Loading...
HomeMy WebLinkAboutSUB201900158 Review Comments Road Plan and Comps. 2020-10-29� AI �h �lRGIN�P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage plan review Project title: Spring Hill Village Road Plan Project file number: SUB201900158 amendment 1 Plan preparer: Collins Engineering [scott@collies-engineering.com] Owner or rep.: Stanley Martin Homes[odonnellgp@stanleymartin.com] Date Received: 28 September 2020 Date of comments: 12 October 2020 Rev. 1 comments: 29 October 2020 Scott, We have reviewed the above referenced plans and have the following comments: Engineering (Emily Cox) 1. WPO amendment 2 must be approved before this road plan can be approved. Rev. 1: Comment addressed. 2. Provide CG-12 on the internal median shown below. ) SCOTTSVILLE ROAD (55 WHY - 'BA PG.354 y Rev. 1: Comment adddressed. 3. Ensure all recorded easements are shown with DB&PG and don't say proposed. Rev. 1: Comment addressed. 4. Ensure there are no trees over storm pipes. Rev. 1: Comment addressed 5. Shared use path that is outside of the right-of-way requires an easement. Rev. 1: Comment addressed. 6. Rev. 1: "Proposed wall easement" is still shown on the road plan. The Db & PG are on the site plan, so it is recorded. Please update the road plan to show it as well. Planning (Daniel Butch) 1. A permit will be required to maintain the 8 ft shared use path on Rt 20 in VDOT's right-of-way and a maintenance agreement stating the developer will take on that responsibility noted on the plans. Rev. 1: No objection. Planning (Tori Kanellopoulos) 1. See attached comment letter dated 10/02/20. Rev. 1: See attached letter dated 10/20/20. VDOT (Adam Moore) Engineering Review Comments Page 2 of 2 1. See attached comment letter dated 10/08/2020. Rev. 1: See approved letter dated 10/23/20. Fire Rescue (Shawn Maddox) 1. No objection. ACSA (Jeremy Lynn) 1. No objection. GIS (Brian Becker) 1. No objection. ARB (Margaret Maliszewski) 1. Remove the "Location of street trees behind pedestrian walk dictated by VDOT clear zone requirements" note from the plan. 2. Show that frontage tree locations are outside the VDOT clear zone or provide evidence of VDOT approval of proposed frontage tree locations. 3. Site plan and road plan landscaping must match. See forthcoming site plan comments from Paty Saternye. 4. Rev. 1: Road plans must match site plan and plat. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. If you have any questions or concerns, please contact me either by email (ecox2@albemarle.org) or by phone at 434-296-5832 ext. 3565. Sincerely, Emily Cox, P.E. Civil Engineer II t VI4r County of Albemarle Department of Community Development To: Emily Cox — CDD Engineering From: Tori Kanellopoulos - Senior Planner Division: Planning Services Date: October 20, 2020 Subject: SUB201900158 — Spring Hill — Road Plan Amendment dated 10-09-20 This road plan amendment is reviewed per ZMA2020-6, approved 09-16-20 The following are Planning comments for Road Plan submittal SUB201900158: Planning (Tori Kanellopoulos): 1. Advisory comment. Planning review of this Road Plan is for comments specific to Road Plan requirements only. Planning approval of the Road Plan does not constitute subdivision plat or site plan approval; Planning has not reviewed this Road Plan for other requirements such as setbacks, minimum lot size, open space, etc. 2. Advisory comment. Recommend provide comment response letter to expedite review of resubmittal. 3. Advisory comment. An easement plat will be needed to provide public access for the path outside the ROW along Route 20. This will need to include an instrument for maintenance and public access. A template has been sent to the applicant. a. REV 1: Easement plat may be approved after road plan approval. An easement plat is currently under review. 4. ZMA202000006, Proffer #4, SR 20 (Scottsville Road). The applicant is responsible to design, bond, and construct the improvements shown on the County -approved engineering drawings titled Spring Hill Village — Application Plan, dated 04-20-20 and last revised on 8-21-20, as prepared by Collins Engineering, for both SR 20 (Scottsville Road) and SR 742 (Avon St Ext). The following proffer requirements are still not met or shown on the Road Plan: public access will be provided along the shared -use path along Koute zu, as the path is mostly outside of the public ROW. Note that the road plan can be approved prior to the easement plat needed for maintenance and public access for the path (but the final site plan must be approved after the 5. 18-32.6, 32.7; 14-302(A)(4)(5) Easements. -ements a. REV 1: Where are the public drainage deed, sight distance easement, private street agreement, and SWM deed recorded? They do not appear to be with the plat and private maintenance agreement, according to the Circuit Court site. The instrument for DB 5382 PG 138 is attached. The road plan can be approved without these documents recorded, but the final site plan cannot be. 6. 18-32.7.9 Landscaping and utilities. Revise the following tree location adjacent to a. REV 1: Please revise landscape cover sheet; it appears CAD layers were shifted. The plan sheet L5.1 appears correct. 7. VDOT requirements and 18-32.7.9 Landscaping and utilities. Note that trees appear to need to be moved back along Route 20 to meet VDOT clearzone requirements. Ensure that revised trees do not conflict with the undergrounded power utilities or any pipes once moved. a. REV 1: Planning has no objection to the tree locations shown on the road plan. Planning defers to VDOT on whether clearzone requirements have been met. Please contact Tori Kanellopoulos in the Planning Division at vkanell000ulosC)albemarle.oro or 434-296-5832 ext. 3270 for further information. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street Commissioner Richmond, Virginia 23219 October 23, 2020 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Emily Cox, P.E., Re: Spring Hill Village — Final Road Plan Amendment SUB-2019-00158 Review #7 Dear Ms. Cox: (804) 7862701 Fax: (804) 7862940 The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 4 October 2019, revised 09 October 2020, and find it to be generally acceptable. If further information is desired, please contact Adam Moore at 434-422-9782. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING