HomeMy WebLinkAboutWPO201800061 Plan - Stormwater Erosion Control Plan 2018-12-03OWNER / DEVEL OPER: PROPERTYADDRESS: PLAN PREPARER: TAX MAP PARCEL No: LOT AREA: ZONING: USE: BUILDING HEIGHT.: SETBACKS: PROPOSED IMPERVIOUS AREA: PROPOSED TURFAREA: SCHEUMANN, CATHERINE P 508 ASHLEY WAY PEACHTREE CITY GA, 30269 BUNDORAN FARM NORTH GARDEN VA, 22959 ROUDABUSH, GALE, & ASSOCIATES 914 MONTICELLO ROAD CHARLOTTESVILLE, VA. 22902 (434)-977 0205 08600-00-00-12200 25.67AC. RURAL AREAS DISTRICT (RA) 1 DETACHED SINGLE FAMILY RESIDENTIAL DWELLING MAXIMUM STRUCTURE HEIGHT IS 35 FEET FRONT SIDE REAR 75' 25' 35' 0.80 AC. 1.70 AC. PROPOSED OPEN SPACE AREA: 4.35 AC. MAGISTERIAL DISTRICT. SAMUEL MILLER DRAINAGEDISTRICT NORTH FORK HARDWARE RIVER, HUC JM46 BOUNDARY: DB. 4992PG. 227 DB. 4031PG. 83-84 (PLAT) DB. 3486PG. 97-154 (PLAT) TOPOGRAPHY. ROGER W. RAY& ASSOCIATES INC. -FEB. 2018 CRITICAL SLOPES: CRITICAL SLOPES EXIST ON THIS SITE & ARE LOCATED AS SHOWN. NO CRITICAL SLOPEAREAS EXIST WITHIN THE LIMITS OF DISTURBANCE FLOODPLAIN: THE SUBJECT PROPERTY IS NOT LOCATED WITHIN THE FL OODPLAIN. STORMWA TER MANAGEMENT. WATER QUALITY OBTAINED FROM 4.35ACRES PROTECTED FOREST/OPEN SPACE ON PROPERTY. WATER QUANTITY OBTAINED FROM LIMITS OF ANALYSIS DOWNSTREAM OF RECEIVING CHANNEL. SWM NOTE: THE SWM FOREST & OPEN SPACE EASEMENT (DB5115 PG 153 IS SUBJECT TO THE GUIDANCE SET FORTH BY DEQ IN THE VIRGINIA STORMWA TER MANAGEMENT PROGRAM. THEAREAS WILL REMAIN UNDISTURBED hV A NATURAL, VEGETATED STATE, EXCEPTACTIVITIES AIS APPROVED BY THE LOCAL PRO GRA M A U THORI T Y, SUCH AS FOREST MANAGEMENT, CONTROL OF INVASIVE SPECIES, REPLANTING AND REVEGETA TING, PASSIVE RECREATION (E.G., TRAILS), AND LIMITED BUSH HOGGING TO MAINTAIN DESIRED VEGETATIVE COMMUNITY (BUT NO MORE THAN FOUR TIMES PER YEAR). THE STREAM BUFFER(S) SHOWN HEREON SHALL BE NIANAGED INACCORDANCE WITH THE ALBEMARLE COUNTY WATER PROTECTION ORDINANCE THIS SITE IS NOT LOCATED WITHIN THE WATERSHED OFA PUBLIC WATER SUPPLY RESERVOIR. 11 * �, �` ' WORK AREA PROTECTION & MAiNTENANCE 1. ALL FENCES REQUIRED TO BE REMOVED OR DISTURBED BY CONSTRUCTION SHALL BE SALVAGED, STORED, PROTECTED AND RE -INSTALLED BY CONTRACTOR AT THE DIRECTION OF AND LOCATION DESIGNATED BY THE PROJECT MANAGER. IF SUCH FENCE MATERIAL CANNOT BE REUSED DUE TO DAMAGE CAUSED BY CONTRACTOR, CONTRACTOR SHALL INSTALL NEW FENCE OF THE SAME TYPE OF MATERIAL. TEMPORARY FENCING REQUIRED BY PRIVATE PROPERTY OWNERS SHALL BE PROVIDED BY CONTRACTOR. CONTRACTOR IS ADVISED TO CONTACT PROPERTY OWNERS AT LEAST FORTY-EIGHT (48) HOURS IN ADVANCE OF REMOVING ANY FENCE IN ORDER TO COORDINATE RELOCATION AND/OR PROTECTION OF ANY ANIMALS, AND TO ESTABLISH AND CONFIRM WITH THE OWNER THE PRE -CONSTRUCTION CONDITION OF ANY FENCE TO BE REMOVED, DISTURBED OR REPLACED. 2. CONTRACTOR IS PERMITTED TO WORK IN THE PUBLIC RIGHT-OF-WAY (FOLLOWING ISSUANCE OF VDOT APPROVAL) AND ANY TEMPORARY OR PERMANENT EASEMENT (FOLLOWING VERIFICATION OF EXISTENCE OF EASEMENT) SHOWN ON THE PLANS. HOWEVER, CONTRACTOR SHALL NOTIFY PROPERTY OWNER(S) FORTY-EIGHT (48) HOURS PRIOR TO WORKING ON ANY PRIVATE PROPERTY TO GAIN AND COORDINATE ACCESS AND TO DETERMINE A STORAGE AREA FOR MATERIALS IF NEEDED. COORDINATION OF ACCESS TO PUBLIC RIGHT-OF-WAY AND STORAGE OF MATERIALS THEREON SHALL BE COORDINATED WITH VDOT AND THE PROJECT MANAGER. CONTRACTOR'S FAILURE TO SO NOTIFY AND COORDINATE WITH PROPERTY OWNERS AND/OR THE PROJECT MANAGER MAY RESULT IN DELAYS. 3. CONTRACTOR SHALL, AT HIS EXPENSE, MAINTAIN THE WORK SITE IN A CLEAN AND ORDERLY APPEARANCE AT ALL TIMES. ALL DEBRIS AND SURPLUS MATERIAL COLLECTED SHALL BE DISPOSED OF OFF THE WORK SITE BY CONTRACTOR, AT HIS EXPENSE. 4. EXISTING LAWNS, TREES, SHRUBS, FENCES, UTILITIES, CULVERTS, WALLS, WALKS, DRIVEWAYS, POLES, SIGNS, RIGHT-OF-WAY MONUMENTS, MAILBOXES AND THE LIKE SHALL BE PROTECTED FROM DAMAGE DURING THE WORK. ANY DAMAGE CAUSED TO SUCH ITEMS SHALL BE REPAIRED OR REPLACED BY CONTRACTOR AT NO ADDITIONAL COST. PROPERTY PINS DISTURBED BY CONTRACTOR THAT ARE NOT SHOWN ON THE PLANS TO BE DISTURBED SHALL BE RESTORED BY A LICENSED SURVEYOR AT CONTRACTOR'S EXPENSE. 5. CONTRACTOR SHALL EMPLOY EROSION CONTROL DEVICES AND METHODS AS REQUIRED TO MEET THE REQUIREMENTS AND INTENT OF THE LOCAL EROSION CONTROL ORDINANCE. CONTRACTOR SHALL PROVIDE THE NECESSARY DIVERSION DITCHES, DIKES OR TEMPORARY CULVERTS REQUIRED TO PREVENT MUD AND DEBRIS FROM BEING WASHED ONTO THE STREETS OR PROPERTY. CONTRACTOR'S VEHICLES SHALL BE KEPT CLEAN TO PREVENT MUD OR DUST FROM BEING DEPOSITED ON STREETS. NO AREA SHALL BE LEFT DENUDED FOR MORE THAN SEVEN (7) CALENDAR DAYS. VEGETATION 1. PRIOR TO REMOVING ANY VEGETATION, CONTRACTOR SHALL MEET WITH THE PROPERTY OWNERS AND THE PROJECT MANAGER TO REVIEW THE LIMITS OF CONSTRUCTION AND OBTAIN PERMISSION TO REMOVE VEGETATION REQUIRED TO DO THE WORK. 2. TREE AND PLANT ROOTS OR BRANCHES THAT MAY INTERFERE WITH THE WORK SHALL BE TRIMMED OR CUT ONLY WITH THE APPROVAL OF THE PROJECT MANAGER. ANY TREES OR PLANTS WHICH ARE SHOWN TO REMAIN THAT DO NOT INTERFERE WITH THE WORK, BUT ARE DAMAGED BY CONTRACTOR OR HIS SUBCONTRACTORS, SHALL BE REPAIRED OR REPLACED BY CONTRACTOR AT NO ADDITIONAL COST. 3. CONTRACTOR SHALL CLEAN UP, RESTORE, SEED AND MAINTAIN ALL DISTURBED AREAS IMMEDIATELY UPON COMPLETION OF WORK ON EACH SITE. TOPSOIL, SEED, FERTILIZER AND MULCH SHALL BE PLACED IN ACCORDANCE WITH ESC AUTHORITY STANDARDS ON ALL DISTURBED AREAS. A PERMANENT STAND OF GRASS ADEQUATE TO PREVENT EROSION SHALL BE ESTABLISHED PRIOR TO FINAL ACCEPTANCE. 4. THE ACT OF RESEEDING SHALL NOT QUALIFY AS "STABILIZED". THE CONTRACTOR SHALL BE RESPONSIBLE TO ESTABLISH VEGETATION, NOT SIMPLY APPLY SEED AND MATERIALS. SCALE: 11=1000 FEET SHEET INDEX SHEET 1-------- COVER SHEET SHEET 2-------- EXISTING CONDITIONS SHEET 3--------- EROSION CONTROL PLAN - PHASE 1 SHEET 4-------- EROSION CONTROL PLAN - PHASE 2 SHEET 7-------- SWM PLAN -WATER QUALITY COMPLIANCE SHEET 8-------- SWM PLAN -WATER QUANTITY COMPLIANCE SINGLE F.4WLY CGNSTRUCT"ON 1. SILT FENCE, SEDIMENT TRAPS AND OTHER PROTECTIVE MEASURES SHALL BE PROVIDED IN AREAS WHERE SEDIMENT FROM DISTURBED AREAS MAY LEAVE THE SITE, AND MUST BE PROPERLY INSTALLED BEFORE LAND DISTURBANCE. THESE MEASURES MUST REMAIN INSTALLED AND MAINTAINED UNTIL ADEQUATE STABILIZATION IS ACHIEVED AS DETERMINED BY THE PROGRAM AUTHORITY. 2. ALL EROSION MEASURES ARE SUBJECT TO INSPECTION PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES AND CLEANUP OF SEDIMENTATION MUST BE MADE IMMEDIATELY. IF EROSION CONTROL MEASURES ARE FOUND TO BE INADEQUATE, OR IN NEED OF REPAIR, BY A COUNTY INSPECTOR, YOU WILL BE NOTIFIED. 3. A TEMPORARY STONE CONSTRUCTION ENTRANCE SHALL BE PROVIDED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND WHERE THERE EXISTS THE POSSIBILITY OF TRANSPORTING MUD DIRECTLY ONTO A ROAD OR OTHER PAVED AREA. 4. ALL DENUDED AREAS ON THE SITE SHALL BE STABILIZED WITHIN SEVEN (7) DAYS OF FINAL GRADING WITH PERMANENT VEGETATION OR A PROTECTIVE GROUND COVER SUITABLE FOR THE TIME OF YEAR. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN THIRTY (30) DAYS. 5. A PERMANENT STABILIZATION/VEGETATIVE COVER SHALL BE ESTABLISHED ON ALL DENUDED AREAS WITHIN NINE (9) MONTHS OF THE START OF CLEARING OR GRADING. UNLESS DOCUMENTED IN WRITING TO THE PROGRAM AUTHORITY AT THE START OF LAND DISTURBANCE, THE NINE (9) MONTHS SHALL BE MEASURED FROM THE PERMIT ISSUANCE DATE. 8. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS SHALL BE STABILIZED, COVERED, OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. 7. ALL STORM SEWER INLETS THAT ARE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADE! WATER CANNOT ENTER THE STORM WATER CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 8. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL NOT BE REMOVED UNTIL DISTURBED AREAS ARE STABILIZED. AFTER STABILIZATION IS COMPLETE, ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS, UNLESS OTHERWISE AUTHORIZED BY THE PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. APPROVED by th Albemarle County Commur,ity Deve i,oprfient Department Fi' pF Dl� DAVID M. ROBINSON Lic. No. 'O 55/6/76 /<v 31 �SS/ONAL ECG k DATE August 03, 2013 FILE NUMBER 8236 SHEET 1 OF 6 91 DENOTES ALBEMARLE COUNTY GIS CRITICAL SLOPES TX 86-271 REVISED PARC WILLOWFIELDS FP D,& 4456-390, 395 8 D.B. 3810-701 THRU m IF 0 i SOIL TYPES 77 HYDREIL_❑GIC SEAL GROUPi B o I ®®6921 143 53l ® ® IRON & CAP SET ELEVATION ® 735.35 IF PRE DEV: Runoff Hydrograph: TR-55 Tabular Hydrograph Method PRE DEV: Runoff Hydrograph: TR-55 Tabular Hydrograph Method PRE DEV: Runoff Hydrograph: TR-55 Tabular Hydrograph Method 1 YEAR Input Data: 2 YEAR Input Data: 10 YEAR Input Data: Rainfall Distribution Type: Type II Rainfall Distribution Type: Type II Rainfall Distribution Type: Type II Rainfall Depth: 3.04 in Rainfall Depth: 3.68 in Rainfall Depth: 5.57 in Base Flow: 0.000 cfs Base Flow: 0.000 cfs Base Flow: 0.000 cfs la/P Interpolation: On la/P Interpolation: On la/P Interpolation: On Subarea Downstream Area CN Tc Tt Subarea Downstream Area CN Tc Tt Subarea Downstream Area CN Tc Tt Name Subareas (acre) (min) (min) Name Subareas (acre) (min) (min) Name Subareas (acre) (min) (min) DA-PRE_DEV NONE 2.50 61 36.10 32.00 DA-PRE_DEV NONE 2.50 61 36.10 32.00 DA-PRE_DEV NONE 2.50 61 36.10 32.00 Computed Results: Computed Results: Computed Results: Peak Discharge (Qp): 0.453 cfs Peak Discharge (Qp): 0.989 cfs Peak Discharge (Qp): 3.143 cfs Time to Peak: 12.50 hrs Time to Peak: 12.50 hrs Time to Peak: 12.40 hrs Runoff Volume: 0.03 acre-ft Runoff Volume: 0.07 acre-ft Runoff Volume: 0.20 acre-ft f r r i a I " i BENCHMARKi IF IRON & CAP SET, (3,3 FROM ELEVATION = 797.95 I,� £ C RNER) £ ii, I cri47 ` �TH op DAVID M. ROBINSON Lic, No. 56760 0 N A L tftl;J i- M v71r4vj Loralo= . 1' A DATE August 03, 2018 SCALE ill =6®' CONTOUR OO_., SHEET 20F8 TEMPORARY -i 3 ` SEDIMENT CALCULATIONS P Drainage Design Volumes: STAGE -STORAGE REPORT Wet Storage- ELEEV (FT) STORAGE (CF) Minimum Volume Req'd. = 67 cy * 1.25 acres = 84 cy Available Basin Volume Prov'd. = 134 cy @ 774.00 770.000 0.000 Dry Storage- 771.000 504.389 Minimum Volume Req'd. = 67 cy * 1.25 acres = 84 cy Available Basin Volume Prov'd. = 135 cy @ 776.00 772.000 1259.934 773.000 2294.325 Design Elevations: 774.000 3623.906 Top of Berm = 776.00 775.000 5273.813 Berm Width = 3' 776.000 7269.177 Weir Elev = 774.00 Weir Width = 8' Floor Elev = 770.00 Sediment Cleanout Elev = 774.00 J➢ STorzAGE (cY) AREA(SF) f ~ 0.000 394.255 18.681 614.814 1, 46.664 889.478 84.975 1171.657 i 134.219 1479.342 195.326 1812.214 # t. 269.229 2169.704 .. f w 991011RK 1 ®ATE August 03, 201 SCALE ill =4 ' CONTOUR a; ' O SHEET F STORAGE(CY) AREA(SF) 0.000 394.255 18.681 614.814 46.664 889.478 84.975 1171.657 134.219 1479.342 195.326 1812.214 269.229 2169.704 TEMPORARY SEDIMENT TRAP CALCULATION Drainage Area= 1.25 acres Design Volumes: STAGE -STORAGE REPORT ' Wet Storage- ELEV (FT) STORAGE (CF) Minimum Volume Req'd. = 67 cy * 1.25 acres = 84 cy Available Basin Volume Prov'd. = 134 cy @ 774.00 770.000 0.000 Dry Storage- 771.000 504.389 Minimum Volume Req'd. = 67 cy * 1.25 acres = 84 cy Available Basin Volume Prov'd. = 135 cy @ 776.00 772.000 1259.934 773.000 2294.325 Design Elevations: 774.000 3623.906 Top of Berm = 776.00 775.000 5273.813 Berm Width = 3' 776.000 7269.177 Weir E1ev = 774.00 Weir Width = 81(6*1.25AC) Floor E1ev = 770.00 Sediment Cleanout Elev = 774.00 Y h POST DEV: Runoff Hydrograph: TR-55 Tabular Hydrograph Method POST DEV: Runoff Hydrograph: TR-55 Tabular Hydrograph Method POST DEV: Runoff Hydrograph: TR-55 Tabular Hydrograph Method 1 YEAR Input Data: 2 YEAR Input Data: 10 YEAR Input Data: Rainfall Distribution Type: Type II Rainfall Distribution Type: Type II Rainfall Distribution Type: Type II Rainfall Depth: 3.04 in Rainfall Depth: 3.68 in Rainfall Depth: 5.57 in Base Flow: 0.000 cfs Base Flow: 0.000 cfs Base Flow: 0.000 cfs la/P Interpolation: On la/P Interpolation: On la/P Interpolation: On Subarea Downstream Area CN Tc Tt Subarea Downstream Area CN Tc Tt Subarea Downstream Area CN Tc Tt Name Subareas (acre) (min) (min) Name Subareas (acre) (min) (min) Name Subareas (acre) (min) (min) DA-POST_DEV NONE 2.50 62 31.40 28.00 DA-POST-DEV NONE 2.50 62 31.40 28.00 DA-POST_DEV NONE 2.50 62 31.40 28.00 Computed Results: Computed Results: Computed Results: Peak Discharge (Qp): 0.525 cfs Peak Discharge (Qp): 1.103 cfs Peak Discharge (Qp): 3.318 cfs Time to Peak: 12.50 hrs Time to Peak: 12.50 hrs Time to Peak: 12.40 hrs Runoff Volume: 0.04 acre-ft Runoff Volume: 0.07 acre-ft Runoff Volume: 0.21 acre-ft T.M. 86-27B REVISED PARCEL C BOAZ M❑UNTAIN, LLC D,B, 3057-299 D.B, 4456-390, 395 & 396 PLAT D,B, 3810-701 THRU 706 PLAT 44I I ; I OO I ®I 00 10 7 Vg" 3� I ff AREA TO BE LIGHTLY GRADE®: FOR Ps, I t�:LT H 0p DAVID M. ROBINSON Lic. No. 56760 4� �o��ss / O N A L rM DATE August 03, 2018 SCALE ill =40' CONMUR INTERVAL i FOOT SHEET 40F8 EROSION AND SEDIMENT CONTROL NARRATIVE PRIOR TO CONSTRUCTION 1. OWNER SHALL POST SURETY BONDS FOR CONSTRUCTION, EROSION & SEDIMENT CONTROL. 2. CONTRACTOR SHALL OBTAIN PERMITS TO WORK WITHIN STATE RIGHT-OF-WAY (VDOT LAND -USE PERMIT). BONDING FOR WORK WITHIN THE VDOT RIGHT-OF-WAY MAY BE REQUIRED TO OBTAIN THE PERMIT. 3. CONTRACTOR SHALL COORDINATE WITH OWNER TO OBTAIN VSMP PERMITS, AS REQUIRED BY THE STATE DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ). 4. CONTRACTOR SHALL OBTAIN LAND DISTURBANCE PERMIT FROM THE COUNTY OF ALBEMARLE PRIOR TO BEGINNING CONSTRUCTION. 5. A PRE -CONSTRUCTION MEETING WITH THE ENGINEER, THE CERTIFIED LAND DISTURBER, AND THE ENVIRONMENTAL INSPECTOR MAY ALSO BE REQUIRED. ALLOW 72 HOURS FOR COORDINATION AND SCHEDULING OF PRE -CONSTRUCTION MEETING. 6. AREA OF FOREST/OPEN SPACE SHALL BE DEMARCATED (FENCED -OFF) PRIOR TO ANY LAND DISTURBING ACTIVITIES. PROJECT DESCRIPTION THIS PROJECT PROPOSES TO BUILD A SINGLE FAMILY RESIDENCE ON LOT "J1" LOCATED IN BUNDORAN FARM. THE DEVELOPMENT WILL INCLUDE A LONG PRIVATE DRIVE LEADING TO THE RESIDENCE WITH PLANS OF A FUTURE AGRICULTURAL BARN AND ASSOCIATED DRIVE. THE ALLOTTED HOMESITE AREA CONSIST OF APPROXIMATELY 1.86 OF THE 26 ACRE PARCEL. THE LIMITS OF DISTURBED LAND WILL INCLUDE APPROXIMATELY 2.50 ACRES IN TOTAL FOR THE DEVELOPMENT. EXISTING SITE CONDITIONS THE CURRENT CONDITIONS OF THIS LOT CONSISTS OF APPROXIMATELY 26 ACRES OF VACANT GENTLE SLOPING LAND THAT DRAINS TO THE SOUTHEAST OF THE PROPERTY TO AN AN EXISTING CREEK. ADJACENT AREAS THE RESIDENTIAL LOT IS BOUND BY ADJACENT RESIDENTIAL PROPERTIES AND IS FRONTED TO THE NORTHEAST BY STATE ROUTE 692 (PLANK ROAD). STATE ROUTE 29 IS TO THE EAST OF THE PROPERTY. OFF -SITE AREAS ANY EXCESS MATERIAL GENERATED AS PART OF THIS PROJECT SHALL BE STORED OR SPREAD WITHIN THE APPROVED LAND DISTURBANCE AREA OR IN AN AREA APPROVED BY THE COUNTY OF ALBEMARLE COMMUNITY DEVELOPMENT DEPARTMENT. SOILS 25C-DYKE SILT LOAM, 7 TO 15 PERCENT SLOPES HYDROLOGIC SOIL GROUP B. DEEP, MODERATELY SLOPING AND WELL DRAINED. STARTING AT SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF SILT LOAM, CLAY, AND GRAVELLY CLAY. PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS HIGH. SURFACE RUNOFF IS MEDIUM. HAZARD OF EROSION IS MODERATE. 26C3-DYKE CLAY LOAM 7 TO 15 PERCENT SLOPES SEVERELY ERODED HYDROLOGIC SOIL GROUP B. DEEP, MODERATELY SLOPING AND WELL DRAINED. STARTING AT SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF CLAY LOAM, CLAY, AND GRAVELLY CLAY. PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS HIGH. SURFACE RUNOFF IS MEDIUM. HAZARD OF EROSION IS SEVERE. 41 B-HIWASSEE LOAM 2 TO 7 PERCENT SLOPES HYDROLOGIC SOIL GROUP B. DEEP, GRADUAL SLOPING AND WELL DRAINED. STARTING AT SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF LOAM AND CLAY. PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS MODERATE. SURFACE RUNOFF IS MEDIUM. HAZARD OF EROSION IS SLIGHT. 41 C-HIWASSEE LOAM 7 TO 15 PERCENT SLOPES HYDROLOGIC SOIL GROUP B. DEEP,MODERATELY SLOPING AND WELL DRAINED. STARTING AT SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF LOAM, CLAY, CLAY, AND BEDROCK. PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS MODERATE. SURFACE RUNOFF IS MEDIUM. HAZARD OF EROSION IS MODERATE. 19C-CULLEN LOAM, 7 TO 15 PERCENT SLOPES DEEP; NEARLY LEVEL AND WELL DRAINED. STARTING AT SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF LOAM AND CLAY. PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS MODERATELY HIGH. HAZARD OF EROSION IS MODERATE. 77 - RIVERVIEW-CHEWACLA COMPLEX (0% TO 2% SLOPES DEEP, NEARLY LEVEL WELL DRAINED SOILS ON FLOODPLAINS. STARTING AT SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF LOAM AND SILT LOAM OR SILT CLAY LOAM. PERMEABILITY IS HIGH WHILE AVAILABLE WATER CAPACITY IS MODERATELY HIGH. OCCASIONAL FREQUENCY OF FLOODING. HAZARD OF EROSION IS SLIGHT. CRITICAL AREAS NO CRITICAL AREAS EXISTS WITHIN THE PROPOSED DEVELOPMENT. STRUCTURAL PRACTICES 5. TEMPORARY CONSTRUCTION ENTRANCE (3.02) - A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE INSTALLED AT SITE ENTRANCE OFF OF PLANK ROAD. 6. ROAD STABILIZATION (3.03) - ACCESS ROADS, PARKING AREAS, AND OTHER ON -SITE VEHICLE TRANSPORTATION ROUTES SHALL BE STABILIZED WITH STONE IMMEDIATELY AFTER GRADING. 7. SILT FENCE BARRIER (3.05) - SILT FENCE BARRIERS WILL BE INSTALLED TO FILTER RUNOFF FROM SHEET FLOW AS INDICATED ON THE EROSION AND SEDIMENT CONTROL PLAN. 8. SUPER SILT FENCE BARRIER - WIRE -REINFORCED SILT FENCE BARRIER WILL BE INSTALLED TO FILTER RUNOFF FROM SHEET FLOW AS INDICATED ON THE EROSION AND SEDIMENT CONTROL PLAN. VEGETATIVE PRACTICES 1. SURFACE ROUGHENING (3.29) - ALL AREAS WITH A GRADE STEEPER THAN 3:1 SHALL BE STAIR -STEP GRADED OR GROOVED (PLATE 3,29-4) TO AID IN GRASS ESTABLISHMENT, INCREASE INFILTRATION, AND TO SLOW RUNOFF VELOCITIES. 2. TOPSOILING & STOCKPILING (3.30) - TOPSOIL WILL BE STRIPPED FROM AREAS TO BE GRADED AND STOCKPILED FOR LATER USE. STOCKPILES ARE TO BE STABILIZED WITH TEMPORARY VEGETATION OR TO HAVE SILT FENCE INSTALLED ALONG THE LOWER PERIMETER TO PROTECT DOWNSTREAM AREAS. 3. TEMPORARY SEEDING (3.31)_ - AREAS NOT BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN 14 DAYS SHALL BE STABILIZED WITH A TEMPORARY SEED MIXTURE ACCEPTABLE FOR THAT TIME OF YEAR. CRIMPING, PUNCH ROLLER -TYPE ROLLERS, OR TRACK WALKING MAY BE USED TO INCORPORATE STRAW MULCH INTO THE SOIL ON SLOPES IF STRAW IS TO BE USED. 4. PERMANENT SEEDING (3.32) - AREAS BROUGHT TO FINAL GRADE OR THOSE CONSTRUCTION AREAS THAT WILL REMAIN DORMANT FOR YEAR OR MORE SHALL BE STABILIZED WITH A PERMANENT SEED MIXTURE ACCEPTABLE TO THAT TIME OF YEAR. PREPARE SURFACE WITH APPROVED TREATMENT AND ADDITIVES PRIOR TO APPLYING SEED. 5. MULCH (3.35) - PLANT RESIDUES OR OTHER SUITABLE MATERIALS SHALL BE APPLIED TO DISTURBED SURFACES TO PREVENT EROSION AND REDUCE OVERLAND FLOW VELOCITIES. THIS PRACTICE SHOULD BE APPLIED TO ALL SEEDING OPERATIONS, OTHER PLANTER MATERIALS WHICH DO NOT PROVIDE ADEQUATE SOIL PROTECTION BY THEMSELVES, AND BARE AREAS WHICH CANNOT BE SEEDED DUE TO THE SEASON BUT WHICH STILL NEED PROTECTION TO PREVENT SOIL LOSS. CRIMPING, PUNCH ROLLER -TYPE ROLLERS, OR TRACK WALKING MAY BE USED TO INCORPORATE STRAW MULCH INTO THE SOIL ON SLOPES IF STRAW IS TO BE USED. 6. DUST CONTROL (3.39) - DUST CONTROL METHODS MUST BE USED TO REDUCE THE AMOUNT OF AIRBORNE DUST DURING ALL PHASES OF CONSTRUCTION WHERE SOIL IS EXPOSED OR DISTURBED. MANAGEMENT STRATEGIES 1. CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS CAN BEGIN AND END AS QUICKLY AS POSSIBLE. 2. THE CONSTRUCTION ENTRANCE AND PERIMETER EROSION CONTROL MEASURES SUCH AS TREE PROTECTION AND SILT FENCE SHALL BE INSTALLED AS THE FIRST STEP OF DISTURBANCE. 3. SEDIMENT TRAP MEASURE SHALL BE INSTALLED WITH PERIMETER SILT FENCE PRIOR TO ANY GRADING AND SHALL BE SEEDED AND MULCHED IMMEDIATELY FOLLOWING INSTALLATION. 4. THE SEDIMENT TRAP SHALL BE CHECKED FOR SEDIMENT ACCUMULATION AFTER EVERY RUNOFF PRODUCING STORM EVENT. SEDIMENT SHOULD BE REMOVED WHEN IT REACHES ONE-HALF OF THE DESIGN VOLUME OF THE WET STORAGE. 5. TEMPORARY SEEDING OR OTHER STABILIZATION METHODS, SUCH AS BASE AGGREGATE WILL FOLLOW IMMEDIATELY AFTER REACHING FINAL GRADES. 6. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RE -SEEDED AS NEEDED TO ESTABLISH GROWTH. 7. THE JOB SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL PRACTICES. 8. DURING FINE GRADING OPERATIONS, MAINTAIN ALL DIVERSION DITCHES TO THE SEDIMENT TRAP. THE SEDIMENT TRAP SHALL REMAIN FUNCTIONAL THROUGHOUT CONSTRUCTION. AFTER BEING NOTIFIED BY THE EROSION AND SEDIMENT CONTROL ADMINISTRATOR, THE TEMPORARY EROSION AND SEDIMENT CONTROLS CAN BE CLEANED UP OR REMOVED, AND THE SEDIMENT TRAP CAN BE FILLED IN AND SEEDED FOR SITE STABILIZATION. PERMANENT STABILIZATION ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH STRAW & SEED IMMEDIATELY FOLLOWING FINISHED GRADE. SEEDING SHALL BE DONE WITH KENTUCKY 31 TALL FESCUE IN ACCORDANCE TO STANDARD AND SPECIFICATION 3.32, PERMANENT SEEDING, OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. ANY FERTILIZER AND LIME APPLICATIONS SHALL BE IN ACCORDANCE WITH SOIL TEST RESULTS. ALL SEEDED AREAS WILL BE STRAW MULCHED TO PROTECT AGAINST RILL EROSION AND TO PRESERVE SOIL MOISTURE THAT WILL ENHANCE SEED GERMINATION. CRIMPING, PUNCH ROLLER -TYPE ROLLERS, OR TRACK WALKING MAY BE USED TO INCORPORATE STRAW MULCH INTO THE SOIL ON SLOPES IF STRAW IS TO BE USED. EROSION CONTROL MAINTENANCE 1. IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL. THE FOLLOWING ITEMS WILL BE CHECKED IN PARTICULAR: 2. THE CONSTRUCTION ENTRANCE SHALL BE CHECKED DAILY FOR SOIL BUILDUP. IF THE ENTRANCE BECOMES CLOGGED WITH SOIL AND FAILS TO PREVENT THE TRANSPORTATION OF SOIL ONTO THE ROADWAY, ADDITIONAL STONE, REPLACEMENT OF STONE, OR A WASH -RACK MAY BE REQUIRED. 3. SILT FENCE SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCE RESULTING FROM END RUNS AND UNDERCUTTING. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY, SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED, AND SEEDED. 4. DIVERSION DIKES SHALL BE INSPECTED AFTER EVERY STORM AND REPAIRS MADE TO THE DIKE, FLOW CHANNEL, OUTLET, OR SEDIMENT TRAPPING FACILITY AS NECESSARY. ONCE EVERY TWO WEEKS, WHETHER A STORM EVENT HAS OCCURRED OR NOT, THE MEASURE SHALL BE INSPECTED AND REPAIRS MADE IF NEEDED. DAMAGES CAUSED BY CONSTRUCTION TRAFFIC OR OTHER ACTIVITY MUST BE REPAIRED BEFORE THE END OF EACH WORKING DAY. 5. STORMWATER CONVEYANCE CHANNELS (WHERE APPLICABLE): 5.1. GRASS LINED CHANNELS - DURING THE INITIAL ESTABLISHMENT, GRASS LINED CHANNELS SHOULD BE REPAIRED IMMEDIATELY AND RE-ESTABLISHED IF NECESSARY. AFTER GRASS HAS BECOME ESTABLISHED, THE CHANNEL SHOULD BE CHECKED PERIODICALLY TO DETERMINE IF THE GRASS IS WITHSTANDING FLOW VELOCITIES WITHOUT DAMAGE. IF THE CHANNEL IS TO BE MOWED, IT SHOULD BE DONE IN A MANNER THAT IT WILL NOT DAMAGE THE GRASS. 5.2. RIPRAP-LINED CHANNELS - RIPRAP LINED CHANNELS SHOULD BE CHECKED PERIODICALLY TO ENSURE THE SCOUR IS NOT OCCURRING BENEATH FABRIC UNDERLINING OF THE RIPRAP LAYER. THE CHANNEL SHOULD ALSO BE CHECKED TO DETERMINE THE STONES ARE NOT DISLODGED BY LARGE FLOWS. 5.3. IF SEDIMENT IS DEPOSITED IN A GRASS -LINED CHANNEL, IT SHOULD BE REMOVED PROMPTLY TO PREVENT DAMAGE TO THE GRASS. SEDIMENT DEPOSITED IN A RIPRAP CHANNEL SHOULD BE REMOVED WHEN IT REDUCES THE CAPACITY OF THE CHANNEL. 6. CHECK DAMS (WHERE APPLICABLE): SHALL BE CHECKED FOR SEDIMENT ACCUMULATION AFTER EVERY RUNOFF PRODUCING STORM EVENT. SEDIMENT SHOULD BE REMOVED WHEN IT REACHES ONE-HALF OF THE ORIGINAL HEIGHT OF THE MEASURE. REGULAR INSPECTIONS SHALL BE MADE TO INSURE THE CENTER OF EACH DAM IS LOWER THAN THE EDGES. EROSION CAUSED BY HIGH FLOWS AROUND THE EDGES OF THE DAM SHOULD BE CORRECTED IMMEDIATELY. 7. THE EARTHEN EMBANKMENTS SHALL BE CHECKED REGULARLY TO ENSURE THAT IT IS STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED BY EROSION OR CONSTRUCTION EQUIPMENT. 8. THE STORMWATER MANAGEMENT FACILITIES SHOULD BE CHECKED REGULARLY BY THE HOMEOWNERS ASSOCIATIONS TO ENSURE THAT THEY ARE STRUCTURALLY SOUND AND HAVE NOT BEEN DAMAGED BY EROSION. 9. THE EMERGENCY SPILLWAY SHALL BE CHECKED REGULARLY TO ENSURE THAT ITS LINING IS WELL ESTABLISHED AND EROSION RESISTANT. GRASS SHALL BE KEPT MOWN BELOW A HEIGHT OF 15" AND THE OUTLET SHOULD BE CHECKED FOR CLOGGING. 10. THE DAM SECTION SHALL BE KEPT FREE OF SAPLINGS OR TREES.(REFER TO THE ADDITIONAL MAINTENANCE SPECIFICATIONS) 11. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RE -SEEDED AS NEEDED. IN THE EVENT THAT THE APPLIED SEEDING FAILS TO TAKE HOLD, BLANKET MATTING SHALL BE PLACED IN APPROPRIATE AREAS DEEMED NECESSARY BY THE ENGINEER OR EROSION CONTROL INSPECTOR. SEQUENCE OF CONSTRUCTION 1. AFTER OBTAINING ALL REQUIRED PERMITS THE CONTRACTOR SHALL COORDINATE A PRE -CONSTRUCTION MEETING, ALLOWING 72 HOURS FOR ITS COORDINATION. 2. INSTALL CONSTRUCTION ENTRANCE OFF OF PLANK ROAD. 2.1. SHOULD THE TEMPORARY CONSTRUCTION ENTRANCE OFF OF PLANK ROAD NOT BE MAINTAINED PROPERLY OR AN EXCESSIVE AMOUNT OF SOIL FOUND TRACKED ONTO THE PUBLIC ROADWAY, THEN A PAVED CONSTRUCTION ENTRANCE, WATER TANKER TRUCK WITH TWO (2) PRESSURE WASHERS AND A SETTLING AREA MAY BE REQUIRED BY THE EROSION AND SEDIMENT CONTROL PROGRAM ADMINISTRATOR. 3. CLEARING AND GRUBBING SHALL FIRST BE LIMITED TO THAT NECESSARY TO INSTALL SILT FENCE, AND OTHER PERIMETER CONTROLS, ALL PERIMETER CONTROLS MUST BE MADE FUNCTIONAL PRIOR TO ANY UPSLOPE LAND DISTURBANCE THAT TAKES PLACE. 3.1. SILT FENCE SHALL BE INSTALLED ON THE DOWNHILL SIDE OF THE ACTIVE TRENCHING OPERATIONS. 4. PRIOR TO ADDITIONAL CLEARING AND GRUBBING, THE CONTRACTOR SHALL COORDINATE INSPECTIONS, AS REQUIRED BY THE COUNTY OF ALBEMARLE. 5. CLEAR AND GRUB THE REMAINDER OF PROJECT AREA. 5.1. THE LAND DISTURBANCE SHALL BE RESTRICTED TO THE LIMITS OF DISTURBANCE SHOWN IN THE APPROVED EROSION CONTROL PLANS. 5.2. THESE LIMITS ARE CONFINED TO THE PROPERTY BOUNDARIES SHOWN HEREON THIS PLAN. 6. STOCKPILE TOPSOIL WITHIN AN AREA ON THE PROPERTY OR A LOCATION APPROVED BY ALBEMARLE COUNTY COMMUNITY DEVELOPMENT. INSTALL SILT FENCE AT THE PERIMETER OF STOCKPILES) AS NECESSARY. 7. DENUDED AREAS SHALL DRAIN TO AN APPROVED EROSION CONTROL MEASURE AT ALL TIMES DURING CONSTRUCTION. 8. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 9. LIME, FERTILIZE AND APPLY TEMPORARY OR PERMANENT SEEDING TO ALL DENUDED AREAS IMMEDIATELY AFTER ACHIEVING FINAL GRADES. 10. ALL PERMANENT SLOPES STEEPER THAN 3:1 SHALL RECEIVE STABILIZATION WITH LANDSCAPING VEGETATION HARDIER THAN GRASS, WHICH WILL NOT REQUIRE MOWING. 11, AFTER PROPOSED CONSTRUCTION IS COMPLETED AND THE SITE IS COMPLETELY STABILIZED, PERMISSION IS TO BE OBTAINED FROM THE EROSION CONTROL INSPECTOR FOR THE REMOVAL OF SILT FENCING AND OTHER REMAINING TEMPORARY EROSION CONTROL MEASURES. EROSION AND SEDIMENT CONTROL MINIMUM. STANDARDS 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. CONTRACTOR SHALL ESTABLISH A STABILIZED SITE, AND NOT ALLOW ANY SEDIMENT TO EXIT THE PROJECT LIMITS. 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. CONTRACTOR TO PROTECT STOCKPILE AREAS WITH SILT FENCE. 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. CONTRACTOR SHALL ESTABLISH A VEGETATIVE COVER ON ALL DENUDED AREAS. 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. CONTRACTOR SHALL ESTABLISH THE PERIMETER CONTROLS OF SUPER SILT FENCE AS THE FIRST STEP OF THE LANDS DISTURBANCE FOR THIS PROJECT. 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AFTER EACH RAINFALL EVENT. 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. THERE ARE NO SEDIMENT TRAPS OR BASINS PROPOSED. A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. 7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.THERE ARE NO PROPOSED CUT OR FILL SLOPES. HOWEVER, THE CONTRACTOR IS TO RESTORE THE PROJECT AREA TO EXISTING GRADE. IF THE AREAS WITH NATURALLY STEEP SLOPES ARE FOUND TO BE ERODING EXCESSIVELY AFTER ONE YEAR, CONTRACTOR IS TO PROVIDE ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. MAXIMIZE SHEETFLOW AND GROUNDWATER INFILTRATION 9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED.CONTRACTOR TO NOTIFY ENGINEER AND COUNTY EROSION CONTROL INSPECTOR. 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT.THERE ARE NO STORM SEWER INLETS PROPOSED. 11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.THERE ARE NO STORMWATER CONVEYANCE CHANNELS OR PIPES PROPOSED. 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NON -ERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NON -ERODIBLE COVER MATERIALS.CONTRACTOR SHALL FOLLOW THE VESCH CHAPTER 3.25 UTILITY STREAM CROSSING REQUIREMENTS FOR THE TWO INTERMITTENT STREAM CROSSINGS. 13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NON -ERODIBLE MATERIAL SHALL BE PROVIDED.CONTRACTOR SHALL FOLLOW THE VESCH CHAPTER 3.25 UTILITY STREAM CROSSING REQUIREMENTS FOR THE TWO INTERMITTENT STREAM CROSSINGS. 14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET.CONTRACTOR SHALL FOLLOW FOLLOW ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS FOR THE TWO INTERMITTENT STREAM CROSSINGS. '15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED.CONTRACTOR SHALL FOLLOW THE VESCH CHAPTER 3.25 UTILITY STREAM CROSSING REQUIREMENTS FOR THE TWO INTERMITTENT STREAM CROSSINGS. 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E. RE -STABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER. F. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.CONTRACTOR TO ADHERE TO THE APPLICABLE STANDARD FOR PRIVATE AND PUBLIC UTILITY INSTALLATION. 17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES.CONTRACTOR SHALL MAKE PROVISIONS TO KEEP ADJACENT ROADS CLEAN FROM SOIL BUILD-UP. 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION.CONTRACTOR SHALL STABILIZE SITE, AND OBTAIN INSPECTOR APPROVAL PRIOR TO REMOVING EC MEASURES. UPON APPROVAL OF THE ENVIRONMENTAL INSPECTOR, INSTALL INFILTRATION AREAS AND CONNECT ROOF DRAINS. 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS:THIS PROJECT DOES NOT INCLUDE ANY ADDITIONAL IMPERVIOUS SURFACES AND THE PROJECT AREA WILL BE RESTORED TO ITS EXISTING CONIDTIONS.THEREFORE WILL NOT PRODUCE ANY ADDITIONAL STORMWATER RUNOFF. A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED USING THE VSMP CHANNEL PROTECTION CRITERIA. STORMWATER DISCHARGES ARE CLASSIFIED INTO ONE OF THREE TYPES OF CHANNEL. (1) "MANMADE STORMWATER CONVEYANCE SYSTEM" MEANS A PIPE, DITCH, VEGETATED SWALE, OR OTHER STORMWATER CONVEYANCE SYSTEM CONSTRUCTED BY MAN EXCEPT FOR RESTORED STORMWATER CONVEYANCE SYSTEMS OR, (A) THE MANMADE STORMWATER CONVEYANCE SYSTEM SHALL CONVEY THE POST -DEVELOPMENT PEAK FLOW RATE FROM THE TWO-YEAR EVENT WITHOUT CAUSING EROSION OF THE SYSTEM DETENTION OF THE STORMWATER OR DOWNSTREAM IMPROVEMENTS MAY BE INCORPORATED INTO THE APPROVED LAND -DISTURBING ACTIVITY TO MEET THIS CRITERIA AT THE DISCRETION OF THE STORMWATER PROGRAM ADMINISTRATIVE AUTHORITY. (B) THE PEAK DISCHARGE REQUIREMENTS FOR CONCENTRATED STORMWATER FLOW TO NATURAL STORMWATER CONVEYANCE SYSTEMS SHALL BE MET. QDEVELOPED <= I.F. * (QPRE-DEV. * RVPRE-DEV.) / RVDEVELOPED UNDER NO CONDITION SHALL QDEVELOPED > Q PRE-DEV. NOR SHALL QDEVELOPED BE REQUIRED TO BE LESS THAN THAT OFOREST * RVPRE-DEV.)/RVDEVELOPED OR IN ACCORDANCE WITH ANOTHER METHODOLOGY THAT IS DEMONSTRATED BY THE VSMP AUTHORITY TO ACHIEVE EQUIVALENT RESULTS AND IS APPROVED BY THE BOARD. (2) "NATURAL STORMWATER CONVEYANCE SYSTEM" MEANS THE MAIN CHANNEL OF A NATURAL STREAM AND THE FLOOD -PRONE AREA ADJACENT TO THE MAIN CHANNEL OR, (3) "RESTORED STORMWATER CONVEYANCE SYSTEM" MEANS A STORMWATER CONVEYANCE SYSTEM THAT HAS BEEN DESIGNED AND CONSTRUCTED USING NATURAL CHANNEL DESIGN CONCEPTS. RESTORED STORMWATER CONVEYANCE SYSTEMS INCLUDE THE MAIN CHANNEL AND THE FLOOD -PRONE AREA ADJACENT TO THE MAIN CHANNEL. (A) THE DEVELOPMENT SHALL BE CONSISTENT, IN COMBINATION WITH OTHER STORMWATER RUNOFF, WITH THE DESIGN PARAMETERS OF THE RESTORED STORMWATER CONVEYANCE SYSTEM THAT IS FUNCTIONING IN ACCORDANCE WITH THE DESIGN OBJECTIVES. (8) THE PEAK DISCHARGE REQUIREMENTS FOR CONCENTRATED STORMWATER FLOW TO NATURAL STORMWATER CONVEYANCE SYSTEMS SHALL BE MET. SEE 19(B)(1)(B). 3.12 DIVERSION 3.13 T SEDIMENT TRAP 3.31 ('� __ TEMPORARY SEEDING PS 3.32 PS _- PERMANENT SEEDING �� DUST CONTROL �,1,TH pF DAVID M. ROBINSON Lic. No. 56760 �o�Fss/ ONAL DATE August 03, 2018 SCALE CONTOUR INTERVAL FILE NUMBER 8236 SHEET 5®F6 CONSTRUCTION ENTRANCE SILT FENCE PERMANENT SEEDING MIXTURES FOR 0 TJS THE CONSTRUCTION OF A SILT .FENCE -- - _MONT AREA SEDIMENT _ _ C 5 r � �.. ......... ...._ �� �i,, .... (WITHOUT WIRE SUPPORT) - �j - %-� -- - - %�/� Nl ilt,i4;'�/'l lr' ►''NdiQ EN'' AC ES - t 2A �SPHAI i � TABLE 25 TOTAL LBS. PER ACREcm 1. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH P VEMIE lr UPSLOPE ALONG THE LINE OF MINIMUM CARE LAWN - COMMERCIAL OR RESIDENTIAL 175-200 LBS. Z 0 1' VARIABLE �7c,,� .E>-I;�,��`z�i�nt ">r; . r �=-.�--- '�..'• l:"-'z �w.._._- .._� ..,,..�,.„„ STAKES. It - KENTUCKY 31 OR TURF -TYPE TALL FESCUE 95-100% cc Ljj T�1 �� I�I 6'MAX. l II, 1� I _ ° VARIABLE All ,---` I IMPROVED PERENNIAL RYE GRASS 0-5 /o ORIGINAL o 0 �iitkt. 2 izkft,I _. k I �- w� -` o GROUND -�'�/ KENTUCKY BLUEGRASS 0-5 /o Li1 ELEV. 1.0'a. PROFILE HIGH MAINTENANCE LAWN 200-•250 LBS. cc KENTUCKY 31 OR TURF -TYPE TALL FESCUE 100% 67 CU. YD./ACRE N VARIABLE* ir�a1 " i t:' t I P - - (I N W i = GENERAL SLOPE 3:1 OR LESS ° rr �' - �� ( ) r 1 ���tJ ileti°i f' ,'PHAI T �,�°�'` EQ d8 1pp FLOW d 67 CU. YD./ACRE it t� �r - KENTUCKY 31 FESCUE 128 LBS. 4' MAX. to ,iir rail ; rr r. III I III , I` ' - RED TOP GRASS 2 LBS. (EXCAVATED) � I�Tihr �rrfirf a i `, �, FILTER CLOTH ORIGINAL 0 , i,,-MSdI - SEASONAL NURSE CROP 20 LBS. GROUND , t!J 12�,, ELEV. L 3. STAPLE FILTER MATERIAL 4. BACKFILL AND COMPACT LOW -MAINTENANCE SLOPE (STEEPER THAN 3:1) �* ®� � TO STAKES AND EXTEND THE EXCAVATED SOIL. SEE PLATE 3.13-1 COARSE AGGREGATE CLASS I RIPRAP (� DOS m IT INTO THE TRENCH. KENTUCKY 31 FESCUE 108 LBS. iJ a C11 � r t O_,i r IC DID I° NQ - 0 U. t�0 f A V/ILrTH A r0 SDI������r - RED TOP GRASS 2 LBS. � , 31 114 I Arl L� } T� .'OPH IG t IPWICE a S T I N ®F U T T 1 Fi ,Tl i t. - SEASONAL NURSE CROP 20 LBS. L W pi ti ::f,A„ - CROWN VETCH** 20 LBS. PLAITOTAL 150 LBS. / I �- __.. � • -' , CLASS I RIPRAP LENGTH (IN FEET) _ °ice � � ` <-• *USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES AS STATED - ' a'tl T� 31 it1 BELOW: (IX DRAINAGE AREA ° (IN AC.) G 1- G I= FEBRUARY 16TH THROUGH APRIL 30TFL ...........ANNUAL RYE �` DIvDIKEaN W MAY 'I ST THROUGH AUGUST 15TH ................ FOXTAIL MILLET�� 0 AUGUST'16TH THROUGH OCTOBER 31ST........ ...ANNUAL RYE L Isl[wTl tI -III -III - NOVEMBER 1ST THROUGH FEBRUARY 15TH ........ANNUAL RYE ~m I'1-'=' SHEET FLOW INSTALLATION (k *** SUBSTITUTE SERICEA LESPEDEZA FOR CROWNVETCH EAST OF FARMVILLE, VA (PERSPECTIVE VIEW) A iilutttamiawatet Cap of I utclr-tit ld be i.itstakd N-Vitlt a itltlttlltl t111 111C11. ballci_rcl<:... (MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL OTHER PERIODS, USE lutoff vatve nm wat!?r eNVitf: r rlitztttei oil uril`r-"rr 1tdltllttl UNHULLED SERICEA.) IF FLATPEA IS USED IN LIEU OF CROWNVETCH, INCREASE constatlt 1Tres lie. Wadi water 1 wA. tie car'l7ei1'awiy fi�O111 the entialice to ,rt� RATE TO 30 LBS./ACRE. ALL LEGUME SEED MUST BE PROPERLY INNOCULATED. °ruil•�� oiluta .� t Alt" r �,iIi 1� � ��OII�I��1� eittitt�;. tirtni �_IraisY, clitolis cr1' �vatrectti r :._ 1 FLOW FLOW WEEPING LOVEGRASS MAY BE ADDED TO ANY SLOPE OR LOW MAINTENANCE MIX�- - DURING WARME(? EEDING PERIODS; ADD 10 20 LBS./ACRE IN MIXES. % O �N' COMMENTS A � A � � COARSE AGGREGATE / / � ��,l4�IYT� ��/IYIIdI�IVT5 PAVES WASH RACK r3 SILT FENCE SEEDINGPERMANENT EXCAVATED / �j�� - _ - __ FERTILIZATION _ FILTER CLOTH AREA _____V__,�'� COUNTY COMMENTS AND MA-INTENANCE ®6dbe1 16, 201 IDv I - ' Ir' s '• s''�, TABLE 24 **COARSE AGGREGATE SHALL BE VDOi #3, #357 OR #5 COUNTY COMMENTS Maintenance Fertilization for Permanent Seedings ®V�lTlb�l' �,®� -I _Use Soil Test Recommendation or Rates Shown Below OUTLET (PERSPECTIVE VIEW) DIVERSION I I �=III=III= I = �= I I = _ Seeding Mixture Formulation Lbs. per Lbs. per Time Mowing _ _ - - _ I I �=1 I=1 =_=III=III=III Acre 1000 sf PLATE. 3.13�•2 I _III I - I -III- I I Tall fescue makes 10-10-10 500 11.5 Yearly, or as *Not closer than 3" if SOURCE: VA. DSWC 10% SETTLEMENT up 70% or more or 400 9.2 needed fall occasional mowing is 0.3' FREE BOARD SF/STONE NOT REQUIRED AFTER SLOPES ARE STABILIZED DOWNSLOPE OF OUTFALL of cover. 30-10-10 desired. POINTS A SHOULD BE HIGHER THAN POINT B. Spring the year Do not mow crownvetch - __ C Service Itch 400 9.2 following MINIM U TOP W T DESIGN FLOW DEPTH DRAINAGEWAY INSTALLATION Service lespedeza 0-20-0 i establishment _W) (FRONT ELEVATION) Birdsfoottrefoil SEDIME - -- - - - - - - - - and every 4-5 REQUIRED FOR S� E V � DATE _ SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control,% DSWC P7107years thereafter. r� Fairly uniform Fall the year Not required. not closer TRAP EMBANKMENTS August ®' 2018 SUGGESTED TEMPORARY DIN MIXTURE Stand of Tall following than 4" if occasional ACCORDING TO HEIGHT OF TeSCUe & Service 5-10-10 500 11.5 establish- ment mowing is desired, and TYPICAL VE E - S HAP E D DIVERSION FERTILIZER: 10-20-10: 1,000 LBS/ACRE lespedeza, or and every 4-5 then in fall after seed E A J� K- -E i (FEEi") SCALE SEPTEMBER-FEBRUARY 15: 50% ANNUAL RYE & 50% WINTER RYE 100 LBS/ACRE FEBRUARY 16-APRIL 30: Birdsfoot Trefoil. years thereafter. has matured. y 1V� 1 ANNUAL RYE 100 LBS/ACRE MAY -AUGUST: GERMAN MILLET 50 LBS/ACRE OTHER OPTIONS EXIST, SEE VA EROSION AND SEDIMENT CONTROL HANDBOOK. Weeping Spring the year Not required. not closer _ -- _-- - --_ - - Lovegrass & g following than if occasional,•, Source: Va. DSWC Plate 3.12-1 SUGGESTED PERMANENT SEEDING MIXTURE Service lespedeza 5-10-•10 500 11.5 establishment mowing is desired, and LIME: 2 TONS/ACRE FERTILIZER: 10-20-10 1,000 LBS/ACRE fairly uniform plant and every 3-4 fall after sericea has H HO W CONTOUR INTERVAL MARCH -MAY 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE MAY 16-AUGUST 15: distribution years thereafter. matured. 1.5 0.5 2.0 KENTUCKY 3.1 FESCUE 200 LBS/ACRE, FOXTAIL MILLET 20 LBS/ACRE AUGUST 16-OCTOBER: KENTUCKY 2.0 1.0 2.0 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE NOVEMBER-FEBRUARY: KENTUCKY 31 FESCUE September, 30 Mow no closer than 2" 2.5 1.5 2.5 200 LBS/ACRE, WINTER RYE 20 LBS/ACRE Red & chewin s 20-10-10 250 5.8 clays later y 9 for red fescue and K 3.0 2.0 2.5 fescue, Kentucky bluegrass; and closer bluegrass, hard ry 3.5 2.5 3.0 December blue , May g 20-10-10 100 2.3 20-June-3O, if than 3" for fescue. fescue mixture: needed. TYPICAL ORIENTATION OF TYPICAL TREA T ENT � 1 I10 H 4.5 3.5 3.0MOM 4.0 TEMPORARY SEEDING MWURES FOR - -- - I15111=11 _ 5.0 4.0 4.5 TREA T ENT , (SOIL S TABILIZA TI ®N R ANKE T'' T� II1_Ili II In, /� �% ]�% /� ]�% INS TALA TIN CRITERIA - PIEDMONTTHE - - r- EXCAVATED AREA 11=,1111� �- (S COIL S TARI.LIZA X IO Y L rl l V �E T) MAX. DEPTH = 4' _ -- -- _ ORIGINAL -- -LU TABLE 26 SOURCE: VA. DSWC GROUND ELEV. PLATE, 3.13-1 SHALLOW TEMPORARY SEEDINGS BY RATES, DEPTHS, AND DATES SLOPE �''` ANCHOR SLOT `Y .rri NOTE s Seeding Rate Planting Seeding zones M and Seeding Date APPROXIMATELY 200 STAPLES REQUIRED depth 1� c ON SHALLOW SLOPES, STRIPS OF PER 100 SQ. YDS. OF MATERIAL ROLL. I 4 ANCHOR SLOTS, JUNCTION SLOTS & Species (1� Per Lbs/1000 7a and 7b 6b 6a and 5b Note: �r � Entran4ces shall ba 12 ft wide and � m NETTING PROTECTIVE COVERINGS J' CHECK SLOTS TO BE BURIED 6" TO 12". q. ( ) tr-Ansitiort sn'100thly into th €"G;� `P�fa.' MAY BE APPLIED ACROSS acre S ft Inches 2l1- 5/1- 8/15- 3/1- 5/1- 8/15- 3l15- 6/1- 8/1- VLStfad any E3r1d Startrl.ards, � r fir• THE SLOPE. 4/30 8/14 11/30 4130 8/14 11/15 5/31 7/31 10/31 Std; PE-1 for outifilt det- is h I surf oe Ddveway entrance pavement > �O 12" MAX. 4:1 OR FLATTER LoI shall exterid o the tight of'� ay line. f" 6°' MAX. STEEPER THAN 4:1 Choose One: BY BY BY All entrancegradea hall start back of l JUNCTION SLOT - Barley 2.5 bu. 2.80 1-2 X - •10/15 X - 10/15 X - 10/1 t1is shoulder lime. I VVllen an existing street Is re-clev€sloped EDGE AND END JOINTS I I I I I I I I I I Oats 3 bu. 2.21 1-2 X - - X - - X - - If ciralrlaB Is necessary, the ditch lirt 0 and modification of an oxlsting rlvewaV # TO BE SNUGLY ABUTTED ntl`;Brioe is required, the entrance � BERM CHECK SLOT { Rye (4) 2.5 bu. 3.22 1-2 X - X X - X X - X may bp- moved bacwk to provide 9 inches l pavem rlf }fall be oxt€�rtd d to the right WHERE THERE IS A BERM AT THE TOP OF THE SLOPE, (JUTE MESH WILL HAVE I i I (min.) cover over pipe, f.tL. BRING THE MATERIAL OVER THE BERM AND ANCHOR IT TERMINAL FOLD STAPLED LAP JOINT IN LLJ 0 way 11n CjP tilt extent r� �t1i 13�tnC t 0 LIEU ED EDGE JOINT) I dx I to the'aKisting drkWowayf' W BEHIND THE BERM. LAP JOINT 2" MIN. I I I I I I (JUTE MESH ONLY) I I � Icc TAMP FIRMLY l ANCHOR SLOT 5' MAX. 4:1 OR FLATTER I I I 1 Bare or -'� Rye Plus X X 10/15 X X 10/15 X X 10/1 r i - STEEP 3' MAX. STEEPER THAN 4:1 I I I Y 150 1bs. 3.45 1 Pipe culvert. _ �_. t, - 2_ F a 111 SLOPE Foxtall I { X X X X X X X X X jF' ��: rra .� 2" millet 5 ' ° urfa d r Weeping t necessary � ;� D � � 4 Q 6" TO 12" p g : I I I I I I I 4lbs 0.09 1/4-1/2 - X - - X - - X - °,. ON STEEP SLOPES, APPLY 1 I I I I lovegrass� ,,✓,�, � ;' '1'�3 fit, _ ,c; ,:,s.- TO� HETDIREC�ON COVERINGPARALLELPLORWLLEL I fi r . 1 �d AND ANCHOR SECURELY. - I I { I Annual Ditch flt�`sotd °ii t I I I I I I ryegrasS 50 Ibs. 1.15 1/4-1/2 X - 11/1 X - 11/1 X - 8/15` CHECK SLOT ,+ F" - 1" TO 2" I { Millet (7) 50 lbs. 1.15 1/2 - X - - X - - X . x- 2 TAMP CHECK SLOT I I I I I I I I I I IM FIRMLY ( ) Applicable P " a'��r u� u 1 A Ilcable on slopes of 3:1 or flatter Shoulder � < �m __ I vAR• v1 AR• I (2) Refer to figureA-Adopted from USDA, ARS Miscellaneous Publication #1475, January 1990 'f_,�,£� t',Z.,, ,u_ L_ ` .:....... PLAN IV VIEW aw n��_u�,.. -__ s" To 12" 6" To 6" MIN. (3) Between fall and spring seeding dates, use mulch only if ground is frozen and reseed when thawed 4 "- 4 May be used as a nurse crop for late fall/earl winter permanent seedin s, add 56 Ibs/ac. to the permanent Ed f cNiv t`'avem r1f P P 9 ° AREA BEFORE Y Y BRING MATERIAL DOWN TO A LEVEL AR '•• `�• ��' TERMINATING THE INSTALLATION. TURN THE END " S TA P LI RI G DIAGRAM :•; :'_, seeding mature UNDER 4" AND STAPLE AT 12" INTERVALS. 4 Mar l--le, Roadway Pinvement and State Hi hwa Administration Tem orar Seed Mix .- 12" STAPLE FORMED FROM N0.11 STEEL WIRE. CHECK SLOTS AT MIN. ( ) Y g Y p Y - - permanent seed mix. L8" STAPLE MIN. LENGTH FOR SANDY SOIL. 50' C C INTERVALS; (5) May be used as a nurse crop for mid summer permanent Seedings. Add 2 Ibs/ac to 6" STAPLE MIN. LENGTH FOR OTHER SOIL. NOT INATIO WITH ALL (6) May be used as a nurse crop for mid -summer permanent seedings. Add 10 Ibs/ac. to the permanent seeding FI URE �" PRIVATE ENTRANCE DETAIL` ` "COMBINATION"BLANKETS mix. DITCH FLOW JUNCTION SLOT TAMP TERMINAL FOLD IN DITCHES, APPLY PROTECTIVE COVERING 2" I II FIRMLY 6" TO 12" TAMP FIRMLY2 �iTH OF PALE NUMBER PARALLEL TO THE DIRECTION OF FLOW. 12" USE CHECK SLOTS AS REQUIRED. AVOID I II 4" -� 1 JOINING MATERIAL IN THE CENTER OF f� THE DITCH IF AT ALL POSSIBLE. - ® �v' �� - DAVID M. ROBINSON Lic. No. 10 56760 �v SOURCE: ADAPTED FROM LUDLOW PRODUCTS BROCHURE PLATE: 3.36--1 SOURCE: VDOT ROAD AND BRIDGE STANDARDS PLATE: 3.36•-2 4'0�� G��`` SHE, SS�ONAL EN F Ft I T.M. 86-27C REVISED PARCEL D LINE BEARING DISTANCE L1 N 30°36'03" W 51.03' L2 N 10° 1 1 '38" W 57.94' L3 N 42° 19'38" W 68.87' L4 N 23° 13' 17" W 43.10' 15 N 00°02'22" E 56.40' L6 N 29° 14' 1 6" W 104.70' L7 L8 N N 42°0507" 43°5634" W W 154.71 ' 174.36' L9 N 38°0849" W 162.39' L10 N 59° 9 21 0699 E 143.539 L11 S 43*06'23" W '122.67' L12 S 59°59'24" E 97.94' L13 S 43°25' 10" E 185.00' 114 N 18005' 1 1 " W 50.33' L15 S 41 °07'06" E 46.80' L1 6 N 67°20'57" W 47.21 ' L1 7 S 39°29' 12" E 95.14' L18 N 09° 15'34" W 77.65' L19 S 21041'16" E 101.97' L20 N 45°20'37" W 46.96' L21 N 18*40'52" W 43.53' L22 S 27°25'26" E 66.74' 123 N 58°20'35" E 215.78' U a N a n wa- 6a:o A Sots 8 Soils C So€Is D Sods Tota3 fo—t(opsn Spa.(acresr undlsturbzdi -t E.� L J ot�£t=afos_�f?cuans ac e>;ea£r tea a s - : £ -PalattagedTur#{acres).--dEsz,Eti3ad,:gcad d t,,. 7. S { _< :,�P ' "x93 V2YG5 eF�tf:ar iFiiI ke �� 1 il: ) tr "Vn1 ,K, F.`' A 174 I > �t„i �[ jimpeCltOl35.�IlVdf (&irefi} 3♦ '{ '� i?� *}1:fE3rt�Q(,+E33 S7,`,crt'e Afax�S TPi N4fi;vt�[id',5tE4 r£�4'iS UCLr9fLjWt1EL,>l4hii,i_I�f33)t,:4Ui+AY1 �i'2.�°ttt,fJa`tES is3efrl L£x` - 68� IJ •E,. Constar is A3�tsuaf <a n a€€ rEne, at ` ,43, ` Ta;gsYRa.7fa=. _.en.{i,-eE➢ssF 1,CQ, Q,t FffnaF'rirtsntcti.4.a3.- ` ASoils R Soils CSoils 0 soils .c=.zstlDpen5paca wQ,g3 • 'OS14 �+anaged�¢i 'O,IS= '-4:_€F- •4r.z3 f��s" snpenJio,iy L4vzr -ti,95 Site Results (dater QualityCompliance) .. ..�_N, Area Cherks t-r➢;aEsTlCIpEN sPnc=_ Jac) ItNIPIIR%005 §Q.VER TREATED (act IVIANAGEO TURF AREA! (act MANAGEO TURF AREA TREATED (ac) AREA C145CM -------------- O.A A[ A D A C D.A. 6 iSA. S ?.x�A t`tEeK 0 �•_� ga . ', , �? �?�� R OLUx 91 4fE t ax ,727 TKO TI CT➢ ; ;?: ox_ ..w, a ear ,_�;€t.,.0 a I ..a , arc. Site Treatment Volume (ft') Runoff Reduction Volume and TP By Draingge Area KUNOff 92DUCTIQN OLUNIE ACH!EY90 (ft;) :TPLOAD AVAR.€➢DLCff R€RMOVAL'(IIblyr) TP LOAD REDUCTION=RCH0,fED [Iohv) TP LOAD Dswirjixi.5'iib/yr i}:A. A. DA. D MA.'C I D.A. D D.A TOTAL -..w1' ;:' ➢ ,� ... (t,QQ P3.CIl3 : ,U,4l;_ ,i ; 010 2.51 DiqZ 0,0 fS.tiD : r➢�Di} "'or,.� �,.. PlIYt1S3&Lit LOAD ..REDUCTION :ACNIEUEO.{IYfyrt _.'l7,G!0, ,, -:i., C➢,.R4 f?,oag_e,. Eqa„a'as. s➢gf7','. zf�. .:r`". tP.+3E} `. Total Phosphorus FINAL Pas➢`.DEVELOPME@ T TP LDAD '{[kjyr) TP WAD REDU'nGkt R9QUTAEO ojyr) TPLUAD REDULMON-ACHIEVED (lbtdr TPICIADREMAININGllb/yr \\/ f,i`� /, _ ,Toxa€:V =rog<n (Tt6t .arr'C (n,gfe}, 1&Cr" i. REMAINING TP LOAD REDIJCTION[99QUIRED(Ib/;tr}. 0.0E Ta,getPLoad losjacrel'tr} Q,4Y Penf sire, nPi durti,nrr t1 n"s } " 9 �% vXf Ei(r t;esscnrrectiar.raetar) 'rk.9D.x Total tgroget➢(For Information Plirpnses) \ j V A POST-DEVELOPMENTLRAD{3b/yr) _ NIT#;OGEN LOAD REDUCTION ACHIEVED,, /f V A Vay� / \. A i A V/ \ f A f real sir, posr-DCLrEco vi,�rrIT§Ps a LOAD jib Jyrt :, zc.ea.: \ /f \ //\, /\ X \f€s �y TP. i aad Reduc%`sryrt Requisd {IbfYt) W U Q4 a t e a r �J /\ . J ... _�.,C.. .. f \ f\ �'... . • .. - i1EQ.YirgFnia Runor"fReduction Ni,eehdd fdxwe Development Compliance Spread>tteek-➢lersfon3.t3 - ) o�^�➢ \/` \ / \ / \ X / \.f< \./ \ / \ / %® ° �I� a a,9.4P Dps gnSpecif cot om 4sr:.ot3 Draft 5tds Spsecs 4lP ?e to urnrgtc F} Sta�ei f/\ \`/\ / m - - , m . ea. _IBM Site ......_ .._.._. �;� /\ K \, / _.. SI% I7 tttaT/ Pr,ni rr / \i i:.;atacl Cce4Er 13mmary "Trove°rne#:Y"s'o@rE,nd atir8 l9ut..i Lr3t Lcads. ! // 1",", Total Rainfall : 43 inches.f \\/ \ / ! / \Treatmentlolume i\ /\\f/\% i� \ \ /ro. estlf➢r�e3t 5ace Cover {ac:?s) 3 ti2/ / / \/" / SsteLandGa�er5umrrtar /Y f \ \ �fJ, f \ / \ � =e / / / \ K t h2d8vs �:. e t cr sk �,. t3 t➢3 'Traott ea un [ is a /` \ %` \ ( 9 n tt Val to u6z le t) ' 4.7&7 / / z.,• TPLuar3(Ih!yr) 2s1 / ,.$. TIV Load,(I b/Yr):: / \ / ,r.. €�,°.ana�ed Turf._rz�t'r. acres IJ ice., T - � in#arnxatiaral Fur usestluiv i / 7 /`� Lvetehrei#.RViturb �-0,2f} Al Asa€ds: h Soils CSods D Sons. Totals Total %of t l" _ Forest/open (acres) U.0 4.35 0,Ufj D.L}}£s 4,35 o4- rtianageddTurf (acres). R.CCF" `1:7Ct d.dU: D'QG L70 23 imperuious Cover (a-.-., DOD 0.80 GAIG DOD 6.8t3 1'. 6.85 IDO Site Rv U,18. Treatment Volume ft' 4.,467 P: Load ((b/yr). 3,81:. TN Load (lb/Yr): 'Se,os Total Runoff Volume Reduction (ft)< D Total TP Load Reduction Achieved Q:OD.. (Ib/yr) Total TIN Load Reduction Achieved tJ. b� (lb/yr) Remaining -Post Development TP toad 2,81> (Iet4r) Remaining TP Load Reduction .(Igjyr)- 0.00 Required / A, .•- �;. SECTION OF SF=400 LF At, ,.v. \ \ \\/ f\ \ , ,<x. �R ®ONOT EXCEED ALL OWABLE \PRO fl, A PER 100 LFm ! �A�EM�Ii \rl / f 071 ® \yam'/ \\// \\ >\ %�\ /\ \ /\\ \ X W \ // \ f>\ / A ix• xx 166°63' A. COMPLIANCE WITH THE WATER QUALITY DESIGN CRITERIA SET OUT IN SUBDIVISIONS A 1 AND A 2 OE 9VAC25-870-63 SHALL BE DETERMINED BY UTILIZING THE VIRGINIA RUNOFF REDUCTION METHOD OR ANOTHER EQUIVALENT METHODOLOGY THAT IS APPROVED BY THE BOARD. A�TH Op CALCULATIONS SHOWN ABOVE WERE DETERMINED FROM ACCEPTABLE METHODOLOGY "DEQ VRRM �� FOR NEW DEVELOPMENT COMPLIANCE SPREADSHEET —VERSION 3.0". VA CONCLUSION: BASED ON NEW DEVELOPMENT ON LOT J1/TMP 86-122 SHOWN HEREON THESE PLANS, WITH A TOTAL DISTURBED ACREAGE OF 2.50 ACRES, LAND COVER CONSISTING OF 1.70 ACRES OF DAVID M. ROBINSON MANAGED TURF, AND 0.80 ACRES OF IMPERVIOUS; A LAND AREA OF 4.35 ACRES OF PROTECTED Lic. No. FOREST/OPEN SPACE IS NECESSARY TO SATISFY THE PHOSPHORUS LOAD REDUCTION REQUIRED �0 56760 FOR THE SITE DEVELOPMENT. A PROPOSED EASEMENT HAS BEEN SHOWN ABOVE, ALONG WITH A \��k S/ONAL SEPARATE EASEMENT PLAT, SHOWING THE ASSOCIATED AREA WITHIN THE PARCEL THAT SHALL BE PROTECTED IN ACCORDANCE WITH THE VIRGINIA RUNOFF REDUCTION METHOD. DATE SCALE ill � ' CONTOUR .. INTERVAL 1 FOOT FILE NUMBER 8236 SHEET 7 F 8 a ml WATER QUANTITY ANALYSIS: TOTAL DRAINAGE AREA TO DOWNSTREAM POINT OF ANALYSIS: 988 ACRES 1 % OF 988 ACRES = 9.88 ACRES SITE DRAINAGE AREA = 2.50 ACRES 2.50 ACRES < 9.88 ACRES OK CONCLUSION: IN ACCORDANCE WITH CHANNEL PROTECTION SECTION B.4.A) OF 9VAC25-870-66 OF VIRGINIA LAW; THE LAND AREA OF THE SITE'S CONTRIBUTING DRAINAGE AREA APPEARS TO BE LESS THAN 1.0% OF THE TOTAL WATERSHED AREA DRAINING TO A POINT OF ANALYSIS DOWNSTREAM IN THE STORMWATER CONVEYANCE SYSTEM. IN REFERENCE TO FLOOD PROTECTION SECTION C.3.A), THE SITE IS WITHIN COMPLIANCE SINCE THE CONTRIBUTING DRAINAGE AREA APPEARS TO BE LESS THAN 1.0% OF THE TOTAL WATERSHED AREA DRAINING TO A POINT OF ANALYSIS DOWNSTREAM IN THE STORMWATER CONVEYANCE SYSTEM. z it r. r„ a , .... .. , _ L . - w r ®'� T H off' Dr y DAVID M. ROBINSON Lic, No, Z- 56760 G F�SS/ONAI- EN Ell Ll DATE August 03, 2013 SCALE 1"®46®' CONTOUR INTERVAL 2 FEET FILE NUMBER 6236