HomeMy WebLinkAboutWPO201500044 Correspondence 2015-05-01John Anderson
From: Josh Woodson [j.woodson@naturalretreats.com]
Sent: Friday, May 01, 2015 4:35 PM
To: John Anderson
Cc: Hunter McCardle; Jonathan Shannon
Subject:Bundoran Farm Driveway
John,
Thank you for your time on the phone earlier this week. As requested, I am writing to you as a means to explain the
proposed driveway on Lot H-08D and how it fits within Bundoran Farm and also how it will have the least amount of
environmental impact.To begin,we are proposing a driveway that will provide access to 2 homesites(H-08 and H-08D)
within a private pasture within the woodland of Bundoran Farm.The proposed road is to enter into within the 100'
stream buffer with a replanting mitigation plan of a 2:1 ratio of planting versus disturbance for site stabilization.The
reason that we are proposing the driveway route to enter within the 100' stream buffer is because we feel it will provide
the least amount of impact environmentally.To go outside of the 100' buffer with the driveway,we would need to
disturb a lot more earth with cutting,filling, and grading in order to provide a reasonable driveway access which would
also require more protocols to ensure further site stabilization for E&S measures. More mature tree removal would also
be required which would take away from the conservation efforts of Bundoran Farm's vision for sustainable
development(see further explanation below).There is also a conflict with the approved septic field for Lot H-08D. If we
go outside of the 100' buffer we would be required to move the septic drainfield and we don't foresee an alternative
area for this without also falling into the 100'stream buffer as well.
As a community, Bundoran Farm's concept and vision was founded on conservation in order to ensure that the agrarian
landscape and agricultural components would remain intact in perpetuity.The way we were able to guarantee this was
to blanket 90%of the 2,300 acres in an agricultural easement and forest use easement to avoid disrupting the beautiful
landscape that we have been afforded in this part of the county.To further this,when planning this community we
carefully placed a 2 acre homesite on each individual lot as a maximum limit of disturbance for a homesite development
so that landscape,trees, and agricultural pastures would continue to be a part of the viewshed for not only the
community but also from the public perspective.This is to include driveway and road alignments in order to not disturb
the landscape and ensure that it would not negatively impact agrarian pastures used for rotational grazing of livestock
and other agricultural uses.
Because of the increased environmental disturbance and site stabilization,conflicts of existing septic field,and potential
disruption of a pastoral field for agricultural purposes we would ask that you please approve our proposed driveway
alignment within the 100'stream buffer and allow us to plant a 2:1 mitigation plan for proper site stabilization.
Thanks for your consideration.
Best Regards,
NATURAL RETREATS
Josh Woodson I General Manager
Natural Retreats Realty-Bundoran Farm I Homestead Preserve
E:j.woodson@naturalretreats.com
M:+1434-260-4304
NR USA:123 East Main St,2^d Floor,Charlottesville,VA 22902
Bundoran Farm A:5005 Edge Valley Road.North Garden,VA 22959
The Dairy at Homestead Preserve A:46 Old Dairy Rd.Warm Springs,VA 24484
www.bundoranfarm.com
www.homesteadoreserve.com
1
www.natwalretreats.com 4itiopi gee
Follow us on Twitter Follow us on Facebook
The information contained in this message is confidential and is intended for the addressee only.If you have received this message in error or there are any problems please
notify the originator immediately.The unauthorized use,disclosure,copying or alteration of this message is strictly forbidden.Natural Retreats will not be liable for direct,
special.indirect or consequential damages arising from alteration of the contents of this message by a third party or as a result of any virus being passed on.Natural Retreats
re-serves the right to monitor and record e-mail messages sent to and from this address for the purposes of investigating or detecting any unauthorized use of its system and
ensuring its effective operation
2
5/8/2015 Driving Directions from 401 Mcintire Rd,Charlottesville,Virginia 22902 to 5005 Edge Valley Rd North Garden,Virginia 22959(MapQuest
lose row'
Notes
mapquest
Trip to:
5005 Edge Valley Rd
North Garden, VA 22959-1520
15.41 miles / 18 minutes
9 401 Mcintire Rd, Charlottesville, VA 22902-4579 Download
Free App
1.Start out going southwest on McIntire Rd toward Preston Ave. Map 0.01 Mi
0.01 Mi Total
111 2.McIntire Rd becomes VA-631.Map 2.2 Mi
2.2 Mi Total
3.Merge onto 1-64 W toward Staunton.Map 1.9 Mi
cp If you are on 5th Street Ext and reach IMndfield Cir you've gone about 0.2 miles too far 4.1 Mi Total
s..qtr 4. Merge onto US-29 S via EXIT 118A toward Lynchburg. Map 9.0 Mi
I-xe1
l 2q 13.1 Mi Total
1114
5.Turn right onto Plank Rd. Map 2.0 Mi
Plank Rd is 0.1 miles past N Garden St 15.0 Mi Total
If you reach Sutherland Rd you've gone about 0.1 miles too far
111+
6.Turn right onto Edge Valley Rd.Map 0.4 Mi
If you reach Drovers Ln you've gone about 0.3 miles too far 15.4 Mi Total
7.5005 EDGE VALLEY RD is on the right. Map
If you reach Deny Ln you've gone a little too far
9 5005 Edge Valley Rd, North Garden, VA 22959-1520
Total Travel Estimate: 15.41 miles - about 18 minutes
201 5 MapQuest, Inc. Use of directions and maps is subject to the MapQuest Terms of Use.We make no guarantee of the accuracy of
their content, road conditions or route usability.You assume all risk of use.View Terms of Use
http://www.mapquest.com/print? 1/1
tiro
PHONE(434)2934251
434)977-0205
FAX(434)2965220
ROUDABUSH,GALE&ASSOC.,INC. INFO@ROUDABUSH.COM
A'479_RtE' `.G
A 'ROcESSCNAL CCPa 'RA":J'+
974 MON'ICELLO ROAD
CHARLO—ESVILLE.VIRGINIA 22902
J THOMAS GALE.LS. WILLIAM S.ROUDABUSH L.S.
MARILYNN R.GALE.LS.
WILLIAM J LEDBETTER.LS
EDWARD D.CAMPBELL 81 L.S
May 26, 2015
Albemarle County—Community Development
Attn: Johnathan Newberry, John Anderson
401 McIntire Road
Charlottesville, VA 22902
RE: Bundoran Farms Lot H-8D &H-8R BLA—Summary of Stream Buffer
Discussion
Gentlemen:
It was requested that there be some sort of summary of the ongoing discussion as to
reasons why it should be permitted to encroach into a portion of the stream buffer
easement with an access road for the existing two lots.
Reference should be made to plats by Roudabush, Gale & Assoc. that show the proposed
new 30' Access Easement as it would leave Hightop Drive by way of an existing farm
entrance, and an existing farm stream crossing. From there the Easement follows a path
walked and marked in the field by NA Bundoran Farms and a County Representative on
May 8th, 2015. With the exception of the existing stream crossing, at no point will the
new drive way road bed or improvements get within 50' of the actual stream.
The construction of the drive is intended to comply all County requirements with regards
to a Mitigation Plan.
What follows is an excerpt of the discussions, and reasons as to why NA Bundoran Farms
feels this would be the best course of action, and the least detrimental to the property.
On May 1, Josh Woodson General Manager for NA Bundoran Farms wrote:
John[Anderson],
Thank you for your time on the phone earlier this week. As requested, I am writing to you
as a means to explain the proposed driveway on Lot H-08D and how it fits within
Bundoran Farm and also how it will have the least amount of environmental impact. To
begin, we are proposing a driveway that will provide access to 2 homesites (H-08R and
H-08D) within a private pasture within the woodland of Bundoran Farm. The proposed
road is to enter into within the 100'stream buffer with a replanting mitigation plan of a
2:1 ratio of planting versus disturbance for site stabilization. The reason that we are
proposing the driveway route to enter within the 100'stream buffer is because we feel it
will provide the least amount of impact environmentally. To go outside of the 100'buffer
with the driveway, we would need to disturb a lot more earth with cutting,filling, and
grading in order to provide a reasonable driveway access which would also require more
protocols to ensure further site stabilization for E&S measures. More mature tree
removal would also be required which would take away from the conservation efforts of
Bundoran Farm's vision for sustainable development (see further explanation below).
There is also a conflict with the approved septic field for Lot H-08D. If we go outside of
the 100' buffer we would be required to move the septic drainfield and we don't foresee
an alternative area for this without also falling into the 100'stream buffer as well.
As a community, Bundoran Farm's concept and vision was founded on conservation in
order to ensure that the agrarian landscape and agricultural components would remain
intact in perpetuity. The way we were able to guarantee this was to blanket 90% of the
2,300 acres in an agricultural easement and forest use easement to avoid disrupting the
beautiful landscape that we have been afforded in this part of the county. To further this,
when planning this community we carefully placed a 2 acre homesite on each individual
lot as a maximum limit of disturbance for a homesite development so that landscape,
trees, and agricultural pastures would continue to be a part of the viewshed for not only
the community but also from the public perspective. This is to include driveway and road
alignments in order to not disturb the landscape and ensure that it would not negatively
impact agrarian pastures used for rotational grazing of livestock and other agricultural
uses.
Because of the increased environmental disturbance and site stabilization, conflicts of
existing septic field, and potential disruption of a pastoral field for agricultural purposes
we would ask that you please approve our proposed driveway alignment within the 100'
stream buffer and allow us to plant a 2:1 mitigation plan for proper site stabilization.
Thanks for your consideration.
Following the on-site visit with John Anderson on May 8; Josh Woodson wrote:
Thanks again for your time this afternoon to review the driveway alignment on Lot H-
08D at Bundoran Farm. Per our conversation (and to add to the points sent last week in
the below email chain) I am summarizing our conversation on site per your request.
Again, we will submit the revised plat with the agreed upon proposed driveway and we
will make sure to include the shaded mitigation plan on that same plat for reference.
As a summary, We were able to determine that the driveway alignment within the 100'
buffer would provide the least amount of disturbance to the environment and protected
easement area. To add to the points in the below email I have added the topics discussed
today in the following bullet points.
The proposed drive alignment will start with the closest edge of the drive approximately
67'from the stream and approximately 77'to the furthest edge of the driveway from the
stream.
We were able to determine onsite today that with this proposed alignment within the
100'stream buffer, we would only be removing one mature poplar tree as opposed to
removing 10 mature trees going outside of the 100' stream buffer for the driveway
alignment.
The proposed driveway within the 100'buffer will not impact the approved septic field
whereas going outside of the 100'buffer will go right into the septic field.
Nave
Staying inside of the 100'buffer would also cause less disruption to the pastoral areas
that are used as a part of the agricultural easement within Bundoran Farm. Part of
Bundoran Farm's conservation efforts are to maintain 90% of the 2,300 acres in an
agricultural easement and the driveway placement outside of the 100' buffer would
restrict the use of that pasture for agricultural purposes.
Another part of Bundoran Farm's conservation efforts are to limit the amount of visible
disturbance of roads and construction within the 2,300 acres and by allowing the
driveway alignment within the 100'stream buffer, we will be able to use more of the
trees to visually buffer the driveway from the view of the road and it will tuck into the
landscape more effectively.
We will utilize the 2:1 mitigation plan to further screen the driveway from the homesite
view and community road view within the stream buffer and that will also provide twice
the amount of stabilization than we disturbed within the buffer.
Thanks again John. I think with the above bullet points along with the below topics
discussed in my previous email that we are taking the path of least resistance and will
cause less disturbance on the environment and protected agricultural easement area.
Please let me know ifyou need anything else.
To which John Anderson responded:
After meeting on-site 8-May, driveway alignment discussed in the field may be approved.
Ref. Sec. 17-604.A.(i); 17-601.B./D.
Sec. 17-601 Management of stream buffer.
Each stream buffer required to be retained or established pursuant to section 17-600 shall be managed as
provided herein:
A. Target vegetative cover. The preferred vegetative cover in a stream buffer shall be a native
riparian forest with ground cover,shrub,and tree canopy layers.
B. Preservation of native vegetation. When evaluating a development design under subsection(C),
when native vegetation may be disturbed or removed under subsection(D)and sections 17-603
and 17-604,and when stream buffers arc maintained under subsection(E),restive vegetation shall
be preserved to the fullest extent possible.
C. Incorporation into development design.Each stream buffer shall be incorporated into the design of
the development by keeping stream buffers in open or natural spaces,and out of residential lots or
areas of active use,to the fullest extent passible.
D_ Retaining native vegetation: disturbance or removal. In order to maintain the runoff, erosion,
nonpoint source pollution control,stream temperature,and ecological values of the stream buffer,
no native vegetation within the stream buffer shall be disturbed or removed,regardless of the size
of the area affected,except to maintain the stream butler as provided in subsection(E), provided
that native vegetation may be removed to construct,install,operate or maintain any improvement,
or engage in any activity,authorized by sections 17-603 and 17-604.
E. Maintaining the stream bzaflir. Each stream butler shall be maintained in as natural a condition as
possible.
Sec. 17-604 Types of structures, iasproveaaemis and activities which may be allowed is a stream
buffer by program authority.
Structures, improvements and activities may be authorized by the administrator in the circumstances
described below,provided that a mitigation plan satisfying the requirements of section 17406,is submitted
to,and approved,by the administrator:
A_ Within the landward 511 horizontal feet. On a lot within the fifty (50)horizontal feet of a stream
butler that is the most landward (furthest from the stream), if the structures, improvements or
activities either:(i)would he for necessary infrastructure to allow reasonable use of the lot;or(ii)
would be on a lot that is within a water supply protection area where the stream buffer protects an
intermittent stream and the lot is within a development area.In all cases under this subsection,any
new building site and sewage disposal system shall be located outside of the strewn buffer.
Various emails detail impacts of alignment that avoids the stream buffer entirely.
Avoiding the buffer entirely destroys irreplaceable mature native vegetation, and, in my
view, the revised alignment discussed 8-May presents less impact to the environment
while preserving forested/agricultural characteristics vital to Bundoran Farm
easements/covenants).
Please submit a revised plat to Johnathan Newberry, Plan Review Coordinator. He will
distribute to Engineering for review comment.
Plat review may yield comments unrelated to stream buffer. As favor, collect points
distributed across email into a single document. Please reference: site visit, Area(SF) of
stream buffer impact (drives Mitigation requirements), alternatives considered
minimization efforts), and Lot numbers. A single document will support request. I
appreciate your patience, the care and attention given to resource preservation efforts at
Bundoran Farm.
To Follow up on the above comments:
Please see the plat submitted to Johnathan Newberry for distribution.
Total square footage of the new 30' access easement that falls within the 100' Stream
Buffer is 16,267 Sq.Ft. However it is not intended in any way shape or form to
grade/rework the entire 30' strip to create the drive.
Assuming a 10' drive way width that follows on grade — there will only be disturbed
5,745 Sq.Ft. for the drive way bed. It is safe to assume that there may be some additional
grading beyond just the drive bed, but this route was selected to help minimize impacts
and grading, and the actual end disturbance area will be substantially closer to the 5,745
Sq.Ft.
As a further point of reference — the existing 30' Access Easement (approved and
recorded in DB 3789, Pg. 5) that this BLA is attempting to vacate and replace cuts a
9,824 Sq.Ft. swath through the 100' Stream Buffer in much steeper terrain.
Please let me know if you require further documentation.
Thank you,
Clint Harmon, L.S.
Roudabush, Gale&Assoc.