Loading...
HomeMy WebLinkAboutWPO201800078 Correspondence 2020-10-26608 Preston Avenue P 434.295.5624 T I M M O N S GROUP Suite 200 F 434.295.8317 YOUR VISION ACHIEVED THROUGH OURS. Charlottesville, VA22903 www•timmons.com October 26, 2020 County of Albemarle John Anderson P.E. Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Keswick Hall Spa WP0201800078 Plan Amendment Summary Dear Mr. Anderson: The following is a summary of the proposed stormwater revisions to WP0201800078 Keswick Hall Spa plan since the previous WPO plan approval for drawings dated 04/01/2020. Please do not hesitate to give me a call if you have further questions. Summary Narrative Ownership has reduced the building square footage by approximately 6,000 SF which created the need to adjust the grading around the southern side of the building. In response to the building size reduction the load dock and mechanical equipment spaces have been revised along the eastern side of the building. Ownership elected to remove excess parking spaces and modifications to the parking lot, east of the building have been incorporated into this set of drawings. All permeable pavers within the eastern parking lot have been removed. Stormwater quantity and quality calculations have been revised to reflect this change. The reduction in proposed impervious area has been noted on sheet C6.0. Stormwater infrastructure, water and sewer lines have been modified to accommodate this update. The 20 ft permanent stormwater management facility easement (DB 05368 PG 0603-00612; DB 05368 PG 0613-00619) has not bee modified as the outfall from the CMP detention system has not been moved. The following is a detailed description of changes per plan sheet • Sheet CO.00 D Building square footage has been updated along with the parking calculations. o E&SC Phase 4 has been added to the plan set. • Sheet C3.0 o Sediment trap #1 and #2 details have been updated to match the E&SC sheets & revised drainage areas. o Sequence of construction has been updated to reflect a fourth phase. • Sheet C3.1 o Sediment trap #2 has been removed from this phase. Disturbance within the existing gravel parking area (location of construction trailers) to be limited during this phase. • Sheet C3.2 o Sediment trap #2 has been removed from this phase. Disturbance within the existing gravel parking area (location of construction trailers) to be limited during this phase. • Sheet C3.3 o Phase 3 has been revised to reflect an intermediate phase between Phase 2 and Phase 4. • Sheet C4.0 o The building footprint has been reduced, loading dock and mechanical equipment location have been updated. o The southern most 12 parking spaces have been removed. o Sidewalk nearest Club Drive, adjacent to the parking lot, has been removed along with the cross walk to the west. • Sheet C5.0: o Site grading has been revised to accommodate the changes described on C4.0. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES Pagel1 0 Inlets and pipes around the site have been updated. The outfall pipes (#101 to #109) have not been moved and remain within the stormwater easement. • Sheet C6.0 0 The Post -Developed drainage area map has been revised to reflect site plan changes described on C4.0. 0 Water Quantity calculations have been updated to reflect the revised post -developed condition. The weir plate detail has been updated to reflect the updated calculations. 0 The Water Quality Analysis has been updated to reflect the removal of permeable paver area. • Sheet C6.1 0 The Hydraulic Design Calculations have been updated to reflect to reduction in permeable pavers east of the building. • Sheet C6.2 0 Stormwater pipe and inlet calculations have been updated to reflect the revised site conditions. • Sheet C6.3 0 Drainage areas have been updated to match the inlet adjustments • Sheet C6.4 0 The VRRM spreadsheet has been updated to reflect the proposed site conditions and reduction in permeable pavers. • Sheet C7.1 0 Profiles have been updated. • Sheet L1.10 0 Landscape plan has been updated to reflect the latest site plan changes. If you have any questions or comments, please feel free to give me a call at 704.941.4097. Sincerely, Andrew Allison, P.E. Project Engineer CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES Page 12