HomeMy WebLinkAboutSDP201900028 Review Comments Major Amendment, Final Site Plan 2020-10-09 411tilillA et" 0 County of Albemarle Department of Community Development Memorandum To: Eric Woolley, P.E. From: Cameron Langille—Senior Planner Division: Planning Services Date: July 2, 2019 First Revision: October 9,2019 Subject: SDP201900028—University of Virginia Research Park: Town Center 4—Major Site Plan Amendment The Planner for the Planning Services Division of the Albemarle County Department Community Development will recommend approval of the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] Albemarle County Planning Services (Planner)—Cameron Langille, blangille@albemarle.org —Required changes: 1. [General Comment] On Sheet C 1.0,please fix the text overlap in the box titled"Site Development Plans."Rev. 1: Comment addressed. 2. [32.5.2 (a)] On Sheet C 1.0,please add each Tax Map Parcel(TMP)number that is affected by this amendment. This includes TMPs 03200-00-00-019J1, 03200-00-00-006A2, 03200-00-00-006R0 and 03200-00-00-019G0. Rev. 1: Comment addressed. 3. [32.5.2 (a)] On all applicable sheets,please clearly identify the existing property boundaries within the scope of the project and label them with the TMP, names of the owner, zoning district, and most recently recorded instrument. Rev. 1: Comment not addressed. This information is missing across numerous drawings. Parcel boundaries on Sheets C2.1 and C2.2,for example,state"(unknown)"on existing parcel boundaries. The deed book and page references for most recently recorded plats are also incorrect. Each existing property line should be identified with a measurement, and each property should contain a label stating the TMP, owner, zoning district, and most recently recorded plat/instrument number. Existing utility easements should be shown and labeled. Some existing easements are currently missing on Sheets C2.1 and C2.2. 4. [32.5.2(a)] On Sheet C 1.0,please state that the portions of the properties lie within the Managed and Preserved Steep Slopes Overlay Districts. Rev.1: Comment addressed. 5. [32.5.2 (a)] On Sheet C3.0, please revise the Legend so that it identifies both Managed and Preserved Steep Slopes. Rev. 1: Per email from Bill Fritz, sent to Eric Woolley dated November 1, 2016, the disturbances to steep slopes within the parcel as shown on SDP2006-113 remained valid and were approved on SDP201600051. This SDP proposes an area of"future parking" within Town Center 4. On Sheets C3.0 and C5.0,please add a note stating that all proposed grading will conform with the disturbances as shown on SDP2006-113 and SDP2016-51. a. Amend Sheet C3.0 so that areas of Managed and Preserved Steep Slopes are differentiated and identified. b. On Sheet C3.0, stat_ source used to identify areas where Managed and Preserved Steep Slopes currently exist. 6. [32.5.2 (a)] Please add a note to Sheet CO.0 that states the instrument numbers (deed book and pages) for all recorded plats and deeds associated each parcel within the development.Rev.1:Comment partially addressed. The amendment proposes new utility easements which are shown on the site layout and utilities plans, their labels state"DB tbd."Once a new easement plat is approved and recorded,these easements will need to be labeled with the new instrument number. Sheet CO.0 should also list the new recorded instrument. 7. [32.5.2 (b)] Please verify the proposed Town Center 4 building footprint. According to SDP201600051, the proposed building footprint was 27, 683 square feet and a gross total square footage of 108, 568 sq. ft. Under "Proposed Building Statistics"on Sheet C 1.0,the footprint has now been reduced to 27,201 sq. ft. but the gross building square footage is still 108,568 sq. ft. Rev. 1:Comment addressed. Per applicant response,the gross building square footage is not changing from the previously approved SDP201600051. a. If the gross building square footage is changing,please revise the figure provided under Note 7 on Sheet C1.0 next to"Gross Building Square Footage."Rev. 1: Comment not applicable. b. If the gross building square footage is changing, please revise the figure provided under Note 13 on Sheet C1.0 next to"Town Center Four—Approved Buildings(sf)."Rev. 1: Comment not applicable. c. If the gross building square footage is changing, please revise the figure provided under Note 13 on Sheet C1.0 for the total approved buildings (sf). Rev. 1: Comment not applicable. d. If the gross building square footage is changing, please revise the figure provided under Note 13 on Sheet C1.0 for the total remaining approved GSF column. Rev. 1: Comment not applicable. 8. [32.5.2 (a)] Please state the application numbers of all approved Special Use Permit and Zoning Map Amendments (ZMA)that apply to the development in Note 5 on Sheet C1.0: a. The properties are subject to the approved conditions of Special Use Permits SP200800015, SP200800062, SP200800063, and SP200800064. Rev. 1: Initial comment made in error. Please remove reference to these SPs on Sheet CO.0. Staff apologizes for the error. 9. [32.5.2 (n)] On Sheet C4.0,please label all proposed features within and next to the lawn area to the north of Building 4. Are the gray items sidewalks or some other sort of paths? Are the white areas grass cover? a. Please provide labels in the white area south of Building 4 explaining whether the white area is grass cover, pavement, etc. Rev. 1: Comment addressed. b. State the paving materials for all walkways in the lawn area. Rev. 1: Comment not fully addressed. Please state the detail and sheet number in the precast paver callouts on Sheet C4.0. It appears that this detail is shown on Sheet S1.0 as detail 23.0. c. State the paving materials for the hatched area next to Building 4. Rev. 1: Comment addressed. 10. [32.5.2(j)] Please label all existing water, sewer and drainage easements by type and include a size/width measurement. State the deed book and page for the recorded instrument number in each existing easement label. Rev. 1: Some existing easements are not shown on Sheets C2.1 and C2.2. Please revise. 11. [32.5.2(k)] Verify that all necessary easements for water,sewer,and drainage currently exist and no new easements are needed. If new easements are required,an easement plat application must be submitted, reviewed,approved and recorded prior to final site plan approval for all proposed easements. Rev. 1: Per applicant response letter,this comment has been acknowledged. A new easement plat must be submitted,approved,and recorded prior to major amendment approval. Once the easement plat is recorded,all easements shown on major amendment will need to include the new DB and page number for the recorded plat and any deeds of dedication. b. Once the easement plat is recorded,the final site plan must be revised to show the recorded instrument number for the easement plat(deed book and page number). The newly created easements will need to be labeled with the instrument number, easement type,width dimensions, and whether it is public or private. Rev. 1: Per applicant response letter,this comment has been acknowledged. A new easement plat must be submitted,approved,and recorded prior to major amendment approval. Once the easement plat is recorded,all easements shown on major amendment will need to include the new DB and page number for the recorded plat • and any deeds of de Lion. 12. [32.5.2 (n)] ADA compliant striping must be provided across all parking lot drive aisles where handicap accessible parking spaces are provided on opposite sides of the travelway. For example, the sidewalk ramps to the west of Building 4 which connect to the 8' asphalt trail are not currently connected by striping in two drive aisle locations. The ramps on either side of the drive aisle south of Building 4 also do not have striping. Rev. 1: Comment addressed. 13. [32.5.2(n)] Please state the height of all proposed fences and retaining walls in the labels used on the drawings. Profile view details of all proposed fences,retaining walls,and constructed screening measures will be required with the final site plan. Each will need to show the types of materials used and dimensions. Rev. 1: Comment not fully addressed. Per the callout for the generator pad and screening wall on Sheet C4.0,the screening wall details are shown on the"architectural plans."The major amendment needs to include a construction detail showing a plan and profile view of the screening wall with dimensions and materials. c. See Engineering Division and Inspections Division comments for additional details on retaining wall requirements. Add the notes specified by Inspections to the applicable drawings mentioned in their comments. Rev. 1: Engineering review still underway.Comment will be updated accordingly once reviews from other staff are complete. 14. 132.7.9] The landscape schedule on Sheet L1.0 lists the incorrect quantities for the following items: a. Only 16 AC (Acer rubrum) are shown,not 74. Rev. 1: Comment addressed. b. Only 9 BN (Betula nigra)are shown,not 28. Rev. 1: Comment addressed. 15. [32.7.9.9] Please add a note to the Sheet L1.0 stating "All landscaping shall be installed by the first planting season following the issuance of the first certificate of occupancy within the development." Rev. 1: Comment addressed. 16. [32.7.8 and 4.17] Please address the following related to site lighting: a. [4.17.4(a)]On Sheet SL2.0 next to each manufacturer cut-sheet,please state the letter from the luminaire schedule on Sheet SL1.0 that identifies which cut-sheet pertains to each luminaire. Rev. 1: Comment addressed. b. 14.17.4 (a)] All proposed outdoor luminaries exceeding 3,000 lumens must be full-cutoff fixtures. The cut sheets provided on Sheet SL2.0 do not clearly verify that this is true for the following luminaires proposed on site: luminaire A, luminaire G, luminaire G2, luminaire OG1, luminaire EXP, luminaire AE. Please provide documentation from the manufacturers that all fixtures will be full-cutoff. Rev. 1: Comment not fully addressed.The cut sheets on Sheet SL2.0 still do not clearly demonstrate that the following fixtures will be full-cutoff: G, G2, OG1, P, and R. Please provide additional information that no light will be emitted above the horizontal plane of the fixture for each of these lights. c. Please state the pole height of all outdoor luminaires in the table on Sheet SL1.0. Rev. 1: Comment addressed. d. [4.17.4 (b)] Add a note to Sheet SL1.0 stating "The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half('h)foot candle." Rev. 1: Comment addressed. e. Please add a note to Sheet SL 1.0 which states"Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half footcandle."Rev. 1: Comment addressed. Please contact Cameron Langille at the Department of Community Development at blangille(a,albemarle.org or 296- 5832 ext. 3432 for further information. Comments From Other Reviewers: Albemarle County Engineering Services (Engineer) — John Anderson, janderson2@a,albemarle.org — Engineering review still underway. Comments or approvals will be forwarded to the applicant upon receipt. Albemarle County, Building Inspections—Michael Dellinger, mdellinger@albemarle.org—No Objection. Albemarle County Zoning Division—Kevin McCollum,kmccollum(aialbemarle.org—Please see the attached comment letter from Zoning. A reduction in the overall parking has been granted per applicant request. Albemarle County Service Authority—Richard Nelson,rnelson@serviceauthority.org—ACSA review still underway. Comments or approvals will be forwarded to the applicant upon receipt. Review Comments few SDP201900028 MajorAmendment Project Name: University of Virginia Resew..... Park::Town Center Four-Major Date Completed: Thursday. September 19, 2019 Department+Division.+Agency: Review Status: Revie ver Michael Dellinger CDD Inspections No Objection No objection. Page: 1 Count. of Albemarle Printed On: 1 10103'2019 „,,g g dF Al.% 4.1gkr- COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 229024596 Phone(434)296-5832 Fax(434)972-4126 October 8, 2019 Mr. Eric Woolley Woolley Engineering 210 5th Street NE Charlottesville, VA 22902 RE: Parking Determination —SDP201900028 - UVA Research Park: Parking Determination Dear Mr. Woolley: This letter is an official determination of the parking requirements for the UVA Research Park. This determination is made in accordance with Section 18-4.12 of the Albemarle County Code. In making this determination, the Zoning Administrator considered the parking study submitted by the applicant (attached below) with current parking usage data and TDM strategies, the existing parking requirements for the site, and the Institute of Transportation Engineers Parking Generation Data for"General Office Building” (attached below). Using a combination of the resources referenced above, it is my official determination that a parking minimum reduction of 18.8%to 1,146 parking spaces will still provide sufficient parking at the UVA Research Park. The parking requirement for the UVA Research Park will therefore be as it reads on page C4.1 (sheet 11 of 36) of SDP201900028 (pictured below)for each Town Center building. 1.Town Center Building Statistics Proposed Use: General Office Buildings Town Center 1 Town Center 2 Town Center 3 Town Center 4 Combined Gross Square Footage: 70,563 83,666 89,814 108,568 352,631 80%of Gross Square Footage: 56,466.4 66,932.8 71,851.2 86,854.4 282,105 Parking Spaces Required: 282.3 334.7 359.3 434.3 1,411 Parking Spaces Provided: 229 269 313 335 1,146 m If you are aggrieved by this determination, you have a right to appeal it within thirty (30) days of this notice, in accordance with Virginia Code § 15.2-2311. If you do not file a timely appeal, this determination shall be final and unappealable. An appeal may be taken only by filing an appeal application with the Zoning Administrator and the Board of Zoning Appeals, in accordance with Albemarle County Code§ 18-34.3, along with a fee of$258. Additionally, a separate fee is required for the cost of providing notice and advertising of the appeal for a public hearing. October 8, 2019 UVA Research Park Parking Determination Page 2 Applications for Appeal of the Zoning Administrator's Determination are available at the Department of Community Development located at 401 McIntire Road, Charlottesville, Virginia 22902 or online at www.albemarle.org/cdapps. This form applies to the appeal of a decision of the zoning administrator or any other administrative officer pertaining to the Zoning Ordinance. Regulations pertaining to the filing of an appeal to the Board of Zoning Appeals are located in Chapter 18, Section 34.3 of the Zoning Ordinance. They may be reviewed online at www.albemarle.orq/countycodebza. (Please note that our online documents are in Adobe Acrobat PDF format and must be viewed with the Adobe Acrobat Reader or an equivalent. A link to download the free plug-in is available at the bottom of www.albemarle.orq/cdapps.) Please contact me if you have questions or require additional information. Sincerely, K€ , Mqt/2-— Kevin McCollum Planner Designee to the Zoning Administrator WOOLLEY ENGINEERING September 23,2019 MEMORANDUM To: Mr. Cameron Langille, Senior Planner County of Albemarle,Virginia From: Mr. Eric Woolley, PE Woolley Engineering Regarding: SDP 201900028—UVA Research Park: Town Center 4 Major Site Plan Amendment Parking analysis and request for determination regarding parking minimums This memorandum shall serve as a justification for a request to modify the minimum number of parking spaces required for the property known as the University of Virginia Research Park in its Town Center district. The project is currently in active development of the Town Center Four building, which joins the existing structures which were completed during earlier phases of development. Parking will be shared by all four buildings. The request for a reduction in minimum required parking is based on Transportation Management Demand strategies and related factors in accordance with the parking requirements set forth in Section 4.12.12 of the zoning ordinance. The mission of the University of Virginia Research Park is to provide state-of-the-art facilities that serve as a catalyst for the creation and enhancement of research and business collaboration between the University of Virginia and the public and private sectors,for the economic and societal benefit of the Commonwealth of Virginia,the Central Virginia region, and the nation. The Research Park is a fully master-planned,mixed-use development zoned for office,light industry, hotel/conference center, laboratory/medical/pharmaceutical,and retail/support commercial uses and is designed with significant open space,trails and interconnectivity in mind. We have studied the parking strategy to determine the appropriate relationships between parking and land uses within the UVA Research Park Town Center district. The analysis focuses on opportunities within the development for shared parking,a shuttle service which runs between the University and the Research Park,and overall site parking reductions based on both the specific use categories and individual uses within the Town Center. Further, information regarding actual observed parking demands has been provided by the end-user of the existing Town Center buildings. The County's Zoning Ordinance allows for shared parking and parking reduction strategies which support the UVA Research Park's Code of Development ZMA 95-04, ZMA 98-27 and WOOLLEY ENGINEERING 210 5th Street NE (434)973-0045 Charlottesville,Virginia 22902 WOOLLEY ENGINEERING ZMA 2005-0003 from March 11, 1999 (Revised: March 2, 2005). The proposed reductions acceptable to the applicant. Relative to the analysis provided in the following, a parking reduction factor of 18.8%has been determined as feasible and has been applied to the entire Town Center District. Factors impacting current parking lot needs The ability to share parking between the UVA Research Park Town Center lots is important from a land use and development perspective. Excess empty parking spaces would add unnecessary impervious surface area and would cause an underutilization of the developable land. The UVA Foundation views the Town Center as a campus within the UVA Research Park. Many tenants occupy office space across multiple buildings within walking distance of one another and do not move their cars throughout the day. The features of the buildings encourage the campus-like feel of the Town Center District. The on-site café inside Town Center Three is an attractive retail option for lunches,providing incentive to not move one's car during the workday. The first floor and outdoor areas associated with Town Center Four will function as a gathering space for the tenants and guests. 84%of the first floor will be occupied by common amenities including a meeting center,a fitness center,a catering kitchen,and large lobby with a coffee bar. These shared spaces will put less of a demand on the parking lots because,by nature of the uses,the lots will not be fully occupied throughout the workday. Additionally, it should be noted that the Town Center Three lot was built in 2009 during a time when the UVA Foundation intended to build out a master plan that called for the building of an additional five office buildings in the Town Center, as well as a hotel; however, the actual plans and construction have resulted in a parking lot that is oversized for the actual needs of the Town Center Three tenants. Parking usage A parking count was conducted during business hours on Tuesday, March 5, 2019 and Thursday, March 9, 2019. The counts of occupied spaces are listed in the table below. UVA Research Park Town Center Parking Lot Usage Total Spots Spots occupied 3/5/19, 9:30am Spots occupied 3/7/19, 2:30pm TC1 244 95 83 TC2 269 130 163 TC3 316 228 209 Per the zoning ordinance, the total required parking spots for the combined parking area of the development are as follows: Building 1: Offices, business,administrative and professional 2 WOOLLEY ENGINEERING GSF: 70,563 Net SF: 56,466 Rate: 1/200 sf Total Required Parking for Building 1 =282 Building 2: Offices, business,administrative and professional GSF: 83,666 Net SF: 66,933 Rate: 1/200 sf Total Required Parking for Building 4=335 Building 3: Offices,business,administrative and professional GSF: 89,814 Net SF: 71,851 Rate: 1/200 sf Total Required Parking for Building 4=359 Building 4: Offices, business,administrative and professional GSF: 108,568 Net SF: 86,854 Rate: 1/200 sf Total Required Parking for Building 4=434 Total Parking Required: Total required parking per Zoning Ordinance= 1,41 1 spaces Proposed Transportation Demand Management Strategies In accordance with section 4.12.12 of the zoning ordinance, the applicant requests a required parking minimums reduction based on the site improvements listed below. The mix of TDM options for the development include: 1. Bicycle racks and changingfacilities: Bicycle racks will be provided adjacent to all of the Town Center buildings. Changing facilities will be located in the Town Center Four building for employees who commute via bicycle. This will encourage and facilitate commuting via bicycle to the Town Center district,reducing the total number of required parking spaces. Improvements related to bicycle commuting would provide for a TDM reduction of 72 parking spaces. 2. HOV parking spaces: 46 reserved HOV parking spaces for carpooling are included in the parking lots for Town Centers One and Four to encourage ride-sharing between commuters. 3. Free Shuttle Service: The UVA Research Park and JAUNT have collaborated to provide a shuttle service for tenants and visitors. The service,which began operating in the summer of 2018,runs between the Research Park and UVA Grounds from 7:22 a.m. to 6:02 p.m., Monday-Friday. Buses arrive every 30 minutes and are free to ride for everyone. The shuttle has three stops within the Research Park and three within UVA Grounds. The two stops with the highest boarding numbers are the UVA Research Park and the UVA Health System at Pinn Hall. Average weekly ridership continues to increase each month. Year-to-date ridership for 2019 is over 1,600 riders(as of 4/12/2019). Shuttle service provides for a TDM reduction of 101 parking spaces. 4. Passenger loading spaces: Two dedicated passenger loading spaces will be located at the Town Center Four building. These spaces will accommodate passenger drop-off by a variety of means to include taxi cabs,ride sharing services, or private vehicle. Additional similar spaces already exist within the Town Center. In addition to the TDM strategies proposed above,the existing pedestrian facilities will be augmented by the pedestrian improvements proposed with the development of Town Center 3 mf .W_. WOOLLEY ENGINEERING Four. The project will create and extend the existing sidewalks throughout the development, encouraging pedestrian traffic throughout the campus. Further,while the applicable TDM strategies listed above are site-specific to the Town Center district, it is recognized that mass transit-oriented alternatives may continue to grow in the region, further allowing for reduced parking minimums for the property. Parking Summary Total Parking Demands for Town Centers One -Four: 1,411 spaces HOV Parking TDM Reductions: 92 spaces Bicycle TDM Reductions: 72 spaces Transit TDM Reductions: 101 spaces Total Supportable Parking Reductions: 265 spaces Parking Reduction Factor: (required spaces relative to actual provided spaces) 18.8% Loading Spaces(Town Centers 1 -4): 12 Based on the demonstration above that the use of TDM strategies reduces the need for parking spaces,the applicant is requesting an 18.8%reduction in the minimum required parking for the UVA Research Park Town Center district. As noted, the Town Center district is a campus designed for interconnectivity and walkability, with many factors contributing to a lessened need for parking. The applicant respectfully requests a determination that the minimized parking as proposed in this memorandum is acceptable as per Section 4.12 of the zoning ordinance. The applicant reserves the right to pursue additional alternatives to providing the minimum required number of parking spaces should the need arise. It is feasible that major variations could occur over time regarding the mix, distribution, phasing and density of land uses. Adjustments to these ratios and final parking allocations at site plan review may require administrative approval by the County. Please do not hesitate to call with any questions or concerns. Thank you for your time and consideration. Sincerely, ,„7.1./..4_,5 / i Eric Woolley, PE Cc: Todd Marshall, UVA Foundation 4 C neral Office Buildi j (710) Peak Period Parking Demand vs: 1000 Sq. Ft. GFA On a: Weekday (Monday - Friday) Setting/Location: General Urban/Suburban Peak Period of Parking Demand: 9:00 a.m. - 3:00 p.m. Number of Studies. 148 Avo 1000 Sq Ft GFA 145 Peak Period Parking Demand per 1000 Sq. Ft. GFA 33rd 35t0 ,=:or i;erg:r Standard eviaL or. Average Rate Range of Rates Percentile Interval f Coeff. of Variation 2.39 _ 0 S0 - 5 58 2.30 3.30 2.26 - 2 50 .2' 69 r29%) Data Plot and Equation x Lu` -- Y I a. Xrt xx - x .SZ D ,/-.- X X X X X • X X 2OC X= 1000 Sq. F:. GFA X Study Site Fitted Curve - - - - Average Rate Fitted Curve Equation: P = 2.15(X) + 34.60 R==0.86 Park.ig gene aeon Manua'. 5tti Ed Tor, .institjte of T'ansporta :cn Eng neers