Loading...
HomeMy WebLinkAboutSDP202000061 Correspondence 2020-11-23L I N E + G R A D E C I V I L E N G I N E E R I N G COMMENT RESPONSE LETTER November 2011, 2020 TO: Department of Community Development 401 McIntire Road Charlottesville, VA 22902 ATTN: Paty Saternye, Senior Planner RE: Airport Road Sheetz — SDP-2020-00061 V round Comment Response Letter Dear Ms. Saternye, On behalf of Airport Plaza, LLC we offer the following responses and plan revisions to comments dated October 22nd, 2020.Our Responses are in bold italic text below each comment. Planning — Poty Saternye 1. (Original comment 2.) A site plan meeting all the requirements of section 32.6 of Chapter 18 of the Code. FINAL: Comment not yet fully addressed. A site plan has been submitted per the above referenced code. Please clarify/identify specific deficiencies of section 32.6 if any remain besides those specifically commented on below. 2. (3.) [32.5.2(a)] General information. Revise the following: a. (b.) Revise the parcel information for TMP 32-39 to include the Steep Slopes — Managed overlay district information. Also, revise the site plan to show the managed slopes information. The area of managed slopes in this parcel appears to be very small and crossing the western property line. FINAL: Comment not yet fully addressed. Since the E&S sheets will be removed from the site plan (see Engineering comments) it will be necessary to ensure the Steep Slopes — Managed information will still be provided in the sheets that remain. The existing conditions sheets show the Steep Slopes — Managed areas, but still require either labels or a legend symbol to clearly locate these areas. LINE GRADE CIVIL ENGINEERING 11341h STREET NE, STE. 100 CHARLOTTESVILLE, VA 22902 LINE-GRADE.COM Airport Road Sheetz — SDP-2020-00061 151 Round Comment Response Letter November 20`h, 2020 1 Page 2 The managed steep slopes hatch from GIS also appears on sheets C1.0, C3.0, C4.0, C5.0, C6.0, etc. A legend has been added to sheet C0.2 indicating the hatch, and the hatch has been labeled directly on the site plan. (i.) This site plan is based upon a boundary line adjustment. Therefore, address the following: i. (a.) A boundary line adjustment plat must be submitted (separate application, fee, and submission) and approved prior to the approval of the final site plan. FINAL: Comment not yet addressed. Address the comment. ii. (b.) The plat at the back of the site plan should be removed prior to final site plan submission. FINAL: Comment not yet addressed. Address the comment. iii. (c.) The final site plan must show all of the required information and not refer to a plat that is a separate document. FINAL: Comment not yet addressed. Address the comment. iv. (d.) The final site plan should show the existing parcels but also show the proposed BLA parcels. FINAL: Comment not yet addressed. Address the comment. A boundary line adjustment plat will be submitted prior to approval. The exhibit on sheet X2.0 has been removed. 3. (6.) [32.5.2(j), (k) & (1)]] Existing sewer and drainage facilities; Private & public easements; Existing and proposed utilities. Address the following: a. (b.) See engineering comments in reference to required storm drainage easements and modification that will be required. FINAL: Comment not yet fully addressed. See engineering comments in reference to required storm drainage. Acknowledged. See responses to engineering comments below. b. (c.) Revise the site plan to show any existing or proposed waterline easements. In the southwest corner, where the water meters are proposed, no easements are shown or labeled for water. FINAL: Comment not yet fully addressed. Although the Fire Hydrant appears to have sufficient easement around it the proposed water meter appears to be places on the edge of the proposed water easement. Water meters typically require the easements to have an additional area around the meter as part of the easements. Ensure the proposed water meters have the required easement area around both of them. The proposed water meters have been relocated to be within the proposed easement with sufficient working space around the meters. See revised sheet C6.0. L I N E + GRADE CIVIL ENGINEERING 113 4`" STREET NE, STE. 100 CHARLOTTESVILLE, VA 22902 LINE-GRADE.COM Airport Road Sheetz — SDP-2020-00061 151 Round Comment Response Letter November 20`h, 2020 1 Page 3 c. (d.) On the western parcel boundary line there is an existing storm pipe that crosses the property boundary. Show all existing or proposed easements for this pipe and the associated grates the rights of all involved are not already covered by the VDOT drainage easement. FINAL: Comment not yet addressed. Address the comment. No record of any existing easements for the existing pipe could be found, other than what is shown on the survey. All rights of entry and maintenance are covered under the existing VDOT drainage easement which completely encompasses these facilities on the subject property. Therefore, no additional easements are proposed. d. (e.) An easement plat must be submitted (separate application, fee, and submission) and approved prior to the approval of the final site plan. FINAL: Comment not yet addressed. Address the comment. Acknowledged. A separate plat will be recorded prior to FSP approval once all comments affecting easement geometry are resolved. e. (f.) Include the abandonment of any easement in the proposed easement plat. FINAL: Comment not yet addressed. Address the comment. The proposed easement plat will show any abandoned easements. f. (g.) A proposed gas line easement is shown. An easement plat will be required. Work with gas provider to establish this easement. FINAL: Comment not yet addressed. Address the comment. Comment noted. We will work with the Gas provided and establish the appropriate easement prior to approval. 4. (7.) [32.5.2(m) & 32.5.2.(i)] Ingress and egress; Streets, easements and travelways. Address the following: a. (a.) An offsite easement is required for ingress egress, a temporary construction easement and a permanent access easement. FINAL: Comment not yet addressed. Address the comment. b. (c.) Ensure that the deed for the access easement included maintenance agreement details. FINAL: Comment not yet addressed. Address the comment. c. (d.) An easement plat must be submitted (separate application, fee, and submission) and approved prior to the approval of the final site plan. FINAL: Comment not yet addressed. Address the comment. d. (e.) Ensure that the deed for the access easement, submitted with the plat, includes maintenance agreement details that meet the Counties minimum L I N E + GRADE CIVIL ENGINEERING 113 4`" STREET NE, STE. 100 CHARLOTTESVILLE, VA 22902 LINE-GRADE.COM Airport Road Sheetz — SDP-2020-00061 151 Round Comment Response Letter November 20`h, 2020 1 Page 4 requirements. FINAL: Comment not yet addressed. Address the comment. Acknowledged. A separate plat will be recorded prior to FSP approval once all comments affecting easement geometry are resolved. 5. (8.) [32.5.2(n)] Existing and proposed improvements. Address the following: a. (b.) Revise the plan to include a detail for the screening fence. FINAL: Comment not yet fully addressed. A screening fence is no longer specified as being on top of the retaining wall. If this fence to be included, then include a detail for the screening fence in the site plan. At this time, this project is still awaiting final ARB approval. Until such time, we will hold off on finalizing this detail to ensure that it matches what ARB approves. (d.) Revise the plan to include a detail for the dumpster enclosure. FINAL: Comment not yet fully addressed. Address the following: i. (1.) Revise the provided detail to include the height of the walls. ii. (2.) Ensure that all portions of the wall and gates have a minimum height of 6' (32.7.9.7(e)). The smaller of the two gates is labeled to have a height of 5'-2". iii. (3.) Ensure that the dumpster pad meets the minimum requirements. The concrete dumpster pad must be at least eight feet beyond the front of the dumpster, and therefore in front of the gate. At this time, this project is still awaiting final ARB approval. Until such time, we will hold off on finalizing these details to ensure that it matches what ARB approves. c. (g.) Show all street/accessway signage on the plan, ensure it is shown on the layout and landscaping sheets, and ensure there are no conflicts with landscaping. FINAL: Comment not vet fully addressed. Please eet anv clarification on required signs from engineering. In reference to this comment, show all existing and proposed signs in the Landscape Plan sheet and ensure that there are not conflicts between the signage and the landscaping. At this time, this project is still awaiting final ARB approval. Until such time, we will hold off on finalizing these details to ensure that it matches what ARB LINE + approves. GRADE 6. (9.) [32.5.2.(e), 32.5.2.(p) & 32.6.2(j)] Landscape plan. A landscape plan is required in the final site plan that complies with section 32.7.9. A landscape plan C I V I L E N G I N E E R I N G was submitted but requires additional information for the final site plan. Such 1134`^STREET NE, STE. 100 information should include, but is not limited to, the following: CHARLOTTESVILLE, VA 22902 LINE-GRADE.COM Airport Road Sheetz — SDP-2020-00061 151 Round Comment Response Letter November 20`h, 2020 1 Page 5 a. (e.) Provide the required shrubs between the parking spaces and Airport Road in the area of the HC ramp. Some shrubs could be provided at the lot side of the ramp and some could be provided at the roadside. FINAL: Comment addressed. b. (f.) Ensure area that utilized to meet the interior parking landscaping bed requirement is planted with landscaping, not just one tree in a much larger area, and is around the parking. The hatched island at the corner of the building could be changed to a planting bed and provide additional area. Do not claim areas not adjacent to parking, especially when it is above the required amount. FINAL: Comment not yet fully addressed. Significant areas of beds hatched as "Interior Planting Areas" have no plantings shown in them in the Landscape Plan sheet. The bed to the north of the main building and the bed between the main building and the carwash area must have plantings (at least shrubs if not trees and shrubs) in them to be considered "planting areas". Interior Planting Areas have been reduced to areas adjacent to parking, and planted with a combination of landscape material including shrubs, ornamental grasses, and trees. c. (g.) Include in the site plan a filled out, signed, and dated conservation checklist. FINAL: Comment not vet fully addressed. Ensure that the owner of the site also siens the Conservation Checklist. The subject parcel is subject to sale of the property to the contract purchaser before the end of calendar year 2020. Therefore we have only included the purchaser signature who will be the owner in the near term. d. (h.) Include in the existing conditions, grading and landscape sheets tree protection fencing around all existing trees that are to remain and include tree protection fencing details in the site plan. FINAL: Comment not yet full addressed. Ensure that on all three sheets (existine conditions. eradine & landscaping) the: i. (1.) Tree Protection Fence line work is actually shown. It is shown in the Landscape Plan, but it does not appear to be shown in the Grading and Drainage Sheet or the Site Plan Sheet. Only the limits of clearing and grading appears to be shown in those two sheets. ii. (2.) Tree protection Fence line work is either clearly labeled or the linetype is included in a legend that specifically calls it out as "Tree Protection Fencing". There does not appear to be any labels in either the existing conditions sheet or in the site plan sheet. In the landscaping sheet it is labeled, but the label is cryptic (TP 91 LF) and nowhere on the sheet does it specify what the "TP" symbol in a circle represents. L I N E + GRADE CIVIL ENGINEERING 113 4`" STREET NE, STE. 100 CHARLOTTESVILLE, VA 22902 LINE-GRADE.COM Airport Road Sheetz — SDP-2020-00061 151 Round Comment Response Letter November 20`h, 2020 1 Page 6 Tree protection fencing has been labeled additionally on the landscape plan. e. (i.) FINAL: [New Comment] Revise or remove the "ADA Route/Sidewalk Not Applicable 30 LF" and ensure that portion of the frontage is included in the frontage calculations. Dimensional note on Airport road and tabulations have been adjusted. (10.) [32.5.2(n) & 32.6.2(k)] Outdoor lighting. In reference to the photometric plan address the following: a. (b.) Revise the Luminaire Schedule to have LLF value for all fixtures and update the table accordingly. FINAL: Comment not yet fully addressed. LLF must be 1.0. Revise the chart and calculations for an LLF of 1.0 on all luminaries/fixtures. Comment noted. Please refer to the revised photometric plan. We also acknowledged this is subject to ARB. b. (c.) Revise the Luminaire Schedule to have values for the total lamp lumens. FINAL: Comment not yet addressed. Revise the charts to contain Total Lamp Lumens and ensure that the column is labeled accordingly. Although the values may be shown in the chart, not chart column is labeled accordingly. Comment noted. Please refer to the revised photometric plan. We also acknowledged this is subject to ARe. c. (d.) Ensure that all product manufacturer cutsheets are provided in the site plan and include pictures or details that allow determination that they are "full cut off". FINAL: Comment not vet fully addressed. Address the followine: i. (1.) Provide manufacturer cutsheets, that include pictures, for fixture "B" (BKLT CH — LED-e69-FL-BZP-12) lighting fixture if it is to be included in the site plan. Otherwise remove it from the photometric plan and the Luminaire Schedule. ii. (2.) Revise the light fixtures so that none can be tilted. Lights that tilt are not considered full cut off. Therefore "F" (QSQ-AAXX- w/PGM-1 + OSQ-A-NM-I5D-B-57K-UL-XX) does not meet the full cut off requirement and must be revised. iii. (3.) Clarify how light fixture "F" is mounted and how it is at almost ground level when all the other OSQ series are mounted on a pole. iv. (4.) Clarify what "Set to switch position 3 in field" refers to for fixture "A" (CAN-228-PS-RS-06-E-UL-XX-700). Please note that titling would not meet the "full cut off" requirements. L I N E + GRADE CIVIL ENGINEERING 113 4`" STREET NE, STE. 100 CHARLOTTESVILLE, VA 22902 LINE-GRADE.COM Airport Road Sheetz — SDP-2020-00061 151 Round Comment Response Letter November 20`h, 2020 1 Page 7 Comment noted. Please refer to the revised photometric plan. We also acknowledged this is subject to ARB. (e.) FINAL: [NEW COMMENT] Revise the Symbols in the Luminaire Schedule to be the same color, darkness, and shape as those shown in the Photometric Plan. It is hard to differentiate the colors from each other in the schedule and the colors in the schedule do not appear to match those in the plan. Also, at least one symbols not match ("F") between the two and other do not appear to match because of scale, color, and darkness. Comment noted. Please refer to the revised photometric plan. We also acknowledged this is subject to ARB. e. (f.) Light fixture "B" does not appear to be shown on the plan. Either make it obvious where the 12 fixtures are located or remove them from the Luminaire Schedule if they are not shown in the Photometric Plan. Items not fully incorporated in the site plan cannot be approved with the site plan. Comment noted. Please refer to the revised photometric plan. We also acknowledged this is subject to ARB. f. (R.) FINAL: [NEW COMMENTI Ensure that the resolution of the photometric plan and the manufacture cutsheets are sufficient resolution to be able to read all text, including the smallest. Comment noted. See revised plans. if resolution is still unsatisfactory we will work with the consultant to further improve the quality. 8. (13.) See the SRC comments from most of the reviewers attached. All SRC reviewer comments must be sufficiently address prior to final site plan approval. FINAL: Comment not yet fully addressed. See the comments from most of the reviewers attached. ARB comments are still pending (see below). All reviewer comments must be sufficiently address prior to final site plan approval. Comment noted. 9. (14.) UPDATE: [NEW COMMENT] The final site plan will not be approved until an ARB Certificate of Appropriateness has been granted. Additional revisions have been made to the site layout, based upon ARB comments, that have not been shown on the version of the initial site plan (see note top of "UPDATE" comments) being reviewed. ARB review of the Initial Site Plan has not been finalized/completed, revisions to the site plan to meet ARB comments have been made since the site plan submission date, and additional revisions may be required. Additional discussion and review of the site plan is on the agenda for the 9/21/2020 ARB meeting. Any revisions to the site plan from the original L I N E + GRADE CIVIL ENGINEERING 113 4`" STREET NE, STE. 100 CHARLOTTESVILLE, VA 22902 LINE-GRADE.COM Airport Road Sheetz — SDP-2020-00061 151 Round Comment Response Letter November 20`h, 2020 1 Page 8 submission date to meet ARB requirements will be reviewed by all reviewers during the final site plan review process. FINAL: Comment not vet fully addressed. The final site plan will not be approved until an ARB Certificate of Appropriateness has been granted. ARB meeting on the Final Site Plan is still pending. Comment noted. Engineering — David James 10. (Original comment 1.) The VSMP plan will need approval prior to FSP approval. Acknowledged. See VSMP plan submission. 11. (2.) Record Plat for SWIM facility easements, Access, Temporary Construction, Forest/Open Space, Drainage Easements needed prior to FSP approval. Acknowledged. See response to comment 4.d. above. 12. (3.) Please remove the E&SC, SWIM, and drainage design sheets from the FSP — Sheets C2.0 thru C2.8, C7.0 thru C7.6. The WPO/VSMP and FSP sheets have been separated as requested. See attached submission. 13. (4.) C3.1—Show the turn and taper lane lengths and widths labeled. Taper at 12:1 with 12' lane widths. Entrance geometry at Rte. 29 has been revised per discussion with VDOT in regard to their comments. See responses to MOT comments below and image below for a summary of entrance geometry changes. L I N E + GRADE CIVIL ENGINEERING 113 4`" STREET NE, STE. 100 CHARLOTTESVILLE, VA 22902 LINE-GRADE.COM Airport Road Sheetz — SDP-2020-00061 151 Round Comment Response Letter November 20`h, 2020 1 Page 9 U � 50'R, offset 12' � � l trom Ex. EP 50'R, no offset \ \k\ t4laper Per Fig 49 ICA. Ex EP — - — _--_---__---_-- — �- Prop. curb to - maiMainirg l2'tum lane witlU tie to ex. cuN (measured from prop. GP �in[ersec[ion °..4y. edge to thru lane) 14. (5.) Sheet C4.1: Show a stone base thickness of 6" for C&G (21-A or better); 4" shown. The stone base for the curb and gutter detail has been revised to be 6" thick. 15. (6.) Provide retaining wall design for walls over 4' high. Comment noted. Final retaining wall will be designed following ARB acceptance of the general design. 16. (7.) Walls over 3' will need separate building permit. Acknowledged. A building permit for the retaining wall will be applied for separately. 17. (8.) Walls over 30" will need safety railing. A railing is proposed on top of the only retaining wall on site. The detail can be found on sheet C4.1. 18. (9.) Show and label SWM facility & access easements. SWM facility easements are labeled on sheet C4.0, sheets C7.5, and C7.7. Access to the facilities will be provided through these easements. L I N E Fire & Rescue —Shawn Maddox 19. (Original comment 1.) If the building is going to be sprinklered an FDC must be GRADE shown and a hydrant located within 100' of the FDC. CIVIL ENGINEERING The building will not be sprinklered. 113 4`" STREET NE, STE. 100 CHARLOTTESVILLE, VA 22902 20. (2.) The ISO needed fire flow for the building is required. LINE-GRADE.COM Airport Road Sheetz — SDP-2020-00061 151 Round Comment Response Letter November 20`h, 2020 1 Page 10 Needed fire flow calculations can now be found on revised sheet C0.2. 21. (3.) Provide the currently available fire flow for the site from a recent ACSA fire flow test. Fire flow data is now provided on revised sheet C0.2. 22. (4.) A Knox box is required. Please indicate this requirement with a note on the plan. The location can be coordinated with the fire marshal's office. This note can be found on sheet C4.0 under Site Plan Notes. VDOT — Max Greene 23. (Original comment 1.) The curb radii should be offset from the EP along Rte. 29 SBL. Per page F-108 in the VDOT road design manual, Appendix F. As discussed in email correspondence, the geometry of the Rte. 29 entrance has been revised to provide continuous curbing from the proposed entrance to the existing curbing at the intersection with Airport Road (south side). The geometry has also been revised to provide a taper from the existing edge of pavement to the proposed curb return end on the north side of the entrance. See revised sheet C4.0. 24. (2.) Please add a note to plan: A Traffic Maintenance Plan (TMP) is required to obtain a permit to work within VDOT Right of Way. The TMP shall be prepared by an Advanced Work Zone Certified person, certification card with verification number is required on the TMP submittal. This note has been added as note 1 under Maintenance of Traffic on revised sheet CO. 1. 25. (3.) Please show and label "mill and overlay' areas to adjacent travel lane in accordance with WP-2. The mill and overlay areas are now shown and labeled on revised sheet C3.0. 26. (4.) Please add the WP-2 detail to the plans. This detail can now be found on revised sheet C4.2. L I N E + CDD Inspections — Michael Dellinger GRADE 27. Add the following note to the general notes page: "Buildings or structures built before January 1, 1985 must have an asbestos survey performed in order to C I V I L E N G I N E E R I N G apply for a demolition permit. Asbestos removal permits are required if positive 1134`^STREET NE, STE. 100 CHARLOTTESVILLE, VA 22902 LINE-GRADE.COM Airport Road Sheetz — SDP-2020-00061 151 Round Comment Response Letter November 20`h, 2020 1 Page 11 for such from Albemarle County and VDOLI. Contact VDOLI for their additional requirements and permits for demolition projects at 540-562-3580 x131." This note has been added to sheet CO.1 under miscellaneous. 28. Add the following note to the general notes page: "Accessible parking spaces, access aisles, and accessible route shall be installed in accordance with ICC ANSI A117.1-09 and the 2015 Virginia Construction Code." This note has been added to sheet CO.1 under miscellaneous. 29. Provide details of accessible spaces, access aisles, and signage. Details of parking spaces and signage can now be found on revised sheet C4.1. 30. Add the following note to the general notes page: "All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks." This note has been added to sheet CO.1 under miscellaneous. ACSA — Richard Nelson 31. Submit 3 copies and PDF of the utility plan to ACSA for review and approval. Acknowledged. See submission package. 32. Relocate proposed light pole outside proposed ACSA easement. The light pole has been relocated outside the easement. See revised sheet C6.0. 33. Provide fixture counts and proposed flow rates to confirm water meter size. Demand has been calculated from actual water demand data from existing Sheetz stores, as provided by Sheetz. Meter sizing calculations are now provided on sheet C0.2. 34. Revise 6x2" tapping sleeve to a 1" Corp. stop. The tapping sleeves have been revised to 1" corporation stops. See revised sheet C6.2. Rivanno Water and sewer Authority Sheet C6.0 35. Please refer to RWSA notes for making a tap connection to the RWSA 12" WL and include on plan and profile sheet "Wet Tap on RWSA Waterline". L I N E + GRADE CIVIL ENGINEERING 113 4`" STREET NE, STE. 100 CHARLOTTESVILLE, VA 22902 LINE-GRADE.COM Airport Road Sheetz — SDP-2020-00061 1' Round Comment Response Letter November 20`h, 2020 1 Page 12 The connection is now called out as required on plan and profile. Contractor is directed to RWSA notes in plan view label. See revised sheets C6.0 and C6.2. 36. Add the following note to the utility plan sheet that shows the proposed connection: "Contractor shall coordinate with RWSA and ACSA for the connection to the existing RWSA 12" waterline. Contractor shall use due diligence to protect the RWSA 12" waterline during construction and tapping. Contractor shall verify the horizontal and vertical location, the outside diameter and the pipe material of the 12" waterline prior to ordering the tapping sleeve. RWSA shall be contacted 3 business days in advance of the test pit and shall be present during the test pit. The tapping sleeve shall be approved by RWSA prior to being ordered. The tapping contractor shall be approved by RWSA prior to the tap. A minimum of 3 business days' notice shall be given prior to installation of the tapping sleeve. The 12"x6" tapping sleeve and valve shall be installed plumb. Following the placement and testing of the 12"x6" tapping sleeve and valve, a concrete pad and thrust block shall be placed under and behind the tapping sleeve and allowed to set prior to making the tap. These notes now appear on both plan and profile sheets. See revised sheets C6.0 and C6.2. Sheet C8.1 37. No trees within 10 feet of RWSA 12" waterline. No trees are proposed within 10' of the RWSA 12" line. See revised sheet C8.1. LINE GRADE CIVIL ENGINEERING 1134ih STREET NE, STE. 100 CHARLOTTESVILLE, VA 22902 LINE-GRADE.COM