HomeMy WebLinkAboutWPO202000034 Preconstruction Form 2020-11-107/1/14, Revised: 8/29/14, 8/28/19, 8/25/2020 Page 1 of 3
Request for Pre-construction Meeting and Grading
Permit from Albemarle County – VSMP
Approved Plan Number: WPO-
Approved Plan Name: ___________________________________________________________
(Plans must be approved prior to a pre-construction meeting.)
(Bonds must be approved and posted prior to a pre-construction meeting or permit.)
Responsible Land Disturber:
Print Name: ___________________________________________________________________________
State Certification Number: ______________________________________________________________
Address ______________________________________________________________________________
City ______________________________________________________________ State ___________ Zip
Daytime Phone ( ___ ) _____________________ E-mail ________________________________________
Primary Contractor:
Print Name ___________________________________________________________________________
Address ______________________________________________________________________________
City ______________________________________________________________ State ___________ Zip
Daytime Phone ( ___ ) _____________________ E-mail ________________________________________
Permit Issuance and First Year Maintenance Fees (Request must include payment):
Total acres proposed to be disturbed is contained on the approved plan and
application: VSMP:
Acres to be disturbed Fee Due at Grading Permit
Less than 1 $63.80
1 and less than 5 $594.00
5 and less than 10 $748.00
10 and less than 50 $990.00
50 and less than 100 $1,342.00
100 and more $2,112.00
Annual Maintenance Fees [Section 17-208 of the Albemarle County Code] – Annual maintenance fees will be assessed
in March of every year this permit is active. Fees cannot be prorated after the first year of permit issuance.
7/1/14, Revised: 8/29/14, 8/28/19, 8/25/2020 Page 2 of 3
Person(s) to attend the Pre-construction Meeting:
Names (type or print) Firm Contact Number or email
FOR OFFICE USE ONLY
WPO # __________________________
Fee Amount $ ________ Date Paid __________ By who? _______________________ Receipt # ___________ Ck# ___________ By: _____________
7/1/14, Revised: 8/29/14, 8/28/19, 8/25/2020 Page 3 of 3
Information for Permit applicants;
9-Month Permanent Stabilization Deadline:
Code Sec. 17-808 Duty to stabilize denuded areas with permanent vegetation within nine months after
commencing land disturbing activity
A. When permanent vegetation required. The owner shall install on all denuded areas on the site within nine (9)
months after the date the land disturbing activity commenced, except for areas that the administrator
determines are necessary parts of the construction that are subject to an active building permit and areas where
erosion is prevented by a non-erosive surface, including, but not limited to, the following surfaces: (i)
roadways and sidewalks covered by gravel, asphalt pavement, or concrete; (ii) trails or paths covered by
gravel, stone dust, or mulch; (iii) buildings and other permanent structures; and such other surfaces that the
administrator determines would adequately provide a permanent barrier to erosion.
(see code 17-808 for information about possible extensions)
Notice to Comply and Permit Revoked for Overdue Fees
Late fees will incur interest, and enforcement actions per code section 17-210.
(1) Owners with late payments of fees required by 17-207C6 will be issued a Notice to Comply (NTC). The notice
gives 7 days to make payments.
(2) At the end of the NTC time period, the permit will be revoked, and a Stop Work Order will be issued
for working without a current permit.
Disturbed Area Reductions
Acreage for the purpose of fee computations will be the entire permitted acreage. This is the disturbed acreage on
approved plans. If fees are to be reduced, an application for plan amendment must be made, and areas reduced by
changes in limits of disturbance and appropriate plan changes. Such amendments must be approved prior to the fee
due date. Amendments to remove disturbed areas can only be approved when such areas are completely stabilized and
all erosion control measures (including traps and basins) removed.
Refunds
The County does not have a refund program. Fees will not be refunded based on completion within the year. Fees will
not be pro-rated at payment, other than the first year VSMP fee as indicated in code section 17-209B.
Re-inspection Fees
Re-Inspection Fees will be charged for inspections following a Notice to Comply or a Stop Work Order. Fees are $250
per inspection, or as given in code sections 17-207 and 17-208.