Loading...
HomeMy WebLinkAboutSP202000012 Correspondence 2020-11-11 (2)• GDNsit November I O h, 2020 Christopher Perez Senior Planner Department of Community Development 401 Mcintire Road North Wing Charlottesville, VA 22902 RE: SP202000012 - Verizon Wireless — Scruby Property — Tier III PWSF — Re -Submittal Review Comment Response Dear Chris, As requested, please see the following response to your re -submittal review comment letter dated October le, 2020. I am only responding to those items specifically mentioned in the letter requiring comments at this time, including which pages of the re- submitted site plan required changes were made. Regarding Comments #1 and #2, the applicant determined that the reference tree identified on the plans submitted with the original application was measured inaccurately. Therefore, the height of the balloon during the balloon test held on July 29, 2020 did not reflect the height of the monopole as being proposed in this resubmission. The applicant intends to conduct another balloon test based on the new proposed monopole height and will provide a new set of photo simulations to the County for review. Comment #3 — Label areas of critical slopes. Areas of proposed and created critical slopes labeled on page Z-2 of the revised site plan. Comment #4 — Design and specification of the Antenna and Equipment Mounts. Details and specification of each individual mounts added to page C-3 of the revised site plan. In addition, a close-up view from the side of the antenna arrays was added to page C-2 of the revised site plan. All equipment is subject to change, subject to the maximum stand-off distance allowed by the Zoning Ordinance and any applicable special use permit conditions. Comment #5 — Location and design of proposed utilities. All proposed utilities will be run underground in proposed conduitfrom the public right-of-way entrance off Greenwood Station Road back to the proposed facility site. Comment #6 —Color. Note W on page C-2 of the revised site plan revised to show that the tower, tower mounts, antennas and RRH's will be painted the county approved color of Sherwin Williams Java Brown #6090. 513 Stewart Street Suite E Charlottesville, VA 22902 • GDNsit Comment #7 — Topography — Elevation markers added to page Z-4 of the revised site plan. Comment #8 — Setback Notes — Setback notes added to page Z-2 of the revised site plan. The fall zone radius is shown on page Z-I of the revised site plan. Comment #9 — Trees — Updated total number of trees to be removed from the tree inventory on page Z-3 of the revised site plan. Comment # 10 — Monopole Height —All heights referencing the tree height and monopole height have been revised to be consistent throughout the pages of the site plan. Comment # I I — Ownership Reference — All reference to Mirador Farm has been removed from the revised site plan. Comment # 12 — Outdoor Lighting — Proposed Lithonia Lighting #OLW14 dimensions added to page C-3 of the revised plans. In addition, equipment specification sheet added to the resubmittal package. Comment # 13 — Existing and proposed improvements — RIO of the existing access road added to page Z-2 of the revised plans. The existing access road will not be improved as apart of this project Inspections— Michael Dellinger — Page Z-1 includes the required note from the inspections department Please let me know if you have any questions regarding the re -submitted documents. Sincerely, Nathan Holland Senior Site Development Manager GDN Sites on behalf of Verizon Wireless (757)305-8420 513 Stewart Street Suite E Charlottesville, VA 22902