Loading...
HomeMy WebLinkAboutWPO202000042 Plan - Revision 2020-10-26 (2)r, SITE DATA OWNER: CALVIN DABNEY 2435 GOBBLERS RIDGE vsmp CHARLOTTESVILLE, VA 22902 PLAN PREPARER: ROUDABUSH, GALE, & ASSOCIATES INC FOR 172 SOUTH PANTOPS DR. STE A CHARLOTTESVILLE, VA. 22911 (434)-979-8121 TAX MAP PARCEL No: 93-15 5RIDGEPOND BOUNDARY ALBEMARLE COUNTY GIS ZONING: RESIDENTIAL CURRENT USE: RESIDENTIAL PROJECT AREA: 1.60 ACRES TOPOGRAPHY: ALBEMARLE COUNTY GIS- 4FT GENERAL NOTE: THE PURPOSE OF THIS OF THIS PLAN IS TO FILL IN AN EXISTING POND ON THE HOMEOWNERS PROPERTY. THIS RESIDENTIAL POND HAS BEEN INSPECTED BY ALBEMARLE COUNTY AND DEEMED AS A FREESTANDING RECREATIONAL MEASURE AND ACCEPTABLE TO FILL IN BY REGULATORY OFFICIALS. THIS POND DOES NOT CONTAIN ANY KNOWN DOWNSTREAM OUTLET AND IS NOT FED BY ANY KNOWN JURISDICTIONAL BODIES OF WATER UPSTREAM. THIS LAND DISTURBANCE IS SUBJECT TO COUNTY REGULATION 18-5. 1.28 (BORROW, FILL, OR WASTE AREAS). ANY OFFSITE FILL USED FOR THIS SITE MUST COME FROM A SITE WITH AN APPROVED ESC AND/OR STORMWATER MANAGEMENT PLAN RESPONSIBLE LAND DISTURBER: CALVIN DABNEY RLD113769 GENERAL EROSION CONTROL NOTES WORK AREA PROTECTION & MAINTENANCE 1.ALL FENCES REQUIRED TO BE REMOVED OR DISTURBED BY CONSTRUCTION SHALL BE SALVAGED, STORED, PROTECTED AND RE -INSTALLED BY CONTRACTOR AT THE DIRECTION OF AND LOCATION DESIGNATED BY THE PROJECT MANAGER. IF SUCH FENCE MATERIAL CANNOT BE REUSED DUE TO DAMAGE CAUSED BY CONTRACTOR, CONTRACTOR SHALL INSTALL NEW FENCE OF THE SAME TYPE OF MATERIAL. TEMPORARY FENCING REQUIRED BY PRIVATE PROPERTY OWNERS SHALL BE PROVIDED BY CONTRACTOR. CONTRACTOR IS ADVISED TO CONTACT PROPERTY OWNERS AT LEAST FORTY-EIGHT (48) HOURS IN ADVANCE OF REMOVING ANY FENCE IN R 0 DER TO COORDINATE RELOCATION AND/OR PROTECTION OF ANY ANIMALS, AND TO ESTABLISH AND CONFIRM WITH THE OWNER THE PRE -CONSTRUCTION CONDITION OF ANY FENCE TO BE REMOVED I T D S URBED OR REPLACED. 2. CONTRACTOR IS PERMITTED TO WORK IN THE PUBLIC RIGHT-OF-WAY (FOLLOWING ISSUANCE OF VDOT APPROVAL) AND ANY TEMPORARY OR PERMANENT EASEMENT (FOLLOWING VERIFICATION OF EXISTENCE OF EASEMENT) SHOWN ON THE PLANS. HOWEVER, CONTRACTOR SHALL NOTIFY PROPERTY OWNER(S) FORTY-EIGHT (48) HOURS PRIOR TO WORKING ON ANY PRIVATE PROPERTY TO GAIN AND COORDINATE ACCESS AND TO DETERMINE A STORAGE AREA FOR MATERIALS IF NEEDED. COORDINATION OF ACCESS TO PUBLIC RIGHT-OF-WAY AND STORAGE OF MATERIALS THEREON SHALL BE COORDINATED WITH VDOT AND THE PROJECT MANAGER. CONTRACTOR'S FAILURE TO SO NOTIFY AND COORDINATE WITH PROPERTY OWNERS AND/OR THE PROJECT MANAGER MAY RESULT IN DELAYS. 3. CONTRACTOR SHALL, AT HIS. EXPENSE, MAINTAIN THE WORK SITE IN A CLEAN AND ORDERLY APPEARANCE AT ALL TIMES. ALL DEBRIS AND SURPLUS MATERIAL COLLECTED SHALL BE DISPOSED OF OFF THE WORK SITE BY CONTRACTOR, AT HIS EXPENSE. 4. EXISTING LAWNS, TREES, SHRUBS, FENCES, UTILITIES, CULVERTS, WALLS, WALKS, DRIVEWAYS, POLES, SIGNS, RIGHT-OF-WAY MONUMENTS, MAILBOXES AND THE LIKE SHALL BE PROTECTED FROM DAMAGE DURING THE WORK. ANY DAMAGE CAUSED TO SUCH ITEMS SHALL BE REPAIRED OR REPLACED BY CONTRACTOR AT NO ADDITIONAL COST. PROPERTY PINS DISTURBED BY CONTRACTOR THAT ARE NOT SHOWN ON THE PLANS TO BE DISTURBED SHALL BE RESTORED BY A LICENSED SURVEYOR AT CONTRACTOR'S EXPENSE. 5.CONTRACTOR SHALL EMPLOY EROSION CONTROL DEVICES AND METHODS AS REQUIRED TO MEET THE REQUIREMENTS AND INTENT OF THE LOCAL EROSION CONTROL ORDINANCE. CONTRACTOR SHALL PROVIDE THE NECESSARY DIVERSION DITCHES, DIKES OR TEMPORARY CULVERTS REQUIRED TO PREVENT MUD AND DEBRIS FROM BEING WASHED ONTO THE STREETS OR PROPERTY, CONTRACTOR'S VEHICLES SHALL BE KEPT CLEAN TO PREVENT MUD OR DUST FROM BEING DEPOSITED ON STREETS, NO AREA SHALL BE LEFT DENUDED FOR MORE THAN SEVEN (7) CALENDAR DAYS. VEGETATION 1. PRIOR TO REMOVING ANY VEGETATION, CONTRACTOR SHALL MEET WITH THE PROPERTY OWNERS AND THE PROJECT MANAGER TO REVIEW THE LIMITS OF CONSTRUCTION AND OBTAIN PERMISSION TO REMOVE VEGETATION REQUIRED TO DO THE WORK, 2.TREE AND PLANT ROOTS OR BRANCHES THAT MAY INTERFERE WITH THE WORK SHALL BE TRIMMED OR CUT ONLY WITH THE APPROVAL OF THE PROJECT MANAGER. ANY TREES OR PLANTS WHICH ARE SHOWN TO REMAIN THAT DO NOT INTERFERE WITH THE WORK, BUT ARE DAMAGED BY CONTRACTOR OR HIS SUBCONTRACTORS, SHALL BE REPAIRED OR REPLACED BY CONTRACTOR AT NO ADDITIONAL COST. 3. CONTRACTOR SHALL CLEAN UP, RESTORE, SEED AND MAINTAIN ALL DISTURBED AREAS IMMEDIATELY UPON COMPLETION OF WORK ON EACH SITE. TOPSOIL, SEED, FERTILIZER AND MULCH SHALL BE PLACED IN ACCORDANCE WITH ESC AUTHORITY STANDARDS ON ALL DISTURBED AREAS. A PERMANENT STAND OF GRASS ADEQUATE TO PREVENT EROSION SHALL BE ESTABLISHED PRIOR TO FINAL ACCEPTANCE. 4. THE ACT OF RESEEDING SHALL NOT QUALIFY AS "STABILIZED'. THE CONTRACTOR SHALL BE RESPONSIBLE TO ESTABLISH VEGETATION, NOT SIMPLY APPLY SEED AND MATERIALS. ALBEMARLE COUNTY, VIRGINIA WP0202000042 732' �6l �762� ells=Dlr ca SITE n F; r ,a-... la s Ci _ 0 _ ? VICINITY MAP SCALE: 1 "=2000 FEET STORMWATER COMPLIANCE SUMMARY WATER QUALITY COMPLIANCE - 9VAC25-870-63 ACCORDING TO THE VRRM SPREADSHEET FOR RE -DEVELOPED LANDS, THE SITE MEETS WATER QUALITY COMPLIANCE REQUIREMENTS BASED ON THE POST -DEVELOPED REDUCTION IN IMPERVIOUS AREA. THE REQUIRED LOAD REDUCTION FOR THE SITE IS -0.07 LBS/YR PHOSPHORUS WATER QUANTITY COMPLIANCE ANALYSIS - 9VAC25-860-66 PROPOSED GRADING PROMOTES SHEET FLOW FROM THE SITE. GENTLE SLOPES ARE PROPOSED AT THE TOP AND BOTTOM OF THE SITE TO MINIMIZE RUN-OFF VELOCITY AND DISCOURAGE RILL EROSION. SURFACE ROUGHENING SHOULD BY UTILIZED ON STEEPER SLOPE SECTIONS DURING CONSTRUCTION OPERATIONS TO MINIMIZE RILL EROSION AND ALLOW VEGETATION ESTABLISHMENT. CHANNEL PROTECTION (COMPLIANCE UNDER 9VAC25-860-66D): SINCE ALL FLOWS FROM THE SITE ARE SHEET FLOW AND DESIGN EVENT PEAK FLOWS FROM THE SITE ARE DECREASED IN THE POST -DEVELOPED CONDITION, CHANNEL PROTECTION COMPLIANCE IS ACHIEVED IN ACCORDANCE WITH 9VAC25-870-66D AND NO FURTHER ANALYSIS IS REQUIRED. CONTRACTOR'S RECORD DRAWINGFLOOD PROTECTION SINCE ALL FLOWS FROMMPLITHENCE SITE ANRE DER SHEET FLOW AND6DESIGN EVENT PEAK FLOWS FROM THE SITE ARE DECREASED IN THE CONDITION, FLOOD CERTIFICATION STATEMENT ACCORDANCE WITH 9VAC2 �870-66DST-DOPED SAND NO FURTHER ANALYSOTION ISCREQUIRED.PLIANCE IS ACHIEVED /N CONTRACTOR SHALL KEEP ACCURATE RECORDS OF ANY CHANGES SUBSTITUTIONS, ALTERATIONS, VARIATIONS OR UNUSUAL CONDITIONS ENCOUNTERED OR IMPLEMENTED WHILE ENGAGED ON THIS PROJECT. THESE RECORDS SHALL BE IN THE FORM OF "REDLINES". "REDLINES" SHALL REFER TO THE CONTRACTOR'S HAND ANNOTATIONS USING RED COLORED PEN/PENCIL TO DEPICT ACTUAL CHANGE, SUBSTITUTION, OR CONDITION. PRIOR TO CONTRACTOR REQUESTING PARTIAL OR FULL PAYMENT, CONTRACTOR SHALL PROVIDE THE OWNER WITH AN UP-TO-DATE CONTRACTOR'S RECORD DRAWING. SPECIFICALLY, THIS SET OF PLANS, ISSUED TO THE CONTRACTOR AS FINAL CONSTRUCTION DRAWINGS, SHALL BEAR THE "REDLINE" MARKINGS LISTED BELOW AS WELL AS THE CONTRACTOR (AGENT OR SUPERINTENDENT) SIGNATURE AND CERTIFICATION BELOW: • REDLINES SHOULD ALWAYS BE ACCURATE NEAT, LEGIBLE, DATED AND REASONABLY SCALED • ADD LARGE RED LETTERS TO TITLE SHEET WITH 'CONTRACTOR'S RECORD DRAWING' INCLUDING CONTRACTOR'S NAME, DATE, AND OTHER RELEVANT INFORMATION • CONTRACTOR'S REPRESENTATIVE OR SUPERINTENDENT SHALL INITIAL EACH SHEET. IF A SHEET HAS NOT BEEN CHANGED AT ALL OR NO MARK HAS BEEN ADDED, LABEL THE SHEET ONLY 'NO CHANGES' • IF A SHEET HAS BEEN CHANGED OR MODIFICATIONS HAVE BEEN ADDED, LABEL IT 'REVISED' • USE WRITTEN EXPLANATION TO DESCRIBE CHANGES. REFER TO SPECIFIC ACTIONS INSTEAD OF REFERENCING CHANGE ORDER NUMBERS OR RELATED DOCUMENTS • USE CLEAR LETTERING • NEVER REMOVE OLD VALUES OR DETAILS, JUST REDLINE OR ❑X❑ THROUGH THEM. IF THERE IS NO ROOM FOR THE NEW VALUE, YOU CAN GO TO THE SIDE AND REDLINE THE REPLACEMENT VALUE. • PROVIDE THE REDLINE DETAILS OF CHANGES OR ADDITIONAL INFORMATION, INCLUDING BUT NOT LIMITED TO FABRICATION, ERECTION, INSTALLATION, LOCATION, SIZING, MATERIAL, DIMENSION, ADDITIONS, RELOCATIONS, SUBSTITUTIONS, ETC • BE SPECIFIC WHEN MAKING NOTES TO UNDERGROUND UTILITIES, SHOWING EXACT LOCATION, DEPTH, AND MATERIAL USED (EXAMPLE: SEWER LATERALS) • PROVIDE ALL NECESSARY INFORMATION OF CONTRACTOR'S DESIGNED SYSTEMS OR SUBSTITUTIONS • CROSS OUT ANY PLAN REFERENCE TO OAPPROVED EQUALO AND REPLACE WITH ANY SPECIFIC INFORMATION OF VARIANCE USED DURING THE CONSTRUCTION PROCESS • ANY CHANGES IN INVERT ELEVATIONS, GRADE MODIFICATIONS, SLOPES, AND RELATED INFORMATION ON PIPING UTILITIES, EARTHWORK, ETC. SHALL BE REDLINED. • RECORD ALL UNEXPECTED OBSTRUCTIONS, COMPLICATING FACTORS, UNSUITABLE CONDITIONS FOUND IN THE PROJECT AREA INCLUDING ROCK, UNUSUAL TOPSOIL CONDITIONS, BURIED DEBRIS, ETC. • ATTACH OR INCLUDE ANY SHOW DRAWINGS OR SUPPLEMENTAL INFORMATION TO THE CONTRACTOR'S RECORD DRAWING • CHANGES MADE AS A RESULT OF ANY REGULATORY OR OWNER INSPECTION PROCESS CERTIFICATION STATEMENT: THIS HAND -MARKED SET OF DRAWINGS HAS BEEN CREDLINED0 TO PROVIDE ACCURATE DETAILED RECORD OF ANY SUBSTANTIVE CHANGES TO THE APPROVED DESIGN DRAWINGS. ANY ITEM NOT ❑REDLINEDo ON THIS PLAN SET OR SUBSEQUENT PAGES SHOULD BE CONSIDERED TO BE DCONSTRUCTED IN ACCORDANCE WITH THE DESIGN AS SHOWND. FOR: NAME TITLE DATE (CONTRACTOR) SHEET INDEX SHEET 1--------- COVER SHEET SHEET 2--------- EXISTING CONDITIONS SHEET 3--------- EROSION CONTROL PLAN PHASE I SHEET 4--------- EROSION CONTROL PLAN PHASE II SHEET 5---------- EROSION CONTROL NARRATIVE SHEET 6---------- NOTES AND DETAILS SHEET 7---------- VSMP GENERAL CONSTRUCTION NOTES PLAN NOTES . THE OWNER WILL DESIGNATE A PROJECT MANAGER TO ACT AS OWNERS REPRESENTATIVE DURING THIS PROJECT. CONTRACTOR SHALL REPORT DIRECTLY TO THIS PROJECT MANAGER UNLESS OTHERWISE DIRECTED. 2. THE H N T DESIGNER AS CONDUCTED ED NO STUDIES DESIGNED TO DISCOVER THE PRESENCE OF ANY HAZARDOUS SUBSTANCES ON THIS PROPERTY AND ASSUMES NO RESPONSIBILITY OR LABILITY RESULTING FROM THE PRESENCE ON ANY SUCH SUBSTANCE. 3. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR THIS WORK AND PAY ALL ASSOCIATED FEES. THIS INCLUDES ALL NECESSARY PERMITS, INSPECTIONS, BONDS, AND OTHER APPROVAL RELATED ITEMS IN ACCORDANCE WITH THESE PLANS AS WELL AS LOCAL, STATE, AND FEDERAL POLICIES. 4. PAVED OR RIP RAP DITCH MAY BE REQUIRED WHEN, IN THE OPINION OF THE RESIDENT ENGINEER OR HIS DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 5. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES, LATEST EDITION, AND SHALL BE PROVIDED BY THE CONTRACTOR. 6. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). 7. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE VDOT ROAD AND BRIDGE STANDARDS (LATEST EDITION) AND THE VDOT ROAD AND BRIDGE SPECIFICATIONS (LATEST EDITION). 8, CONTRACTOR SHALL PROVIDE NECESSARY REFLECTORS, BARRICADES, TRAFFIC CONTROL DEVICES AND/OR FLAG PERSONS TO ENSURE THE SAFETY OF ITS WORKERS AND THE PUBLIC. TRAFFIC CONTROL SHALL BE DONE WITH THE KNOWLEDGE AND PERMISSION FROM THE STREET'S OWNER AND AUTHORITY. 9. CONTRACTOR SHALL MAINTAIN SAFE AND PASSABLE PUBLIC ACCESS TO PROPERTIES AND THE PUBLIC RIGHT-OF-WAY DURING CONSTRUCTION. ACCESS FOR EMERGENCY VEHICLES SHALL BE MAINTAINED AT ALL TIMES. EARTHWORK DRAINAGE, & SITE CONDITIONS 1. EXCEPT AS OTHERWISE SHOWN ON THE PLANS, ALL CUTS AND FILLS SHALL MATCH EXISTING SLOPES OR BE NO GREATER THAN 2:1. 2. UNLESS OTHERWISE NOTED ON THE PLANS OR IN THE SPECIFICATIONS, ALL FILL MATERIALS SHALL BE COMPACTED TO 95% OF THEORETICAL MAXIMUM DENSITY AS DETERMINED BY AASHTO T-99 METHOD A, WITHIN PLUS OR MINUS 2% OF OPTIMUM MOISTURE, FOR THE FULL WIDTH AND DEPTH OF THE FILL, 3. ALL GRADING AND IMPROVEMENTS TO BE CONFINED TO THE PROJECT AREA UNLESS OTHERWISE INDICATED, 4. ALL MATERIALS AND INSTALLATION DETAILS SHALL CONFORM TO APPLICABLE LOCAL ORDINANCES AND VDOT ROAD & BRIDGE STANDARDS (LATEST EDITION) UNLESS OTHERWISE STATED WITHIN THE PLANS.. 5. ANY UNUSUAL OR UNANTICIPATED SUBSURFACE CONDITIONS SHALL BE IMMEDIATELY REPORTED TO THE ENGINEER. 6. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND LOCATIONS PRIOR TO BEGINNING WORK, AND IMMEDIATELY NOTIFY THE PROJECT MANAGER IN THE EVENT THERE ARE ANY DISCREPANCIES BETWEEN SUCH CONDITIONS AND THOSE SHOWN ON THE PLANS AND SPECIFICATIONS. T IN THE EVENT THAT GRADING AS SHOWN ON THE PLANS IS NOT FEASIBLE, CONTRACTOR SHALL ADVISE THE PROJECT MANAGER AND ENGINEER BEFORE FINAL GRADING COMPLETION FOR ADVICE AND CONSENT. GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS),THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF Y IT AN ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVEDT WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN Y W N 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:00 AM TO 9:00 PM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES, WHERE APPLICABLE, ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT UNIT BUILDING BU LD NG OR OTHER PORTION OF THE PROPERTY. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80 LBS/100SSF. ALTERNATIVES ARE SUBJECT TO BE APPROVED BY THE COUNTY EROSION CONTROL IN SPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90 LBS/1000SSF. INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000 LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180 LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS R K 0 ENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80 LBS/100SSF. ALTERNATIVES ARE SUBJECT TO BE APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIRED IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 YEAR OF THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17-204G). 22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) MONTHS AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. (WATER PROTECTION ORDINANCE SECTION 17-207B). 23. THESE PLANS DO NOT GUARANTEE THE EXISTENCE, NON-EXISTENCE OR LOCATION OF UTILITIES. CONTRACTOR SHALL VERIFY THE EXISTENCE AND LOCATION OR THE NON-EXISTENCE OF UTILITIES. AT LEAST 48 HOURS PRIOR TO ANY EXCAVATION OR CONSTRUCTION, CONTRACTOR SHALL NOTIFY MISS UTIUN (1-8W-552-7001) AND/OR THE RESPECTIVE UTILITY COMPANIES FOR GAS, WATER, SEWER, POWER, PHONE AND CABLE. CONTRACTOR SHALL TIMELY ARRANGE TO HAVE THE VARIOUS UTILITIES LOCATED, AND TO HAVE THEM REMOVED OR RELOCATED, OR TO DETERMINE THE METHOD OF PROTECTION ACCEPTABLE TO THE RESPECTIVE OWNER, IF THE METHOD OF PROTECTION IS NOT OTHERWISE SPECIFIED. CONTRACTOR SHALL CONDUCT ITS WORK IN THE VICINITY OF EXISTING UTILITIES IN ACCORDANCE WITH THE RESPECTIVE UTILITY'S RULES AND REGULATIONS. ANY COST INCURRED FOR REMOVING, RELOCATING OR PROTECTING UTILITIES SHALL BE BORNE BY CONTRACTOR UNLESS INDICATED OTHERWISE. CONTRACTOR SHALL EXCAVATE TO LOCATE BURIED UTILITIES FAR ENOUGH IN ADVANCE OF ITS WORK TO ALLOW FOR HORIZONTAL AND /OR VERTICAL ADJUSTMENTS TO ITS WORK AND/OR THE UTILITIES. NO ADJUSTMENT IN COMPENSATION OR SCHEDULE WILL BE ALLOWED FOR DELAYS RESULTING FROM CONTRACTOR'S FAILURE TO CONTACT AND COORDINATE WITH UTILITIES. A z 0 a W w a z z 5 (7a o p� o M z v 0 a z � W u o � 0 z D 0 0 0 N o� 0 O Z DESIGNED BY: JLF/LPO DRAWN BY: JLFTP-0 CHECKED BY: 1 .1 OF f� L. TAGGART Lic. No. 22841 �Wa D-26-2020 1 , 'IONAL �- a p O Z g a. Q W (] Z cui W > W It 0 cn� D W LL o CO)W ui Z m�.y•� W O 0 cn w V rCr)� V 1 W LC) Z N DATE: 8-25-2020 SCALE: AS SHOWN JOB: GOBBLERS RIDGE FILE: 19.0896 SHEET: 01 OF 7