - - _ - -� \ ♦' ` - - '_,- `♦♦\
SWM EASEMENT AREA 5.43 - , ' - - - - , - \ `s
- - -
`II o\F\ _ - _ GENTS-SCHOOL-OF-kkARLOTI`ESV1G \�` 01
ACRES _ It
-_
Ilk
r
r
r
.s mpa
4 183
low w� 1
LSIONAL
_\ _ JI _' -_ ___ - "__ ♦a.. - I \\ _ -' T. _ - _ '� ems!• '' - - \7 / /-_ -` - i �Ai 1 ' , `�-_ ♦ S
-&9B'
_-- _ _
� _- - - _ _ _ - / .__ - _ REGENTS _ . �- - - �,
100 STREAM �' %t -- ;"--- ;� ;/-' I '`<.`\ ks
BUFFER `6` - - // IJLr
\\\`q`` �.\ Sa SCHOOL
\ \ ``,\"FCC\ -
`_ ♦ � n ♦- --_ � -_' - - ,ra/ n, yil'CI \`(f I l • I I, . \_---_- — \ v\l1 o\$ �l
\_
�-g
i>-- _:MA ED
Si\NIrES 100 R L_
\` ♦
COUNTY, VIRGINIA\ I - �_ FLOODPLAIN � SUBMISSION:
2020.05.14
\� --- ESSERVED
STEEP SLOPES,. �) REVISION:
v� = - Sl 2) 2020.10.22
� Q.
IN
IN
IN IN
I /
2,136 SF ♦1, 1 s/ _-- ----- —v _ IN
STREAM �� �� y
0.
BUFFER �'" vv r // ----- v
1 FILE
DISTURBANCE`\`, ;` ;18.020
I TRINITY PRES�YTERA ,CHURCH ♦�
D.B. TKO, PG.
r SITE OVERVIEW
,TM 76 17C //� A
� _
v 80 0 80 160 240
--------------
Il
v'� ��!_„ �I 1 ��. �, Graphic Scale: 1'=80' SHEET C3 Of C18
Iry — �. - �-
_ ;=" /'
T�V}— 5� 61 A, I i 0 o G
� I�
° 00 D.B. 9�, PG. 722 '
R1 RSIDNPfi ---- I TM �6-14 I
E F MILY RESIDHITIAL
I ZQNE: R1 RESIDENTIAL I
USE: SQG�E FAMILY RESIDENTIAL
aw
Abmu
\Ot—avu—aHu—au—\aw—emu �_oHU
22� 2 � � ST1 /— — i — — � — f Rl%0AD A
i
-7 ` x
UNIVERSITY
UI-
vlKoiNiH
rvulvuH II�IN
D.B.
4170,
PG.
689
TM 76-13B
ZONE: R1 RESIDENTIAL
USE: SINGLE FAMILY RESIDENTIAL
\ ` �� �� \ 4 �� \
/- .-12_ \ \ \ \ \\ \\ \
DEAD PINE X. 18" v vC \ X. 20" �� /� v v �
- TREE TBR �� PINE v /v p v v A
C X. 15" -_-_- PIN V of
PINE ---- ��
>k. y I I
/�Z_, -- --- — — DEAD
TR TREEFINE
, �\ \ III P PLN6R\
2" S \
CIN ERRY151,
� = -- -♦ \ \\ CEX.I, 12\\P E♦ \\ \ �c v\ \ `
SEDIMENT TRAP 2 \ /
1 \ w
\ DRAINAGE AREA 7 � ♦ X. 6'
2.20 ACRES
`\(TRAP SIZED FOR \� \\ I vs0 \ I X. 10'1\
LARGEST DRAINAGE / MAPLE-
AREA\SHOWN IN PHASE 2) �9 / 0 N /1 \\ /'C \\ \ \�
- - - - -P 0
/ , 1 1
vv �lJ EMAPLE v � KX. 2'��,pv+i V / ♦ vv \\
� 1 I \� EX. ---
/ � � M PL � \
AD DX.
R BAD PI \
II I I \ v \ THE Y811 - _
/ 1•
-- /
71
EX. 15 , P I I \\ �" � \ \ ' \ � \� \ � 12 / TREE TAR X 18
- v 1 //0 POP A " SANS ORTI OF DIRTW O FlE FIELD URING / / CSC �� Ex / �11 w ^ AK\ v
X. 15" X. 12" "' -LOCTJ
TBII
- / EX. 1 / MAPLE Q AD - v � __M — v
f
/ EX. 18 IMAPLE 15" APLE " \ \\ \\ \ � / SEDILARGEST AREA SHOWN) AREA _max iP' \ \ \ \ \ \`\ \ \ - _ — �R
-- --' / PIN / / MA LE --- - - \ \ / I DEADPINE----'-' ��� ------
Y / 1$"X. P"1E15 \\\ \\ i-_�HQQr__ I 8 \ \ / \ - -TREE TBR
/ X 24"/ 1 MAP O" XI 18`R v / - --- - Q 1 v v 15"-------
g X. 6 \-_-- 2.37ACRES \ \
X. 24" X. 1'8" OPLAk PLE /BEECH Xi 15" \ \ / \ _ /' P PLAR� \ \ - - DEAD_-PNE. _ - -
'POPLAR X. 15" 10 MA " OAIC - - - \ \ \ /\
PINE ICE EX. 1 \ " I CHERRY ` \ / \'--- \ \ 1 TREE TER ----
X. 18 MAP E `� 18" X. 1 _ - -__ \ ---- --'
X. 0" APLE A. X. 15 _ \ - - - - - -
- - - - ..Eif� POPLAR \ � � _ _ � - - - -
/ EX.1 /// PO - 'POP�RR \\\%\ \� ` `
- BE B X_ 6" \ \ - � / �o �i i'EX. 2 "14LAPLE / \ \
s��� - - - - -
:: X HICKORY - _ \ - - - - / ' / /' LFr 15 OP�AR - - X. 8" \/ \ - - - — _ —
• 8"
" E H o 15"
EX. 1 P EI EX. CA X. 1�1 ORY X. 10" /' / / /EBEECH
MAP E- MAP - \ \ A L MAPLE_ \ / EX. 1 / - LAR 6 x.\
\ - - / - X.iS pLE \ /\ - -
\ X. 15" \\ 15 X. 5" I ORY _ — — — / // // O �,i POPLAR
" PINE X. 6 , - _ / �" / -
X. / EEC X. 15" v _
- - X^1 -M LE X. 18" \ 7-------
B H ^ _ 8"/ E 18 \ \\ X. 1 '�"" N 1 C O - HI \\ \ MAPL POPLAR------- \ /--------- // / / POP HYC OR 4 PIN 1BR EPLA I \ // \-------- ivol
ce, -
1
n ,T \� 1 \ !+ PLA` / _1u PINE _ I \ / - �_- N — — ''-4r- ---
KO I p _ B CH EX. / / HICKORYr I �\ h - -- % - - - - - -
if '
"
MAPLE < __ =_ POP R X. 10" /------_ _ / -I M�$L POPL X_10"I
1 � ♦ �'� - \ X. � 1 APLE EX. 1
E ( - / I
`\ "X. 12" _ 7 5 � `� APLE MAPLE \ \ -Eit 12 / --- / 5 \\\
A
�
- Z / X. 10 -
_ CIA - MAPLE " - - 1 / \ - 18 \ /_-
\ / 1 BEEC X` � � Sig
\ f
\ R Y X. 12' `� X. , 5' l GKOR C \ \ \ X MAPLE \ 1 OAK` \ - HI lZOR1� // \ 1 / / ` APLE HOLLY / / MAPLE / X. 1�" X / APLE \ / _ - \ - - - - - - - - - - - - \ ! _ _ _ _ \
v \ \ O OAK PI R 5 - i - i / -EX. 12 OAIS M�P
MAPLE LAR �-
��L MA CIN \Ile
I �-� 1-- '6AK i / L._. - X.,'1 _ '1v� - I Ate_ �-�
1 X III \ i 1 - - ool
Ry
/ I � A /--_ _ - _
OPL
\� V "1 \„ - - �� \�„ ,i�T'H �KORY PINEDEAD TBR , D / �� D ��/(I /^-1 �- /v vv V _�+
6" -E 18- 6 _ c �+
\ DEAD x g• hPLE 15" i / I1� \ \
\ MAPLE '9AK \ HICK RY / �--- -\ -\ \ n •�.R /� -\'�-' L
\ -
12" 2 \ \ _
\ \ \ / — \ - '� E<X. 10 ,a EX\ 15' �.��� \ \ > 0 / / / �� _� ` / \ Ir p \
OAK ` APLE p7 1 - ' MAP ( ��/ / ---- f
1 �- __ \y/
SEX. 8 \ �X /--I VA - I __ ' / 15• AK X. -_
ZI MAPLE / i - v f
XEECH\ - - I \ \\` \\� \` \\\�\\ / -_ C / /' - ��` 1 TBR A4 FIP LEA'---' / //j /--- BOTTOM �Q/1 - f���- `_\ ^\ \\ �,� _Q
v / v _ _
-- - \ ELEV 483.0'/ 9 T `�\I \
1 I ell
\ — X. 2'i \ _ i ff i
\ ♦ -_ _ SOAK OAK / _ \ \ y \ / �� — i / / / •7 -
_ s' I . \
00
411
41.
00
EX.__2 _AK / V 1 \ v - I - T / / 40 �- /
\\ / PINE _ _ \ I, I ♦� \ / / / / r� / 1 / / / / /
v - - - �" / �� �-
BOTTOM - / i i / / /
s
< ELEV 487.0' y -� s�� / \ — — /
- i / /I / i/ i / 00,00
00
j---
211
JII
_ — _ —
�\ v / 2 /
\ / F 2- ---XX
ow
L
100
/ /
--- �- T - i'
/
00
40
100
00
- -�� �Q / �f
\ / `- _
00
- A
\ '� / / / % / \
00
-470 -rt-�, /�l v �v
------' v v \
--
vv • �A \\ \ -v i
1 V � v yam'• �v I \ ! \ v � 1 � �v ,, � `v — — _ ,' ,'� /�__�I / � 1 I 1 / / � i/ /� 1 A r � \\ 1v- �v � � V I v A_ - v — — — � / v v
_45 02,44" \E 30 0 30 60 90 6. PROTECT
\ \ \ TEMPORAF
264\\\� \\ \\ \\ \\ Graphic Scale: 1"=30' 7. TRANSPOF
\ \ \.3 \ \\ \\ \ \ \ AREA.
SOIL Ell
SYMB
Px PHASE 1 LIMITS OF- ♦ \ \ INE \ `
v v vv vv v —BANCE 0 ---
s,t���s�\ ::,�\-T,_� _ X. 15" 20 E\T B LDING S BA K - s = .\``` ✓�� �
I I
EX 18 PINE \own
V A v \ \I 6..la —
J� \ \ \\ \\ \ \\ \ E.30 (PINE 1 � \ X. 18"
Z V AV A v V A V DEA PINE I EX. 1 T X. 18" �/
UI \ \ \ 1 \ 1 1RE TER I DEAD PIE I EX. 15 PINE 24" ---_ \
V \ L DEAD PINE I V A
H \V A v\ \\ \ V A TREE R TREE TBR X. 1 "� ��! I \ _ �� [DRAWN TI
12
-- \ \ \ \ 1
EX. Intl
-� - � v I v P FC
I_ \ 1 1 1 'DEAD PINE
\\ \ TREE TO PNE
\ \ \ 11 1 I
\ � 1 11 I
\ --- \ CP I
1 I ill I - � \ - I .1_____ I II
I
\ I
� - I
1 � L
\ \ I
I
/ 0
---- 1 v
— i r rt \
---
/ 11 I
SHIMP
ENGINEERING2'"
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA 22902 JUSTIN@SHIMP-ENGINEERING.COM
"P
r+
MP a
Lic.
VSMP PLAN
REGENTS
SCHOOL
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2020.05.14
REVISION:
1) 2020.08.03
2) 2020.10.22
FILE NO.
E&SC PHASE 1
SHEET C4 of C18
C4
i. ;-- 2 -PHASE 1
-
- - /
---- - T -
_ -- � / � �" _ ��� � i CECIL JOHNSO
v ` I---- I RESID�NTTA�; D.B. 936, PG. 72
ZOf�E: R� +-- � 1. INSTALL CONSTRUCTION ENTRANCE.
-� -- I ;I � I �� � � TM 76-14
I —
�� - S GLE FAMILY ESIDENTPL RESIDENTIAL 2. INSTALL SEDIMENT TRAPS 1,2, AND 3 WITH ASSOCIATED
/ v�v-3E_ I �� ZQNE: R1 RE SILT FENCE.
/ I I
�— _____ - ► USE: SIN��E FAMILY RESIDENTIAL 3. INSTALL DIVERSION DIKES.
—
\ \ \ -
-� - APPROVAL OF EROSION
- I \� " 4 CALL COUNTY INSPECTOR FOR
AND SEDIMENT CONTROL MEASURES.
-- / /
/-�� . / \ \ \ \ \ \ \ Graphic Scale: 1 "=30'
/ / 1 \ ; -- \ \ , _-_ =- I\ \� ` IP- �-�� \� �\ -- emu_-u_\ \\ \\ \ \ \ \ \ I 5. UPON APPROVAL, BEGIN MASS GRADING OF SITE.
�� v v4 v w \ C V ` vv -----E----� _ x�� �� ���-a�� v vv 1 6. PROTECT SOIL STOCKPILES WITH SILT FENCE AND
\ °'�' —lane—��Taiu
\ ___- 4 _ - � TEMPORARY SEEDING AS NECESSARY.
-/ - _\ 7. TRANSPORT DIRT FROM PARKING LOT AREA TO FIELD
\\\ \\ \\ -\
\ _ _ li D /� _ \ \ ��\.3 AREA.
i \ --\\ \� ♦ ,, \ \^_ F��� ' �- — — 57R\ \ - — -1 _---j— _—♦-� — SOIL EROSION & SEDIMENT CONTROL SYMBOLS
-7-1 AN
� SYMBOL N0. TITLE KEY
IT \ v A \ \\ \ \ v \ \V.---_--__�♦� �� \ \ OF <��� PINE \V 3.02 CONSTRUCTION ENTRANCE CE I
\ \ >
\i. F \ ; _
\ � I
\ \ \ \ \ \I \ \ \ \ PHASE\1 LIMIT5
\ x x x x _ SILT FENCE
\ \ \ INE \ \ \ — — — 3 05 S L SF
� — � \ � \ \ \ \ � DISTURBANCE I z0 L[
v A --� 1 X. �15 E.T B
_ 1 � � ' ' � � � A A � �� — �-- -♦ � �` I � EX 18 1 PINE \ A ® 3.07 INLET PROTECTION IP
V �� V \v A INE A
\ 28 XG1 \ V A ?v \ A V V A A V A I V A I I EX. 15 I \ X. 1 3.09 TEMPORARY DIVERSION DIKE DO
\ — ELEV �) .0 // / A \ V v\ \\ \V I `\ \ '� V - _ A V A A V I E�C 30 EX 1\ I I PINE 1 3.11 RIGHT OF WAY DIVERSION 10
v — \ ;� �- V A V DEA PINE I
\ F=U-I \ \ \ \ \ \ \
\ \_\ \\ \ R TREE A 313 TEMPORARY SEDIMENT TRAP
_ DEAD PINE EX. 15
\ \ -- \ I \ \ \ \ - - 3.18 OUTLET PROTECTION
\\ \ \ \ \\ \X ` E TB IR DAD PINE X 1 DRAWN TO SCALE] ST
\ \ �;\ EE TBR /
EX. 12 EX. 12 24" oP
N / / DEAD PINE
/ / \ — \ \ \ 1 I PIN / P NE 3.31 TEMPORARY SEEDING TS
I I\ \\ \ �� v v v\ vv \ TREE TBR� — o--
i ITIT DEAD
\ � 1 I I I I I I
/ DEAD PINE
v M
3.32 PERMAN
ENT SEEDING
\ TREE TBR_ P 3.35 MULCH PS
3 3 DUST 0 TRO O
v s us CON L
oc
-6J it / I/ / I v A v I V A� 1 I I I l l l LIMITS OF DISTURBANCE
\,
/l / SEDIMENT TRAP 1 DRAINAGE AR
--- �I — �� �/ \ / 2.97ACR8� — _ — /'I I STOCKPILE
•� — � \\V���� � � / �—
i —_
�0
IT
/ /
/ y --v v v
— r � \ ; \ I I I \/ I I I I SEDIMENT TRAP 2 \
I / \ = 1 \ \\
r \ \
II 1`
I \\ DRAINAGE AREA
/ — I ` 2.20 ACRES /
---1w��� v (TRAP SIZED FOR �
\ � _ /\ \ __ \ —� / ' � / / j �-- I I / — 1 \� \ � � / \ \\ I II AINAGE
AREA\SHOWN RN PHASE 2
\ IT �A / / i -
i _-___-/l -- �'' � \\ II /
--I -L
_ -- -
IT IT/ - - /
�� / ��--�L —il � � II II II II I\1 v\V /
EX. �5 1
� POP AR I I X. 18" X. 12" I I
\ \ \
/ / _ i POPL A 15" /
C \ \ — ING
'/ � i // / /� � / '_�\ EX'O \ II \ITRANS�ORTI OF DIRT W TO FIELDAREABUR
LE �
/ X. 10" /
— E LE
/ MAPLE APLE 1 \ \
I / X. v1�8 / A
/ PI
MA LE
---� v �------- / / 8" IX. O
/ A A \ V A �\ �— �F� , X. 24",— PIE v SHIMP
/ / / / / X. 0" APL HICKOR I 15"
X.
AP
I POPLAR X. 15" �EX8" OPLAfE M X / 8" / PLE Off" M BEECH" X 15" v v v /
G vv v / // / EX. 14" X.
10 MAP X. 1 " CH RY G�'` pp G�''``
/ /— / PINE EX.1 EN�7INEECINU
7'
-- I POPLAR X. 1 APLE 1 P 6" POPLAR \ \ \ / LAND PLANNING - PROJECT MANAGEMENT
,,_ —
/ / IT EX. 1 K 8E" IC O — /
f ♦ i �' / TS 0 / / �� � vv MAP EI EX. 1 � 8" X. �E H HICKORY—_�-----/
\ / \ �. .91s MA E 1, \ KORY X. 10" \
\� F� �'� �� DI C� _�� EX. 1 OA X. 1� _— --_ / 912 E. HIGH ST. 434.227.5140
__— — _\ \ O ► _ / i MAP \ — MAPL \ \ A MAPLE — — — \ \ = _ — CHARLOTTESVILLE VA 22902 JUSTIN@SHIMP-ENGINEERING.COM
'vv 5" vv
15" \ \ X. 12 a I C X \ / —
09 X. 6 1NAPLE 12" P A X. 18 \ 7 — _ _
— v v R — HICKORY v MAC POLAR— — — — — — — — / — —
_ PiNE
�� — i l MAP 6 H g"/ 18 v X. 1 �_�� • v
T I IN
_ X �� q __= 10 M
-3—T �E51. A \ \ y' �� — — — \, MAPLE ��APL€ ..� 1� v v (. 1_ _ v\ M PL " A BE —
OP
\\ vv vv \\ — v _LMAPLE
�. �v ♦ ������ MAPLE �� \I "X F -� P� � / —� X. 10" ---
5" v , MAPLE
\ v A 1 RRY X. OA — v MA LE 5 � V A A t Eif: 12 /�
\ OAK 8_ A X 15 V / BEEC / ' N X` 1— (,1
\ 0 v v v v v -- MAPLE — vv v \ \-- v 0 PX. 12 X 15'S GSQR V A� X. 2" t�1APLE \ fr"�/ / / APLE
- ECH _AR v aAK��x. 15 CIN 'kuEoR/ --- �i _ - 2
`C
_ _ MAP A Yi 12 1�
_ - —\ — ` \ \ \ \ \ \ \ \ \ \ \ LE E 6 `•.` X 5,. 'R E _ P —
—
- \ X l ' M E„ , —��
•� / i A \ � A _�_\\ A\ v \ V ` A v v --- OAK - '. 12.' /� V �1�" X .d
0 \ i EX. 12 �QIGUU�w
\ \ \ \ \ \ \ \ \ \ \ \ \ \ EX. 1 \ E�' OA1 X \ \ EX 5 I - HC
—I A A V A v _ v o i v PLI v-� �`�� k! 1 Y ��7 MAPLE --- O
\\ YX"Qil ---SOP R-- P41C RY \ PLA II 0 K �I LA �..�PS '�NIAF\ T� 6" fY.-18. - I TB +��y
i\ _ _ � -\ � l i \ \ 1 � 'In'I�KORY DEAD ;DE
v v _ _ _A. .� PINE TBR
vA v A _ _ — — v 1 i— P
— _ — — — — DEAD X. 8" H — \
— /
_ A OAK ICK RY i -� .� -V A 10" 'EXV 15' v A 0'
x \ V A \ v A \ v _ - - - v \ \ \ X _ A \ --- - \ XAPLE QAK MA
���
18 \ \ - - _ _ _ \------- -r----
\ PI -MAPLE \ OA \
--EX. 2"
�`vOA'� v V v OAK z., V �\ \�I ���- ��v� I �
0 \
IT
— ' \ _
X. 12 / 12" Av A� Avv /� /� / // IfTBR
\ \ M,4PLE �
i - �\� EEOH � _M PLE, - - -\ \ � _�� `� / � '� _ _, VSMPPLAN
\\ \ v A _ y — vv \ A E� X. 12 — — �_�\V \ \ I v I� — —
• 2� --
OA / --= — REGENTS
v �v v v --- 8 —
\ 1 K
\T,`\ \ \\ _--- _ EX AK 2 _ SCHOOL
IT
PINE
I
` ♦��v BOTTOM
ALBEMARLE COUNTY V IRGINIA
28L v� SUBMISSION:
-ELE
v - 2020.05.14
REVISION:
-
`v A ,\\ \\ 1 =9--+�-�_? _-` 1j2020.08.03
v_ v v v ` _
- _ _ `v y A `v - - '�1 - - 2)2020.10.22
vIT-
— v v vV A — — V V / _
F \ ___ �_____ /
I\. A A 1 {IT
\\ \ \ \ \ \Jo 1 \ \ — -- - _ _ - ---
\ h ` \ \ 0' 4 -- -
v v y ----
.\ I
WON
yy q
V ff - - FILE NO
v v y A �. r v — V v
- _ �� \v - "� A --- - Q �r \ - _ A / l --- _ — — i _ _
__\.. A y- A\ —i i �-_.� — ------ .
v v v v v �\ v — v v
IT
v —v _
vA > V A v v - ---- — i
y v v `.v ,-
E&SC PHASE 1
�*-� \ v L
v vv�Vvv _ —I v /' \ ---- / ----
V�A ��. v v \V y / — J
IT I, \ w� v v may- ���., v v \ `� 1� - �'vv �o IT
0, v� v`v ��_r -�_v - v A� —----%�I� /� SHEET of
_
vv vv , , C5
rll n 'PT I o CECIL&i,_JUHI\IJuly
M- 1a ��I , -�� , UNIVERSITY UI vIK�iI�IH rvulvu UIN SEQUENCE FCONSTRUCTION-PHASE 2
D. g PG. 722 D.B. 4170, PG. 689
R1 RSIDNTPfi ---- I TM 1�6-14 I
1. ONCE SITE IS BROUGHT TO GRADE, INSTALL STORM
E F MI`LY RESIDL'�NTIAL ZQNE: R1 RESIDENTIAL TM 76-1 3B PIPE Al-A5 WITH CONNECTIONS A3a AND A4a. DO
i L , NOT INSTALL MANHOLE Al IN THIS PHASE, INSTEAD DIG
USE: SIN'G�E FAMILY RESIDENT(
-i- - Z � N E: R 1 R E S 0 E N TI A D SMALL CONVEYANCE CHANNEL FOR PIPE Al TO OUTLET
TO SEDIMENT TRAP 2.
\ II\ \ \ I USE : D N G D E E A M I L Y D E S I D E N T I A D 2. PLACE INLET PROTECTION ON ALL STORM INLETS.
-� �« ---- \ \ 3. BRING FIELD TO GRADE.
\ --\;_� - -� \ \\ y q J�D2 L�4" D 30 0 30 60 90 4. IF T00 MUCH WATER COLLECTS ON EASTERN HALF OF
FIELD, PUMP IT TO SEDIMENT TRAP 1.
i\\ \\ \\ `\ \\ \\ \\ Graphic Scale: 1 "=30' 5. STABILIZE FIELD AREA WITH PERMANENT SEEDING.
�too �D A \ \ 26�\• D �\ \\ \ \ \ `\ 6. BEGIN WATER & SANITARY INSTALLATION.
SOIL EROSION &SEDIMENT CONTROL SYMBOLS
�(/�I SYMBOL NO TITLE KEY
.' mm I ' 3 02 CONSTRUCTION ENTRANCE
C� V A \ \ \ \ \ A ♦ -
a I e r -� / ,\r-e a 3.05 SILT FENCE o
CE
\\ \\ \ \\ \\ \ \ \ 11 I \ I 1 1 CI I\0O \ - \ \\ \ 3.09 TEMPORARY DIVERSION DIKE DO
!. e r/ fop - \ \ 3.11 RIGHT OF WAY DIVERSION 10
\ \ _ ------ \ ---- 1 `- -- - \ 1 ` 11 II i I 4' GR \ - - - - - \ \ 3.13 TEMPORARY SEDIMENT TRAP ST
V61 A\ vv v x9 _ I I (SHOULDER \ V [DRAWN TO SCALE]
V A -r----- MA i2:1 SLOPE
I•
\ >
_ p � � � � � 3.18 OUTLET PROTECTION OP
� I V V A A .P`�cP � v v
xy v v vv v-
\ 3.31 TEMPORARY SEEDING TS
50 --�3.32 PERMANENT SEEDING PS
"NO PARK( FI E 7/ _ \ V ��� \v \v \\ 26. v\ x27' � / A � v
� - v v v _ 3.35 MULCH
LAN (' SIG S YELLOW \ \ _
Q \ \ \ I 1 I I I I I I a PAINT ON URB // / 24 \\ �\ \ \\ �� x0�. 1 S � I Q 3.39 OUST CONTROL DC
\ LIMITS OF DISTURBANCE
v I I (P {19,
f I 1800 S I j 1 \ A v A 11 x \
--- G MNASIU / i / / --- �\ 01 11 1
/ o FFE 519.75 x191�'I
/ o A; 22 \ 23 °°
x - 1t---- A ♦ 1 6' A
- -
20 II 9.0' V - �v\vv�_ ��p v
97° ,..� .00 I II I \\\ / %'ouMaeiEa t \\ \\ ♦�IAvA�d: x �♦ \\\ /x0��
Alk W EDIMENT TRAP 2 DRAIN ISE AR ?g p
// I \ 19 \ \ 2.93 ACRES N / PAO. , \ ♦ x , \9p �` ♦ \ \ ♦ \ \
/ 80 \ 0' \ 18 I LA " SIGIQ R YELLO 2 /'ouMt,G7ea \ \ �\p ` ♦ \ \
I '�'� UTCD R7-8 /
7 / "•.I PA TON C R 20 \ \ \ ♦ ♦ ��' \
( / b .I. w 1 R7-80 PLACA TYP)
- ' RETAI G W N l \ ✓ I % \ `� 9 10
A ll _ o /iv ��
MAX HET. T 1 .Ol �S °�.'° d (\x II x18 17 4 1 1 \\ 0 29 CO
o o \ �'-
I 0.0'
� ® I
17 ISE 1680 °`17, m. / 5 •.al N' I \ \ o - -O 150 .��' w �„`` �. \ \ ♦ O
8 21 18.0' ! w
1318 I .01
17''P I 1 w 00 25 W / ♦♦� \X
�19 ISEYE ! I LOCK�'16
RF \\ Lw \ I�zo KJ o -r- - - w
w�' �W w _N -w,-w -w -w -w -w -w -20 w -w -w -w -w -w w ,-- - i♦�__ �\ \ \ \ _..,I __ -
/ I i 98'�° / I X -� �G-6 NOT T s o f - ---\ .- -- --- SHIMP
12�'x° ''.;s ..:: •, �.1..%.,. Ay� .., %gl' I °'' \\ `•, EXCEED KSLOPE -� �\ f--- \\ \\ \\ _ - --- --- /
4 .. 'oi6 I �yn AT -12 3� SVC �\ ) - i L' / \ - _ \ \ \
4'• VC f STACKING AND LOADIN AREA DD�\\\ \\ \\ \ _ .�` --- ,-_ - - - ENGINEERING'°
Iv 6 F \ "A.-. �. 15'HDPE .a. CG-6 n°i 7 N Y�F -�LJ�_ 1 �i -\\\' \�- i
.}I 6 \
„� a rn o \pOER \ 5 y, •/ 5' MU GHED-PED€STRIAN P TfTT T
\ \a' 8. - FFE 12.5 .Q� \ REGENTS -]_2.:.
O \ RET I G� LL \ 117 \ PLAZA �, _ ECG a W p °n�.. °✓,. i \ - _ ' /
4 06 08 �I T 14. "\`u' :;. 600 SF fi °-n-�- " / / ---- �` �.;
_---_ \ ° ° " ° , \ \ \ --- _ --- 912 E. HIGH ST 4342275140
AIn�N �
LOCKER
\ 4 j-jL/,�ry�J `y u, s 4U.6 r,\ - __ 2255 SF -ON pCFO SR 0 �C�LASOS♦SIF �O �- I' 6 M\ \ \\ \�LY4SS B TYPE+ R NAT E -_ CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
FFE 5h?.5 f�M?)lK IN$IkSIHIT 1n A c„-2;686-5�- _ /�� &EfF�ITS - - - -. 4' 5X$ / F�/5 5 JI / / 1 \ \ `�fjR�+IL �Ef+ .AL BEVLE C�IJ Ll'_�
-- _ �^� no o ADMINISTRATIVE V - / - - �CC9q..HCS }j - --- /�
\ \4 -
\_ FFE318 ---- --- --- ----
BUILDIN �� IS-STABIT ZED PA ,� \ \ P`6� jkp f
HALL x
�FE 518.5 r x SEDIMEN RA \ \ � -�
6�fj x x � \ � � \ �
ceAss o / READY TO BE OV€D-
A1 MAXIMUM DLO
\ . -�`•, O O -\ __ I s \ .� 36.35' - -3 FFE 5 $.5 °. �♦ \ +. 'f~'' _ - - -
:
SF
1 / t ;/� 21.58�- G // EF\-1 ,x y�♦ \\\ , \\ _ -
S @ _ FA I-� \ -
RISERS 600 SF ) -
x _ r - L BROOM
�\�m \ 4 FFE 516..`a -�---------
\.., \ ) R .16' 60b p
� A \ - - _
\ MA CIN ` -- --- - - sFE s�1a.�i - x\ I \\ \ = ------ - \-- f' ;T - > ��� -=-- -- L .,.t� � � � � � � ,ter � � ��y,�y,.,y�7I,. F� - .� °� �� "� ��'�r r'��= _ _ _ r � - � � "c. .43183� a
\ x \ x x I \ a \\--e,� \�\ IW ♦ /� x\t" GFFE 51A / 655 "-5 hT / / // r sue\--_�caL \\ �= _----------- -_-_ f� �- x - p `hU
♦� I p 600 SIF _ / GY-EE5 3 / DJ�S
/ --------------- --_-- �-
i
o_ FFE 514.5 60 RO 5 Ir y Tw)-TNE -x /�/ ,�_\ 1e96 F -"f�P 5� S / f II
F 0 / 0 \ \ -
v CLASSRO
S \ \ - / FIFE 514.5//
\ \ \ \ \ \\ / \ / --�/ / _- I 6005Rp 5 17 RISER I /� / I / BOTTOM ---' - - f\\ l ♦ I j
\ S\ - / J' GEFE �1// �/ II I ELW483.0'/' / , ,/ 9�- �7� ` •\ �T 1 ♦ \ VSMP PLAN
// 6
�- �� _ / vv v A �v - ---- --$J ISEj2 - BUILDING F� f �\ N 8" SAN EWER_- / l
♦.� - I v - -- b,� / / --- / - _ A CLEANOU SDR-35 TYP A
�� REGENTS
\ I " \ \ LE ATED ON PIER - / _ _ _ - --- f \ \ \ � ,E V �'
sD _ --I- SCHOOL
_ FOUNDi�T40NS_ G
\
BorroM ® v --- 00
10
�/ -� COUNTY,IRGINIA
\ `� \ \ '
_ Z���{�{ _ ALBEMARLE
28-ifOO'-- // /tr' A �._ // / j �� / / // /
' / /% / /
ELEV 487.0 / / - -
_ AAAA11Pr,_
v , _ - - _- �_ �-_- v--- ♦ v v .�A - I � v �- � .►'�_ / - - �_- / � L� I / / � ���/ ,'- ,�' / / � SUBMISSION:
:v 2 2020.05.14
r -- - ---
--- ---- Z
- v 1 � - � �_' � �/ • f / � 1 /' / / REVISION:
Acac� L _ .v - - - ; _ - - -- ---1) 2020.08.03
- � s
r i
Wood
) 0201022
v V �r� // 2 2
�iF- .a ,/
v
v - \ �� \\-- / 'i 1. // // /
\ \ / / XCAVATED MATERIAL SHALL BE \
�c �0 _ - _ ------ / / / /
/� � � // D �/ / // / � PLACED ON 'THE UPHILL SIDL�OF -__ /
- - - - - - / / / / / TRENCH PER MS-16 v v v FILE NO.
/�f� _- l / //
A pp
r / `v
11
--- - 1 18.020
-
v
\
18 020
�-T f-----d, E&SC PHASE 2
------- -Are
-\
-47
v v v \ _ --- ,
v :� _ - /
- SHEET C6 f C18
I
/
/
I I
I II
\
-- \ - -- -
-- ! CECIL JOHNSON
- i���i �5=6�'--T I D.B. 936, PG- 722
��- J I I ZON11�E: R1 RESID(NTTALi -
TM 76-1 4 1. ONCE SITE IS BROUGHT TO GRADE, INSTALL STORM
I RESIDENTIAL PIPE Al-A5 WITH CONNECTIONS A3a AND A4a. DO
Aoade IC - SIf�GLE FAMILY RESIDENTIAL Z NE: R1
���� I I v � I � NOT INSTALL MANHOLE Al IN THIS PHASE, INSTEAD DIG
\ �- - L Q
� I � / I
Woods - \\ ` \ \ ' \ \\ \-� 1 I I �� -- I USE: SINGE FAMILY RESIDENTIAL SMALL CONVEYANCE CHANNEL FOR PIPE Al TO OUTLET
r I \ � I � \ � I 30 0 30 60 90 TO SEDIMENT TRAP 2.
\ \ a Y\ \\ -\ \ \ a- \ 2. PLACE INLET PROTECTION ON ALL STORM INLETS.
- >,��\ - \ \ / \y I -�- \\ °�Y ��° ` ` ` Graphic Scale: 1 "=30'
_ \ W - ` \ \ ` P\ I 3. BRING FIELD TO GRADE.
---\\ \ \ \� \ \ \�1 _ I- -� -----\ \
Area I I �� II \\ I axu �.\ aeu
- \ V orm
I � i v �� I I, � -�,� v vv 4. IF T00 MUCH WATER COLLECTS ON EASTERN HALF OF
- - � \ �`anu-emu ��aeu-au
_ �°"� I FIELD, PUMP IT TO SEDIMENT TRAP 1.
P R1cMfbF 5. STABILIZE FIELD AREA WITH PERMANENT SEEDING.
j WA / - _ �y i/ �i - uoo �,I v 6. BEGIN WATER & SANITARY INSTALLATION.
I _
lift�j \ ' ' f „- .x ` - - ✓ SYMBOL N SEDIMENT CONTROL SYMBOLS
SOIL EROSION & SED TITLE KEY
\
\ \ -- SCC � I 1 \ ♦\ \ \ � � / 2 CONSTRUCTION ENTRANCE CE
v v T C v 1 =
\ r 4_ U \r'1 _- �\ 1 I x x
v S �nl A ` ♦ v - -
\ O\ \ s� s - - - 3.05 SILT FENCE SF
\ \ \\ 1 ( BO%0M _ I \ \ \ \ \---- -------- e' - 1 ( I I \ ® 3.07 INLET PROTECTION IP
28X61 \ \ \ \ \ 3.09 TEMPORARY DIVERSION DIKE
1 ELEV �59.0: v ` v`
\\ \ � 11 I \ I I I I II C�\Q � \ f DD
1 3.11 RIGHT OF WAY DIVERSION W
87 \ \ : A A. V A V v A V 9 _A_ - -------.• I I I I I I (SHOULDER
1 / x \ - V� V A A \ x I 3.12 DIVERSION
1_ 1 I---- ---- �\ \ \ \ 1 MA 1�2:1 SLOPE 3.13 TEMPORARY SEDIMENT TRAP ST
� �.1 I I -- II I � V V [DRAWN TO SCALE] O
/ -- -- --- --- --- A ` z,. V A \ V 1 1°I I A I 3.18 OUTLET PROTECTION OP
I \ I
300.00� \ 0.0� 93 1 \ I 1:�.. / \
` TS ago
3.31 TEMPORARY SEEDING TS
/ / / I I✓ - - __ 1 I I I �+ "NO IPARKI FI E 7 -- A
LANE(' SIG S YELLOW 3.32 PERMANENT SEEDING Ps
PAIN ON URB / / 24 `
1 I •e
1 / 3.35 MULCH M
1 I I' O
I 1
: I I / /
� I I
I \
L II
- �6 /i / // \ �--DC 339 OUST CONTROL
o
I LIMITS OF DISTURBANCE
fQ 1 1 1s°° I // \
/ o � G NASIU
i
519.
A5 x ao 22 \ \
�� / /us
i I
/
�. v o o 1 /� 20
I I I I 1 I I
- 9' oR are -�r� ,
9 0'
\T ri
/ -fix / r �� s�' " ' 1 i / x ` I `�- I v
a 98 l / / // -� - / \ �}0:00' p 19 >o `v EDIMENT TRAP 2 DRAIN GE ARI
�, �.� tab a 1 - - - - - -
- / ♦ _� 1 / -- - // sn \\ LA I .. SIG R YELLOWS 3 \ \ \ 2.93 ACRE
--- -- - UTCD R7 8
,- / - - \ ' 7 78 I PA T ON C R 20 \ - �
, rry BSI
- � -- - - I ` '( / I I. � w 1 ., R7-Ca PLACA . YP
MAX. HEIGHT 1 .0'\ 181
7(9
I / t o-
_. ISE <se5. .1,. I,o•..c; wl E y,l I \ \ o / (1i r
98 1 I F I 9.0' C
17
I /
I
I w. o- -
�l--�. 19 ISEqF -I LOCK RF \ r�
-- __ I I I --ram_ i v / C •\� \
R00 \ S" WL
/ p
FFE §.1 .16 / a. / '1-. a.\ \ \� W - Wes' �W - W
\� _v\ v v v r - 11 / / s v
-I i : / I \ ` a o' \�� 6 NOT T - o �\\
\ 9 R SHIM
\ \/ C� EXCEED %SLOPE
SVC
AlAT CG-12
G 6, F ENGINEERING2.
ER \ \ A .. \ 15" HDPE LAND PLANNING - PROJECT MANAGEMENT
r \ 4" VC STACKINE
FFEVOOM 5 \ REGENTS \ ..�..
,ems2 An: o �. • \ PLAZA -" G WM
/ �. '` 0 06 RET I G ALL 1 \
5
I-, O$ �I T 14. `, \V' ; 600 SF 912E HIGH ST 4342275140
I I; / _ \ 0 \ LOCKER <: '� 6 - \ 40.48 N \
ROOM o - - - - - CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
n + + /
T i _ _ %WitA1'�' fif�i4iIF�T W _
1
yy/ l I (+ l / l • FFE �1�.5 4 fTil�il'Wh'fl�'Wil.lL, x A-2686-S� - 2.255
I I I ---- - ' ��� 50 o ADMINISTRATIVE V --REG L
04 / -- _ -- --
- ----
v t _
/ � r� HAL
I it �\ ♦ ♦ ♦ - \- I �� \� \� : m -. - �6i5 \\- co FFE31S.S/ �� N -FFE 5
\ \ 1 oo`a �
, \\ - i y / - \ I �- - x I x \-'+�l- �1
/� e `\ , `� �t
F v v I _ \ Fdi I ERS
,�r .,a, \\ \\ �♦-� ---- --- I �1 A A v vv v v _ � � \ �-- I� -i AV A I\ x �� ♦' �'1�y,- / \� A �C w / O
- v -/ 5 RIS REr -
16' _
/ x �� \ V �\ x Wt ,� �T`SF
/ �v ` v v `. vv - L e. 4183
-
\ � \ � ♦ \ ter. 1 \v, `�.r \ � ��a ` 1 � OFF ,p �6
��; _ Ar--?v- _ \V A. ` \ A v 7-Q �o-C6ASSB�M
\ \ \ V !� ' ` x \ - --iY o FFE 51 .5
x I \ I '\' a \ \ \ \ \ \\\I ---- .+ - --r-\ \\ \ x �\ \ 7 \ \ `' sal misn GO'
x GAF G,1
'•.\ \\ \ (may\ -� \ \ � '. \ \ � \ � � \ _- - - - � `�� `+� -- \ \ � \ - \ � " / _ I �\ F � \ \ I \
'.� A I V ♦ ♦ �� Av -� \ v A v /' -I-- A- v 9)
� CLASSR
V A \
v-
t� \ I \I � � A \, _ T/ � - _ .♦ �- ♦ I�� \ � A - - x- /--� A \ fT\ � V �_-- � � � FFE�514.5
\ � I
i
`X� \V A A �- 0t� I� II `v _ f-�t A �A -- A Avv-- �- GV- VSMP PLAN
__ -- ._
is S- REGENTS
v V v y".Av
- -
2 --- \ SCHOOL
0.
\ _ •\ ( -- --
Jv �vA `v `_- A\VA v\ y.��� _ ��•� s�s�s�s�-�-��___ �-\vAvv� �v I BOTTOM
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:2n&O'
ELEV 487.0' a
2020 0514
--� v / v N _ ,/ REVISION:
� _ t
r
1_� / v v v v -� v v _ �_
Q A _-90 _ - - 1 y� 1) 2020.08.03
�� �V
- - \NO
- s 2 2
020.10.22
1r
�•.-170-A �'`{ -�.. ---. �AV-_� A V-I' \ \\\ '� - --_-- /- ----- _-- t
A A
Q
OP
v v� v v v \� - A ✓ O vv vv�\\ �.R \ V v v - - V ----- ----- -
_
v y
y •, v v v � v v y '. �� � � � I `�70 v 1 yt -OFF \� �' _ - - - v `� v v M �_- ♦ `- ��? � ----------------
\ V A\v .•` `� V v v _ ..v _-i- . �,IV 1 •�-' _ A V r \ �A v lJ '� /- ------ FILE NO.
V A A A v O
r
v \v V.�•w •_X 'v ,y A� •�v r -�I� ��--�`�.� - -1V \� �O� --- ------ / 18.020
1 4
- _ -
-- ------
` - E&SC PHASE 2
_-
t
�/
-�o --
SHEET C7 of C18
\ \
C7
_ E r --�, -- - SEQUENCE OF CONSTRUCTION - PHASE 2
51A'
' � � / �� \ O^•. v "� I o^600 SF / -- / GEES , � / WO � / -- --�-------------- - ---_ --- �\, \ -- `�
- I _-- �� _ _ _ _T�` 1. ONCE SITE IS BROUGHT TO GRADE, INSTALL STORM
FFE 514.5 IC/S (T ) // NE' — — — _ — _----
y\ __ - _ \♦ PIPE Al-A5 WITH CONNECTIONS A3a AND A4a. DO
— E� --- �+ �,� s/j / ati v 8-�s� — v $ NOT INSTALL MANHOLE Al IN THIS PHASE, INSTEAD DIG
CLASSROOM /' sE M `""'/ // \ --- - - SMALL CONVEYANCE CHANNEL FOR PIPE Al TO OUTLET
FFE 514.5 _ 6 SSRp°5 S / / _ \ `, ♦ TO SEDIMENT TRAP 2.
�T\
- ' - // ti - SF GE I \ 2. PLACE INLET PROTECTION ON ALL STORM INLETS.
v v v�� s rt r I 6 �5 p6, 17 RISE s � � / / BOT7�M ` _ vvv w 30 0 30 60 90 3. BRING FIELD TO GRADE.
y1 - --''' ELE� 483.0/ � 90
�— ♦� -_ eulLowc �i I _! r -- -- - - x 4. IF T00 MUCH WATER COLLECTS ON EASTERN HALF OF
�� j x ♦\` FIELD PUMP IT TO SEDIMENT TRAP 1.
Graphic Scale: 1 "=30'
_ -- IS N' 8" SAN EWER - I ♦ / ' ' '
/� /�pL ✓ �5V/ LL_� \ \\ - 8 �` -- __ y \ r ELEVATED ON PIER �� J / / / -_ - _ \\ C�EANOur SDR-35'(TYP) \♦ //o �9s/ / // /l j j 5. STABILIZE FIELD AREA WITH PERMANENT SEEDING.
LJ_F 7�v v v S9 I v w / / / A y 1 �i s/' a / / / / _� _� FouNDRTION�= T // , / / / , ♦ - __ ` \ x / / /�° <qm / / / / 6. BEGIN WATER & SANITARY INSTALLATION.
gDRI 3 �
/ 2 - / /
1 LF _ -
/00
�\� / \ v y / /! // / ' /' / // / ♦ h ° �'p �P / SOIL EROSION & SEDIMENT CONTROL SYMBOLS
TIVI _��-- _�--'� / `_� V �� �- - ® BOTTOM ®.-. \ .. �_� ♦ I _ _ '� / �� / / --- o-� �v I l /.� I� / // / v� sv /
v T- , Q _
________ --_ _.-- - / //01
�� �/ / —�/ / /��� G / / / I SYMBOL N TITLE KEY
/ \ _ ELEV 487.0 ,' / / �1i �► °
��� �/
T _ —
3.02 CONSTRUCTION ENTRANCE CE
�- / / / tP \
/ � / ,/ ♦ 3.05 SILT FENCE
307 INLET PROTECTION IP
_ _ _ _ / - _ - - / r / / y / / / I \ 3.09 TEMPORARY DIVERSION DIKE DO
3.11 RIGHT OF WAY DIVERSION
\ i _ __ _ -_ _ '' i` _ / / // '/ '// / ! tG // , / / / / I 'lam ♦ \ \ \ \
,-- ''//
-' i _ / / / A / / ♦ 3.13 TEMPORARY SEDIMENT TRAP ST
10 —
_ / \\ 11 ♦ [DRAWN TO SCALE] O
\ \ _- 3.18 OUTLET PROTECTION OP
-r /f
�10 , / / / 3.31 TEMPORARY SEEDING TS
\ _ _
- - - � � � / / / / / / � A - � ♦ � � � $ 3.32 PERMANENT SEEDING PS
_ / XCAVATED MATERIAL SHALL BE v v //\ v 3.35 MULCH
PLACED ON THE UPHILL SIDS OF�� \
- - - - - - - - - - - - - - / = / / / // // // I �I / // // / / TENCH PER MS-16 v-----V � / � vv v�\� � _ �_ 3.3s DusTcoNrnoL Dc
�_ / ---' ----- r /
-\ I � A � - � � '/ i' / / / (/ / // / /// � ��,�� / / / // / A -� V A A\ ♦, ♦ � � � � � LIMITS OF DISTURBANCE
O i - �/ I A\ �-
_ -- - /
J I-
\ ��
\ \ - T - - - Bufj/
-- - / /1. / / /�A / A ♦�
' _ A rye ,
vV v\ �. v / // - _ _I // / / // �� J A v V v v v v
�� �� 47� /r� / / v A vv _,--- vv v, ����_-/��
vv - --- / / --- --
It
-- p Y
�— — —� 0 i
2�
_ _ _
V \ \ vv ��v� �� I__'I __
e - -
e A\/ /
\�-- ----- --- �- -- \ \ / / / Q \
�- ---- / t v �� 9 / v
\ _ So- SHIMP
v vvII'
T
- ENGINEERING2.
\ I
— LAND PLANNING -PROJECT MANAGEME
�— �— ---- NT
KS),
V __
912 E. HIGH ST. 434.227.5140
\I\ \ - •�� - - - - / ' / --�-�J S I CHARLOTTESVILLE VA, 22902 JUSTIN SHIMP-ENGINEERING.COM
l l I I I
I -t%_1
00
// // /- '� / \ I / /\
i
Lic. .4 183
v v - / —� / ' / / / SO 1 � �
� v v'y •..�L� 1\- - v // // �/ // � �/� ! /' / / / /" /// // i // / // _-_--' / / /' ' _y� / A\ V ♦ �� / // '\ R�\�Y PRESBY ���IOTIAL
/
// // // // // // / // / /// /// / / / //i //i / i---- / \\
V A V I / / / / / --� -- / / �' / -- ♦ / 3-S2 TO BE BORED / / \--
v� 'v �� �/ > - / / / / / / / ,' - — _ / /♦ // / / , — — A VSMP PLAN
I /
REGENTS
\ \ \ \ \ \\ SCHOOL
�o ♦ XCAVATED/MATERIAL SHALL BE
/
/ // // '------ s °°
v� cV v A V v ACED ON THE UPHILL SIDE OF
>�F NCH PER MS-16 — J � \
v v 1 v v v v y \ v A v v v v
\ \ \ ` \ \ \\ \� `\ \ \ \ \ \ ` / / r / '� ♦°� / ALBEMARLE COUNTY VIRGINIA
vvvvv v 1"\�_ v vv vv vv v �v v \ v v `v v v / / �� ♦ -
ti / \ SUBMISSION:
\ \ \ \ \
\ v �� A \ v v v v / v� v / 9
\ �� // 2020.05.14
TI TNITY PP CHURCH
CHURL
vv
\ 4�v� v v�� vv v1 Ov v vv vv v�V vvv �v v \\ A 1 / �.8. /��t ��. \� �♦ REVISION:
y
L V / / v \ v
\ M 7 6 -17 C / \ \ 1) 2020.08.03
L
2) 2020.10.22
1 \ \ \ \ -
4-
1
FILE N0.
/
�_ \ -- \ I.. - i-: - L__ I / I \ \ \ \ / / / / / ♦ _ _ - EEW PUM STATION TO /
♦ __ REPLACE ISTING SUMP PUMP / \
// � � -' � . ?� p� SERVING TR ITY CHURCH' / A pp
(APPRORIMA LOCATION). / \ \ EOISC PHASE 2
� y\
-�-------------- SHEET C8 of C18
\ \
vv vv v
v-4 �� vv v v
/
r
��-�4 \\�� "-i-�_. u_+->-. A v� vv_ ��------ - - - - - - - - C\/4\JV
rp n �� I CD CECIL&�JUHNJuIv I
� I1 �� , -�� , UNIVERSITY UI vIK�Ii�iH rvulvuH ll�I�SEQUENCE FCONSTRUCTION-PHASE 3
D. g PG. 722 D.B. 4170, PG. 689
R � R'�SI D EN �A�� --- - I TM � 6 _ � 4 I 1. FINISH CONSTRUCTION OF BUILDINGS.
D F MILY RES D TEAL 2. INSTALL RIP RAP CONVEYANCE CHANNEL AT OUTLET
I ZQNE. R1 RESIDENTIAL TM 76-1 3B OF PIPE AO PRIOR TO PIPE INSTALLATION.
i - , 3. STABILIZE PARKING AREA WITH BASE STONE.
USE: SQG�E FAMILY RESIDENTIAL ZONE: R1 RESIDENTIAL 4. ONCE PARKING AREA IS STABILIZED, INSTALL MANHOLE
Al AND PIPES AI -AO, Al-A1x, AND ALL ROOF AND
\I� I USE: SINGLE FAMILY RESIDENTIAL YARD DRAINS.
°- ` \- �- \ \\ \ `\ \ 5. ONCE FIELD IS STABILIZED, INSTALL PIPES A1d-Al AND
vi °a°-�`- _45°02 44" E 30 0 30 60 90 B4-Bo.
6. KEEP INLET PROTECTION IN PLACE UNTIL ENTIRE SITE
L
\\\ \\ \\ \ \\ \\ Graphic Scale: 1 "=30' IS STABILIZED.
oo�LAD A 26�\• 3 �\ \\ \\\ \ \ \ `\ 7. REMOVE SEDIMENT TRAPS, BRINGING THOSE AREAS
BACK TO ORIGINAL GRADE. APPLY PERMANENT SEEDING
\ Y ---- --- COVER WHERE
--- _ - .
�s� AND LOW MAINTENANCE GROUND
- - I
r ' - - - / 4+ o. -- - - 8. INSTALL MITIGATIONPLANTINGIN DISTURBED STREAM
- BUFFER AREA PER PLANTING SCHEDULE.
v v
!CCJS\ 1�\ \\ \\ PINES \ ;
\ v
c of user A\rea\ _ I I \
SOIL EROSION 8. SEDIMENT CONTROL SYMBOLS
:may _ SYMBOL NO TITLE KEY
\ \ \\ \\ \ \ II I \ 1 I 1 h\Q O \ / / / a / \ \ \'( \ \ \ \ \ _ \ 3.02 CONSTRUCTION ENTRANCE CE
- 9 �ffe - - - /�
VI \ \ \ \ \ _ � \ 1 I 1 I 4• GR \ / \ '+00 -\ \ x -x -x -x 3.05 SILT FENCE SF
_ \ --- \ \ \ \ ---- - \�\ N \ 1 I I I I I (SHOULDER - ' - - \ \ \
\ \ MA 12:1 SLOPE 1 \\ ® 3.07 INLET PROTECTION IP
\ \ \ \ \ \ d N 1 1 II 3.02 TEMPORARY DIVERSION DIKE DD
3.11 RIGHT OF WAY DIVERSION I@
\ \ \ l/` 3.13 TEMPORARY SEDIMENT TRAP ST I \ \�- 50 , [DRAWN TO SCALE]
v vV LOW MAINTENANCE GROUND COVE I "NO PARK( G FI E / v vv vv vv x27 °0 v
\ \ � AL 1 � 1- L _ �, I LANf�i' SIG S OR YELLOW v) �� A V A v � `\ � � v � 3.18 OUTLET PROTECTION OP
Q \ I I I I I I 1 PAINT ON URB // / ?4 \ \\ \ \ /�`T `� "00 1
` / / �/ / / \ \ \ \ \ LOW\MAINTENANCE GRO �CQVE \ \ \ q8 I 3.31 TEMPORARY SEEDING TS
I W I
\ \ � \ � � S 3.32 PERMANENT SEEDING �S
ALL, S� ES 3.1 OR GR TES'' - _ _ 1 v x♦ � \ �_
v 800 S 19 \ \\ v v 3.35 MULCH
t1} GYMNASIU�v1 79g'I / �' / / \\\_ _ �� \z, I C oo FEE 519.715 x 3.39 DUST CONTROL C
\�-- --- --_-- - --24�---_- - i� Pe4A v v �..�
I I I I I 0 1 // / / - x - _ _-_ - _ - - - _ _ \ I� Ej. 1 \ R6 \ ^�/\� LIMITS OF DISTURBANCE
/ j' o \`s v CAER
/ O
i � � I I •. p M I 20 I \\ � 12" \P E1
/ / \ � I I 11 I i {• a �`i'18, I II I 9.0' _ O \ \��I \\ \\w _ `� ,pK
71-7 \ \ \ 1 I I w \ _ _ - t \ \\EX:012a ` ` \I `
�Nl
\ d: ♦ B� CH \ O v
�20.00'� I a \ ....Dumm4w \ \ i� vA X I V OI v
lip
aAO, .. \ T ��90
/ MAPLE v v vv \
/ A \ A UTCD R7 8 S R \ ` 10" GYP ♦ X. 8" V `� v
/. 80 0' 18 { I I L "SIG R YELLO _ 2� ..,Dup �TE,;', \,, ♦ \ _ v v
- \ `" 7 , / / "•, 1 w 1 PA TON C R 20 \ R7-8o PLACARD TYP) -�-� ^<.. 14E - \ KAKX. 2"��P\� �+• 0AY\
- REtAI G 1 :' 1 � ° . a '/
/ MAX HEI T 1 aT. °° l 17 4 1 V ,.,v
��:. P X8 x18 A v 0 29 0 o :V : vv yip A 9T� �M�F
\\
1 G -
17 ISE
w
,16°'..,..1,..,.�17;'., �/ a.. „! ... E wI I \ - 180 ' _- \\ -
8 9.0' 21 w ��♦ A4�1 vv\ vvv LYi O
13 1° I .1 Z° I 1 w m 25 w
19 ISDR ! '� I luouLOCK RF \\ .N ,° \` \ o o - - - - o
_ / = C `! -
/ r - /
R00 - \WLI
FIFE 5-1 16 / `O / s \ \ �w - w -w �w w _ -w, -w -w -w -w -w -w -20 w -w -w -w -w -w �W
/ 1A00 -6 NOT T _� s o f _ _ _ -X. 8„ \ \ y
'4 SHIMP
C�G
12x°' '' 1% A 6., NYLOPLAST'�1 \ EXCEED SSLOPE ---�� -r -� - X�1\8'. \\ \\ \\----- -----
pdp. 4 YARD
DRAIN 6 3 /4" VC STACKING AND LOAD
IN AREA \ ` / // f- 1 POPLARD-
N / RAT GRAT d \. ` - -5n 1 CG-6 - \ \ \ \ \\�� ------ ENGINEERING
2.
\\ -- (� f-'- 'I� . � 912' kAIN•N, o L CKER x6 o n oA\ \..... \ 3 .. SVC - /'_� / \ ` '.. � �� ... \ =\ \\ � `- '� i - - -
- o i6 AT CG-12
ro 6 a F w n0 / N F �� V - - -- -- - - - - / _ _ _ _ LAND PLANNING -PROJECT MANAGEMENT
W _ - �-. 5' MU (,H �EpESTRIAN P TFTT T INIF C '
v gd o ROOM d '.� BI 3Ga6 . v �. .. CH.P KING LOL /'
\ -7
.\a 4 FFE\ 12.5 a _ i REGENTS�" L5/;°,': NT
::. 111
\"•I12e of
co PLAZ \ ,.0 .� a _WM men. .,r ✓.. /. / \ \ \\\---_ 06 RET INING LL .\ \ \ ci \
�I 08 EIGHT 14. ' .• ) 600 SF \ .�-- I � o - '.' ^` /, -`_♦ -- . \ \ ` - _-- 912 E. HIGH ST. 434.227.5140
\\ 10 \ .I� LOCKER �, ARD DRAIN \\ 40.48 ^? -\ - -----8 - 60 SF �/ 600 SFM /��� �-�--- _.� y\� PLAR \\ \ \�LY�, B TYPE+ , _--- /
\ \
- - -- - - -- \ . - . , - \ C SRQ.O CLASS / - - `2X. �1 \ ` \ CHARLOTTESVILLE VA, 22902 JUSTIN(�SHIMP-ENGINEERING.COM
&OOM 4 fRdfTfMYI1Flt#iD�1MtllL, I __ 2.255 SF of 5X$. FF /514.5 I / �dlNl�lfv19d 0 �\ 'h�SB lh-RRlyl NAT
\ >,, FFE Bh?.5 - i A-2;68GS� o' / �+ \ \ \ <, IL �Efb -ALBEM LL-C�I*JTY
\ k144Pk N�kSHf - &EGELNTS----. / /� v _ HI GA STANDAR�p� - �tf
o \ wALAL
o ADMINISTRATIVE �f
/-- BUILDING u w r� - HALL EX.---
X. 1 � R � FFE3185�/ `O - _--- � � \. -MAXIMUM2b1�LOP + `
- - - - - _ - ---
A - - -
1 D DRAInL sA6 F PL \\
f� - - \ s --��, \'`�� \ 36.35' (� `I 5 - �3 CF ES5$.S/PNEI---
\ \_ `\ •� - \ \�s ` _ 1 / x / rA�O I POPL -P _•�, X\1 --- _ �, -_ `� ----'
_
\ ,\ `♦♦ i . �--\ \ � ``�___-- - --- = \ �t
5' v CLgS�R00M/ /F A P PLNf2�18
\ ♦ - - RISERS 600 6F OA ' ♦♦ ` QR \ X 2" 0 \ H / 5 RIS R .16' 21.58' 60 _ \ \ \
\ - 8: \ �, \ X T1 - FFE 516.,5 \ ( >
\ \ \ OAK X. 12" X. 15" \ \ C R�AK\ \\ / / �a / 1 /�APLE \ \ \ ,�l\- ---- \
. PIN€ LAR IC \ � _- - bRSF/ Mp -- �i 5" \ _- -
-- L -OAK \ _- ` 5 A. - \ F CL H „ \ -,�00
15, -- X.
6 \ \\ 1 \- �I j POFO- - \ � - ':,� -
\ MAPLE E L g' ---- .♦ X. 15 MA LIN �' E ` �-� - SF -FE 5 �OSA.1/I ---- --- \\ ---- -- ♦� �'�� . S MP P>
\ _ ` �\\ - - � _ - -� x x AGg T Ci
t -� T,} T "� �\� r �'!J� - . . . . . . . . �7 -- � • Lic. 4 183
°°
OAK X. 12' 12' 0 \ i /� t"1 G / 0 O- ti _-I r. L_ ` ��---- ----
., OA / - E?PLA ♦ F i / / v Ps'r-��" -v v '.. �c��sGUU�
_ K E I F 5 / -
\\_~, - o FEE 514.5 06P 6 , ' I /D �C/S / / ------------------- - II ---_ �:\�
_ f W Qw
RY \ I K �K' 1 F / / _ _ _ _ y
v P PLA - \ ( Oar / I 1 �j ♦�E„�� M_A-PLE v v \ D6" 1 o-CM Q_ F 00 OOM 6 A I' o �� vI - _ t� - - - f�v- �
\ � 0
DORY f1A'. / �/ CI D/y S/�`/ , / D /^ �`\.\\\.��\_ NE f1i46fs� _-__--��`f \ - \, ♦ _ \\ I
EV Y I T -
V A X. 8" gAK L -
M.APLEI2"I', \ AW .. -\---
X.
\ OAK ` OAI \� \ --0 - / /- \ �♦ \ \_ �F\--- - ` 11 I \ CLASSRO
V v A A A OAKS / /-\ V A/ LE/
V A 7--- - � - FEE 514.5
/ N., F FFE 5 /
\\ \\ ` L12' \\ \ SO \ / P O 500�` /- 17 RISEFS I I / /--- ` -----
v x. 12 X _ - D VSMP PLAN
v - M�.PLE V vv At / 6PSSR A5 / / I / /� v \\ -�9 - 01 A 1 I
� V A v �v EEC � M P E � �� \ \\ � Cv - _---------_ x OLF�S / // F / / / / / v _ ��
oo
�. -- -,OAK X. 2i - v v v v - I v / -NREGENTS
v / <� /
T9 RISE
-` - -ELEVATED ON IP ER / / / / / \ \ CLEA N UT S DR A3 TYP 1 r // `9d'
A\ \ 59 - v' - _ �- \ \ �_ __ ��� ///// ////// // f� v �l l� \ ) D /� L/
E X. AK
v _ ,. _ / / / // ,--__ __ �� SCHOOL
_ PINE / \ 1 - \ 41� SD
2LU
� \ � / / /` ALBEMARLE COUNTY, V
IRGINIA
atss� v � i /oz / //�
A
40
00
v v - _� �� ��� \v / A ��/ / / i / _/ / / / �/ //
_ , _ 2020 0514
v _ v - u ---_-/ �V A \ V vv v / A�- A� - ---- -w' v�� __ _ �/ / / / f�� --- /l l // / / /� // i/ /-
s v 6 a V - ♦ �� / / / / f /� / � / / / / / / / / / / / / REVISION:
Aca c 1
_ - _ / =>-/ ,\ �+\\ \ >.�_ \�`____// \ \ \ \ � � �/-Lg�'- � ` -- / � ���� // // �� // ��-��� // / D / 1)2020.08.03
e � _`11 _ I
vyWoods ._ y �� ♦v ♦vv vv _� ___ - - _ -- _- - ---- ) 020.10.22
��. v / _ �/ ff / / // /// / // // // /
\ - - - \ , / �♦ // / / / // // /I// / j // // / / / 2 2
01,
\ \ \ \ A re-lyl - 1 \ 1 �' \ -- --- - _ _ - - - - - - �-_ _ - , , / / / / D ---�
v A
•1�i // / V A V r. i i
v v vKv - - - - ' XCAVATED MATERIAL SHALL BE
- � \- +- \ L ♦ ♦ lQ� I � ----- ==- �- /// /// //�j / / / / l / / /" / PLACED ON UPHILL SIDL`OF
- - - - - -
-vv� ; �- , v �v v v ♦v t8 7 �_/ ------ // ��f l / / / // / / / / / TRENCH PER MS-16 v A FILE NO.
y
\ /
v 1
�,�� y - , \ A�v v.v vv v vvvv ��; : \ �V� � \ v \ �yA/i- I vL T v A �v♦ / � I���� - -- �/ � ///l/-i.._�. --j-- ---------
\v---------- - �SC �� vvvv
v vv v
l 1vvv
18.020
00 B u f f e/r 100
E&SC PHASE 3
v .Area/`� �� \_---- -- - _ - - - SHEETC9ofC18 f�
l
v A - /Y A I I\ A A V �
_Q/
—61 A' D o
CECIL JOHNSON SEQUENCE E UEN E F CONSTRUCT
ION PHASE 3
D_ D.B. 936, PG. 722 1FINISH CONSTRUCTION OF BUILDINGS.
ZONE: R1 RESIN
TM 76-14
2. INSTALL RIP RAP CONVEYANCE CHANNEL AT OUTLET
��( RESIDENTIAL OF PIPE AO PRIOR TO PIPE INSTALLATION.
— SLE FAMILY LY ESQ E� T AL Z N E: R 1 3. STABILIZE PARKING AREA WITH BASE STONE.
\ -- USE: SINCE FAMILY RESIDENTIAL 4. ONCE PARKING AREA IS STABILIZED, INSTALL MANHOLE
CiS I v v vT / - - OF AND
v �� �— �- _ i 30 0 30 6C 9^ Al AND PIPES Al AO Al A1x AND ALL ROOF
- - - - \ - \I \ —� Graphic Scale: 1 "=30' YARD DRAINS.
Area - v v v __ v �� v v y
�I , _ \ \ �a\\' -`-----I \\ � \\ \ `\ P\ I 5. ONCE FIELD IS STABILIZED, INSTALL PIPES A1d-Al AND
1 \
A v AV A _" / /I 1 IL - A l -lonu—emu �_am
V A
� L i \ � 6. KEEP INLET PROTECTION IN PLACE UNTIL ENTIRE SITE
/ l P RIGHt. of --� 1 _ \\ \ IS STABILIZED.
I I WA TC / - 1 ---, / 0a A \ � � 3 1 7. REMOVE SEDIMENT TRAPS, BRINGING THOSE AREAS
BACK TO ORIGINAL GRADE. APPLY PERMANENT SEEDING
COVER WHERE
7° -- >-- _ - - - - AND LOW MAINTENANCE GROUND
__-! ' _ -
I D
_ ! SLOPES ARE 3:1 OR STEEPER.
\ \ 1 / - I \ - - - ! 8. INSTALL MITIGATION PLANTING IN DISTURBED STREAM
v /� �) v \ v v - '� — - J=� _ •� x ' - • - run
v BUFFER AREA PER PLANTING SCHEDULE.
—\
U -
— i-
® 3.02 CONSTRUCTION ENTRANCE
c\o x—x—x—x \_if 1 3.05 SILT FENCE
4' GR 3.07 INLET PROTECTIONV7 (SHOULDER
—7 --- MA2:1 SLOPE 3.09 TEMPORARY DIVERSION DIKE
gDCPDE I A
311 RIGHT OF WAY DIVERSION I&
3oD.bo� 931 11 \V II 1.�. /I A 1\ 3.12 DIVERSION
/ I �' " NO (PARK G F E \ 3.13 TEMPORARY SEDIMENT TRAP ST
LOW MAINTENANCE GROUND COVE I /
— - � � I 1 I I h" � -- — [DRAWN TO SCALE] O
�-- -- // I I AL A\ I II -- � I j. LANE(' SIGNS OR YELLOW �� �' ' 24 � \
\ N I I PAINT ON URB 3.18 OUTLET PROTECTION OP
_ _ 98 v
: /'/ — O O - I 1 I I l 1 I. ao / ' /'/ / /3.31 \ {I'1!—� 3.32 ERMORARY SEEDING
ANENT SEEDING
/ / v
/ \ _ v _-. / 8 I - 19 335 MULCH
- ---- / v I I o GEE 19. ,
- / o - FEE 519.7 19 \
// 22 \
A ZIP
' LIMITS OF DISTURBANCE
,Soho ---Ivv
' s � � I I
-
I v [_ 0�.�1.1 I 90'
;' _ I l \��� ��� <, OW S OIPESN3IICOR GRE ROVER ��r E'-� on
V / /
1-7 ALL
\ i av
_ ,-7
��
�� oe tab a A r, a _ + -- _19,- - - - -
\ - s E RK v A
- y
>> \ i
- � ILA SIG R YELLON�
I
_.. p` _ ->
>�>>>> \ l�1rV -- -- - ,�� -'-. -- - % RE>'AI G \ N 7 l P/ k
wIPA T ON C R \ aPLACARD T�1p v - 6.�..\ I/_/MAX NEIG T 1 .0'\_ l \ g� . :1°, II 18
T
V , <,.� \V ♦+�� -t I--- -- - _ ' `" N
I
-- r
i xi
-._ _- � �, v \ ♦ j I // i/ I i ISE - xl. 1%
_ V
98_ _ _ 11 0�
1
� 1 ' ,� F 9 0'
13
I19 ISE�F/" -I LOI'jiJCK RF \ <,49
P \ ♦ - r - �_ v / R00 CGS A A 8., W,
E
�1.16�w — w —w �w w-w_ —w —W —v
W
\
\ � - --_ � � /- � \ � � \ \ \ \ 1 1r , / /... / / , � /, /.., ' . , 9 ✓ , \ \,\ Roo \ �C6c6 IN F O E
SHIMP
\ \ b' . S0
C ' _ _ \ , r /. J.... I T i i I. . 12. ... / . 6,. NYLOPLAS11 EXCEED AT CGO12
:� \i \ \ 1 I / - - - --- ,o .�.1% RAt:., _ xa • a�n \\ 3 SVC
l G / /.. 97 I- .. ..12' kAItJ'W 4---t,< t6 YARD DRAIN \1�° AT CG-12
o.,,RADTE, GRAT ro 60 F ` w(TYP.) \\•.sA g°'__\ \\ 344" VC f STACKINC ENGINEERING
s
�. �, _ 1, I i / / ♦ _ e L CKERa O A 11-�C 6' LAND PLANNING -PROJECT MANAGEMENT
R _
-\3.\;. - FFE\ EGEN -
_ t "1 5 R TS
/ OZ <� s 2`� io PLAZ
06
� RET NNG ALL . \ \ � � 12
o EIGHT 14. \N 600 SF 1°� \ ° G �- 912E HIGH ST 4342275140
q.
- _-
r WM :.
- - FF I / ♦ / -- o \ 10 \ LOCKER <: ARD DRAIN 40.48 ^? \
� 1 �� I � I- ` - / - - '� / / I � _ � — _ — _ CHARLGTTESVILLE VA, 22902 JUSTIN(�SHIMP-ENGINEERING.COM
%_ ROOM
fF�ll�i 1F N1�
\ v "V ��- �'-t-' �- // / ♦ % I vi FFE �1�.5 N4Yk'1aX Nf�l$HtilT A w-2,686-SF= _ t�-_
RREGE0L;i--%/ \I/ ) _ A0 _ ���•�0 o ADMINIRATIVE I ♦ r / / •. _. \4 / �� ..� x a - _ _°vV co -----BUILDING��'__�FEA5
C l� E'rYl �I `�MAINTENANCE
T NANC 3G OR GREATER-� � NEr""FFE 315.�♦ -- v�� s� v
I ice' ♦ /
\ ♦ � - I v v OW MAIN NC �� ---- - � - _ - -
_ '1 H 'I v ♦ ALL -R 36.35'
L NA E GROUND COVE
Ali
ill IiWhi�
\I I \ \ \ %� - �- iRSEArea RS O
_-
---
_ _ A \ �� �/ x � — �� Ix V H
v
\ \\ \ - MA CIN ` - _-, --- sF 3 MP
\ v v v x
- = — �°° Lic. .4 �183
t \ x _
-\ \ •� --- ''� \ \ \ \ \ \ \\ \ \ \ Tom' \ \- __� - ---/\\ x\ y \ `- / 1 ��� ` ��^V• x e"7 I
Tu/1 �` _ � �! -�It
\ _ , -♦> - -> ` x V- - V n __i� ITm L_ FFE 514.5 x GF>�FPyES A: %bl�iAL
y
AV A
_ _ _ -�
CLASSRO
o 1 ` \ \ �\ �� - >> \ \ `\ x �I\ \ \ __ -\ \\ \ \i x\ FEE 514.5
I
VSMP PLAN
- siit,- REGENTS
v y v v _ v - �♦♦\I ♦♦ — __ v _ y r9 ti -v w
♦ � I RISE
_ SCHOOL
♦>> >♦
\ '--t_ — \ �v A ♦ ::a \ i
_ . \
- ♦ _
-I+ \ \ \'�_ - --- ? \ \ ` \\ \ ----- __� — i►� S --- \ ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
\ - - ---
v y v i
2020 0514
�
Aca-� - ♦ ♦ v \ y / v v _ REVISION: 1) 20208 03
v\W�S2)2020.10.22- gv
od
0A 10
v� y v ���- v��A I . � � c � � � v v v •�•J ��,� � � v �+v v �y� � - —_- _ � v � v �v v � � -�- --- f
---
--------------
FILE NO.
18.020
1 � �- � - � � \ �
\ < \ 9//I/
'-___-- _-___-'-'� E&SC PHASE 3
---- ��
------- _
— —_ SHEET T 7f�
C 10
��-- x — —`----------- _� \ -- SEQUENCE OF CONSTRUCTION-PHASE3
/± --- \ ♦ ' , /x -�-" ; G�.�� SSA / 60 5R OM T / / 1 r y� - c.� \ \ - - - - - - - F sv _ 7-
1
_-_ \ ______ ---______ - _ 1. FINISH CONSTRUCTION OF BUILDINGS.
wo / - - T OUTLET
o/< s
_ _, N --cLnsse2M D x c�P ooM 2. INSTALL RIP RAP CONVEYANCE CHANNEL A
o FFE 514.5 — A5 tix /`` / l/; j _---- \\ ,\\ ve f '�FT"'•Z __ i =----- — _ ; \� OF PIPE AO PRIOR TO PIPE INSTALLATION.
�UN'o oM l � ys � ✓r / / \ --- a � �-�� -,\ � ��� � � 3. STABILIZE PARKING AREA WITH BASE STONE.
CLAASSSRoY>r� ' / sF �-_--� // / / \ ` \\ 9s - \ __. � I\ 4. ONCE PARKING AREA IS STABILIZED, INSTALL MANHOLE
FFE 514_5- SF / sR0 5 / / S \ \ ----- -�` \
6 sR 5 / \ \ \ Al AND PIPES AI -AO, Al-A1x, AND ALL ROOF AND
x ° I NE -----� YARD DRAINS.
\ s EE / - / \ \ ---- ---
coo o s RISERS / / • 6 \\ \1 0 30 60 90 5. ONCE FIELD IS STABILIZED, INSTALL PIPES A1d-Al AND
\ / 5 HOPE X 0 0�4 ' I
P g1 / I I� I / / \ \ ".:� -- \ T` 1 `
E / - i
_I I _ _ - -� B4-B0.
1 � i ♦ phic Scale: 1"=30'
- / ' ---- - i 6. KEEP INLET PROTECTION IN PLACE UNTIL ENTIRE SITE
\ \ \ \, _-__ T9 RISER BUILDING -- __ _,[ / ------
-----� _ _ I --__ NO _
G —0 — `L_O �\J Vi L L - N w T -ELEVATED ON PIER dk / / - /- d - - - -
/ /------- \\ CLEANU SDRA35jEWER 1 wF` \ , \�, /° !9// / / / / / S STABILIZED
�� _ vFouNDAT�ONs- _-' /, // /I / ,/ v (rYP) �� 7 REMOVE SEDIMENT TRAPS, BRINGING THOSE AREAS
_ ' \ 1 \ \\ \ N w 2 __ L /,' / // /' ' / _ __ _--_______ `LF
�� r� BACK TO ORIGINAL GRADE. APPLY PERMANENT SEEDING
p �-- - -- /-v `� -------------4� — - -- _ '�' �/ !'I'r� �; ' ♦ --- --- - �'� = / /� /� �/� / i / A ""���� / /' / /l % AND LOW MAINTENANCE GROUND COVER WHERE
l
\ \ \\ ✓ / / /
a - -
TIVI--\\\ \ \ \ \ - _ - - ''
�-�-- - � _ v /---- -- � � _-__ - I � /' �� �-- - �_ j/ � � /'� / // // ' � h is�w,p�i' / / j / SLOPES ARE 3.1 OR STEEPER
��
v a /�/� �� / �� /
✓ v vv C v v\ '' /'�/�� A / /---' / �/ /'� -// � \ ��� 1;.91Fc���// / j 8 INSTALL MITIGATION PLANTING IN DISTURBED STREAM
/ / ///���
\I - — /
_-_ � /
\ \ / g _ `-_ , �- *, // / / // /I / // // / �/ j// / / --- ' '- / / /-� , !l SOIL EROSION &SEDIMENT CONTROL SYMBOLS
-� - SYMBOL N0, TITLE KEY
\g 1 / / / ' �� /' I / '/ ' i L /i' / / / / // / / l \\ \\ \\ 3.02 CONSTRUCTION ENTRANCE CE
_.01
we0
\
\\ — — — — — ✓ - - -- - / / I I // t ✓ �/ / Ij' /// ,/ / �/ // LACEDXC4TON MATERIAL SHALL BE
v v v � -48 G — _ _ _ � -- ' / / � / PLACED ON /THE UPHILL SIDE OF
\ � �CrlooY / / / TRENCH PFTk MS-16
- \ �\
�R f /
LJ U/ I�i / �/ �/
_
_ o
� i �\
v FBI �/ Areb/
A -� / /� i
--- -- - -- _i
,- I I //
\ A \ i v - ✓ F7� ✓ '' i'/ / - -- // / //// / \� \ \\ \ IV A V ✓ Av \vv �/
__ \ � - --
\� v v ✓ '-- -v v y ��vv �� I ' \� f ----- A / 0
••, v ,� 460
v QV
/ 0
a /
Un / 0
v - -
�_ r I I r�,�
'j
EW 20 FT SANITARY EASEMENT \ I I
I vy v v� v 1 I I 1 1 r
/ / I
//-
lQP
\ a `.\�• - / /'/'' ' ' - `J - -- � ///' / / / // l / l l / l I O ICI I // / / I
\ — — — — —
I
2,136 SF $EAM BU /' ' ' / —— - ---'--,�' �'��
�v o DI T1RBAN
LARG T OPY MWhTES PION
UNDERST D�4YSHRUB, 11
TO BE
INST ED NIT v S EAM BUFFER
A ♦: ' '- -- / /ice i / i' i _--_'i ---i' r__� / // // / / � // //
i
v / i / / / / / / _ _ ✓ i / - v v \
\-. A A A /
-- ✓ \ S3-S2 TO BE BORED
v v T
v y vy A n
XCAVATED/�ATERIAL SHALL BE
y V v jl I 1
v v A v V A
v v ry v v vv�� / --- °v ACED ON THE UPHILL SIDE OF
vIv v V v NCH PER MS-16
v,
�V/
°I' \Av
,TH
� Y�CHURC
\ \v\ \T�v
\ \ �BERfTRINITY PRES=T D.B. 7/301 PG4�v�
;-- /TV76-177C
\
vv
v--- v �
v
I \
1
MITIGATION PLAN LANDSCAPE
SCHEDULE
Plant Symbol
Planting Type
Botanical Name
Common Name
Caliper/Height
Quantity
Canopy
i a3
Large Shade Tree
Fagus grandifolia
American Beech
1-211'-2"
11
227
Q
Ornamental Tree
Cercis canadensis
Eastern Redbud
4"-12'
11
124
0
Broadleaved Evergreen Shrub
Ilex glabra
Inkberry Holly
15"-18"
11
23
Total Canopy
I37a
PUM
STATION 70 I /
REPLACE I SUMP PUMP
2 SERVING TR ITY CHURCH
pIZC APPRORIMA LOCATION) A
ti
-
3.05
SILT FENCE
SF
®
3.07
INLET PROTECTION
IP
�--��
3.09
TEMPORARY DIVERSION DIKE
DD
�--��
3.11
RIGHT OF WAY DIVERSION
It@W
[DRAWN TO SCALE]
3.13
TEMPORARY SEDIMENT TRAP
ST
3.18
OUTLET PROTECTION
OP
3.31
TEMPORARY SEEDING
TS
3.32
PERMANENT SEEDING
�S
3.35
MULCH
3.39
DUST CONTROL
DC
LIMITS
OF DISTURBANCE
SHIMP
ENGINEERING2.
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
Lic.
w w� I
VSMP PLAN
REGENTS
SCHOOL
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2020.05.14
REVISION:
1) 2020.08.03
2) 2020.10.22
FILE NO.
E&SC PHASE 31
MITIGATION PLAN
SHEET C11 of C18
C11
LD-229
BO B1 B2 o B3 "' B4
50 505
50 500
49 Hrl 495
53 A4 Ala 535
49 490
530 o A 530
m-o
M_
48 485 a o o M
m
52t a- Qo 525
n� off+
AO Al A2 A4 AS 48 480 w pis cO1p -
z
53 535 520 a520
L-tib
53 530 FX. GRADE,
47 475
51 515
47 470 m a, 36.1 OLF 15"-�
52 525
HDPE @ 1.00%- a
51 ( 510
52 520 46 465 0 > HIMP
- 55
59 0 00 - 10. 85
46 46D ENGINEERING2.
51 515 555g 5g s STORM PROFILE A4 -A4a LAND PLANNING - PROJECT MANAGEMENT
51 510 410+00 10+50 11+QO 11+50 12+00 12+50 13+0405 (',12 VERT: 1"=10'
2 STORM PROFILE BO-B4 HORZ: 1"=30' 912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN(�SHIMP-ENGINEERING.COM
50 5os C12 VERT: 1"=10'
Can I HORZ: 1"=30'
50 500
53 A3 A3a 535
49 495
49 490 530 - 530+��
o X. GRADE ro C
52 525 U , S a
Lic. 4 183
w _ -�
48 485 o ROP. GRADE ,p to I(��///x
523. z 520
48 480 z GL
51 - 515
471� 4 5 - 204.85LF - 5" HDPE @ 1.50%
1 +00 10+50 11+00 11+50 12+00 12+50 13+00 13+50
51 N 510
n o
50� z - 5 VSMP PLAN
1 STORM PROFILE AO-A5 >z 0+50 +°° 11+50 12+00 12+�8
C 12 VERT: 1 "=10' z
HORZ: 1 "=30' - REGENTS
4 STORM PROFILE A3-A3a
C12 VERP 1"=10' SCHOOL
L HORZ: 1 "=30'
ALBEMARLE COUNTY, VIRGINIA
Al Atx
(/ SUBMISSION:
51 515 51 515 2020.05.14
Al Ala Alb) A1d A1d
i I rn -
s1 510 _ _ o - REVISION:
J 510 1) 2020.08.03
510 N
o60
a
so sos 3 0 °+ z ---- -- X_ GRADE 1 2) 2020.10.22
Z ZOO_ M N
505s¢_�� 0 0 0 505
ad oo �N o
50 500 zcnr. rn� �+ --
- - - - - - - - - - - - - - - - - Q
CS I
11215
50 IL-
GRADE a- ¢ d ¢ 500
z LnZZHN ZHN49 HUL 495
G49 - 495
49 5400 88.01LF - __ FILE Na.020
49 88.01LF - 15"-HDPE 1,007 90_ _E @ L 09
HDPE of rn tD °� "'�
18 -15" H -PE-@ 1..007 r-----�0.99% rn a,. �- 4
O.0 ftft
�� 10+50 11+00 11+50 0�12+00 0>12+50 13+00 >z 13+50 14+00 z 14+54Q5 STORM PROFILES
-
�- >- z
o > z -
>z -
z
s STORM PROFILE A 1-A 1 x NOTE: IN MI I RAIN PROFILES NOT SHOWN.
6 STORM PROFILE Al-A1 d MAINTAIN MINIMUM 1.5% SLOPE ON ALL RUNS OF SHEET C12 of C18
C12 VERT: 1"=10' 6" PIPE, MINIMUM 0.65% SLOPE ON ALL RUNS OF
HORZ: 1 "=30' C 12 VERT: 1 "=10' 8" PIPE. C12
HORZ: 1"=30'
ca
(ac) (min) (in/hr) El El
fAb
CD
t
From
Point
To Point
Catch
A
Runoff
Coef
Inc
AC
Accum
AC
Tot
Tc
Tot
Int(10yr)
Tot
Flow(10yr)(cfs)
Up
Inv
Dn
Inv
Pipe
Len
Inv
S
Pipe
Dim
Pipe
Cap
Velocity
Flow time
Inc
�X. GRADE
0
N
3
3a-
0-
Z
- - - -
5
- -
--
53.40LF - 15° HDPE
o
- ---
-
I O
�v5�
3-
5
_
I
z
_
-
o
0o
I<0
roo
_
z
-
>
I-
D
o
5
6.8.27LF - 24" HDPE
@ 1.50% o
�
�
ro
5
r-
>
0
_
z
io
o
xzoo
w
or
roro
a�
�
0
>z
z
a
s
�-
a¢
i
I OH
I J5
3
i
z_
10+50 11 +00 11 +
LD-204StormwaterinletComputations
Inlets on Grade Only
Sag Inlets Only
a
�
2
in
�
s
�
m
mc�6i
U
�
U
�
cY
O
c7
F
a
Z
O)
�
�
n
fn
�
�
N
�
�
o_
o
X
a>
�
c7
�
10 �
r cn
n
o
W
N
-o
1
2
3
4
5
6
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
(
N N N
O M
h N
O h
ca
EOM
_m
N
0
5
0
M
z
rn�
coro
5
--
0
�h6 � �z
NpP�
z-
-
>_
5
0
HDPE
15"
5
n
as
0
_
0
51
505
500
495
490
48
48
0
0
ro
a
47t
0
ppz
4'it 00 10+50 111+00
1 SANITARY PROFILE S1-S6
C13 vERT:1"=to'
HORZ: 1 "=30'
510
505
500
495
490
485
480
475
470
'SANITARY PROFILE S6-S10
913 VERT. 1"=10'
HORZ: 1"=30'
n
Q
(D
---
�d4
r n
0
I
a+
I
lb5-
�-� DFZ=Z
ai
ro
4--
PVC O-o 7
N<
m
ro -m
-.220.60LF - 8" DUCTILE 1
-0 N 0 2.00%
N
�
�
~
z
a
~-
4
o
>
�
z
IN
z_
0
>
>z
z
11+50
12+00
12+50
13+00
13+50
14+00
14+50
15+00
15+50
16+00
16+50
17+00
17+50
510
505
500
495
490
485
480
a475
18+0070
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
s NIPa
Lic. 4 183
�o rol�c�w w�
VSMP PLAN
REGENTS
SCHOOL
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2020.05.14
REVISION:
1) 2020.08.03
2) 2020.10.22
FILE NO.
18.020
SANITARY PROFILES
SHEET C13 of C18
C13
STONE - 70' MIN.
CONSTRUCTION
ACCESS 3" SM-2A ASPHALT -0?
COURSE
i% 2%
STONE
CONSTRUCTION
ACCESS --
�5" %-I N. 2'A AGGREGATE BASE
PROFILE
70' MIN.
ASPHALT PAVED
WASHRACK
27 2%
IIIIIIIIII2% 12 MIN.*
t *MUST EXTEND FULL WIDTH `---® I POSITIVE DRAINAGE To SEDIMENT
OF INGRESS AND EGRESS 4 OPERATION TRAPPING DEVICE
PLAN
EXISYING
PA1.71AFN-
EXISTING
12 MIN. POSITIVE DRAINA I
2% TO SEDIMENT
TRAPPING DEVICE
FILTER CLOTH-r
SECTION A -A
A inininnuu water tap of 1 inch must be fitstalled vith a n ininitun 1 finch ballcocl(
shutoff vah a suppi 1, a wash hose «ith a (Ganreter of 1.5 filches for adequate
constant presgure. Nash water must be carried away front the entrance to an
approved settling area to remove sedunent. All secluneut shall be prevented fionr
entering stomr drams, ditches or watercourses.
PAVED WASH RACK
NO SCALE
PAVED CONSTRUCTION ENTRANCE (PCE
Not To Scale
2 )TEMPORARY SEEDING
14 Not To Scale
��W
EXTENSION OF FABRIC AND WIRE INTO THE TRENCH.
3 SILT FENCE S
C 14 Not To Scale
SILT FENCE DROP INLET
PR 0 TECTION
2 X 4' WOOD FRAME
DROP INLET
\��`
\� M
3' MIN.
7
AT CORNERS
PERSPECTIVE VIEWS
STAKE
ELEVATION OF STAKE AND
FABRIC ORIENTATION
SPECIFIC APPLICATION
DETAIL A
THIS METHOD OF INLET PROTECTION IS
APPLICABLE
WHERE THE
INLET DRAINS A RELATIVELY FLAT AREA
(SLOPE NO
GREATER
THAN 5%)
WHERE THE INLET SHEET OR
OVERLAND
FLOWS (NOT
EXCEEDING
1 C.F.S.) ARE TYPICAL. THE
METHOD SHALL
NOT
APPLY TO
INLETS RECEIVING CONCENTRATED FLOWS,
SUCH AS
IN STREET
OR HIGHWAY MEDIANS.
4 '�1NLET PROTECTIOL (IP
C 14 Not To Scale
GRAVEL CURB INLET SEDIMENT
FIL TER
i
GRAVEL FILTER
RUNOFF WATER
I I
III IIII o D
SEDIMENT��� hIIIIII O d
CONCRETE GUTTER II12"a
SPECIFIC APPLICATION
12"
/ r
WIRE MESH
FILTERED WATER
\1
CURB INLET
THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS
WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE
INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED
AREAS.
* GRAVEL SHALL BE VDOT #3, #357 OR 5 COARSE AGGREGATE.
5 INLET PROTECTION IP
C 14 Not To Scale
IT
PERMANENT SEEDING SPECIFICATIONS
February 16 through April 30:
Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre;
Annual Rye - 20 lbs/acre.
May 1 through August 15:
Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre;
Foxtail Millet - 20 lbs/acre.
August 16 through October 31:
Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre;
Annual Rye - 20 Ilbs/acre.
November 1 through February 15:
Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ilbs/acre; Winter
Rye - 20 lbs/acre.
MULCHING SPECIFICATIONS:
Straw or hay at a rate of 2 tons/acre. Must be anchored. Spread with
mulch blower or by hand.
LIME AND FERTILIZER SPECIFICATIONS:
Lime and fertilizer needs should be determined by soil tests. Soil tests
may be preformed by the Cooperative Extension Service Soil Testing
Laboratory at VPI&SU, or by a reputable commercial laboratory.
Information concerning the State Soil Testing Laboratory is available from
CITY Extension Agents. Under unusual conditions where it is not possible
to obtain a soil test, the following soil amendments will be applied:
For Permanent Seeding: Seeded areas shall be limed at a rate of 2 tons
per acre, and fertilized at a rate of 1,000 lbs. per acre of 10-20-10 (10
lbs. per 1,000 square feet) or equivalent.
For Temporary Seeding: Seeded areas shall be limed at a rate of 2 tons
per acre, and fertilized at a rate of 600 lbs. per acre of 10-20-10 (10
lbs. per 1,000 square feet) or equivalent.
LOW MAINTENANCE GROUND COVER:
SOUTHEAST NATIVE GRASS SEED MIX (AMERICAN MEADOWS INC.)
For slopes steeper than 3:1 grade, Mix the following seeds at 30 lbs/acre
acre
P P 9 � 9 /
each, along with EC-2 Matting:
Virginia Wildrye (Elymus virginicus), Little Bluestem Grass (Schizachyrium
scoporium), Purpletop (Tridens flavus), Broomsedge (Andropogon virginicus),
and Indian Grass (Sorghostrum nutans).
s PERMA
C14 Not To Scale
vc
cc
T SEEDIN
I
18" min. -
4.5' min.
7 DIVERSION DIKE-
C14 j Not To Scale
I
Compacted Soil
TEMPORARY RIGHT-OF-WAY
DIVERSIONS
Flow
TYPICAL TYPICAL GRAVEL STRUCTURE
8 RIGHT OF WAY DIVERSION RWD
C14 Not To Scale
Stormwater Conveyance Channel Section
SCC
Channel
Channel
Channel
Channel
2-Yr
10-Yr
Number
Lining
Depth
Bottom
Top
Side
Velocity
Depth
Vlfidth
Width
Slope
Class Al
AO
Rip -Rap
1.33
2.0
10.0
3:1
5.11
0.69
2
EC-3 Type 1
1.00
0.0
4.0
2:1
3.84
0.43
Channel Top Width -
Matting
Channel Side
s SCC SECTION DETAIL
C 14 Not To Scale
Sediment Trap Design Data
Weir
DA
Wet
D1
Wet Vol.
Area 1
Dry
D2
Dry Vol.
Area 2
No.
A
B
C
H (ft)
2 (ft)
Length
(Acs.)
(ft.)
(sq. ft.)
(ft.)
Cy
(sq. ft.)
(Req.)
(ProV)
(Req.)
rov.)
1
464
462
459
4
3.0
17.8
2.96
198.3
3.0
221
2244
198.3
2.0
201
3150
2
492
490
487
3
3.0
17.6
2.93
196.3
3.0
218
2244
196.3
2.0
198
3108
3
488
486
483
5
4.5
14.2
2.37
158.8
3.0
165
1735
158.8
2.0
159
2491
(EXCAVATED) I/ \FILTER CLOTH \ ORIGINAL
GROUND
EL=C ELEV.
tt
*SEE PLATE 3.13-1 COARSE AGGREGATE CLASS I RIPRAP
CROSS SECTION OF OUTLET
CLASS I RIPRAP
LENGTH IN FEET =
( )
6 X DRAINAGE AREA
N AC.
S \_
/DIVERSION
DIKE
�-
COARSE AGGREGATE
EXCAVATED ( ! / (��-
R CLOTH
j//��
AREA
**COARSE AGGREGATE SHALL BE VDOT #3, #357 OR #5
OUTLET (PERSPECTIVE VIEW)
10 )TEMPORARY SEDIMENT TRAP
C 14 Not To Scale
SECTION A -A
La
ox� I
d
FILTER CLOTH KEY IN 6-B'-. RECOMMENDED FOR ENTIRE PERIMETER
3do (MIN.)
?f�� o-
o
' , 1
1
C14 / Not To Scale
Specifications
Pipe
La (ft)
d (in)
W (ft)
BO
9
6.0
10.25
Class Al Riprap for all outlets
SHIMP
ENGINEERING2.
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
Lic.
w w�1
VSMP PLAN
REGENTS
SCHOOL
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2020.05.14
REVISION:
1) 2020.08.03
2) 2020.10.22
FILE NO.
E&SC DETAILS
SHEET C14 of C18
C14
Section 5. Stormwater Management Plan
This site contains two distinct drainage areas. Runoff from each drainage area is collected and analyzed at two different
points of analysis, A & B. The runoff to POA A is collected and piped to a stormwater conveyance channel lined with rip rap
to outlet at a manmade portion of stream leading to Moores Creek. At this point of outlet, the disturbed area from the site is
less than 1% of the contributing drainage area to POA A. Therefore this drainage area is in compliance with channel and
flood protection requirements outlined in 9VAC25-870-66 Sections B(1)(A) and C(3)(A).
Runoff to POA B is piped and outlet to a natural stream leading to Moores Creek. This drainage area was analyzed for
compliance with 9VAC25-870-66 Section B(3) and satisfies the energy balance equation with a 0.8 improvement factor. The
post -development 10 yr, 24 hr flow rate outletting to POA B is less than in pre -development, therefore this drainage area is
in compliance with flood protection requirements outlined in 9VAC25-870-66 Section C(2)(B).
To satisfy water quality requirements, 5.43 acres of the property will be put under a SWM conservation easement. Nutrient
credits will be purchased in the amount of 2.79 Ibs to satisfy the remaining phosphorous reduction requirement.
Section 6. Pollution Prevention Plan.
A. Plan showing pollution activities and prevention practices
i t--1>a��7 7
\� D;S� OF,III n \I 0 F B M
DD
OT I �� �� Rd�AryOf I Q
3'
4,59. l 8�
4 i
i
a
I I f i I Q
I it
EDJMENT TIFAP _` ' I { I ' IMENT TRAP 2 DRAINAGE\ ;
1 I � �ED •-�j� ( OkAINAGE\i II li 11 i AREA
� �� I I �I I` � 2.20 ACRES ks�
RAP SRED FOR LAIR
— - I DRAINAGE AREA SHOWN +s
/ I PHASE,,2) ( s
4
— �_ MAINTAIN RIGHT
I v�WAY DIVERSION ' l
- - �1 DURING TRANSPORT'`_ ^ %_ -- -
OF`01RTg0 FIELD
EA l2�
f ,
--- - \` - _ _ - _i-- _
l / 1 --- - --- -- - ��\ -- -`T-
o _ __
OF DIS URBANCE
-
POLLUTION PREVENTION
PLAN
SYMBOL
ACTIVITY
PROTECTION
MATERIALUSE
DURING
BUILDING
PROCESS
WASTE
®SOLID
DISPOSAL
SANITARY
WASTE
O
LANDSCAPING
OPERATIONS
WASH WATERS
VEHICLE AND
EQUIPMENT
WASHING
F
ON -SITE
FUELING
PAVING
OPERATIONS
CONCRETE
WASHOUT AND
®
CEMENT
WASTE
STRUCTURE
CONSTRUCTION
Q
STUCCO,
PAINTING, AND
CLEANING
A
DEWATERING
OPERATIONS
MATERIAL
DELIVERY AND
STORAGE
GAUGE LOCATION +
P MAILBOX
_ t
EDIMENT TRAP 3 DRAINAGE 1 \
AREA
(LARGEST AREA SHOWN)
2.37 ACRES _
1
o€NWTE
5fOW- —
��
W TER
— _ -
' Y GE
0ul1OM��$ I
-- LEV 487.0_ 1
_ ;
� ,, LLI 1'
11, IT
— -�—
POLLUTION PREVENTION PLAN '- - -- ��
REGENTS SCHOOL -
_-. _ _ - -- _ — I
SOIL EROSION s SEDIMENT CONTROL EYYI `.
SYMBOL NO. TITLE KEY , —_ _
_
_ _ _ _ _ _
3.02 CONSTRUCTION ENTRANCE CE I
—x —x — A
105 SILT FENCE 9F
® 307 INLET PROTECTION IF � 11 �' ✓ �_�
>�
�--�� 3.09 TEMPORARY DIVERSION DIKE DO
�--�� 3.12 TEMPORARY DIVERSION DV
rwAm T sv i 3.13 TEMPORARY SEDIMENT TRAP ST '
3.18 OUTLET PROTECTION OF i '
�Y 3.31
TEMPORARY SEEDING
TS
3.32
PERMANENT SEEDING
PS
�- 3.35
MULCH
MU
3.39
DUST CONTROL
DC
�••�••� LIMITS
OF DISTURBANCE
SI NVENNNEERM,, P.C.
FV6IA'EERIN6-L9NOPIANNGYG-FR0fECT MANAGEMF.Mf
N) a
p
0
----------------
o
- 'b
f� —
f =
r =
1'
--
C(� TRATE71'
OTTOM MWATER
ifs
-,ELE1Y ND1SC%IARQ�E
Of
i
NOTE: CONTRACTOR CAN
RELOCATE POLLUTION
PREVENTION ITEMS, BUT MUST
MARK UP DRAWINGS WITH
UPDATED LOCATION.
LIMITS OF DISTURBANCE TO BE
FIELD MARKED WITH WHITE
FLAGS OR WHITE PAINT
IMPORTS MUST BE NOTED IN
THE SWPPP GRADING LOG.
SECTION[
REGENTS SCHOOL
CONCRETE WASHOUT AREA NOTES
POLLUTION PREVENTION
mgnwrom"wwm.sir..w.m..o-ie..
PLAN -PHASE 1
b ngvM wn.ugn R'rownpl w,na.p..
m uepe,mrb .f,tnwxe..wpsw.
nb•�*^-n-•���
°^- REVISION DATE:10/21/2020
TMy,,,.nb b.,.MrRnzme,.'.fN.
GAUGE LOCATION +
MAILBOX
POLLUTION PREVENTION
PLAN
SYMBOL
ACTIVITY
PROTECTION
MATERIALUSE
DURING
BUILDING
PROCESS
WASTE
®SOLID
DISPOSAL
SANITARY
WASTE
O
LANDSCAPING
OPERATIONS
WASH WATERS
VEHICLE AND
EQUIPMENT
WASHING
F
ON -SITE
FUELING
PAVING
OPERATIONS
CONCRETE
WASHOUT AND
®
CEMENT
WASTE
STRUCTURE
CONSTRUCTION
Q
STUCCO,
PAINTING, AND
CLEANING
A
DEWATERING
OPERATIONS
MATERIAL
DELIVERY AND
STORAGE
9
�s
POLLUTION PREVENTION PLAN(
REGENTS SCHOOL
SOIL EROSION s
SEDIMENT CONTROL EYYIOLE
SYMBOL
NO.
TITLE
KEY
3.02
CONSTRUCTION ENTRANCE
CE(-
-x —x —
105
SILT FENCE
SF:.
®
3.07
INLET PROTECTION
IF
`(!
�--��
3.09
TEMPORARY DIVERSION DIKE
DO
�--��
3.12
TEMPORARY DIVERSION
DV
[MAW m Sc ]
3.13
TEMPORARY SEDIMENT TRAP
ST
�.
3.18
OUTLET PROTECTION
OF
3.31
TEMPORARY SEEDING
TS
3.32
PERMANENT SEEDING
PS
�-
3.35
MULCH
MU
3.39
DUST CONTROL
DC
�••�••�
LIMITS
OF DISTURBANCE
SHINENGINEERIM P.C.
EV6TffERBV6-L40PL MNG-PROWTMAM010.Mf
a >_
5
CURB IN I AM _
UNTIL SITE IS
STABILIZED_ AND
SEDIMENT TRAP-3'_
IS READY TO BE - -
-REMOVED_
__
rolxunR �� 1 €LEV 0'
A --
-'NTRATED
® RMWAT '
13ISOHARGE R -
A, �i �1 / (BE,PLACED ON Tk
" $ aNTRATE3 /' `SIDE�YiF 1REN0+1 I
_ SfpROAT€R _ School'.
j1LSCHARGE - Buffer
Area
_ _ -- -
—_46B'��- _ -1
�1
r 1
1
i
SF AM BUFFER DISTURBANCE. -
OPTION 1A: 11 LARGE
PY TREES, 11 UNDERSTORY, AND 11== r (((
SHRUBS TO BE INSTALLED WITHIN
STREAM BUFFER AREA \ /`
�\ xl
1"=1
E UPHILL
NOTE: CONTRACTOR CAN RELOCATE
POLLUTION PREVENTION ITEMS, BUT MUST
MARK UP DRAWINGS WITH UPDATED
LOCATION.
LIMITS OF DISTURBANCE TO BE FIELD
MARKED WITH WHITE FLAGS OR WHITE
PAINT
IMPORTS MUST BE NOTED IN THE
SWPPP GRADING LOG.
REGENTS SCHOOL
POLLUTION PREVENTION
PLAN -PHASE 2
1 REVISION DATE: 10/21/2020
Frr
1' nLL
I
I_
EC-3 TYPE 1 LOW MAINTE+IANCE
—MAMG GROUND CO
_®_ ® 0 ,GREATER
Cho
;re tion p
Ara
ANC GROUO COVER I.
3:1 OR GREATER
e � ++� JI
`d
s
t
Academic '�
Woods OW
ti
Area
MAINTENANCE
GROUND COVET y
ALL SLOPES 3:1f OF"
OR GREATER `
POLLUTION PREVENTION
PLAN
SYMBOL
ACTIVITY
PROTECTION
MATERIALUSE
DURING
BUILDING
PROCESS
SOLID WASTE
DISPOSAL
SANITARY
WASTE
O
LANDSCAPING
OPERATIONS
WASH WATERS
VEHICLE AND
EQUIPMENT
WASHING
F
ON -SITE
FUELING
PAVING
OPERATIONS
CONCRETE
WASHOUT AND
®
CEMENT
WASTE
STRUCTURE
CONSTRUCTION
Q
STUCCO,
PAINTING, AND
CLEANING
A
DEWATERING
OPERATIONS
MATERIAL
DELIVERY AND
STORAGE
v
Academic
�O Woods-
i Area
s�H
o�
POLLUTION PREVENTION PLAN
REGENTS SCHOOL
8011. EROSION A, SEDIMENT CONTROL BYYIeLB
SYMBOL NO. TITLE KEY
3.02
CONSTRUCTION ENTRANCE
CE t
—x —x —
105
SILT FENCE
SF
®
3.07
INLET PROTECTION
IF
�--��
3.09
TEMPORARY DIVERSION DIKE
DO
�--��
3.12
TEMPORARY DIVERSION
DV
[[FARM T SC ]
3.13
TEMPORARY SEDIMENT TRAP
ST
3.18
OUTLET PROTECTION
OF
3.31
TEMPORARY SEEDING
TS
3.32
PERMANENT SEEDING
PS
�-
3.35
MULCH
MU
3.39
DUST CONTROL
DC
�••�••�
LIMITS
OF DISTURBANCE
SI NVENNNEERM,, P.C.
FY6IM1EERBV6-L4ADPL1MIZY6 -FR0kCT MANAGE40T
a >_
77,
a«.
_- 2 _
t �\
0 CENTRATED , i - i
CA�AIED,MATERIAL SHALL �� \
kJ
BE k�LACED ON THE UPH14L
�: .� <ae �C9NCENA2Afto-- - School 3 SIDE OF-iRtMtm-r't{ M
URMWA Buffer
y<5 ___-DIS�RARGE Area
--------------
-- -
2,1 , SF S AM BUFFER DISTURBANCE:
MITIG TH OPTION 1A. 11 LARGE
C UN
RU S To BE INS INSTALLED
WITHIN STREAM` '
BUFFER AREA
CAVATE
P CE
100 0 100 200 300 �, ��
1"=1
PER
NOTE: CONTRACTOR CAN RELOCATE
POLLUTION PREVENTION ITEMS, BUT MUST
MARK UP DRAWINGS WITH UPDATED
LOCATION.
LIMITS OF DISTURBANCE TO BE FIELD
MARKED WITH WHITE FLAGS OR WHITE
PAINT
IMPORTS MUST BE NOTED IN THE
SWPPP GRADING LOG.
REGENTS SCHOOL
POLLUTION PREVENTION
PLAN —PHASE 3
REVISION DATE: 10/21/2020
B. Sources of Pollutants, locations, and prevention practices
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Follow Erosion and Sediment Control
Clearing, grading, excavating, and un-
Land disturbance area
Plan. Dispose of clearing debris at
stabilized areas
acceptable disposal sites. Seed and mulch,
or sod within 7 days of land clearing
Cover storm drain inlets and use drip pans
Paving operations
Roads and driveways
and absorbent/oil dry for all paving
machines to limit leaks ands ills
Direct concrete wash water into a leak -
Concrete washout and
Current location and detail shown on
proof container or leak -proof settling basin
cement waste
plan
that is designed so that no overflows can
occur
Enclose or cover material storage areas.
Mix paint indoors in a containment area or
Structure construction, stucco,
Structures
in a flat unpaved area. Prevent the
painting, and cleaning
discharge of soaps, solvents, detergents
and wash water, paint, form release oils
and curing compounds.
Water shall be filtered, settled or similarly
Dewatering operations
Dewatering sites shown on plan
treated prior to discharge as shown on
Ian.
Designated areas for material delivery and
Material delivery and storage
Designated area shown on plan
storage. Placed near construction
entrances, away from waterways and
drainage paths
Material use during building process
Building areas
manufacturer's instructions,eas
MSDS's attached.
C. Sources of Pollutants continued. Common activities and minimum control and prevention
practices
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Waste collection area will not receive a
substantial amount of runoff from upland
areas and does not drain directly to a
Solid waste disposal
Current designated container areas on
waterway. Containers have lids covered
plan
before periods of rain, or are in a covered
area. Scheduled collection to prevent
overfilling. MATERIALS NOT TO BE
BURIED ON -SITE
Convenient and well -maintained portable
sanitary facilities will be provided, and
Sanitary waste
Current locations shown on plan
located away from waterways or inlets.
Such facilities shall be regularly
maintained.
Apply fertilizers in accordance with
Landscaping operations
Landscape areas shown on plan
manufacturer's recommendations and not
during rainfall events
To be treated in a sediment basin or better
Wash Waters
Wash areas shown on plan
control as specified on plan. Minimize
the discharge of pollutants from
equipment and vehicle washing
Vehicle and equipment washing
Designated areas and details shown on
Provide containment and filtering for all
plan
wash waters per the plan
Fueling station
Provide double walled tanks, a lined
Fueling
containment area, drip pans, and spill
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
prevention and cleanup materials.
Liquid Spills
Current location shown on plan
Spill Kit readily available
Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products,
construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials
present on the site to precipitation and to stormwater.
(Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site
changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.)
D. Allowable non-stormwater discharges
Discharge
Pollutants or Pollutant
Constituents
Location on Site
Firefighting activities
Fire hydrant flushings
Equipment wash waters
Dust control waters
Potable water sources
Building wash waters
Pavement wash waters
Uncontaminated air conditioning
condensate
Uncontaminated groundwater
Footing drains
Excavation dewatering
Landscape irrigation
E. Persons responsible for pollution prevention practices
Owner of Record
Regents School of Charlottesville Inc.
3045 Ivy Road
Charlottesville, VA 22903
F. Response and reporting practices
Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and
implement chemical spill and leak prevention and response procedures as follows. To the extent practical, do
not store oils, chemicals, or other potential contaminants on site. When storage of potential contaminants is
required, provide secondary containment, such as spill berms or spill containment pallets. These should be
located within the drainage areas to a sediment trap or sediment basin. Direct concrete wash water into a settling
basin, dispose of hardened concrete with other construction waste debris to an appropriate waste facility.
Respond to all spills, leaks and discharges as follows. Spills of oil, petroleum products, sanitary wastes, and
substances listed under 40 CFR parts 110, 117, and 302 should be cleaned up as soon as possible while
protecting worker safety. Construct an earthen dike around any spills on dirt to prevent spreading. If a spill
occurs during rainfall, cover it with a tarp or another impermeable cover to prevent contaminating runoff. Do
not bury any spills or wash them with water. Maintain a spill kits in a readily accessible location. A spill kit
shall consist of a lined drum with bags of universal sorbents in the bottom, accessible without tipping the drum,
sorbent socks above the bags, and personal protective equipment on the top. All materials used to remove the
contaminants, including any water used to rinse equipment, and all dirt removed must be treated as
contaminated. Textiles, such as from coveralls, may be sent to a certified laundry facility. Waste must be
disposed of according to the standards of The City of Charlottesville and the Commonwealth of Virginia. Store
hazardous materials and wastes in covered containers.
Report all spills, leaks and discharges as follows: All spills, leaks, and discharges shall be recorded in the
inspection logs. If construction activity results in a discharge of contaminants that may be reasonably expected
to enter surface waters, the operator shall notify the Department of Environmental Quality immediately or
within 24 hours, and shall submit a written report within five days. For significant spills that cannot be
controlled by personnel in the immediate vicinity, notify the local emergency response by dialing 911. The City
of Charlottesville must also be notified, and potentially some of the following agencies: the Fire Department,
the Public Works Department, the Coast Guard, the Highway Patrol, the County Police Department,
Department of Toxic Substances, OSHA, etc. For spills of federal reportable quantities, in conformance with
the requirements in 40 CFR parts 110, 119, and 302, the contractor should notify the National Response Center
at (800) 424-8802.
G. Pollution Prevention Awareness
The engineer, project superintendent, and contractor shall have weekly meetings to review on -site conditions
and advise contractor of potential risks that should be addressed. Contractor will be responsible for following
procedures on a daily basis and applying appropriate waste management and prevention practices to be in
compliance with the conditions of the general permit. Employees shall be informed of the danger to nature and
to human health of various chemical spills.
Section 7. Discharges to impaired waters, surface waters within an applicable TMDL
wasteload allocation, and exceptional waters.
The site discharges to the tributary from the outfall of the Ragged Mountain Reservoir to the impaired water
body Moores Creek. Causes of impairment are Benthic-Macroinvertebrate Bioassessments. Site work shall be
in compliance with the following requirements:
1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after
final grade is reached on any portion of the site;
2. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved
nutrient management plan and shall not be applied during rainfall events; and
3. In accordance with Part I B 4 and Part I B 5, inspections shall be conducted as follows:
I. Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at
least once every five business days and no later than 48 hours following a measurable storm
event. In the event that a measurable storm event occurs when there are more than 48 hours
between business days, the inspection shall be conducted on the next business day; and
II. Representative inspections used by utility line installation, pipeline construction, or other similar
linear construction activities shall inspect all outfalls discharging to impaired waters.
Section 8. Qualified personnel
The following personnel are responsible for inspections;
Justin Shimp, P.E.
Shimp Engineering, P.C.
(434)227-5140
Virginia Professional Engineer license 0402045183
Section 9. Signed Certification
CERTIFICATION
"I certify under penalty of law that I have read and understand this document and this document and all
attachments were prepared in accordance with a system designed to assure that qualified personnel properly
gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties
for submitting false information, including the possibility of fine and imprisonment for knowing violations."
Owner/Operator Name:
Company:
Title:
Signature:
Date:
Ile
Section 10. Delegation of authority.
Delegation of Authority
I, (name), hereby designate the person or specifically described position below to be a
duly authorized representative for the purpose of overseeing compliance with environmental requirements,
including the Construction General Permit, at the Regents School of Charlottesville construction site. The
designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents
required by the permit.
(name of person or position)
(company)
(address)
(city, state, zip)
(phone)
By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in
the Construction General Permit (CGP), and that the designee above meets the definition of a "duly
authorized representative".
Operator Name:
Company:
Title:
Signature:
Date:
Section 11. General permit copy
(to be included with final SWPPP)
COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
General Permit No.: VAR10
Effective Date: July 1, 2019
Expiration Date: June 30, 2024
GENERAL VPDES PERMIT FOR DISCHARGES OF
STORMWATER FROM CONSTRUCTION ACTIVITIES
AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT
PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT
In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the
Virginia Stormwater Management Act and regulations adopted pursuant thereto, operators of
construction activities are authorized to discharge to surface waters within the boundaries of the
Commonwealth of Virginia, except those specifically named in State Water Control Board
regulations that prohibit such discharges.
The authorized discharge shall be in accordance with the registration statement filed with the
Department of Environmental Quality, this cover page, Part I - Discharge Authorization and
Special Conditions, Part II - Stormwater Pollution Prevention Plan, and Part III - Conditions
Applicable to All VPDES Permits as set forth in this general permit.
Construction General Permit
Effective July 1, 2019
Page 2 of 26
192TO 1
DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS
A. Coverage under this general permit.
During the period beginning with the date of coverage under this general permit and lasting
until the general permit's expiration date, the operator is authorized to discharge stormwater
from construction activities.
This general permit also authorizes stormwater discharges from support activities (e.g.,
concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated
material disposal areas, borrow areas) located on -site or off -site provided that:
a. The support activity is directly related to the construction activity that is required to have
general permit coverage for discharges of stormwater from construction activities;
b. The support activity is not a commercial operation, nor does it serve multiple unrelated
construction activities by different operators;
c. The support activity does not operate beyond the completion of the last construction
activity it supports;
d. The support activity is identified in the registration statement at the time of general permit
coverage;
e. Appropriate control measures are identified in a stormwater pollution prevention plan and
implemented to address the discharges from the support activity areas; and
f. All applicable state, federal, and local approvals are obtained for the support activity.
B. Limitations on coverage.
1. Post -construction discharges. This general permit does not authorize stormwater discharges
that originate from the site after construction activities have been completed and the site,
including any support activity sites covered under the general permit registration, has
undergone final stabilization. Post -construction industrial stormwater discharges may need to
be covered by a separate VPDES permit.
Discharges mixed with nonstormwater. This general permit does not authorize discharges that
are mixed with sources of nonstormwater, other than those discharges that are identified in
Part I E (Authorized nonstormwater discharges) and are in compliance with this general
permit.
Discharges covered by another state permit. This general permit does not authorize
discharges of stormwater from construction activities that have been covered under an
individual permit or required to obtain coverage under an alternative general permit.
Page 3 of 26
4. Impaired waters and total maximum daily load (TMDL) limitation.
Nutrient and sediment impaired waters. Discharges of stormwater from construction
activities to surface waters identified as impaired in the 2016 § 305(b)/303(d) Water
Quality Assessment Integrated Report or for which a TMDL wasteload allocation has
been established and approved prior to the term of this general permit for (i) sediment
or a sediment -related parameter (i.e., total suspended solids or turbidity) or (ii)
nutrients (i.e., nitrogen or phosphorus) are not eligible for coverage under this general
permit unless the operator develops, implements, and maintains a stormwater
pollution prevention plan (SWPPP) in accordance with Part II B 5 of this permit that
minimizes the pollutants of concern and, when applicable, is consistent with the
assumptions and requirements of the approved TMDL wasteload allocations and
implements an inspection frequency consistent with Part II G 2 a.
Polychlorinated biphenyl (PCB) impaired waters. Discharges of stormwater from
construction activities that include the demolition of any structure with at least 10,000
square feet of floor space built or renovated before January 1, 1980, to surface waters
identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment
Integrated Report or for which a TMDL wasteload allocation has been established and
approved prior to the term of this general permit for PCB are not eligible for coverage
under this general permit unless the operator develops, implements, and maintains a
SWPPP in accordance with Part II B 6 of this permit that minimizes the pollutants of
concern and, when applicable, is consistent with the assumptions and requirements
of the approved TMDL wasteload allocations, and implements an inspection frequency
consistent with Part II G 2 a.
Exceptional waters limitation. Discharges of stormwater from construction activities not
previously covered under the general permit effective on July 1, 2014, to exceptional waters
identified in 9VAC25-260-30 A 3 c are not eligible for coverage under this general permit
unless the operator develops, implements, and maintains a SWPPP in accordance with Part
II B 7 of this permit and implements an inspection frequency consistent with Part II G 2 a.
6. There shall be no discharge of floating solids or visible foam in other than trace amounts
C. Commingled discharges. Discharges authorized by this general permit may be commingled
with other sources of stormwater that are not required to be covered under a state permit, so long
as the commingled discharge is in compliance with this general permit. Discharges authorized by
a separate state or VPDES permit may be commingled with discharges authorized by this general
permit so long as all such discharges comply with all applicable state and VPDES permit
requirements.
D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, 1 C, and I E, all
discharges covered by this general permit shall be composed entirely of stormwater associated
with construction activities. All other discharges including the following are prohibited:
1. Wastewater from washout of concrete;
2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing
compounds, and other construction materials;
Page 4 of 26
3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance;
4. Oils, toxic substances, or hazardous substances from spills or other releases; and
5. Soaps, solvents, or detergents used in equipment and vehicle washing.
E. Authorized nonstormwater discharges. The following nonstormwater discharges from
construction activities are authorized by this general permit when discharged in compliance with
this general permit:
1. Discharges from firefighting activities;
2. Fire hydrant flushings;
3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not
been used and the wash water has been filtered, settled, or similarly treated prior to discharge;
4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge;
5. Potable water sources, including uncontaminated waterline flushings, managed in a manner
to avoid an instream impact;
6. Routine external building wash down where soaps, solvents or detergents have not been used
and the wash water has been filtered, settled, or similarly treated prior to discharge;
7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred
(or where all spilled or leaked material has been removed prior to washing); where soaps,
solvents, or detergents have not been used; and where the wash water has been filtered,
settled, or similarly treated prior to discharge;
8. Uncontaminated air conditioning or compressor condensate;
9. Uncontaminated ground water or spring water;
10. Foundation or footing drains where flows are not contaminated with process materials such
as solvents;
11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations
that have been filtered, settled, or similarly treated prior to discharge; and
12. Landscape irrigation.
F. Termination of general permit coverage.
1. The operator of the construction activity shall submit a notice of termination in accordance
with 9VAC25-880-60, unless a registration statement was not required to be submitted in
accordance with 9VAC25-880-50 A 1 c or A 2 b for single-family detached residential
structures, to the VSMP authority after one or more of the following conditions have been met:
Page 5 of 26
a. Necessary permanent control measures included in the SWPPP for the site are in place
and functioning effectively and final stabilization has been achieved on all portions of the
site for which the operator has operational control. When applicable, long term
responsibility and maintenance requirements for permanent control measures shall be
recorded in the local land records prior to the submission of a complete and accurate
notice of termination and the construction record drawing prepared;
b. Another operator has assumed control over all areas of the site that have not been finally
stabilized and obtained coverage for the ongoing discharge;
c. Coverage under an alternative VPDES or state permit has been obtained; or
d. For individual lots in residential construction only, final stabilization as defined in 9VAC25-
880-1 has been completed, including providing written notification to the homeowner and
incorporating a copy of the notification and signed certification statement into the SWPPP,
and the residence has been transferred to the homeowner.
The notice of termination shall be submitted no later than 30 days after one of the above
conditions in subdivision 1 of this subsection is met.
3. Termination of authorization to discharge for the conditions set forth in subdivision 1 a of this
subsection shall be effective upon notification from the department that the provisions of
subdivision 1 a of this subsection have been met or 60 days after submittal of a complete and
accurate notice of termination in accordance with 9VAC25-880-60 C, whichever occurs first.
4. Authorization to discharge terminates at midnight on the date that the notice of termination is
submitted for the conditions set forth in subdivisions 1 b through 1 d of this subsection unless
otherwise notified by the VSMP authority or department.
5. The notice of termination shall be signed in accordance with Part III K of this general permit.
G. Water quality protection.
1. The operator shall select, install, implement, and maintain control measures as identified in
the SWPPP at the construction site that minimize pollutants in the discharge as necessary to
ensure that the operator's discharge does not cause or contribute to an excursion above any
applicable water quality standard.
If it is determined by the department that the operator's discharges are causing, have
reasonable potential to cause, or are contributing to an excursion above any applicable water
quality standard, the department, in consultation with the VSMP authority, may take
appropriate enforcement action and require the operator to:
a. Modify or implement additional control measures in accordance with Part II C to
adequately address the identified water quality concerns;
b. Submit valid and verifiable data and information that are representative of ambient
conditions and indicate that the receiving water is attaining water quality standards; or
Page 6 of 26
c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3.
All written responses required under this chapter shall include a signed certification
consistent with Part III K.
7_1:M
STORMWATER POLLUTION PREVENTION PLAN
A. Stormwater pollution prevent plan.
A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission
of a registration statement and implemented for the construction activity, including any support
activity, covered by this general permit. SWPPPs shall be prepared in accordance with good
engineering practices. Construction activities that are part of a larger common plan of
development or sale and disturb less than one acre may utilize a SWPPP template provided
by the department and need not provide a separate stormwater management plan if one has
been prepared and implemented for the larger common plan of development or sale.
The SWPPP requirements of this general permit may be fulfilled by incorporating by reference
other plans such as a spill prevention control and countermeasure (SPCC) plan developed for
the site under § 311 of the federal Clean Water Act or best management practices (BMP)
programs otherwise required for the facility provided that the incorporated plan meets or
exceeds the SWPPP requirements of Part II B. All plans incorporated by reference into the
SWPPP become enforceable under this general permit. If a plan incorporated by reference
does not contain all of the required elements of the SWPPP, the operator shall develop the
missing elements and include them in the SWPPP.
3. Any operator that was authorized to discharge under the general permit effective July 1, 2014,
and that intends to continue coverage under this general permit, shall update its stormwater
pollution prevention plan to comply with the requirements of this general permit no later than
60 days after the date of coverage under this general permit.
B. Contents. The SWPPP shall include the following items:
1. General information.
a. A signed copy of the registration statement, if required, for coverage under the general
VPDES permit for discharges of stormwater from construction activities;
b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for
discharges of stormwater from construction activities (i.e., notice of coverage letter);
c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from
construction activities;
d. A narrative description of the nature of the construction activity, including the function of
the project (e.g., low density residential, shopping mall, highway, etc.);
e. A legible site plan identifying:
Page 7 of 26
(1) Directions of stormwater flow and approximate slopes anticipated after major grading
activities;
(2) Limits of land disturbance including steep slopes and natural buffers around surface
waters that will not be disturbed;
(3) Locations of major structural and nonstructural control measures, including sediment
basins and traps, perimeter dikes, sediment barriers, and other measures intended to
filter, settle, or similarly treat sediment, that will be installed between disturbed areas
and the undisturbed vegetated areas in order to increase sediment removal and
maximize stormwater infiltration;
(4) Locations of surface waters;
(5) Locations where concentrated stormwater is discharged;
(6) Locations of any support activities, including (i) areas where equipment and vehicle
washing, wheel wash water, and other wash water is to occur; (ii) storage areas for
chemicals such as acids, fuels, fertilizers, and other lawn care chemicals; (iii) concrete
wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste
facilities, including those temporarily placed on the construction site; and (vi)
construction waste storage; and
(7) When applicable, the location of the on -site rain gauge or the methodology established
in consultation with the VSMP authority used to identify measurable storm events for
inspection as allowed by Part II G 2 a (1) (ii) or Part II G 2 b (2).
Erosion and sediment control plan.
a. An erosion and sediment control plan designed and approved in accordance with the
Virginia Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu
of a plan" as defined in 9VAC25-840-10 from the VESCP authority, or an erosion and
sediment control plan prepared in accordance with annual standards and specifications
approved by the department.
b. All erosion and sediment control plans shall include a statement describing the
maintenance responsibilities required for the erosion and sediment controls used.
c. An approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion
and sediment control plan prepared in accordance with department -approved annual
standards and specifications, implemented to:
(1) Control the volume and velocity of stormwater runoff within the site to minimize soil
erosion;
(2) Control stormwater discharges, including peak flow rates and total stormwater volume,
to minimize erosion at outlets and to minimize downstream channel and stream bank
erosion;
Page 8 of 26
(3) Minimize the amount of soil exposed during the construction activity;
(4) Minimize the disturbance of steep slopes;
(5) Minimize sediment discharges from the site in a manner that addresses (i) the amount,
frequency, intensity, and duration of precipitation; (ii) the nature of resulting stormwater
runoff; and (iii) soil characteristics, including the range of soil particle sizes present on
the site;
(6) Provide and maintain natural buffers around surface waters, direct stormwater to
vegetated areas to increase sediment removal, and maximize stormwater infiltration,
unless infeasible;
(7) Minimize soil compaction and, unless infeasible, preserve topsoil;
(8) Ensure initiation of stabilization activities, as defined in 9VAC25-880-1, of disturbed
areas immediately whenever any clearing, grading, excavating, or other land -
disturbing activities have permanently ceased on any portion of the site, or temporarily
ceased on any portion of the site and will not resume for a period exceeding 14 days;
and
(9) Utilize outlet structures that withdraw stormwater from the surface (i.e., above the
permanent pool or wet storage water surface elevation), unless infeasible, when
discharging from sediment basins or sediment traps.
3. Stormwater management plan.
a. Except for those projects identified in Part II B 3 b, a stormwater management plan
approved by the VSMP authority as authorized under the Virginia Stormwater
Management Program (VSMP) Regulation (9VAC25-870), or an "agreement in lieu of a
stormwater management plan" as defined in 9VAC25-870-10 from the VSMP authority, or
a stormwater management plan prepared in accordance with annual standards and
specifications approved by the department.
b. For any operator meeting the conditions of 9VAC25-870-47 B of the VSMP regulation, an
approved stormwater management plan is not required. In lieu of an approved stormwater
management plan, the SWPPP shall include a description of, and all necessary
calculations supporting, all post -construction stormwater management measures that will
be installed prior to the completion of the construction process to control pollutants in
stormwater discharges after construction operations have been completed. Structural
measures should be placed on upland soils to the degree possible. Such measures must
be designed and installed in accordance with applicable VESCP authority, VSMP
authority, state, and federal requirements, and any necessary permits must be obtained.
Pollution prevention plan. A pollution prevention plan that addresses potential pollutant -
generating activities that may reasonably be expected to affect the quality of stormwater
discharges from the construction activity, including any support activity. The pollution
prevention plan shall:
a. Identify the potential pollutant -generating activities and the pollutant that is expected to be
exposed to stormwater;
Page 9 of 26
b. Describe the location where the potential pollutant -generating activities will occur, or if
identified on the site plan, reference the site plan;
c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit, that
are or will be commingled with stormwater discharges from the construction activity,
including any applicable support activity;
d. Identify the person responsible for implementing the pollution prevention practice or
practices for each pollutant -generating activity (if other than the person listed as the
qualified personnel);
e. Describe the pollution prevention practices and procedures that will be implemented to:
(1) Prevent and respond to leaks, spills, and other releases including (i) procedures for
expeditiously stopping, containing, and cleaning up spills, leaks, and other releases;
and (ii) procedures for reporting leaks, spills, and other releases in accordance with
Part III G;
(2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling
and maintenance activities (e.g., providing secondary containment such as spill
berms, decks, spill containment pallets, providing cover where appropriate, and having
spill kits readily available);
(3) Prevent the discharge of soaps, solvents, detergents, and wash water from
construction materials, including the clean-up of stucco, paint, form release oils, and
curing compounds (e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs)
to prevent contact with stormwater; (ii) collection and proper disposal in a manner to
prevent contact with stormwater; and (iii) a similarly effective means designed to
prevent discharge of these pollutants);
(4) Minimize the discharge of pollutants from vehicle and equipment washing, wheel wash
water, and other types of washing (e.g., locating activities away from surface waters
and stormwater inlets or conveyance and directing wash waters to sediment basins or
traps, using filtration devices such as filter bags or sand filters, or using similarly
effective controls);
(5) Direct concrete wash water into a leak -proof container or leak -proof settling basin. The
container or basin shall be designed so that no overflows can occur due to inadequate
sizing or precipitation. Hardened concrete wastes shall be removed and disposed of
in a manner consistent with the handling of other construction wastes. Liquid concrete
wastes shall be removed and disposed of in a manner consistent with the handling of
other construction wash waters and shall not be discharged to surface waters;
(6) Minimize the discharge of pollutants from storage, handling, and disposal of
construction products, materials, and wastes including (i) building products such as
asphalt sealants, copper flashing, roofing materials, adhesives, and concrete
admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape
Page 10 of 26
materials; and (iii) construction and domestic wastes such as packaging materials,
scrap construction materials, masonry products, timber, pipe and electrical cuttings,
plastics, Styrofoam, concrete, and other trash or building materials;
(7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or toxic
wastes, waste concrete, and sanitary wastes;
(8) Address any other discharge from the potential pollutant -generating activities not
addressed above;
(9) Minimize the exposure of waste materials to precipitation by closing or covering waste
containers during precipitation events and at the end of the business day, or
implementing other similarly effective practices. Minimization of exposure is not
required in cases where the exposure to precipitation will not result in a discharge of
pollutants; and
f. Describe procedures for providing pollution prevention awareness of all applicable wastes,
including any wash water, disposal practices, and applicable disposal locations of such
wastes, to personnel in order to comply with the conditions of this general permit. The
operator shall implement the procedures described in the SWPPP.
SWPPP requirements for discharges to nutrient and sediment impaired waters. For
discharges to surface waters (i) identified as impaired in the 2016 § 305(b)/303(d) Water
Quality Assessment Integrated Report or (ii) with an applicable TMDL wasteload allocation
established and approved prior to the term of this general permit for sediment for a sediment -
related parameter (i.e., total suspended solids or turbidity) or nutrients (i.e., nitrogen or
phosphorus), the operator shall:
a. Identify the impaired waters, approved TMDLs, and pollutants of concern in the SWPPP;
and
b. Provide clear direction in the SWPPP that:
(1) Permanent or temporary soil stabilization shall be applied to denuded areas within
seven days after final grade is reached on any portion of the site;
(2) Nutrients shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events;
and
(3) A modified inspection schedule shall be implemented in accordance with Part II G 2 a.
SWPPP requirements for discharges to polychlorinated biphenyl (PCB) impaired waters. For
discharges from construction activities that include the demolition of any structure with at least
10,000 square feet of floor space built or renovated before January 1, 1980, to surface waters
(i) identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated
Report or (ii) with an applicable TMDL wasteload allocation established and approved prior to
the term of this general permit for PCB, the operator shall:
Page 11 of 26
a. Identify the impaired waters, approved TMDLs, and pollutant of concern in the SWPPP;
b. Implement the approved erosion and sediment control plan in accordance with Part II B 2;
c. Dispose of waste materials in compliance with applicable state, federal, and local
requirements; and
d. Implement a modified inspection schedule in accordance with Part II G 2 a.
7. SWPPP requirements for discharges to exceptional waters. For discharges to surface waters
identified in 9VAC25-260-30 A 3 c as an exceptional water, the operator shall:
a. Identify the exceptional surface waters in the SWPPP; and
b. Provide clear direction in the SWPPP that:
(1) Permanent or temporary soil stabilization shall be applied to denuded areas within
seven days after final grade is reached on any portion of the site;
(2) Nutrients shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events;
and
(3) A modified inspection schedule shall be implemented in accordance with Part II G 2 a.
8. Identification of qualified personnel. The name, phone number, and qualifications of the
qualified personnel conducting inspections required by this general permit.
9. Delegation of authority. The individuals or positions with delegated authority, in accordance
with Part III K, to sign inspection reports or modify the SWPPP.
10. SWPPP signature. The SWPPP shall be signed and dated in accordance with Part III K.
C. SWPPP amendments, modification, and updates.
1. The operator shall amend the SWPPP whenever there is a change in the design, construction,
operation, or maintenance that has a significant effect on the discharge of pollutants to surface
waters and that has not been previously addressed in the SWPPP.
The SWPPP shall be amended if, during inspections or investigations by the operator's
qualified personnel, or by local, state, or federal officials, it is determined that the existing
control measures are ineffective in minimizing pollutants in discharges from the construction
activity. Revisions to the SWPPP shall include additional or modified control measures
designed and implemented to correct problems identified. If approval by the VESCP authority,
VSMP authority, or department is necessary for the control measure, revisions to the SWPPP
shall be completed no later than seven calendar days following approval. Implementation of
these additional or modified control measures shall be accomplished as described in Part II
H.
Page 12 of 26
3. The SWPPP shall clearly identify the contractors that will implement and maintain each control
measure identified in the SWPPP. The SWPPP shall be amended to identify any new
contractor that will implement and maintain a control measure.
4. The operator shall update the SWPPP as soon as possible but no later than seven days
following any modification to its implementation. All modifications or updates to the SWPPP
shall be noted and shall include the following items:
a. A record of dates when:
(1) Major grading activities occur;
(2) Construction activities temporarily or permanently cease on a portion of the site; and
(3) Stabilization measures are initiated;
b. Documentation of replaced or modified controls where periodic inspections or other
information have indicated that the controls have been used inappropriately or incorrectly
and were modified;
c. Areas that have reached final stabilization and where no further SWPPP or inspection
requirements apply;
d. All properties that are no longer under the legal control of the operator and the dates on
which the operator no longer had legal control over each property;
e. The date of any prohibited discharges, the discharge volume released, and what actions
were taken to minimize the impact of the release;
f. Measures taken to prevent the reoccurrence of any prohibited discharge; and
g. Measures taken to address any evidence identified as a result of an inspection required
under Part II G.
5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with
Part III K.
D. Public notification. Upon commencement of land disturbance, the operator shall post
conspicuously a copy of the notice of coverage letter near the main entrance of the construction
activity. For linear projects, the operator shall post the notice of coverage letter at a publicly
accessible location near an active part of the construction project (e.g., where a pipeline crosses
a public road). The operator shall maintain the posted information until termination of general
permit coverage as specified in Part I F.
E. SWPPP availability.
1. Operators with day-to-day operational control over SWPPP implementation shall have a copy
of the SWPPP available at a central location on -site for use by those identified as having
responsibilities under the SWPPP whenever they are on the construction site.
Page 13 of 26
The operator shall make the SWPPP and all amendments, modifications, and updates
available upon request to the department, the VSMP authority, the EPA, the VESCP authority,
local government officials, or the operator of a municipal separate storm sewer system
receiving discharges from the construction activity. If an on -site location is unavailable to store
the SWPPP when no personnel are present, notice of the SWPPP's location shall be posted
near the main entrance of the construction site.
The operator shall make the SWPPP available for public review in an electronic format or in
hard copy. Information for public access to the SWPPP shall be posted and maintained in
accordance with Part II D. If not provided electronically, public access to the SWPPP may be
arranged upon request at a time and at a publicly accessible location convenient to the
operator or his designee but shall be no less than once per month and shall be during normal
business hours. Information not required to be contained within the SWPPP by this general
permit is not required to be released.
F. SWPPP implementation. The operator shall implement the SWPPP and subsequent
amendments, modifications, and updates from commencement of land disturbance until
termination of general permit coverage as specified in Part I F.
All control measures shall be properly maintained in effective operating condition in
accordance with good engineering practices and, where applicable, manufacturer
specifications. If a site inspection required by Part II G identifies a control measure that is not
operating effectively, corrective actions shall be completed as soon as practicable, but no later
than seven days after discovery or a longer period as established by the VSMP authority, to
maintain the continued effectiveness of the control measures.
If site inspections required by Part II G identify an existing control measure that needs to be
modified or if an additional or alternative control measure is necessary for any reason,
implementation shall be completed prior to the next anticipated measurable storm event. If
implementation prior to the next anticipated measurable storm event is impracticable, then
additional or alternative control measures shall be implemented as soon as practicable, but
no later than seven days after discovery or a longer period as established by the VSMP
authority.
G. SWPPP Inspections.
1. Personnel responsible for on -site and off -site inspections. Inspections required by this general
permit shall be conducted by the qualified personnel identified by the operator in the SWPPP.
The operator is responsible for ensuring that the qualified personnel conduct the inspection.
2. Inspection schedule.
a. For construction activities that discharge to a surface water identified in Part 11 B 5 and B
6 as impaired or having an approved TMDL or Part I B 7 as exceptional, the following
inspection schedule requirements apply:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business
days or (ii) at least once every five business days and no later than 24 hours following
a measurable storm event. In the event that a measurable storm event occurs when
Page 14 of 26
there are more than 24 hours between business days, the inspection shall be
conducted on the next business day; and
(2) Representative inspections as authorized in Part II G 2 d shall not be allowed.
b. Except as specified in Part II G 2 a, inspections shall be conducted at a frequency of:
(1) At least once every five business days; or
(2) At least once every 10 business days and no later than 24 hours following a
measurable storm event. In the event that a measurable storm event occurs when
there are more than 24 hours between business days, the inspection shall be
conducted on the next business day.
c. Where areas have been temporarily stabilized or land -disturbing activities will be
suspended due to continuous frozen ground conditions and stormwater discharges are
unlikely, the inspection frequency described in Part II G 2 a and 2 b may be reduced to
once per month. If weather conditions (such as above freezing temperatures or rain or
snow events) make discharges likely, the operator shall immediately resume the regular
inspection frequency.
d. Except as prohibited in Part II G 2 a (2), representative inspections may be utilized for
utility line installation, pipeline construction, or other similar linear construction activities
provided that:
(1) Temporary or permanent soil stabilization has been installed and vehicle access may
compromise the temporary or permanent soil stabilization and potentially cause
additional land disturbance increasing the potential for erosion;
(2) Inspections occur on the same frequency as other construction activities;
(3) Control measures are inspected along the construction site 0.25 miles above and
below each access point (i.e., where a roadway, undisturbed right-of-way, or other
similar feature intersects the construction activity and access does not compromise
temporary or permanent soil stabilization); and
(4) Inspection locations are provided in the inspection report required by Part II G.
e. If adverse weather causes the safety of the inspection personnel to be in jeopardy, the
inspection may be delayed until the next business day on which it is safe to perform the
inspection. Any time inspections are delayed due to adverse weather conditions, evidence
of the adverse weather conditions shall be included in the SWPPP with the dates of
occurrence.
3. Inspection requirements.
a. As part of the inspection, the qualified personnel shall:
(1) Record the date and time of the inspection and, when applicable, the date and rainfall
amount of the last measurable storm event;
Page 15 of 26
(2) Record the information and a description of any discharges occurring at the time of
the inspection or evidence of discharges occurring prior to the inspection;
(3) Record any land -disturbing activities that have occurred outside of the approved
erosion and sediment control plan;
(4) Inspect the following for installation in accordance with the approved erosion and
sediment control plan, identification of any maintenance needs, and evaluation of
effectiveness in minimizing sediment discharge, including whether the control has
been inappropriately or incorrectly used:
(a) All perimeter erosion and sediment controls, such as silt fence;
(b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment
trapping measures;
(c) Completed earthen structures, such as dams, dikes, ditches, and diversions for
stabilization and effective impoundment or flow control;
(d) Cut and fill slopes;
(e) Sediment basins and traps, sediment barriers, and other measures installed to
control sediment discharge from stormwater;
(f) Temporary or permanent channels, flumes, or other slope drain structures
installed to convey concentrated runoff down cut and fill slopes;
(g) Storm inlets that have been made operational to ensure that sediment laden
stormwater does not enter without first being filtered or similarly treated; and
(h) Construction vehicle access routes that intersect or access paved or public roads
for minimizing sediment tracking;
(5) Inspect areas that have reached final grade or that will remain dormant for more than
14 days to ensure:
(a) Initiation of stabilization activities have occurred immediately, as defined in
9VAC25-880-1; and
(b) Stabilization activities have been completed within seven days of reaching grade
or stopping work;
(6) Inspect for evidence that the approved erosion and sediment control plan, "agreement
in lieu of a plan," or erosion and sediment control plan prepared in accordance with
department -approved annual standards and specifications has not been properly
implemented. This includes:
Page 16 of 26
(a) Concentrated flows of stormwater in conveyances such as rills, rivulets, or
channels that have not been filtered, settled, or similarly treated prior to discharge,
or evidence thereof;
(b) Sediment laden or turbid flows of stormwater that have not been filtered or settled
to remove sediments prior to discharge;
(c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch
basins that discharge to surface waters. Inlets and catch basins with failing
sediment controls due to improper installation, lack of maintenance, or inadequate
design are considered unprotected;
(d) Sediment deposition on any property (including public and private streets) outside
of the construction activity covered by this general permit;
(e) Required stabilization has not been initiated or completed or is not effective on
portions of the site;
(f) Sediment basins without adequate wet or dry storage volume or sediment basins
that allow the discharge of stormwater from below the surface of the wet storage
portion of the basin;
(g) Sediment traps without adequate wet or dry storage or sediment traps that allow
the discharge of stormwater from below the surface of the wet storage portion of
the trap; and
(h) Land disturbance or sediment deposition outside of the approved area to be
disturbed;
(7) Inspect pollutant generating activities identified in the pollution prevention plan for the
proper implementation, maintenance, and effectiveness of the procedures and
practices;
(8) Identify any pollutant generating activities not identified in the pollution prevention plan;
and
(9) Identify and document the presence of any evidence of the discharge of pollutants
prohibited by this general permit.
4. Inspection report. Each inspection report shall include the following items:
a. The date and time of the inspection and, when applicable, the date and rainfall amount of
the last measurable storm event;
b. Summarized findings of the inspection;
c. The locations of prohibited discharges;
d. The locations of control measures that require maintenance;
Page 17 of 26
e. The locations of control measures that failed to operate as designed or proved inadequate
or inappropriate for a particular location;
f. The locations where any evidence identified under Part II G 3 a (6) exists;
g. The locations where any additional control measure is needed;
h. A list of corrective actions required (including any changes to the SWPPP that are
necessary) as a result of the inspection or to maintain permit compliance;
i. Documentation of any corrective actions required from a previous inspection that have not
been implemented; and
The date and signature of the qualified personnel and the operator or its duly authorized
representative.
5. The inspection report shall be included into the SWPPP no later than four business days after
the inspection is complete.
The inspection report and any actions taken in accordance with Part II shall be retained by
the operator as part of the SWPPP for at least three years from the date that general permit
coverage expires or is terminated. The inspection report shall identify any incidents of
noncompliance. Where an inspection report does not identify any incidents of noncompliance,
the report shall contain a certification that the construction activity is in compliance with the
SWPPP and this general permit. The report shall be signed in accordance with Part III K of
this general permit.
H. Corrective actions.
The operator shall implement the corrective actions identified as a result of an inspection as
soon as practicable but no later than seven days after discovery or a longer period as
approved by the VSMP authority. If approval of a corrective action by a regulatory authority
(e.g., VSMP authority, VESCP authority, or the department) is necessary, additional control
measures shall be implemented to minimize pollutants in stormwater discharges until such
approvals can be obtained.
The operator may be required to remove accumulated sediment deposits located outside of
the construction activity covered by this general permit as soon as practicable in order to
minimize environmental impacts. The operator shall notify the VSMP authority and the
department as well as obtain all applicable federal, state, and local authorizations,
approvals, and permits prior to the removal of sediments accumulated in surface waters
including wetlands.
Page 18 of 26
PART III
CONDITIONS APPLICABLE TO ALL VPDES PERMITS
NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to
monitor stormwater discharges or control measures, the operator shall comply with the
requirements of subsections A, B, and C, as appropriate.
A. Monitoring.
1. Samples and measurements taken for the purpose of monitoring shall be representative of
the monitoring activity.
Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or
alternative methods approved by the U.S. Environmental Protection Agency, unless other
procedures have been specified in this general permit. Analyses performed according to test
procedures approved under 40 CFR Part 136 shall be performed by an environmental
laboratory certified under regulations adopted by the Department of General Services
(1 VAC30-45 or 1 VAC30-46).
3. The operator shall periodically calibrate and perform maintenance procedures on all
monitoring and analytical instrumentation at intervals that will ensure accuracy of
measurements.
B. Records.
1. Monitoring records and reports shall include
a. The date, exact place, and time of sampling or measurements;
b. The individuals who performed the sampling or measurements;
c. The dates and times analyses were performed;
d. The individuals who performed the analyses;
e. The analytical techniques or methods used; and
f. The results of such analyses.
2. The operator shall retain records of all monitoring information, including all calibration and
maintenance records and all original strip chart recordings for continuous monitoring
instrumentation, copies of all reports required by this general permit, and records of all data
used to complete the registration statement for this general permit, for a period of at least
three years from the date of the sample, measurement, report or request for coverage. This
period of retention shall be extended automatically during the course of any unresolved
litigation regarding the regulated activity or regarding control standards applicable to the
operator, or as requested by the board.
C. Reporting monitoring results.
Page 19 of 26
1. The operator shall update the SWPPP to include the results of the monitoring as may be
performed in accordance with this general permit, unless another reporting schedule is
specified elsewhere in this general permit.
2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms
provided, approved or specified by the department; or in any format provided that the date,
location, parameter, method, and result of the monitoring activity are included.
If the operator monitors any pollutant specifically addressed by this general permit more
frequently than required by this general permit using test procedures approved under 40 CFR
Part 136 or using other test procedures approved by the U.S. Environmental Protection
Agency or using procedures specified in this general permit, the results of this monitoring shall
be included in the calculation and reporting of the data submitted in the DMR or reporting form
specified by the department.
4. Calculations for all limitations which require averaging of measurements shall utilize an
arithmetic mean unless otherwise specified in this general permit.
D. Duty to provide information. The operator shall furnish, within a reasonable time, any
information which the board may request to determine whether cause exists for terminating this
general permit coverage or to determine compliance with this general permit. The board,
department, EPA, or VSMP authority may require the operator to furnish, upon request, such
plans, specifications, and other pertinent information as may be necessary to determine the effect
of the wastes from his discharge on the quality of surface waters, or such other information as
may be necessary to accomplish the purposes of the CWA and the Virginia Stormwater
Management Act. The operator shall also furnish to the board, department, EPA, or VSMP
authority, upon request, copies of records required to be kept by this general permit.
E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress
reports on, interim and final requirements contained in any compliance schedule of this general
permit shall be submitted no later than 14 days following each schedule date.
F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except
in compliance with a state permit issued by the department, it shall be unlawful to cause a
stormwater discharge from a construction activity.
G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a
discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance or a
hazardous substance or oil in an amount equal to or in excess of a reportable quantity established
under either 40 CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or § 62.1-44.34:19 of the Code
of Virginia that occurs during a 24-hour period into or upon surface waters or who discharges or
causes or allows a discharge that may reasonably be expected to enter surface waters, shall
notify the Department of Environmental Quality of the discharge immediately upon discovery of
the discharge, but in no case later than within 24 hours after said discovery. A written report of
the unauthorized discharge shall be submitted to the department and the VSMP authority within
five days of discovery of the discharge. The written report shall contain:
1. A description of the nature and location of the discharge;
2. The cause of the discharge;
Page 20 of 26
3. The date on which the discharge occurred;
4. The length of time that the discharge continued;
5. The volume of the discharge;
6. If the discharge is continuing, how long it is expected to continue;
7. If the discharge is continuing, what the expected total volume of the discharge will be; and
Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present
discharge or any future discharges not authorized by this general permit.
Discharges reportable to the department and the VSMP authority under the immediate reporting
requirements of other regulations are exempted from this requirement.
H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge
including a "bypass" or "upset," as defined in this general permit, should occur from a facility and
the discharge enters or could be expected to enter surface waters, the operator shall promptly
notify, in no case later than within 24 hours, the department and the VSMP authority by telephone
after the discovery of the discharge. This notification shall provide all available details of the
incident, including any adverse effects on aquatic life and the known number of fish killed. The
operator shall reduce the report to writing and shall submit it to the department and the VSMP
authority within five days of discovery of the discharge in accordance with Part III 12. Unusual
and extraordinary discharges include any discharge resulting from:
1. Unusual spillage of materials resulting directly or indirectly from processing operations;
2. Breakdown of processing or accessory equipment;
3. Failure or taking out of service of some or all of the facilities; and
4. Flooding or other acts of nature.
I. Reports of noncompliance. The operator shall report any noncompliance which may adversely
affect surface waters or may endanger public health.
An oral report to the department and the VSMP authority shall be provided within 24 hours
from the time the operator becomes aware of the circumstances. The following shall be
included as information that shall be reported within 24 hours under this subdivision:
a. Any unanticipated bypass; and
b. Any upset that causes a discharge to surface waters.
2. A written report shall be submitted within five days and shall contain:
a. A description of the noncompliance and its cause;
Page 21 of 26
b. The period of noncompliance, including exact dates and times, and if the noncompliance
has not been corrected, the anticipated time it is expected to continue; and
c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the
noncompliance.
The department may waive the written report on a case -by -case basis for reports of
noncompliance under Part III I if the oral report has been received within 24 hours and no
adverse impact on surface waters has been reported.
3. The operator shall report all instances of noncompliance not reported under Part III 1 1 or 2 in
writing as part of the SWPPP. The reports shall contain the information listed in Part 111 1 2.
NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP
authority. Reports may be made by telephone, email, or by fax. For reports outside normal working
hours, leaving a recorded message shall fulfill the immediate reporting requirement. For
emergencies, the Virginia Department of Emergency Management maintains a 24-hour telephone
service at 1-800-468-8892.
4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of
incorrect information in any report, including a registration statement, to the department or the
VSMP authority, the operator shall promptly submit such facts or correct information.
J. Notice of planned changes.
1. The operator shall give notice to the department and the VSMP authority as soon as possible
of any planned physical alterations or additions to the permitted facility or activity. Notice is
required only when:
a. The operator plans an alteration or addition to any building, structure, facility, or installation
that may meet one of the criteria for determining whether a facility is a new source in
9VAC25-870-420;
b. The operator plans an alteration or addition that would significantly change the nature or
increase the quantity of pollutants discharged. This notification applies to pollutants that
are not subject to effluent limitations in this general permit; or
2. The operator shall give advance notice to the department and VSMP authority of any planned
changes in the permitted facility or activity, which may result in noncompliance with state
permit requirements.
K. Signatory requirements.
1. Registration statement. All registration statements shall be signed as follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a
responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president
of the corporation in charge of a principal business function, or any other person who
performs similar policy -making or decision -making functions for the corporation; or (ii) the
manager of one or more manufacturing, production, or operating facilities, provided the
Page 22 of 26
manager is authorized to make management decisions that govern the operation of the
regulated facility including having the explicit or implicit duty of making major capital
investment recommendations, and initiating and directing other comprehensive measures
to assure long-term compliance with environmental laws and regulations; the manager
can ensure that the necessary systems are established or actions taken to gather
complete and accurate information for state permit application requirements; and where
authority to sign documents has been assigned or delegated to the manager in
accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or the proprietor,
respectively; or
c. For a municipality, state, federal, or other public agency: by either a principal executive
officer or ranking elected official. For purposes of this chapter, a principal executive officer
of a public agency includes (i) the chief executive officer of the agency or (ii) a senior
executive officer having responsibility for the overall operations of a principal geographic
unit of the agency.
2. Reports and other information. All reports required by this general permit, including SWPPPs,
and other information requested by the board or the department shall be signed by a person
described in Part III K 1 or by a duly authorized representative of that person. A person is a
duly authorized representative only if:
a. The authorization is made in writing by a person described in Part III K 1;
b. The authorization specifies either an individual or a position having responsibility for the
overall operation of the regulated facility or activity such as the position of plant manager,
operator of a well or a well field, superintendent, position of equivalent responsibility, or
an individual or position having overall responsibility for environmental matters for the
operator. (A duly authorized representative may thus be either a named individual or any
individual occupying a named position); and
c. The signed and dated written authorization is included in the SWPPP. A copy shall be
provided to the department and VSMP authority, if requested.
3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because
a different individual or position has responsibility for the overall operation of the construction
activity, a new authorization satisfying the requirements of Part III K 2 shall be submitted to
the VSMP authority as the administering entity for the board prior to or together with any
reports or information to be signed by an authorized representative.
4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following
certification:
"I certify under penalty of law that I have read and understand this document and that this
document and all attachments were prepared in accordance with a system designed to assure
that qualified personnel properly gathered and evaluated the information submitted. Based on
my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant
Page 23 of 26
penalties for submitting false information, including the possibility of fine and imprisonment for
knowing violations."
L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state
permit noncompliance constitutes a violation of the Virginia Stormwater Management Act and the
Clean Water Act, except that noncompliance with certain provisions of this general permit may
constitute a violation of the Virginia Stormwater Management Act but not the Clean Water Act.
Permit noncompliance is grounds for enforcement action; for state permit coverage, termination,
revocation and reissuance, or modification; or denial of a state permit renewal application.
The operator shall comply with effluent standards or prohibitions established under § 307(a)
of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish
these standards or prohibitions or standards for sewage sludge use or disposal, even if this
general permit has not yet been modified to incorporate the requirement.
M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit
after the expiration date of this general permit, the operator shall submit a new registration
statement at least 60 days before the expiration date of the existing general permit, unless
permission for a later date has been granted by the board. The board shall not grant permission
for registration statements to be submitted later than the expiration date of the existing general
permit.
N. Effect of a state permit. This general permit does not convey any property rights in either real
or personal property or any exclusive privileges, nor does it authorize any injury to private property
or invasion of personal rights, or any infringement of federal, state or local law or regulations.
O. State law. Nothing in this general permit shall be construed to preclude the institution of any
legal action under, or relieve the operator from any responsibilities, liabilities, or penalties
established pursuant to any other state law or regulation or under authority preserved by § 510 of
the Clean Water Act. Except as provided in general permit conditions on "bypassing" (Part III U)
and "upset' (Part III V), nothing in this general permit shall be construed to relieve the operator
from civil and criminal penalties for noncompliance.
P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to
preclude the institution of any legal action or relieve the operator from any responsibilities,
liabilities, or penalties to which the operator is or may be subject under §§ 62.1-44.34:14 through
62.1-44.34:23 of the State Water Control Law or § 311 of the Clean Water Act.
Q. Proper operation and maintenance. The operator shall at all times properly operate and
maintain all facilities and systems of treatment and control (and related appurtenances), which
are installed or used by the operator to achieve compliance with the conditions of this general
permit. Proper operation and maintenance also includes effective plant performance, adequate
funding, adequate staffing, and adequate laboratory and process controls, including appropriate
quality assurance procedures. This provision requires the operation of back-up or auxiliary
facilities or similar systems, which are installed by the operator only when the operation is
necessary to achieve compliance with the conditions of this general permit.
R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of
treatment or management of pollutants shall be disposed of in a manner so as to prevent any
pollutant from such materials from entering surface waters and in compliance with all applicable
state and federal laws and regulations.
Page 24 of 26
S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in
violation of this general permit that has a reasonable likelihood of adversely affecting human
health or the environment.
T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an
enforcement action that it would have been necessary to halt or reduce the permitted activity in
order to maintain compliance with the conditions of this general permit.
U. Bypass.
1. 'Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams
from any portion of a treatment facility. The operator may allow any bypass to occur that does
not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to
ensure efficient operation. These bypasses are not subject to the provisions of Part III U 2 and
3.
2. Notice.
a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the
operator shall submit prior notice to the department, if possible at least 10 days before the
date of the bypass.
b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass as
required in Part III I.
3. Prohibition of bypass.
a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may
take enforcement action against an operator for bypass unless:
(1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property
damage. Severe property damage means substantial physical damage to property,
damage to the treatment facilities that causes them to become inoperable, or
substantial and permanent loss of natural resources that can reasonably be expected
to occur in the absence of a bypass. Severe property damage does not mean
economic loss caused by delays in production;
(2) There were no feasible alternatives to the bypass, such as the use of auxiliary
treatment facilities, retention of untreated wastes, or maintenance during normal
periods of equipment downtime. This condition is not satisfied if adequate back-up
equipment should have been installed in the exercise of reasonable engineering
judgment to prevent a bypass that occurred during normal periods of equipment
downtime or preventive maintenance; and
(3) The operator submitted notices as required under Part III U 2.
b. The department may approve an anticipated bypass, after considering its adverse effects,
if the department determines that it will meet the three conditions listed in Part III U 3 a.
Page 25 of 26
V. Upset.
1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which there is
unintentional and temporary noncompliance with technology -based state permit effluent
limitations because of factors beyond the reasonable control of the operator. An upset does
not include noncompliance to the extent caused by operational error, improperly designed
treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or
careless or improper operation.
2. An upset constitutes an affirmative defense to an action brought for noncompliance with
technology -based state permit effluent limitations if the requirements of Part III V 4 are met.
A determination made during administrative review of claims that noncompliance was caused
by upset, and before an action for noncompliance, is not a final administrative action subject
to judicial review.
3. An upset does not include noncompliance to the extent caused by operational error,
improperly designed treatment facilities, inadequate treatment facilities, lack of preventative
maintenance, or careless or improper operation.
4. An operator who wishes to establish the affirmative defense of upset shall demonstrate,
through properly signed, contemporaneous operating logs or other relevant evidence that:
a. An upset occurred and that the operator can identify the cause of the upset;
b. The permitted facility was at the time being properly operated;
c. The operator submitted notice of the upset as required in Part III I; and
d. The operator complied with any remedial measures required under Part III S.
5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset
has the burden of proof.
W. Inspection and entry. The operator shall allow the department as the board's designee, the
VSMP authority, EPA, or an authorized representative of either entity (including an authorized
contractor), upon presentation of credentials and other documents as may be required by law to:
1. Enter upon the operator's premises where a regulated facility or activity is located or
conducted, or where records shall be kept under the conditions of this general permit;
2. Have access to and copy, at reasonable times, any records that shall be kept under the
conditions of this general permit;
3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring
and control equipment), practices, or operations regulated or required under this general
permit; and
4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance
or as otherwise authorized by the Clean Water Act or the Virginia Stormwater Management
Act, any substances or parameters at any location.
Page 26 of 26
For purposes of this section, the time for inspection shall be deemed reasonable during regular
business hours, and whenever the facility is discharging. Nothing contained herein shall make an
inspection unreasonable during an emergency.
X. State permit actions. State permit coverage may be modified, revoked and reissued, or
terminated for cause. The filing of a request by the operator for a state permit modification,
revocation and reissuance, or termination, or a notification of planned changes or anticipated
noncompliance does not stay any state permit condition.
Y. Transfer of state permit coverage.
1. State permits are not transferable to any person except after notice to the department. Except
as provided in Part III Y 2, a state permit may be transferred by the operator to a new operator
only if the state permit has been modified or revoked and reissued, or a minor modification
made, to identify the new operator and incorporate such other requirements as may be
necessary under the Virginia Stormwater Management Act and the Clean Water Act.
As an alternative to transfers under Part III Y 1, this state permit may be automatically
transferred to a new operator if:
a. The current operator notifies the department at least 30 days in advance of the proposed
transfer of the title to the facility or property;
b. The notice includes a written agreement between the existing and new operators
containing a specific date for transfer of state permit responsibility, coverage, and liability
between them; and
c. The department does not notify the existing operator and the proposed new operator of
its intent to modify or revoke and reissue the state permit. If this notice is not received, the
transfer is effective on the date specified in the agreement mentioned in Part III Y 2 b.
3. For ongoing construction activity involving a change of operator, the new operator shall accept
and maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking
over operations at the site.
Z. Severability. The provisions of this general permit are severable, and if any provision of this
general permit or the application of any provision of this state permit to any circumstance, is held
invalid, the application of such provision to other circumstances and the remainder of this general
permit shall not be affected thereby.
Section 12. Inspection logs
Reqents School SWPPP Inspection Loq
Inspection: Last Rainfall:
Date Time Date Rainfall Amount
Summary:
Locations of:
• Prohibited discharges
• Controls needing maintenance
• Failed controls:
• Evidence per Part II F 3 a (7):
(see back of sheet for details)
• Additional measures needed:
Corrective actions required:
Unimplemented corrective actions from previous inspection:
Inspector Signature Date Operator Signature Date
Part IIF3a(7)
(a) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that have not
been filtered, settled, or similarly treated prior to discharge, or evidence thereof;
(b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove
sediments prior to discharge;
(c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that
discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper
installation, lack of maintenance, or inadequate design are considered unprotected;
(d) Sediment deposition on any property (including public and private streets) outside of the
construction activity covered by this general permit;
(e) Required stabilization has not been initiated or completed on portions of the site;
(f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the
discharge of stormwater from below the surface of the wet storage portion of the basin;
(g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of
stormwater from below the surface of the wet storage portion of the trap; and
(h) Land disturbance outside of the approved area to be disturbed;