Loading...
HomeMy WebLinkAboutARB202000096 Staff Report 2020-10-28ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB-2013-96: Rio Hill Redevelopment Review Type Conceptual Plan Parcel Identification 04500-00-00-094AO Location West of Rt. 29, East of Berkmar Drive, south of Woodbrook Drive Zoned Planned Development Shopping Center (PDSC), Entrance Corridor (EC) Owner/Applicant SCT Rio Hill LLC C/O Rosenthal Properties/ BRW Architects (David Timmerman) Magisterial District Rio Proposal To renovate a majority of the existing Rio Hill Shopping Center (excluding the Kroger store and the southeast corner of the center), removing portions of the existing canopies and store entries to update the current fa*e. Context The subject property is an existing strip shopping center. The shopping center is surrounded primarily by commercial development. Some residential development is located to the west and beyond Rt. 29 to the east. Visibility The portion of the parcel that is adjacent to the Rt. 29 Entrance Corridor is occupied by a stormwater facility. The shopping center building begins approximately 219' from the EC street and is located as far as approximately 1113' from the street. Despite this distance, the shopping center building has some visibility from Rt. 29, with the increased height of building elements marking major tenants more visible from the street. Site lighting and illuminated signage are visible and make the shopping center more noticeable at night. ARB Meeting Date October 19, 2020 Staff Contact Khris Taggart PROJECT HISTORY The development was built prior to the establishment of the Entrance Corridor overlay district. The ARB has approved a Comprehensive Sign Plan and a number of sign applications for the development, as well as some renovations to tenant spaces. A pre -application conference was held to discuss the proposed fagade changes on July 13, 2020. A minor site plan amendment for the proposed work was submitted to the County on October 5, 2020. ANALYSIS REF GUIDELINE ISSUE RECOMMENDATION GENERAL GUIDELINES ftipose, ConWadbility with si ni cant historic sites, ConWaabffity with the character of the Entrance Corridor 1 The goal of the regulation of the design of development within the designated The development was constructed prior to the establishment of Provide line drawing elevations and Entrance Corridors is to ensure that new development within the corridors reflects the Entrance Corridors. The size, layout and configuration of plans to show in more detail what is the traditional architecture of the area. Therefore, it is the purpose of ARB review the building is not consistent with the development pattern of proposed. and of these Guidelines, that proposed development within the designated the County's historic buildings. The existing shopping center Entrance Corridors reflect elements of design characteristic of the significant uses a colonnade to connect its storefronts. Colonnades are used Incorporate warmer -toned materials historical landmarks, buildings, and structures of the Charlottesville and in some of the County's most historic buildings, but its use in and colors into the design. Albemarle area, and to promote orderly and attractive development within these this building does not result in an obvious reflection of local corridors. Applicants should note that replication of historic structures is neither historic architecture. re aired nor desired. The conceptual design, while contemporary in style, shows 2 Visitors to the significant historical sites in the Charlottesville and Albemarle area experience these sites as ensembles of buildings, land, and vegetation. In order to forms and materials that are varied but coordinated, helping to accomplish the integration of buildings, land, and vegetation characteristic of break up the lengthy facade. The conceptual renovation design these sites, the Guidelines require attention to four primary factors: compatibility uses sharp geometry along the facade to break up the with significant historic sites in the area; the character of the Entrance Corridor; elevation/storefronts and to highlight storefronts, windows and site develo ment and layout; and landscaping. openings. The design also has a strong focus on horizontals and the application of layered materials/colors. While the use of 3 New structures and substantial additions to existing structures should respect the traditions of the architecture of historically significant buildings in the varying forms and materiaWcolors help to break up the length Charlottesville and Albemarle area. Photographs of historic buildings in the area, and height of the building; the overall appearance of the as well as drawings of architectural features, which provide important examples of renovation proposal would be well served by the inclusion of this tradition are contained in Appendix A. additional warmer -toned materials/colors. 4 The examples contained in Appendix A should be used as a guide for building design: the standard of compatibility with the area's historic structures is not While some of the forms are typical strip shopping center intended to impose a rigid design solution for new development. Replication of forms; others (like the L shaped "frames") are not. The distance the design of the important historic sites in the area is neither intended nor from the EC street helps mitigate the appearance of the non - desired. The Guideline's standard of compatibility can be met through building traditional forms present in the renovation design. scale, materials, and forms which may be embodied in architecture which is contemporary as well as traditional. The Guidelines allow individuality in design The character of this Entrance Corridor is mixed, with large - to accommodate varying tastes as well as special functional requirements. and small-scale commercial buildings nearby. The designs in the conceptual plans note the use of stucco as well as metal 5 It is also an important objective of the Guidelines to establish a pattern of compatible architectural characteristics throughout the Entrance Corridor in order panel and ceramic tile in many places along the facade. While to achieve unity and coherence. Building designs should demonstrate sensitivity stucco is used in some of the nearby developments, the to other nearby structures within the Entrance Corridor. Where a designated buildings in the surrounding area as a whole largely use brick. corridor is substantially developed, these Guidelines require striking a careful The use of brick in addition to other warmer toned materials in balance between harmonizing new development with the existing character of the the proposed renovation would better connect to both the corridor and achieving compatibility with the significant historic sites in the area. historic architecture of the county and the surrounding area. 9 Building forms and features, including roofs, windows, doors, materials, colors and textures should be compatible with the forms and features of the significant historic buildings in the area, exemplified by (but not limited to) the buildings described in Appendix A [of the design guidelines]. The standard of compatibility can be met through scale, materials, and forms which may be embodied in architecture which is contemporary as well as traditional. The replication of important historic sites in Albemarle County is not the objective of these guidelines. 10 Buildings should relate to their site and the surrounding context of buildings. I 1 The overall design of buildings should have human scale. Scale should be integral It appears that the design attempts to establish human scale by Consider alternate materials, to the building and site design. breaking up the length of the building by using a series of additional architectural details, and architectural elements to highlight major tenants and to form additional canopies/canopies with groups of minor tenants. This series creates a rhythm, albeit an greater depth to improve human irregular one, that breaks up the length. Some individual spaces scale and the pedestrian experience. retain a more monumental scale that doesn't read as particularly pedestrian -friendly (for example, the new spaces created near the existing Jo -Ann and Five Below stores). Incorporating materials with more texture (for example, ceramic tile) and/or adding more architectural detail would be appropriate for the expansive wall spaces at the major tenant shops. In many places, canopies appear to be shallow or non-existent, which would diminish the pedestrian experience. 12 Architecture proposed within the Entrance Corridor should use forms, shapes, The conceptual plan shows a design that uses forms and None. scale, and materials to create a cohesive whole. materials to create cohesion and coordination within the development. 13 Any appearance of "blankness" resulting from building design should be relieved Where blankness currently exists (on either side of the JOAnn Consider alternate materials and/or using design detail or vegetation, or both. and the previous Dick's Sporting Goods) is the renovation additional architectural detail to would replace it with additional storefront (to the right of reduce the scale of expansive wall JoAnn) and storefront and material changes (where Dick's was areas. located). Some of the larger architectural forms incorporate expansive wall areas without relief Alternate materials with greater texture (ceramic tile) and/or incorporating more architectural detail to reduce the scale of theses aces would be appropriate. 14 Arcades, colonnades, or other architectural connecting devices should be used to The colonnade in the existing building design would be Consider design revisions that unify groups of buildings within a development. removed in the proposed design. Although the design of the improve the pedestrian experience. colonnade may be "dated" it provides weather protection and scale. Lack of a colonnade may result in a diminished pedestrian experience. 15 Trademark buildings and related features should be modified to meet the The renovation designs shown in the conceptual plan does not None. re uirements of the Guidelines. appear to reflect a trademark building design. 16 Window glass in the Entrance Corridors should not be highly tinted or highly Details on window glass have not been provided with the None. reflective. Window glass in the Entrance Corridors should meet the following conceptual plan. Although clear, non -tinted, non -mirrored glass criteria: Visible light transmittance (VLT) shall not drop below 40%. Visible light would support the pedestrian experience, the distance from the reflectance (VLF shall not exceed 30%. Specifications on the proposed window street suggests that the glass type will not have a significant lass should be submitted with the a lication or nal review. impact on the EC. Accessory structures and equipment 17 Accessory structures and equipment should be integrated into the overall plan of There are no new accessory structures or equipment shown in Indicate if any new accessory development and shall, to the extent possible, be compatible with the building the conceptual plan. If new IIVAC equipment will be included structures or mechanical equipment desi used on the site. in the renovation, it must not be visible from the EC. will be included in the renovation. If so, show how they will be screened 18 The following should be located to eliminate visibility from the Entrance Corridor street. If, after appropriate siting, these features will still have a negative visual from view from the EC. impact on the Entrance Corridor street, screening should be provided to eliminate visibility. a. Loading areas, b. Service areas, c. Refuse areas, d. Storage areas, e. Mechanical equipment, f Above -ground utilities, and g. Chain link fence, barbed wire razor wire, and similar security fencing devices. 19 Screening devices should be compatible with the design of the buildings and surrounding natural vegetation and may consist of. a. Walls, b. Plantings, and c. Fencing. 20 Surface runoff structures and detention ponds should be designed to fit into the No new surface runoff structures or detention ponds are None. natural topography to avoid the need for screening. When visible from the Entrance proposed. Corridor street, these features must be fully integrated into the landscape. They should not have the appearance of engineered features. 21 The following note should be added to the site plan and the architectural plan: The note will be needed on the site and architectural drawings. Provide the standard mechanical "Visibility of all mechanical equipment from the Entrance Corridor shall be equipment note on the site and eliminated." architectural drawings. 22-29 Lighting Lighting details have not been provided at this stage or review, although one note states, "Gutter or architectural steel channel Provide a lighting plan for review. Over -illumination of the building is 30-31 Guidelines for the Use of Decorative Landscape Lighting with light" and some of the proposed elements would lend not appropriate for the EC. themselves to illumination (for example, the L-shaped "frames"). The ARB has typically not approved the illumination of buildings except for safety and security. Distance from the EC street could be a mitigating factor in this case, but over -illumination, which can function as a type of signage, provides for an uncoordinated appearance along the corridor and would not be appropriate. Landscaping 7 The requirements of the Guidelines regarding landscaping are intended to reflect Although the shopping center building is set back 219' and The owner is responsible for the landscaping characteristic of many of the area's significant historic sites which more from the EC, the parcel has approximately 389' of ensuring that the site matches the is characterized by large shade trees and lawns. Landscaping should promote frontage adjacent to the street. The previously approved plan approved site plan. Missing visual order within the Entrance Corridor and help to integrate buildings into the shows a mixture of Sweet Gum and Winter King Hawthorne landscaping must be installed. existing environment of the corridor. trees in addition to Dwarf Burning Bush along the frontage. Only the shrubs remain along the EC frontage. Alternatively, the owner may submit a site plan amendment that proposes 8 Continuity within the Entrance Corridor should be obtained by planting different types of plant materials that share similar characteristics. Such common elements alternate landscaping. allow for more flexibility in the design of structures because common landscape features will help to harmonize the appearance of development as seen from the street upon which the Corridor is centered. 32 Landscaping along the frontage of Entrance Corridor streets should include the following: a. Large shade trees should be planted parallel to the Entrance Corridor Street. Such trees should be at least 3% inches caliper (measured 6 inches above the ground) and should be of a plant species common to the area. Such trees should be located at least every 35 feet on center. b. Flowering ornamental trees of a species common to the area should be interspersed among the trees required by the preceding paragraph. The ornamental trees need not alternate one for one with the large shade trees. They may be planted among the large shade trees in a less regular spacing pattern. c. In situations where appropriate, a three or four board fence or low stone wall, typical of the area, should align the frontage of the Entrance Corridor street. d. An area of sufficient width to accommodate the foregoing plantings and fencing should be reserved parallel to the Entrance Corridor street, and exclusive of road right- and utility easements. 33 Landscaping along interior roads: The previously approved landscape plan shows large trees a. Large trees should be planted parallel to all interior roads. Such trees should be (Sweet Gum) parallel to the interior roads in the development. at least 2%: inches caliper (measured six inches above the ground) and should be Large trees (Sweet Gum) are also shown along the perimeter of of a plant species common to the area. Such trees should be located at least every the parking areas. This landscaping is needed to help break up 40 feet on center. the large amount of paved area in the development. 35 Landscaping of parking areas: a. Large trees should align the perimeter of parking areas, located 40 feet on center. Trees should be planted in the interior of parking areas at the rate of one tree for every 10 parking spaces provided and should be evenly distributed throughout the interior of the parking area. b. Trees required by the preceding paragraph should measure 2% inches caliper (measured six inches above the ground); should be evenly spaced; and should be of a species common to the area. Such trees should be planted in planters or medians sufficiently large to maintain the health of the tree and shall be protected by curbing. c. Shrubs should be provided as necessary to minimize the parking area's impact on Entrance Corridor streets. Shrubs should measure 24 inches in height. 34 Landscaping along interior pedestrian ways: Other than the pedestrian walkway along the building frontage, None. a. Medium trees should be planted parallel to all interior pedestrian ways. Such there are no interior pedestrian ways in the existing trees should be at least 2'/z inches caliper (measured six inches above the ground) development. The conceptual plan shows the addition of and should be of a species common to the area. Such trees should be located at landscaped open spaces where the existing clocktower is least every 25 feet on center. located and near the JoAnn store, but landscaping in these open s aces is not ex cted to be visible from the EC. 36 Landscaping of buildings and other structures: The applicant has presented this as a fagade remodel and plans Consider adding landscaping close a. Trees or other vegetation should be planted along the front of long buildings as to minimize site work, with no new landscaping proposed. to the building to further break up its necessary to soften the appearance of exterior walls. The spacing, size, and type of While the existing building has long elevations, the distance length and to improve the pedestrian such trees or vegetation should be determined by the length, height, and blankness from the EC helps to mitigate its length. There is no existing experience. of such walls. space for planting along the building, but the addition b. Shrubs should be used to integrate the site, buildings, and other structures; landscaping close to the building could help to improve the The owner is responsible for dumpsters, accessory buildings and structures; "drive thru" windows; service pedestrian experience. ensuring that the site matches the areas; and si . Shrubs should measure at least 24 inches in height. approved site plan. Missing landscaping must be installed. 37 Plant species: a. Plant species required should be as approved by the Staff based upon but not Alternatively, the owner may submit limited to the Generic Landscape Plan Recommended Species List and Native a site plan amendment that proposes Plants or Vir 'nia Landscapes (Appendix D . alternate landscaping. 38 Plant health: The following note should be added to the landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and onl to su ort the overall health of theplant." Site Development and layout Development pattern 6 Site development should be sensitive to the existing natural landscape and should The existing site layout is to remain. None. contribute to the creation of an organized development plan. This may be accomplished, to the extent practical, by preserving the trees and rolling terrain ical of the area; planting new trees along streets and pedestrian was and choosing species that reflect native forest elements, insuring that any grading will Portions of the building are not parallel to the EC and the blend into the surrounding topography thereby creating a continuous landscape; building is set back from the frontage; however, no major site preserving, to the extent practical, existing significant river and stream valleys changes are proposed. which may be located on the site and integrating these features into the design of surrounding development; and limiting the building mass and height to a scale An existing sidewalk runs along Rt. 29 and is to remain that does not overpower the natural settings of the site, or the Entrance Corridor. Views are not expected to be negatively impacted. 39 The relationship of buildings and other structures to the Entrance Corridor street and to other development within the corridor should be as follows: a. An organized pattern of roads, service lanes, bike paths, and pedestrian walks should guide the layout of the site. b. In general, buildings fronting the Entrance Corridor street should be parallel to the street. Building groupings should be arranged to parallel the Entrance Corridor street. c. Provisions should be made for connections to adjacent pedestrian and vehicular circulation systems. d. Open spaces should be tied into surrounding areas to provide continuity within the Entrance Corridor. e. If significant natural features exist on the site (including creek valleys, steep slopes, significant trees or rock outcroppings), to the extent practical, then such natural features should be reflected in the site layout. If the provisions of Section 32.5.2.n of the Albemarle County Zoning Ordinance apply, then improvements required by that section should be located so as to maximize the use of existing features in screening such improvements from Entrance Corridor streets. f The placement of structures on the site should respect existing views and vistas on and around the site. Site Grading 40 Site grading should maintain the basic relationship of the site to surrounding The existing site grading is not being altered. None, conditions by limiting the use of retaining walls and by shaping the terrain through the use of smooth, rounded land forms that blend with the existing terrain Steep cut or fill sections are generally unacceptable. Proposed contours on the grading plan shall be rounded with a ten foot minimum radius where they meet the adjacent condition. Final grading should achieve a natural, rather than engineered, appearance. Retaining walls 6 feet in height and taller, when necessary, shall be terraced and planted to blend with the landscape. 41 No grading, trenching, or tunneling should occur within the drip line of any trees or other existing features designated for preservation in the final Certificate of A ro riateness. Adequate tree protection fencing should be shown on, and coordinated throughout, the grading, landscaping and erosion and sediment control Tans. 42 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and protected on the site prior to any grading activity on the site. This protection should remain in place until completion of the development of the site. 43 Preservation areas should be protected from storage or movement of heavy e ui ment within this area. 44 Natural drainage patterns (or to the extent required, new drainage patterns) should The site is already developed. Drainage patterns are not None. be incorporated into the finished site to the extent possible. changing. SIGNS The fagade renovation will require an update to the Provide with the next review a Comprehensive Sign Plan. proposed Comprehensive Sign Plan for the renovated building. SUMMARY OF RECOMMENDATIONS Staff recommends the following as the primary points of discussion: 1. The forms and materials shown in the conceptual plans. 2. Landscaping along the EC and within the site. Staff offers the following recommendations on the proposal: 1. Provide line drawing elevations and plans to show in more detail what is proposed. 2. Incorporate warmer -toned materials and colors into the design. 3. Consider alternate materials, additional architectural details, and additional canopies/canopies with greater depth to improve human scale and the pedestrian experience. 4. Consider alternate materials and/or additional architectural detail to reduce the scale of expansive wall areas. 5. Consider design revisions that improve the pedestrian experience. 6. Indicate if any new accessory structures or mechanical equipment will be included in the renovation. If so, show how they will be screened from view from the EC. 7. Provide the standard mechanical equipment note on the site and architectural drawings: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 8. Provide a lighting plan for review. Over -illumination of the building is not appropriate for the EC. 9. The owner is responsible for ensuring that the site matches the approved site plan. Missing landscaping must be installed. Alternatively, the owner may submit a site plan amendment that proposes alternate landscaping. 10. Consider adding landscaping close to the building to further break up its length and to improve the pedestrian experience. 11. Provide with the next review a proposed Comprehensive Sign Plan for the renovated building. TABLE A This report is based on the following submittal items: Sheet # Drawing Name Drawing Date/Revision Date l Cover Page 9/8/2020 2 Site Plan/Narrative 9/8/2020 3 Existing Conditions/Project Narrative 9/8/2020 4 Overall Proposal 9/8/2020 5 South Elevation —Phase 1 9/8/2020 6 South Elevation — Phase 2 9/8/2020 7 New — South Elevation Perspective 9/8/2020 8 New — South Elevation Perspective 9/8/2020 9 Southwest Elevation 9/8/2020 10 Existing South Elevation Perspective/ New— South Elevation Perspective 9/8/2020 11 North Elevations 9/8/2020 12 Existing South Elevation Perspective/ New— South Elevation Perspective 9/8/2020 ATTACIlbIFNT Rio Hill Conceptual Plan (below) 10 MA F'T �a-■® A RIO HILL FACADE RENOVATION - ARB CONCEPTUAL DESIGN REVIEW September 8, 2020 TO. 45. PAR. 109F INIVERSITY OF VIAGINIA EMioYE'ES OEJIIT W 14WdIa P5 ;,d A-90.32' R-57.50' Se6'S6'S99i TN LP-81.32'L T.N. 45 PAR. 93A1 MARK I. WILL MNS W 16M p.� CA III o TO 45 PAR. IOS �II LF 9MMAR LAND TRUST W 1544. P.428 TO, A5 PAR. 954 ME OS 11K �26. P DS Mg.. P.68 TO. 45 PAR. 94 C TY OF ALSEfeARE DS 697. PMI IS. = 1R:N ROD SET IF. - Mov ADS FMN0 N.S - MAIL SET N.F. - N4IL FOLIO DABUSK GALE & ASSOMM, WC. xNeena. etm�,evona,wP uNP rw+"vm 419, 81 M A R C H I T E C T S 112'Pmtb street NE chmPotw.]JN 0rg me 22902 134.971.7160 wwwbrwarcNltmLLc9m DPI NASa4RY WILD N'G EXIERAN FOOTPRINT AT GNIAD LEVEL 15Q4672 W. FT. BUILDING HEIGHTS AT SELECTED POINTS ATE SHOW IN S"WW GPAa0=T5. N66'34'S5'N 86.02' d TAT. 45. PAR. 934 LOPES ASTMENT GOP. 09 1573 P.A!i9 e cQQ3Fe�Dsoy �•`/CC'C7 F OD 1 45. PAR. 173 FMS70Y O. sr&LAW '\ W 71Q P.182 M 1325 PM TUMFIF EXTENSM OF S' INGIESS 7iAS Il N"Tw9w P 121Q N El T.N. A5 PAR. 93C RI(HARD N. 6 NEL&1 S. AMIASON MARTIN S. 6 A" RESECCA SETTS 08 1000, P574 DMETNT USE VE/E, RIAN OFFILT: 22 PARTING SPATES LINE TABLE LINE SEARING DIST. LS 548P03'01N 5. 00' L2 S41056'59'E 20.00' L3 N4SW3'01 •E 5. 00' L4 548P03'5.00O1'N 5.00' L5 541P56'59'E 20. 00, L6 N48P03'O1•E ' i• L7 S47500'42"N 5. 00' L8 W5651'18'E 5.00' TO. 45 PAR94C PAP. T. 6 N.:EAN 'S9• M pM A CLR9ENT We A,& IESTAWART 67 PA9fAG SPACES � � 3• 1NMWZNG 3 HANDMAPPED 4 ; r° PAR.G TNP�E (� ill . M. W 146a P.168 EA PECOPD 00aBENTS PERTAINING TO 80 VARY NELL ff PARCEL 94A IF TAN NAP AS SEE a 06 955, p.709 (plat of Pa 25 A. 8 C D 8 El 1f23 P.374 (0.EB7 At. to Mate 7,W 45-940 DETAIL SCALE DO 1210. P.1E7 (0.0171 AC. aGlid"I R/6 dad) 1' - 30' DS 1464 p.178 (1.091AC. t0 TAP 45-948) Ce 165R PP:K404 OiVOSUS' ALTA sraey) '-` !o 3116. Ip3LG-3l0 (1213 Ac. oft c yaice) aOGNDARV V�V/�I SCALE 1' • In' NOTE A WAS LW�FTI SOF ) DN AAPPR➢� �ING AELL M. 4.� NOTE' FOR a.ARITY. SYh80L ASSrEVIATIGN6 ARE USED QNLY W THE PAGE C016RIAG THE ASSDCIATED EASEMENT. LEGEND a UT! ILITY FOLE LI LIGHT` ` PoLE TFANWORIEER KWOLLEE aR GR4TE MET or DRoP MET NY NAIER VALVE W NATER METER PH FINE HTOR4tfT RD AL TOTELE SDI( ON GAS METER OR SIGNAL IS�Icc ER ELECTRIC METER E9 ELECTRIC 60( STCR4 SPAIN LINE —a—a— 34y1TARY SENER LINE W PUNIER LINE WATER LINE MINOR CHANGES TO EXISTING SITE PLAN Scale: 1 " = 200'-0" SITE PLAN *, �b� �7'- ' -- _yN,_'u':�ii�"Yj7�� .► -r1 ���. ����ly�rT `s i _✓' `� We are pleased to present to the Architectural Review Board a conceptual Facade Redevelopment Design for the existing Rio Hill shopping Center. This scope of work is a complete facade remodel of the areas shown in this de- sign package; which constitutes most of the existing shopping center (with the exception of Krogers and the site's South East Corner - see below). While the existing buildings will remain, new construction would involve removing por- tions of the existing canopies and store entries and transforming these build- ing fronts using a variety of new materials, forms and storefront windows. As strictly a 'facade remodel; the plan is to minimize site work. Most individuals living in the region can relate to Rio Hill as a large retail space, anchored by such various stores as Krogers, TJ Maxx, JoAnns fab- rics and various restaurants - among a variety of other smaller businesses. Perhaps most the most prominant feature is the site is centered around a large parking lot. Most would likely agree that the complex gives the impression -with its disorganized facade and tired materials - of being out-of-date. When one begins analyzing the problems with the existing conditions, it becomes apparent that the solution for a truly successful site transformation requires a creative design response revolving around a major reorganization of the current facade. Indeed, ownership approached us with the problem of how to make these 33 acres (developed in the 1980s) more 'current' and 'pedestrian friendly.' In developing these initial design ideas, certain themes central to the ARB have become paramount in re -orienting what we see as a new'vision' for Rio Hill. NEW VISION FOR RIO HILL RIO HILL FACADE RENOVATION ARB Submittal September 8, 2020 Perspective looking from E.C. Perspective looking SW Perspective looking NW EXISTING SITE CONDITIONS H R w 4 R C H i T E L T s 112'emtb .,reel NE cWww. ]J* Org me 22M2 e34 971.7160 wwwbrwarcbltmLLc9m .t i r• Y• ' -M M' Given Rio's oversized scale and length (1600' In. ft.), the design team pro- poses demolishing portions of the existing canopy. Also, removing the external 'wing walls', seen between the canopies, helps to restructure the current relent- less march of a rather disorganized facade design. This removal of the major existing architectural elements, in turn, begins this process of site reorganiza- tion by'breaking down the scale' of the facade. Removing these most visible features clears the way for a more interesting, varied front and for the potential of replacing the block walls with new materials. We see this idea of 'breaking down the scale' as working hand in hand with creating a more human scale. Currently, the site's pedestrian experience is dominated by the parking lot and the uninspiring covered canopy that stretch- es nearly the entire front. Through the reorganizing of a series of new and various building fronts, this design concept looks to the idea of the pedestrian experience that is enhanced through a variety of experiences and walkway that changes and evolves at different locations. Further, with the removal of structures like the clocktower (south west corner), the intent is to open areas mil W OFF J�,•Aa �V J �M1 along the building fronts that provide potential gathering space. It is not hard to imagine this new corner'opening' becoming a wonderful spot for outdoor dining while also providing a much needed attractive 'pass through' between buildings. Working in real time within the current Covid crisis, our team realizes that the idea of 'human scale' becomes even more important in determining the way future stores are developed. Much can be learned by paying attention to how certain restaurants are able to survive in these times: A priority on better indoor/outdoor connection, easier access for quick pick-up and enticing out- door environment all appear to be important features of new business models trying to adapt to this changing world. And we hope to integrate these features within the architecture of this project. It is important to understand that the owners see a potential later phase that may likely come into play with this site. They have identified the southwest corner as near -term future redevelopment option. That portion the site is prob- lematic in that its retail space is difficult to attract clients due to its awkward location — generally hidden from the rest of the site and from the road. This potential later construction phase would include the demolition the first 150 ' of retail space and the re -building of a new 2 story office or medical office building. You will notice on our elevations and renderings of this corner, we have illustrated both the current scope of work (Phase 1) and the new potential future building (Phase 2). In changing the dynamic of Rio Hill, concepts like 'breaking down the over- size scale' of this large strip mall and 'introducing ways of better relating to the human scale' are vital to the overall project success in the way they relate to our changing world and in this particular instance the future viability of the retail business center. As we work through this process, our hope is to balance this initial project with a more general road map for how to make Rio a more pedestrian friendly, attractive space that has stronger connections to its sur- roundings. We respectfully ask for the ARB guidance in finding the best possible solution - for the Center's redevelopment in its relation to the Entrance Corridor. PROJECT NARRATIVE RIO HILL FACADE RENOVATION ARB Submittal September 8, 2020 w� R R w 4 R C H I T E C T S 112'emtb .,reel NE cWww.vljm Orgime 22902 134 971.7160 wwwbrw.rcbltmLLcom OVERALL PROPOSAL �- 1 77- e`ta�nl�c, � Rruz�gab�srl F77, — -_- _ — -Lo — OVERALL PROPOSAL RIO HILL FACADE RENOVATION ARB Submittal September 8, 2020 EXISTING CONDITIONS Sl) ( S2) 53.5� S4 ; �S4.5, S5 �S5.51 CS6� S7 S8) S9 (S10) S10.5 (S1 1) I I I I I I EXISTING ELEVATION I EXISTING TO REMAIN & RE -PAINTED - I ARCH STONE OR METAL PANEL NEW PROPOSAL H R yr A R C H I T E C T S 112'umtb .,reel NE cWww.vljm vlrg me 22M2 1 34 971.7160 wwwbrw.rcbltmLLc9m CHANNEL W LIGHT Scale: 3/64" = 1'-0" SOUTH ELEVATION -'PHASE 1' (or current project) RIO HILL FACADE RENOVATION ARB Submittal September 8, 2020 FUTURE M.O.B. DEVELOPMENT ALLEY/ OPEN SPACES t B■ M A R C H I T E C T S 112'emtb .,reel NE cWww.vljm Orgime 22M2 e34 971.7160 wwwbrw.rcbltmLLc9m ARCH STONE OR METAL PANEL GUTTER OR ARCH STEEL CHANNEL W LIGHT View from Route 29 (see existing condition photo adajacent) Scale : 3/64" = F-0" SOUTH ELEVATION - PHASE 2 RIO HILL FACADE RENOVATION ARB Submittal September 8, 2020 TENANT ----------------- } _ J0-4NN 0�4IV T EXISTING PERSPECTIVES ■ W A R C H I T E C T S 1121uurth street HE chenauewllk vbpnb 22W2 434,971.7160 www.brw architecu.COM - :rr EXISTING PERSPECTIVES NEW - SOUTH ELEVATION PERSPECTIVE RIO HILL FACADE RENOVATION ARB Submittal September 8, 2020 W cz= vim- r I, E R R W N R C H I T E C T S 112'umtb .,reel NE cWww.vljm Org me 22902 134 971.7160 wwwbrw.rcbltmLLcom five BMW EXISTING+ NEW PERSPECTIVES 4 �1 I�i�l eiihr TENANT CLEANW,L� CTlIC� �f'fil f� CAT�F-- NEW - SOUTH ELEVATION PERSPECTIVE RIO HILL FACADE RENOVATION ARB Submittal September 8, 2020 EXISTING CONDITIONS EXISTING ELEVATION NEW PROPOSAL SW1 SW2 SW3 SWW4 SW5 SW6 c,\An SW8 SWW9 \-r -r T T T T I -r \-r DECORATIVE PANEL I ARCH STONE PANEL OR BLOCK METAL SCREEN/ GREEN SCREEN TENANT -_ - STUCCO METAL PANEL ARCH METAL PANEL Scale: 3/64" = 1'-0" SOUTH WEST ELEVATIONS RIO HILL FACADE RENOVATION ARB Submittal September 8, 2020 L 11 r EX - SOUTH ELEVATION PERSPECTIVE b H w r, R C H i T E C T S 1121Qerth etre.t HE chenawwllk vbpeb 22W2 434,971.7160 www.brw architecu.COM TENAN Hertz _ I ik,F° ilk C. 177,M0 Scale: 3/64" = 1'-0" NEW - SOUTH ELEVATION PERSPECTIVE RIO HILL FACADE RENOVATION ARB Submittal September 8, 2020 EXISTING CONDITIONS EXISTING ELE NEW PROPOSAL H R v, A R C H I T E C T S 112'emtb .,reel NE cWww.vljm vlrgime 22M2 134 971.7160 wwwbrw.rcbltmLLcom ,N1 N2 N3 �N4j �r ARCH METAL PANEL CANOPY Heft FjW WINE IFT040 7w,rs BRICK OR STUCCO L—_. DARKER COLOR BRICK GUTTER OR ARCH STEEL CHANNEL W LIGHT WL OWN Iwo LN/i N 1U' N10.5 Nl l� N11.5 N12' N 12.E T' T EX KROGER TO REMAIN — EFm` lima immliil r !!!!■!!!!I!!i!N! of Ei i METAL SCREEN/ GREEN SCREEN CANOPY k'K.=s I Scale: 3/64" = l'-0" NORTH ELEVATIONS RIO HILL FACADE RENOVATION ARB Submittal September 8, 2020 YII`a _z �i t � SriCIL v R R w A R C H I T E C T S 112 !uwtb .beet NE chmww.ljm Org me 22903 e34 971.7160 wwwbrwarcbltmLLcom — A—Z. f EX - SOUTH ELEVATION PERSPECTIVE O E p kr-- i- i 1 1 1 17 TENANT w-�� rFwvr TWT rLr 'fL'Uii �"� tiro+ B �CK�/EN �R SIi�AfGd'K I NEW - SOUTH ELEVATION PERSPECTIVE RIO HILL FACADE RENOVATION ARB Submittal September 8, 2020