HomeMy WebLinkAboutWPO202000043 Review Comments WPO VSMP 2020-10-13Phone (434) 296-5832 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia22902-4596 VSMP Permit plan review Fax (434) 972-4126 Project title: Airport Road Sheetz Project file number: WPO202000043 Plan preparer: Line and Grade Civil Engineering [dhyer@line-grade.com] Owner or rep.: Airport Plaza, LLC, Andrew Baldwin [dhyer@line-grade.com]-See below Plan received date: Sept. 14, 2020 Date of comments: Oct. 14, 2020 Reviewer: David James [djames2@albemarle.org] County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. General 1. VSMP Application -Please provide owner's correspondence info. 2. The WPONSMP & FSP need to be separate plans. 3. Cover: a. Please add the WPO# under title. b. Please remove the VDOT Design Criteria, Submittal Log, and Signature Panel. c. Please remove sheets C0.2, C2.6 thru C3.3, C4.3, C9.0, C9.1, AL0, ALL from the WPO plan. 4. Add in the County's `General construction notes for Erosion and Sediment Control plans', and `General construction notes for Stormwater Management plans'. 5. Obtain VDOT entrance permits prior to start of construction. 6. Record any offsite easements prior to start of construction. B. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Registration Statement: a. Sec. I. A. — Provide Contact person & Primary Email information prior to VSMP plan approval. b. c. Sec. IV. F. —Please answer yes or no. anty's MS4. C. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Show where any fueling/fuel storage, chemical storage locations are on the PPP. Also, show locations where concentrated stormwater discharges (Ex. Spillway from VDOT basin, X-7, X-2). D. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. Unfortunately, no infiltration BMP practice is allowed at this site due to gas stations & car washes being a stormwater hotspot (VADEQ, BMP Spec#8, p.21). 2. C7.2: a. Please provide VRRM spreadsheet for verification (email is fine). b. Please provide Letter of Availability from nutrient entity provider. 3. C7.5: a. BMP A - Runoff from 15" pipe could short circuit to riser structure. Provide some alternate design or configuration to achieve 0.3 min. m Length of shortest flow path/Overall length = 0.3; U OR, other design methods used to prevent short. O circuiting; a one -cell design (not including the pre- cii Pre-treatment (Section 6.4): a pretreatment Cell, F geometry (Section 6.3). 1 film. �frm „ul Alen6rnnm LEVEL 1 BIORETENTION FILTER /55O PER DEQ. SPEC. NO.9 /g52/ PROVIDED SOIL MEDIA 672 SF 1 VIDE VEE DITCH TO CIUNNELA 55 � SEES2INatALC9-TH15S ET EDWITHIr DIASTONE SEE LANDSCAPE PLAN FOR P NGS �SA9 WS :RAP. CHANNELA 4- BOTTOM WIDyVs1 _ 547, GRA55 LINm 37.; C/R A61N CL M0111 R RI1A'544.75 _ )ESS\ INV.OUL 56p.75 IpAITRs 'AR WASH C= WASH RECLAMATMM -A4KS b. Bioretentions (#1) - Provide a form of pretreatment (Section 6.4). C7.6 does depict a Gravel flow spreader, but it's not called out or shown in the BN P plan views. Pre-treatment should be located at the concentrated outflow, but located outside of biorentention's bed surface area. I treatment cell). I Pre-treatment (Section 6.4): a pretreatment cell, grass filter strip, gravel diaphragm, gravel flow spreader, or another approved (manufactured) 4. C7.4 - Please also provide channel design & liner needed from SD-12 to channel. 5. Bioretention setbacks (Section 5): a. BMP A- i. It appears that the car wash is within 10' of the facility and must be located outside. ii. It appears that water lines are within 5' of the facility and must be located outside. iii. It appears that the facility is located within 35' of a sanitary line and must be located outside. iv. Gas & cable lines can cross under the facility, but you must show that these lines are protected & can be accessed (repaired) without disturbing the facility. b. BMP B — It appears that the facility is located within 35' of a sanitary line and must be located outside. 6. C8.1 (Section 6.8) — The landscape plan shows a hatched area for the bioretentions, but does not indicate what plants or bio-seed mix is used there. -75% (min) plant surface coverage needed within 2yrs. 7. C7.0/7.1— Your pre -development land cover areas, specifically forest/open space area, doesn't match land cover areas found in GIS. This is what the 2013 land cover overlay looks like: Green — Tree/Pasture Tan — Turf Black — Impervious Please provide an accurate account of land coverages values to justify pre -/post- runoff quantity analysis, and VRRM worksheet. 2. Please provide SWM routing/ponding reports: Summary of pre-/post-dev. runoff values for Energy Balance is not enough. 3. Provide manufacture's long-term maintenance for the UD system & Specs. What are the orifice or weir controls present (locations)? Show the release rates for each. Show the design storm elevations at these control release locations. 4. Provide list of materials, cost -estimate for the UD system. 5. C6.2 — For storm pipes operating under pressure flow (HGL above) provide that these pipe joints & connections are made water -tight. 6. Provide inlet shaping (IS-1) at X-2. 7. Reduce spread to under loft for SD-11. S. Show that the entrances won't flood during 25-yr storm. Show 100% capture of flow will happen at entrances. E. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Sheet C2.2, 5.0, etc.: Please tie in 5571, 558' contours along west entrance. 2. Provide low maintenance (not grass) ground cover specified on the plans where grades are steeper than 3:1. [DSM, Sect 8A] 3. Please confirm that you will not be using the existing entrance off Rt. 29 as a construction entrance. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the entails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; bttp://www.albemarle.ory/deptfortns.asp?department==cdengno