HomeMy WebLinkAboutARB202000101 Plan - Approved 2020-10-28MARKETING G
WEBSITE DESIGN
We build websites that drivIraifi
engage customers, and dee fiver rec,ulu
ills
KAHMpher Taggart Dgital Bgnalae
Thrsapprwal is only fame ArUitedural Review Board
tl'is9Ny one appraal d other ppro tp my
sal agn.
_j Zorirrg, WlNingarrd 0lperaignpersRey stillce
pengO tober a, 2npartit
October 22, 20ti
VEHCIIE WRAPS 6
_ GRAPHIC DESIGN
materiWhethals,
i 1P'p a new logo, febranin�
materials, or complete rebranti
we'll bring your vision to ttel
W
>A
ZZ
VH
AC
CLIENT'.
Mark FIs,dors
nA,k®bluehi IbIders.ppm
+16M-38I 5850
PROJECT'.
B JlldIF, Number
MATERIALS'.
Supercet 950
FONTS:
N/A
PROJECTLEAO',
Tyler B.
DRAWN BY:
J. Buchanan
ORIGINALISSUE PROOF HOURI
0
7
/2
DO0 1 s
REISSUEDATES
PAGE NUMBER
1of1
96"
MARKETING S
XI.WEBSITE DESIGN
Wt build websiters that drive trafitraffic,engage customers, and de fiver results)
Khnersi her Taggart Digital signature
This approval is only for the Architectural Radial Board
It is only one approval required pna to Installing a sign.
Zaring, building and other approvals nay shil be
pendng for yarn sgn gel
October 22, 20M
Material: 3mm
aluminum composite
panels
ROAD SIGN OPT. 1
NGLE Pantones:
Dark Blue -281 C
Light Blue - 284 C
VEHCILE WRAPS G
_ GRAPHIC DESIGN
Whether it's a new bile malkelin�
materials, or a complete "a""Id
well bring your valen to Biel
W
tn
Uy
CLIENT:
Mark Flanders
mark®biushlllbuildi s.cnm
i1603-30.!-5850
PROJECT:
Road Sign
MATERALS.
3641
Ora, card 200
ACM
COLORS
FUII Calm ■
■
■
FONTS
N/A
PROJERLFAD�
Tyler B,
DRAWN BY
J. I:uchanan
ORIGINAL ISSUE PROOF HOURS
O20R0 1 5
PER J55UE DATES
PAGE NU MBER
1 of 1
36"
j i'r.' MrstopBerTaggart Dgital Bgnatde
_ 1Ino"approval lead, fur Me Ardritedural Renie" Board
R'i£pdy one approval required pdq to Retailing a BIT,
Zodrg, OUlkhng and over approvals trey sell de
p pending for your sign partit
„I OdaBer 22, 20A
Master Home Builders & Remodeling
BLUE HILL
B U I L D ING CO
72"
MARKETING G
\WEBSITE DESIGN
We usttomers, and dellverrreSultsr
FRONTELEVATION: BUILDING SIGN OPT,'
OUAN:1 SIDES: SINGLE
Material: 3mm
aluminum composite
panels
Pantones:
Dark Blue - 281 C
Light Blue - 284 C
VEHCILE WRAPS G
GRAPHIC DESIGN
d
Whether it'B a new to o, marketln
materials, or a complete rebrand,
we'll bring your vision to life) XAA
W
Re,
MA
ZZ
uVi
CLIENT
ZrFlanders
kOlujualydouildars.mm
.160338I-5350
PROJECT:
Building Sign
MATERIALS.
3641
Oraguard200
ACM
Pull Color ■
■
■
FONTS
NIA
PROJECTLEAD.
Tyler B.
DRAWN BY
J. Buchanan
ORIGINALISSUE PROOF HOURS
0712T20 5
REISSUE &.TES
PAGE NUMBER
1of1
Khdelopher TaggaR Digital 5gnatve
Atlsapproyal is only for the Artlst rteral Review Board
tlns OalY one approval Fe0ulred Dda to Installing asla4
Zgning, bu ding and other Enamels nay still 0e
Denting for yaw sign Dermt
Ocrober22,2020
- Flat Wall Sign Panel Attachment
_ Existing building wood front (behind sign band) c
Flat Sign Panel
MARKETING G
\WEBSITE DESIGN
We build websitesthat tlri traffic,
engage customers, and dejNer resahsl
Mounting Stud w/ Adhesive to Anchor
-Weight of 6'W x 3'H sign panel is about 60 Ibs
-Attachment to include 6 achors as shown
(3 along top, 3 along bottom - load per fastener is
approx 10 Ibs)
- Fasteners heads to match sign face
- NTS (for illustration only)
IIEHCILE WRAPS G
_ GRAPHIC DESIGN
mavenWhether it's a new logo, merrarUd,
mafe 11 b in a complete rto FBI ,
'well bring your vrslon to ffel
W
�y Z
uth
y61C
CLIENT
Mark Flendera
mar k®bluehlllbuilders.com
+1603-387-58ED
PROJECT
Building Number
MATERIALS:
3upercaf 950
FONTS
N/A
PROJF4 LEAD:
erFC
DRAWN EY.
J. Buchanan
ORIGINAL ISSUE PROOF HOURS
mnazo I s
RE 55DE DAIL,
PAGE NUMBER
1 of 1