HomeMy WebLinkAboutWPO201500044 Bond WPO VSMP 2015-07-24 ,_ Qo a o (Soccy u r�d
�� ' JJI 6
11 Internal Use Only /
G / �A L��
Date Received:7`D-,S Fee Paid:aso'G„ 'y�
Received by: h Sty- �� 1 IA ft ;`t
Y}41
" wai
Intake: Forward to Management Analyst UQ �j
‘..fl.RG1.1
✓
REQUEST TO ESTABLISH A BOrf� z
APPROVED PLAN# / /�
( tom/ f Z�-.) i
PROJECT NAME: Bundoran Farm ,,,,s,�
jt,
(As listed on the approved plan) 1 r /`�/� �
a 3M1,7 A)
All parcels in the project,including any off-site work if easements are not provided,and current owners. Use a
separate sheet if more owners are required.Owner and tax map information must be correct,and plans must be
approved prior to bond estimates being prepared.
TAX MAPs/PARCELs: 08600-00-00-107A0 OWNER'S NAME: NA Bundoran Farm,LLC
SIGNATURE: C.`+€. • date: ?Ark
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
i
NOTE: If ownership of the property is in the name of any type of legal entity or organization
including, but not limited to the name of corporation,partnership,limited liability company,
trust,association,etc.,documents acceptable to the County must be submitted certifying that
the person signing above has the authority to do so.
The requested estimates are;
❑ VESCP Erosion&Sediment Control per Water Protection Ordinance section 17-207;$0 fee
® VSMP Erosion and Sediment Control,Stormwater Management and Mitigation per Water
Protection Ordinance section 17-208;$250 fee required
❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435;
&Water&Sewer per Subdivision Ordinance section 14-435;$250 fee required
A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide
contact information.
EMAIL: m.hahajr7n naturairetreats.com
OR REGULAR MAIL ADDRESS:
Revised 6/20/2014
•
Project Name: Bundoran Farm Lots H-8D & H-8R - BLA
WPO file number: (SUB201500019) Will Assign WPO #when VSMP Applic received
Stormwater Management Plan (Mitigation Plan) Bond Estimate
Item Item No. Unit Unit Cost Cost
Number (installed) '
trees 180 ea $150.00 $27,000.00
shrubs 90 ea $50.00 $4,500.00
seedlings 0 ea $5.00
$0.00
mobilization $500.00
cost sum $32,000.00
JANDERSON,070215 proj mgmt $4,800.00
contingency $3,680.00
Total $40,480
7/7/2015