Loading...
HomeMy WebLinkAboutARB202000096 Action Letter 2020-10-28COUNTY OFALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 Phone (434) 296-5832 Fax (434) 972-4126 October 27, 2020 David Timmerman BRW Architects 112 4'h Street NE Charlottesville, VA 22902 RE: ARB-2020-96: Rio Hill Redevelopment (TMP: 04500-00-00-094A0) Dear Mr. Timmerman, The Albemarle County Architectural Review Board, at its meeting on Monday, October 19, 2020, completed a conceptual review of the above -noted request to renovate a majority of the existing Rio Hill Shopping Center (excluding the Kroger store and the southeast corner of the center), removing portions of the existing canopies and store entries to update the current fagade. The Board offered the following comments for the benefit of the applicant's preliminary submission. Please note that the following comments are those that have been identified at this time. Additional comments may be added or eliminated based on further review and changes to the plan. 1. Provide line drawing elevations and plans to show in more detail what is proposed. Include 3- dimensional views. 2. Incorporate warmer -toned materials and colors into the design. Provide a material and color palette for consideration. 3. Consider alternate materials, additional architectural details, and additional canopies/canopies with greater depth to improve human scale and the pedestrian experience. 4. Consider alternate materials and/or additional architectural detail to reduce the scale of expansive wall areas. 5. Consider design revisions that improve the pedestrian experience. 6. Indicate if any new accessory structures or mechanical equipment will be included in the renovation. If so, show how they will be screened from view from the EC. 7. Provide the standard mechanical equipment note on the site and architectural drawings: 'Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 8. Provide a lighting plan for review. Over -illumination of the building is not appropriate for the EC. 9. The owner is responsible for ensuring that the site matches the approved site plan. Missing landscaping must be installed. Alternatively, the owner may submit a site plan amendment that proposes alternate landscaping. 10. Consider adding landscaping close to the building to further break up its length and to improve the pedestrian experience. 11. Provide with the next review a proposed Comprehensive Sign Plan for the renovated building. You may submit your application for preliminary ARB review at your earliest convenience. Application forms, checklists and schedules are available on-line at www.albemarle.org. Revised drawings addressing the comments listed above are required. Include updated ARB revision dates on each drawing. Please provide a memo including detailed responses indicating how each comment has been addressed. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. If you have any questions concerning any of the above, please feel free to contact me. Sincerely, Khris Taggart Planner ktaggart@albemarle.org cc: SCT Rio Hill LLC C/O Rosenthal Properties 300 Galleria Parkway, 121h Floor Atlanta, GA 30339 Josh Kagan / Albert Fitch Hart Realty Advisors 92 Hopmeadow St. Weatogue, CT 06089 File