Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO202000047 Bond Estimates 2020-11-06
Project Name: T.M.P. 55EO-01-F1 Old Trail Medical Offices WPO: VSMP Plan WP02020-00047 WPO file number: WP0202000047 TM P(s): 055E0-01-00-GOOF 1 Date Estimate Completed: 11-06-2020, A. Franklin; chk. by JA Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 slablization (PS, TS) 1.0 acres $5,000.00 $4,950.00 2 silt fence (SF) 406.0 ft $5.00 $2,030.00 3 safety fence (SAF) 0.0 ft $5.00 $0.00 4 diversion (DID, FD, RWD) 0_0 ft $13.00 $0.00 5 temporary slope drain (TSD) pipe length -ft pipe diameter 111PF-0 in $0.00 $0.00 6 silt fence inlet protection (IP) qq $100.00 $0.00 7 stone inlet protection (IP) $200.00 $800.00 8 outlet protection (OP) - basin 1 length ft width ft 0 $0.00 $0.00 9 channel (SCC, matted) length ft width ft kft 0 $0.00 10 check dam depth in channelEft channel width 0 $0.00 $0.00 11 construction entrance (CE) 0 $2,500.00 $0.00 lz wash rack 1 $2,000.00 $2,000.00 13 paved construction entrance 1 $3,500.00 $3,500.00 14 rip -rap, placed depth It length _.0 ft 15 width (tons) $60.00 $0.00 16 17 survey and layout (price per 0.1 mi.) acres traps and basins 0 $500.00 18 mobilization $2,500.00 19 Temporary Culvert $0.00 cost sum $16,280.00 WP0202000047 Old Trail Medical Ofrice_ESC Bond_est_A.Franklin 110620.xlsx contingency $1,628.00 Total $17,910 11/6/2020