Loading...
HomeMy WebLinkAboutWPO201700070 Review Comments WPO VSMP 2020-11-03COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Albemarle County Route 250 Business (Ivy Road) Sidewalk Project file number: WPO201700070 Plan preparer: Brian McPeters [ brian.mcpeters(a�Jcimley-hom.com ], Jonathan Oliver, Michael Mitchell / Kimley-Hom Associates Owner or rep.: Jack Kelsey [ ikelsev(a),,albemarle.org ] Plan received date: September 25, 2017 (Rev. 1) 28 Jan 2019 (Rev. 2) 17 Oct 2019 — diQM (Rev. 3) 4 Feb 2020 — digital (Rev. 4) 16 Mar 2020 — dtrrtal (Rev. 5) 2 Nov 2020 (Anticipated print plan /SWPPP receipt date) Date of comments: October 27, 2017 (Rev. 1) 5Mar 2019 (Rev. 2) 15 Nov 2019 (Rev. 3) 22 Feb 2020 — Approval pending completion of non -plan items (below) (Rev. 4) 28 Apr 2020 — Approval pending completion of non -plan items (items IA.) (Rev. 5) 3 Nov 2020—Approved pending SWPPP signature; item 1, see below. Reviewer: David James /Initial, J. Anderson /Rev. 1, 2, 3, 4, 5 County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved pending: 1. Revision to SWPPP (items listed at A., below), (Rev. 5) Partially addressed, plan is approved pending SWPPP signature. Engineering to obtain SWPPP Sec. 1 signature (CGP Registration Statement). 2. Acquisition and recordation of easements required to construct the project, and, (Rev. 5) Addressed. Ref. Brian McPeters email, KHA, 10/30/2020 8:57 AM. 3. Written (FES CAO) County-VDOT Agreement that stipulates maintenance responsibility for the stormwater detention facility proposed within existing VDOT right-of-way, U.S. Rt. 250. Albemarle and VDOT appear to be only entities eligible to maintain this SWM facility. (Rev. 5) Addressed. Ref. Brian McPeters email, KHA, 10/30/2020 8:57 AM. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Provide a SWPPP including registration statement. (Rev. 1) Not addressed. Please provide SWPPP at earliest convenience. (Rev. 2) Comment persists. Also see email sent, 11/15/2019 12:39 PM. Use county template; link: httD://www.albemarle.or2/uDload/images/forms center/departments/Community Develooment/forms/Enei neering and WPO Forms/Stormwater Pollution Prevention Plan SWPPP template.pdf (Rev. 3) Partially addressed. As follow-un: a. Sec. 1, Registration Statement: 1. Sec. II/B. —Complete address (Recommend `Rt. 250') (Rev. 4) Addressed. ii. Sec II/C. —Complete construction entrance (recommend `Access via Rt. 250 /Attached') (Rev. 4) Addressed. iii. Sec. IVB. — Enter estimated project start and completion dates (Rev. 4) Partially Engineering Review Comments Page 2 of 4 addressed. As follow-up: Please consider estimated completion date later than 4/30/2020 that does not impose schedule hardship, especially given covid-19 impacts to county, and economy. May want to extend completion date to any date prior to Jul 1, 2024, a year or more from now. iv. Sec. VI/Certification — Print Name, sign, date (Rev. 4) Persists /pending. M. Mitchell email (March 16, 2020 9:13 AM): `We can coordinate those signatures with Jack and provide the required hard copies once you approve the updates.' (Rev. 5) Persists. Once print plans /SWPPP received (anticipate receipt 2-Nov), Engineering will obtain SWPPP signature on Sec. VI of CGP Registration Statement. b. Sec. 6 Pollution Prevention Plan: I. 6 A. — Provide I Y' x 17" single -sheet Exhibit to show: (Rev. 4) Addressed. 1. Rain gauge 2. Concrete washout (essential, may not be upslope of a near storm inlet) 3. Construction entrance (NA, if work staged entirely from hard surface) 4. Porta-john (may not be upslope of a near storm inlet) 5. Solid waste dumpster, NA, if none 6. Solvent /chemical storage, NA, if none ii. 61. — List individual responsible for PPP practices. `Contractor' is not specific. KHA personnel or J. Kelsey are eligible, or state `TBD prior to receiving Grading Permit.' (Rev. 4,5) Comment persists. SWPPP indicates the individual will be determined prior to receiving a Grading Permit. (Rev. 5) Email to Applicant, 10/30/2020 11:46 AM. c. Sec. 8: List qualified individual who will perform compliance inspections, or (similar to Sec. 6.E.) state `TBD prior to receiving Grading Permit.' (Rev. 4, 5 Comment persists. SWPPP indicates the individual(s) responsible for conducting inspections will be determined prior to receiving a Grading Permit. (Rev. 5) Email to Applicant, 10/30/2020 11:46 AM. d. Sec. 9: SIGNED CERTIFICATION — Please sign certification. (Rev. 4, D Comment persists. Ref. M. Mitchell /KHA email, March 16, 2020 9:13 AM. Note: Engineering cannot register this project with DEQ for VPDES permit issuance until Sec. 9 of SWPPP is signed and cannot approve the plan without SWPPP (Sec. 1. Sec. 9) signatures. (Rev. 5) KHA to sign Sec. 9, per telecon, Engr. with M. Mitchell, 10/29/20. e. Sec. 12: Provide template inspection logs. (Rev. 4) Addressed. B. Pollution Prevention Plan (PPP) (Rev. 2) Comment persists. See email sent 11/15/2019 12:39 PM. The PPP content requirements can be found in County Code section 17-404. 1. Provide a PPP. (Rev. 1, 2.3) Not addressed. Please include PPP Exhibit with SWPPP. This is a single - sheet exhibit that identifies items of particular relevance to SWPPP; exhibit is distinct from ESC and SWM plan sheets. See A./ SWPPP/Sec. 6.A., above. (Rev. 4) Addressed. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved. 1. Cover Sheet — Change application number to WP0201700070' Update box with nutrient credit purchase information when acquired, Include source & date of topographic information, and last date of field verification of existing site conditions, missing survey date on sidebar. (Rev. 1) Partially addressed. As follow-up, please revise ref. to `purchasing 0.78 lbs. phosphorus from xxx Nutrient Bank on xx/xx/xxxx' to read from `Gold Hill Nutrient Credit Offset Bank on 02/05/2019.' (Ref.:_age�ow.; image removed with Rev. 3 comments) (Rev. 2) Comment persists. Sheet 1 not included with plan /digital submittal. .PDF preview/ Sheet 1, welcome. (Rev. 3) Addressed. 0.78 lbs. phosphorus credits purchased from Gold Hill Nutrient Credit Offset Bank on 02/05/2019. Ref. plan sheet 1 Note. 2. Who will be responsible for the maintenance of underground detention SWM facilities? (Rev. 1) Comment withdrawn. SWM facility eliminated per review meeting, 2/14/19 (Jack Kelsey, Frank Pohl, J. Anderson). UG detention is not required (sheets 3, 3D, 6(4), etc.) if runoff conveyed via man-made channel to 1% point of analysis. Engineering to confirm design meets 9VAC25-870-66.B. L/4. (Rev. 2) Comment withdrawn per (design) discussion with J. Kelsey, 11/15/19. Also, 1% point of analysis NA Engineering Review Comments Page 3 of 4 given energy balance (Outfall A), and Q2-post-deve1opment velocity < Q2-pre development Vel. (Outfall B) compliance methodologies. 3. Show that the channel (ditch) at Outfall A will be non -erosive when meeting 2-yr design, velocity is 15.36 (fps) and considered excessive (>10 s). (Rev. 1) Not addressed, Also, item 2, above. At 2/14 meeting, Engineering and PMD discussed ditch maintenance, soil stabilization blankets /matting (VESCH 3.36), etc. Engineering to confirm revised design (final submittal) meets 9VAC25-870-66.B.1./4., that final design 2- yr, 24-hour event velocities are non -erosive. Ref table sheet 1H(1): [ image of table removed w Rev. 2 comments ] 15.42 fps is erosive per VESCH. 3`d Edit., 1992. Std. & Spec. 3.36 /P. III-357: "Treatment-1 is a degradable soil stabilization blanket ... During the establishment of vegetation, Treatment-1 should not be subjected to shallow or deep concentrated flow moving at greater than 4 feet/second." Then: "Since Treatment-2 is non -degradable, it can be used in permanent conveyance channels, and can withstand higher velocities of flow than the vegetation and soil would normally allow. However, a 10 feet/second velocity of flow should be the maximum allowed in a conveyance system which utilizes Treatment-2." (p. III-358) (Rev. 2) Addressed. Ref plan sheet IH(1) Water Quantity Summary. Also, item 5., below. 4. Contact Ana Kilmer regarding nutrient credit purchase & agreement. Plan cannot be approved without nutrient purchase agreement. (Rev. 1) Addressed. Ref. A. Kilmer email (2/27/2019 9:56 AM) "TES has paid for the credits.", and, Dahris Garcia email (February 27, 2019 9:52 AM) "This was paid on 2/21/19 via check number 200175667." 5. New: Sheet 1H(1) Water Quality and Quantity data sheet: Provide narrative discussing man-made conveyance capacity to convey the post -development peak flow rate from a two-year 24-hour storm event without causing erosion of the system. Include capacity and condition of roadside ditch (Ivy Rd.-Rt. 250) to 1% limits of analysis. Transportation Engineer may provide further coordinating details to KHA. (Rev. 2) Addressed. Kimley-Hom Assoc. Hydraulic Design Report, Oct-11, 2019, table, p. 23, and water quantity summary table, plan sheet IH(1), indicate compliance with 9VAC25-870-66. 2-yr. Velocity, Outfall B =14.49 fps. This is non -erosive since discharge is to an existing manmade storm sewer system. Outfall A channel protection compliance method is Energy Balance Eq. 6. New: Revise match -line references, sheets 3D and 3E. (Rev. 2) Comment persists. Sheets 3D and 3E not included. Provide FTP link to WPO Plan set prior to print submittal —will check this item on final plan set. 7. New (Rev. 2) Hydraulic Design Report, WPO Plan, SWPPP must be sealed (signed -dated by PE). (Rev. 3) Addressed. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved. 1. Remove Roadway Plan including road profiles/sections from this set. (Rev. 1) Partially addressed. As follow-up: Please remove driveway and Ivy Road (Route 250) profiles from VSMP /WPO Plan set. (Rev. 2) Persists. Engineering to confirm sheets removed from final Plan set. Request link to final WPO plan set at earliest convenience. (Rev. 3) Addressed, driveway and road profiles are not included in the VSMP /WPO plan set. 2. Provide a soils map &description. Show existing conditions sheet (easements deed bk/pg, critical slopes, etc.). (Rev. 1) Request for soils map withdrawn, unnecessary given project corridor. Existing conditions shown in sufficient detail across multiple plan sheets. Please provide 2 print copies of SWPPP (once comments addressed), 4 full-size print copies of VSMP/WPO plan. Process fteF ..rt___.V.__., ate e0 filt.t_. ease ieRt. Feeffded, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit Engineering Review Comments Page 4 of 4 coverage letter. This should be copied to the county After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay t4e -o....,inde- of the a piteawan fee. The form identifies the contractor and responsible land disturber, and `"o fee remaining to be ai This will be checked by county staff, and upon approval, a (virtual) pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. Please also note: This project is approved pending: 4- Revision to SWPPP (items listed at A., below), 3. qteFM'.vAtP'F dp4pstion fauility pFaposed within existing VPOT Fight of way, U.S. R4. 254). A1hP'FaAF1P' and VPOT appeaF to be Only entities eligible to maintain this SATM fauility County forms can be found on the county website forms center under engineering applications, httos: //www.albemarle. ore/government/community-develODment/aDDIv-for/engineering-aDD] ications Preconstruction request form: https://www.albemarle.orWhome/showdocument?id=4659