Loading...
HomeMy WebLinkAboutSUB201700090 Correspondence 2020-10-27SHIMP ENGINEERING, P.C. Design Focused Engineering October 2711, 2020 David James, P.E. Albemarle County Dept. of Community Development Re: Sparrow Hill — Engineer's Certification Letter — Road Improvements Dear Mr. James, I have reviewed surveys and inspections on Sparrow Hill Lane & McKinley Lane in the Sparrow Hill Subdivision. Based on these, I can confirm that the roadways were installed in accordance with the approved plans for the project, except as noted. Specifically we have surveyed the following: • The roadway centerlines and elevations are in accordance with the approved plans. • The length and width of the roadways are in accordance with the approved plans. • The fire apparatus road dimensions are in accordance with the approved plans. • The entrance and taper dimensions are in accordance with the approved plans. • The stone base, asphalt base and asphalt top coat are in accordance with the approved plans. We believe that a full reduction in the bond amount is warranted based upon completed work. The overall installation of the improvements was performed in accordance with the approved plans. A copy of the As -Built Plan has been included with this submittal to demonstrate compliance with the approved plans as mentioned above. If you have any questions please do not hesitate to contact me at justin@shimp-engineering.com or by phone at 434-227-5140. P.C.