Loading...
HomeMy WebLinkAboutSDP201900068 Correspondence 2020-10-28 (2)I® COLLINS ENGINEERING October 27, 2020 Paty Saternye and Tori Kanellopoulos Department of Community Development 401 McIntire Road Charlottesville, VA 22902 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 (�434.293.3719 PH 434.293.2813 FX www.coll i ns-engineering.com RE: Spring Hill Village ARB Plan (ARB 202000024), Final Site Plan (SDP201900068), & Road Plan Amendment (SUB201900158) Thank you for your comments dated October, 2020 on the above referenced projects. Below are our responses to the remaining comments on the road plans. ARB Plan (ARB202000024): 20. i) i. Acknowledged. iii. Acknowledged. iv. Acknowledged. vii. Acknowledged. viii. A 6' landscape easement has been proposed for the trees located on the Rt 20 side of lots 84-100 as shown on all plan sheets. ix. The landscaping plan sheets have been revised to ensure that the trees are outside of easements and away from curbs/sidewalks/etc. 31. 2. The second large shade tree from the southern property line along Rt 20 is at least 3' from any pavement/sidewalk/trail/curb. Final Site Plan (SDP201900068): Planning 1. The existing conditions sheet has been updated to show the correct TMP information. 2. Acknowledged. 3. The drainage easement is labeled on sheets 6 & 8. 4. The recordation information has been noted on all plan sheets. 5. The Rt 20 ROW dedication note has been updated as requested. 6. A. The landscaping plan cover sheet has been revised. B. Acknowledged. C. Acknowledged. D. Acknowledged. E. Acknowledged. 7. Acknowledged. Engineering 1. Acknowledged. 2. Acknowledged. Road Plan Amendment (SUB201900158): Planning 1. Acknowledged. 2. A comment response letter is provided with this submittal. 3. Acknowledged. 5. The recordation information is listed on all plan sheets. 6. A. The landscaping plan cover sheet has been revised. 7. Acknowledged. Should you have any questions, please feel free to contact Scott Collins at Scott@collins-engineerine.com. Sincerely, Scott Collins, PE