Loading...
HomeMy WebLinkAboutSUB201900156 Correspondence 2020-10-30 (3)ALAN FRANKLIN PE, LLC 427 Cranberry Lane Crozet, Virginia 22932 (434) 531-5544 alan@alanfranklinpe.com October 29, 2020 Mr. Adam Moore & Mr. Max Greene Area Land Use Engineer Charlottesville Residency RE: Rivanna Village Phase 2 (Blocks D, F, G, I, and J) Road Plans - 4thSubmittal (SUB2019-00156) Dear Adam and Max, Please accept for review and approval the attached revised road plans, geotechnical reports, bridge plans/calc, and retaining wall/calcs which address VDOTs latest review comments. This letter is intended to accompany the revised plans and serve as written response to the comments. VDOT (Adam Moore/Max Greene) Bridge Plans, Retaining Wall Plans, Geotechnical Reports: Due to the adjusted COVID plan review protocols, the format of review comments directly (red lined) on the electronic documents made it difficult to create a point by point comment response letter. The geotechnical engineer, the retaining wall engineer, and the bridge engineer were all provided copies of the VDOT mark-ups and they each have provided revised plans and calculations that they believe fully address the comments. I can provide copies of the VDOT mark-ups if needed to assist with review of revisions. Road Plans: I believe all previous comments road plan related were addressed except for the need, or not, for a maintenance agreement for the retaining walls and whether the walls need to be outside or inside the VDOT R.O.W. Email from Frank Pohl on 10/20/2020 indicated that the R.O.W. should be adjusted so that walls fall within VDOT R.O.W. with adequate room for access or with an additional access easement and that no maintenance agreement would be required. R.O.W.s have been adjusted to include the retaining walls and end walls and additional 10' wide access easement provided where appropriate. Please do not hesitate to call me at (434) 531-5544 or email at alan@alanfranklin ep com with any questions or request for additional information that will aid in review of the final site plans. Sincerely, AA �qit�/� Alan Franklin, PE cc: David Harper; Tim Culpepper Attachments: Revised Road Plans Revised Retaining Wall Plans/Calcs Revised Geotechnical response Revised Bridge Plans/Calcs from Contech Executed agreement with TMP 80-58A