Loading...
HomeMy WebLinkAboutSUB201800039 Review Comments Road Plan and Comps. 2020-12-030 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Project: Project File Number: Plan preparer: Owner: Plan received date: (Rev. 1) (Rev. 2) (Rev. 3) Date of comments: (Rev. 1) (Rev. 2) (Rev. 3) Reviewer: Briarwood Phase 6 — Road Plan SUB201800039 Collins Engineering [scott@collins-engineering.coml Wendell Wood and Nena Harrell Woodbriar Associates 26 February 2018 22 April 2020 9 September 2020 20 November 2020 27 April 2018 16 June 2020 13 October 2020 3 December 2020 Matt Wentland Scott, The Briarwood Phase 6 road plans have been approved. Engineering 1. A new VSMP plan (not an amendment) will need to be submitted and approved. (Rev. 1) Comment not addressed. WP0201600054 is an early grading plan and does not match the currently proposed layout. (Rev. 2) The VSMP amendment has been approved. 2. Provide Deed Book and page numbers for all required off -site easements prior to plan approval. (Rev. 1) Comment not addressed, response noted. (Rev. 2) Provide written documentation to perform off -site work. (Rev. 3) Comment addressed. 3. Pipe slopes will need to be less than 20%, with anchor block provided for slopes over 16% (County policy and VDOT Drainage Manual). (Rev. 1) Comment addressed. 4. Pipe velocities over 10 fps should be avoided (VDOT DM). (Rev. 1) Comment addressed. 5. Provide HGL calculations and show the HGL on the profiles. (Rev. 1) Comment addressed. 6. Provide a'/2 inch steel plate in storm manholes with drops or 4' or greater (VDOT DM). (Rev. 1) Comment addressed. 7. Provide the design for the riprap at the pipe outlets (VDOT DM). (Rev. 1) Comment addressed. 8. The maximum height of retaining walls located on managed slopes is 6' (18.30.7.5). It appears that reverse slope benches or surface water diversions may also be required. (Rev. 1) Comment partially addressed. The label on sheet 3 says max height 14'. The managed slope overlay hatch should be darkened, as it was hard to distinguish. Proposed slopes will still need to follow the design standards in 18.30.7.5 even if shown in a survey to not be 25% or more. Reverse slope benches/surface water Engineering Review Comments Page 2 of 2 diversion will be required per 18.30.7.5c every 20' height interval on 2:1 slopes. (Rev. 2) Comment addressed. 9. Surveyor verification of the steep slopes will be required prior to VSMP approval. (Rev. 1) Comment not addressed, response noted. (Rev. 2) Comment addressed. Revision 1 Comments 10. Include on the plans the Public Road Acceptance Procedure and the As -built Road Plan Policy. (Rev. 2) Comment addressed. 11. It appears there should be a drainage easement on Lots 61 and 62 for pipe 437 and on Inlet 454 on the existing lot. (Rev. 2) Comment addressed. 12. [VSMP comment] SWM access path have a maximum allowable grade of 20% without being surfaced with gravel or pavement (25% with surface). The access should also be moved outside of the preserved slopes. [DSM, policy] (Rev. 2) Comment addressed. Planning, ACSA, VDOT, E911 and Fire Rescue had no objection. Thank you, Matt Wentland 434.296.5832 -x3458 File: SUB201800039 Briarwood 6 RP approval 12-03-20.doc