HomeMy WebLinkAboutWPO201900060 Bond Estimates 2020-10-30Project Name: UVA Foundation - Discovery Drive Development VSMPIWPO 2019-00060 WPO file number: WP0201900060 TMP(s): 03200-00-00-019E0,03200-00-00-006R0,03200-00-00-019H0,03200-00-00-019H1 Date Estimate Completed: 10-30-2020 Erosion and Sediment Control Bond Estimate Item Item Number i z 3 4 5 6 7 8 0 ii 12 13 14 15 16 17 18 19 20 21 zz 23 24 25 26 27 28 29 30 31 32 33 34 stablization (PS, TS) silt fence (SF) safety fence (SAF) tree protection (TP) diversion (DID, FD, RWD) temporary slope drain (TSD) Sediment Trap #1 earthwork for trap/basin pipe length ft pipe diameter 0 in hei ht of dam at toe ft cut at high sideoff ft 9 9 height of fill at face ft length of dam ft top width Mft (area above transition; 25.5 sf (total width of dam) 4 ft (height below transitio -1 ft (area below transition; -3 sf (total fill volume) 36.7 cy length of spillway _ft width of spillway ft Sediment Trap #2 (excavated drop inlet sediment trap) earthwork for trap/basin height of dam at toe height of fill at face length of dam top w dth (area above transition; (total width of dam) (height below transitio (area below transition; (total fill volume) length of spillway width of spillway 1 J 0 sf 2ft ift 0 at 0.0 cy cut at face ft length of cut ft width of cut (area below transiti( 230.625 sf (total width of cut) 74 it (depth below transit 2.5 ft (area above transiti, 86.25 sf (total cut volume) 880.2 cy (TOAL CY estimate 892 cy (spillway stone tons 4 tons cut at high side cut at face length of cut width of cut (area below transiti( (total width of cut) (depth below transit (area above transiti, (total fill volume) (TOAL CY estimate (spillway stone tons 78.8 sf 47.4 ft 2ft 43.4 sf 366.6 cy 367 cy 8.6 tons No. Unit Unit Cost Cost (installed) J3. acres $5,000.00 $17,050.00 616. ft $5.00 $3,480.00 886. ft $5.00 $4,430.00 585 ft $5.00 $2,925.00 ft $13.00 $8,957.00 $0.00 $0.00 $13.00 $11,596.00 $50.00 $200.00 $13.00 $4,771.00 $50.00 $430.00 10/30/2020 Project Name: UVA Foundation - Discovery Drive Development VSMPIWPO 2019-00060 WPO file number: WP0201900060 TMP(s): 03200-00-00-019E0,03200-00-00-006R0,03200-00-00-019H0,03200-00-00-019H1 Date Estimate Completed: 10-30-2020 Erosion and Sediment Control Bond Estimate Item Item Number 35 Pump -around diversion for stream crossing 0 it 36 silt fence inlet protection (IP) 37 stone inlet protection (IP) 3 outlet protection length channel (SCC, matteatte d) length Eftk39 it40 check dam depth in channel 41 construction entrance (CE) 42 wash rack 43 paved construction entrance 44 rip -rap, placed depth 0 it 45 width 0.0 46 47 survey and layout (price per 0.1 mi.) acres OL a 48 mobilization 49 Temporary Access road - CRS access road, $500 if applicable 50 Temporary Culvert WP0201900060, WA Foundation 1725 Discovery Dnve_103020.xlsx No. Unit Unit Cost Cost (installed) Iq .00 $0.00 $10000.00 $0.00 $200.00 $2,600.00 width 0 k 0 $0.00 $0.00 width 0 k 0 $0.00 channel width 0 It $0.00 $0.00 1 $2,500.00 $2,500.00 1 $2,000.00 $2,000.00 ftL 1 $3,500.00 $3,500.00 length -ft (tons) 0 tons $60.00 $0.00 traps and basins $2,705.00 $2,500.00 $0.00 $0.00 cost sum $69,644.00 contingency $6,964.40 Total $76,610 10/30/2020