Loading...
HomeMy WebLinkAboutWPO202000038 Calculations 2020-12-06SLEEP NUMBER FINAL SITE PLAN STORMWATER MANAGEMENT CALCULATIONS PACKET Date of Calculations J U LY 10, 2020 PREPARED BY: COLLINS ENG11,1==RING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com Lic. No. 035791 12/07/20 SCS TR-55 Calculations Soils Mapping (Source: NRCS Web Soil Survey Online Database) Soils Table (Source: NRCS Web Soil Survey Online Database) Albemarle County, Virginia (VA003) Map Unit Map Unit Name percent of Symbol AOI 27B Elioak loam, 2 61.3% to 7 percent slopes 34C Glenelg loam, 38.5% 7to15 percent slopes 91 Urban land 0.2% Totals for Area of 100.00/0 Interest The NRCS web soil survey defines this development's soils as having a hydrologic group type B. Precipitation Data (Source: NOAA's National Weather Service, Hydrometerorological Design Studies Center, Atlas 14 Point Precipitation Frequency Estimates) E Map � ❑'� TEffaID O 1� �c �eF 29 'Hull pi `mac �3 C� F� P amid � Hillsdale Dr 100m 300ft POINT PRECIPITATION FREQUENCY (PF) ESTIMATES WITH 90% CONFIDENCE INTERVALS AND SUPPLEMENTARY INFORMATION NOAA Atlas 14, Volume 2, Version 3 PDSbased precipitation frequency estimates with 90% confidence intervals (in inches' Average rewaerke irbml (years( Dualion o00 ,9 0® 166 99 ® ,600 24-0r (2713.39) (3. 9-4-10) (4: 85 24) (4.93-6.17) (6.01 7856) (6. 2�74) p.91--110.1) (B.OG11.5) (10.5- 3.7) (1 -7- 5.5) m m 00 X a w w N jp � 10 ei rl � j r vi ri m V n � v u m w � y v 3 m o z o " u x z u wp m m m m N r m Gi m o � o .ti N .-i O m of ao 0 ¢ v 0 a q -ii Li V Ol 1p vl m m V1 Ol tD N C '— N N N m 6 N C m O 3 r p C 2 O C n O « 6 d C } c m c c p c o c 0 w E c o ;, :'v o o� m e a o c c o c c o c c o ` c m up u m up '-' m u u > ¢ 0 po ¢ 0 00 ¢ 0 0 « 3 U' U' p 3 0 IDO 3 0 ? Z p C C p C C p C C o 4+ c o N c O _up, E 3 E 3 E 3 eo o a o v` x L � W c a m ¢ °1 a c � m c ¢ o m a 0 a a a O` O 0 a U.S. Department of Agriculture Natural Resources Conservation Service TR 55 Worksheet 3: Time of Concentration (TJ or Travel Time (TJ Project: Sleepy's Designed By: FGM, PE Location: North of 1425 Seminole Trail Checked By: SRC, PE Check One: Present X Developed X Check One: Tc X Ti Through subarea Segment ID: Sheet Flow: (Applicable to Tc only) 1 Surface description (Table 3-1) 2 Manning's roughness coeff., n (Table 3-1) 3 Flow length, L (total L < 100) (ft) 4 Two-year 24-hour rainfall, Pz (in.) 5 Land slope, s (ft/ft) 6 Compute Ti = [0.007(n*L)0.e] / P20.5 S A Shallow Concentrated Flow: 7 Surface description (paved or unpaved) 8 Flow Length, L (ft) 9 Watercourse slope, s (ft/ft) 30 Average velocity, V (Figure 3-1) (ft/s) 11 T,= L/3600*V Channel Flow: 12 Cross sectional flow area, a (ft) 13 Wetted perimeter, Pw (ft) 14 Hydraulic radius, r = a/Pw (ft) 15 Channel Slope, s (ft/ft) 16 Manning's Roughness Coeff, n 17 V= [ 1.49r2/3s° s ] / n 18 Flow length, L (ft) 19 T,= L/ 3600*V 20 Watershed or subarea TcorTt (Add Tt in steps 6, 11 and 19) Note: The shoretest SCS Tc is 0.10 hrs. FL-ENG-21A 06/04 Date: 7/10/2020 Date: 7/10/2020 n/a DAA&B DAA DAB (Pre-Dev.) (Post-Dev.) (Post-Dev.) Woods- Light Woods- Light Underbrush Underbrush 0.4 0.4 100 100 3.66 3.66 0.16 0.16 0.15 0.15 Unpaved Unpaved 150 20 0.12 0.35 5.6 3.0 0.01 0.00 0.16 1 0.15 1 0.10 m a ¢ a m 00 D o e- o ` ¢ O ¢ p O O O o 0 0 L a c U a a w a p¢ > 00 p 0 of u 0 O H ¢ O a0 d m m S U y p t m y a m a L U 7 p g V � `u y a y p al O F m 'm x F � a a a � O W a y Vl p V � � e x `a H y q w o a rv= I d l l J> In Z a II V 11 6� u N d E Z H g � - c QET°a3 E o a a c 3 K c ¢ a U c H U U O a 3 a u m Iri 'o u a p c m O c w E Ia c o N N O p O V1 ID ci Cl rl V1 O O of N L Ql m c O L to N W t0 rl c i O 6 m m -i m O a « 3 c 01 N N 0 p ..I O N m mo ci o m ..I N m m o 0 o N O In rl O � N m ¢ O ' E I° m O m N In m OJ € 01 y� ry O N m O '.I '6 t+f .-i yl a p 3 O K � N In e O In .1 O O m IO vl ,y o N m m o n m � V1 V1 t° m N O ID V ry I° In O O V .i m O O N m ei M O V1 Ill N N ei emi o 0 a LL O L C u W \ ' N y a L H y a E 0 n y �pO m adU o °c m 3 a w v ii a u E m m a a a g c N c a¢ 0 c 1O E r °c c m a Ii ¢ u a a w L ry ri 4 vi to r o0 of 3 3 3 O O 0 0 rl rl 0 0 LL m L ,n o N N O O A D O m a O T T N N m Oi! m a a m a L U a Il1 N n W ¢ 0 ¢ 0 0 0 K aa0 O V U b C a 6 � F u=f w _ tk V1 a t� K m O 0 W yfi a a¢ ¢m 0 00 3 Channel and Flood Protection Computations 9 VAC 25-870-66 Section B: Channel Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet the criteria in subdivision 1, 2 or 3 of this subsection..." Section B.1: Manmade stormwater conveyance systems "When stormwater from a development is discharged to a manmade stormwater conveyance system, following the land -disturbing activity, either..." a. or b. shall be met: Section B.1.b. "The peak discharge requirements for concentrated stormwater flow to natural stormwater conveyance systems in subdivision 3 of this subsection shall be met." Section B.3 "... the maximum peak flow rate from the one-year 24-hour storm following the land -disturbing activity shall be calculated either.." a. or b." Section B.3.a. In accordance with the following methodology: Q Allowed !� LF• * (Q Pre -Developed * [RV Pre -Developed I ) / (RV Developed ) Q Allowed Where: Q Pre -Developed = CN Pre -Developed = S Pre -Developed = RV Pre -Developed= CN Post -Developed= S Post -Developed = RV Post -Developed = I.F. = Q Developed < 0.04 cfs Section B.4 Limits of Analysis 0.13 cfs (From Worksheet 4 Watershed Summary) 57 (From Worksheet 4 Watershed Summary) 7.66 (From SCS TR-55 eq. 2-4) 0.24 in. (From SCS TR-55 eq. 2-3) 69 (From Worksheet 4 Watershed Summary) 4.45 (From SCS TR-55 eq. 2-4) 0.69 in. (From SCS TR-55 eq. 2-3) 0.90 (Factor of Safety) 0.04 cfs The analysis terminates at Subareas A & B since subsection B.3.a is met. 9 VAC 25-870-66 Section C: Flood Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet one of the following criteria as demonstrated by use of acceptable hydrologic and hydraulic methodologies:" Section C.2.b.: The point of discharge (Detention Basin B's Outfall), "releases a postdevelopment peak flow rate for the 10-year 24-hour storm event that is less than the predevelopment peak flow rate from the 10-year 24-hour storm event. Downstream stormwater conveyance systems do not require any additional analysis to show compliance with flood protection criteria if this option is utilized." 10-Year, 24-Hour Pre -Development Subareas A & B Peak Flow 1.33 cfs 10-Year, 24-Hour Post -Development Subareas A & B Peak Flow 1.26 cfs Section C.3 Limits of Analysis The flood protection analysis terminates at Subareas A & B since subsection C.2.b is met. Post -Development Underground Detention Basin 'A' Routings & Outflow Hydrographs The following routing calculations and outflow hydrographs reflect the post -development attenuation in Subarea A from the proposed underground detention basin A. BasinFlow printout INPUT: Basin: Sleepys- UGD A Routings 0 Contour Areas Elevation(ft) 1 Storage Pipes Storage pipe 0 name: UGD diameter (in) length (ft) invert (ft) angle volume (cy) Start—Elevation(ft) 5 Outlet Structures Outlet structure 0 Orifice Sleepys- UGD A Routings Area(sf) Computed Vol.(cy) 36.000 117.500 469.250 0.000 30.761 469.25 Vol.(cy) 0.00 name: Barrel area (sf) 0.196 diameter or depth (in) 6.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 469.150 multiple 1 discharge out of riser Outlet structure 1 Orifice name: Low -Flow Orifice area (sf) 0.022 diameter or depth (in) 2.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 469.250 multiple 1 discharge into riser Page 1 Sleepys- UGD A Routings Outlet structure 2 Orifice name: Emergency Overflow Orifice area (sf) 0.530 diameter or depth (in) 9.860 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 471.250 multiple 1 discharge into riser Outlet structure 3 Weir name: Str 2 diameter (in) 48.000 side angle 0.000 coefficient 3.300 invert (ft) 474.000 multiple 1 discharge into riser transition at (ft) 1.215 orifice coef. 0.500 orifice area (sf) 12.566 Outlet structure 4 Culvert name: multiple discharge D (in) h (in) Length (ft) Slope Manning's n Inlet coeff. Ke Equation constant set Invert (ft) Emergency Overflow / 1 through dam 15.000 0.000 49.000 0.036 0.010 0.500 3 471.500 Bypass Pipe Page 2 Sleepys- UGD A Routings 4 Inflow Hydrographs Hydrograph 0 SCS name: 1-yr 24-hr SCS TR-55 Design Storm Area (acres) 0.540 CN 66.000 Type 2 rainfall, P (in) 3.020 time of conc. (hrs) 0.1500 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 0.349 peak time (hrs) 11.930 volume (cy) 40.199 Hydrograph 1 SCS name: 2-yr 24-hr SCS TR-55 Design Storm Area (acres) 0.540 CN 66.000 Type 2 rainfall, P (in) 3.660 time of conc. (hrs) 0.1500 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 0.559 peak time (hrs) 11.930 volume (cy) 64.483 Hydrograph 2 SCS name: 10-yr 24-hr SCS TR-55 Design Storm Area (acres) 0.540 CN 66.000 Type 2 rainfall, P (in) 5.520 time of conc. (hrs) 0.1500 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 1.315 peak time (hrs) 11.930 volume (cy) 151.660 Page 3 Hydrograph 3 SCS name: Area (acres) CN Type rainfall, P (in) time of conc. (hrs) time increment (hrs) time limit (hrs) fudge factor routed peak flow (cfs) peak time (hrs) volume (cy) Sleepys- UGD A Routings 100-yr 24-hr SCS TR-55 Design Storm 0.540 66.000 2 9.060 0.1500 0.0200 30.000 1.00 true 3.076 11.930 354.849 OUTPUT: Routing Method: storage -indication Hydrograph 0 Routing Summary of Peaks: 1-yr 24-hr SCS TR-55 Design Storm inflow (cfs) 0.348 at 11.94 (hrs) discharge (cfs) 0.092 at 12.10 (hrs) water level (ft) 470.450 at 12.16 (hrs) storage (cy) 11.460 Hydrograph 1 Routing Summary of Peaks: 2-yr 24-hr SCS TR-55 Design Storm inflow (cfs) 0.558 at 11.94 (hrs) discharge (cfs) 0.117 at 12.14 (hrs) water level (ft) 471.134 at 12.20 (hrs) storage (cy) 20.308 Hydrograph 2 Routing Summary of Peaks: 10-yr 24-hr SCS TR-55 Design Storm inflow (cfs) 1.313 at 11.94 (hrs) discharge (cfs) 1.280 at 11.96 (hrs) water level (ft) 471.757 at 11.96 (hrs) storage (cy) 27.423 Hydrograph 3 Routing Summary of Peaks: 100-yr 24-hr SCS TR-55 Design Storm inflow (cfs) 3.073 at 11.94 (hrs) discharge (cfs) 3.004 at 11.94 (hrs) water level (ft) 472.207 at 11.94 (hrs) storage (cy) 30.639 Thu ]ul 09 13:26:24 EDT 2020 Page 4 Post -Development DA A Outflow Hydrograph (From UGD A's Routings) Time (hrs) Outflow (cfs) 0.0 0.00 0.5 0.00 1.0 0.01 1.5 0.01 2.0 0.01 2.5 0.01 3.0 0.01 3.5 0.01 4.0 0.01 4.5 0.01 5.0 0.01 5.5 0.01 6.0 0.01 6.5 0.01 7.0 0.01 7.5 0.01 8.0 0.01 8.5 0.01 9.0 0.01 9.5 0.01 10.0 0.02 10.5 0.02 11.0 0.02 11.3 0.03 11.6 0.03 11.9 0.07 12.0 0.08 12.1 0.09 12.2 0.09 12.3 0.09 12.4 0.09 12.5 0.09 12.6 0.08 12.7 0.08 12.8 0.08 13.0 0.07 13.2 0.07 13.4 0.06 13.6 0.05 13.8 0.04 14.0 0.03 14.3 0.02 14.6 0.02 15.0 0.01 15.5 0.01 16.0 0.01 16.5 0.01 17.0 0.01 17.5 0.01 18.0 0.01 19.0 0.01 20.0 0.01 22.0 0.01 26.0 0.00 26.5 0.00 27.0 0.00 27.5 0.00 0.10 0.09 0.08 0.m 0.06 0.05 0.04 0.03 0.02 0.01 0.00 Outflow Hydrograph (1-yr Design Storm) 0.0 5.0 10.0 15.0 20.0 25.0 30.0 Post -Development DA A Outflow Hydrograph (From UGD A's Routings) Time (hm) Outflow (cfs) 0.0 0.00 0.5 0.01 1.0 0.01 1.5 0.01 2.0 0.01 2.5 0.01 3.0 0.01 3.5 0.01 4.0 0.01 4.5 0.01 5.0 0.01 5.5 0.01 6.0 0.01 6.5 0.01 7.0 0.01 7.5 0.01 8.0 0.01 8.5 0.02 9.0 0.02 9.5 0.02 10.0 0.02 10.5 0.03 11.0 0.03 11.3 0.04 11.6 0.04 11.9 0.09 12.0 0.11 12.1 0.12 12.2 0.12 12.3 0.12 12.4 0.12 12.5 0.11 12.6 0.11 12.7 0.11 12.8 0.11 13.0 0.10 13.2 0.10 13.4 0.09 13.6 0.08 13.8 0.08 14.0 0.07 14.3 0.06 14.6 0.05 15.0 0.03 15.5 0.02 16.0 0.02 16.5 0.02 17.0 0.01 17.5 0.01 18.0 0.01 19.0 0.01 20.0 0.01 22.0 0.01 26.0 0.00 26.5 0.00 27.0 0.00 27.5 0.00 O.t4 O.0 OJO O oa O oe O o4 0.02 O.00 Outflow Hydrograph (2-yr Design Storm) 0.0 5.0 10.0 15.0 20.0 25.0 MA Post -Development DA A Outflow Hydrograph (From UGD A's Routings) Time (hrs) Outflow (ds) 0.0 0.00 0.5 0.01 1.0 0.02 1.5 0.02 2.0 0.02 2.5 0.02 3.0 0.02 3.5 0.02 4.0 0.02 4.5 0.02 5.0 0.02 5.5 0.02 6.0 0.02 6.5 0.03 7.0 0.03 7.5 0.03 8.0 0.03 8.5 0.03 9.0 0.03 9.5 0.04 10.0 0.04 10.5 0.05 11.0 0.06 11.3 0.06 11.6 0.08 11.9 0.77 12.0 1.28 12.1 0.75 12.2 0.36 12.3 0.23 12.4 0.18 12.5 0.15 12.6 0.13 12.7 0.12 12.8 0.12 13.0 0.12 13.2 0.11 13.4 0.11 13.6 0.11 13.8 0.10 14.0 0.10 14.3 0.09 14.6 0.09 15.0 0.08 15.5 0.06 16.0 0.05 16.5 0.04 17.0 0.03 17.5 0.03 18.0 0.03 19.0 0.02 20.0 0.02 22.0 0.02 26.0 0.02 26.5 0.01 27.0 0.01 27.5 0.01 1.40 1.20 1.00 0.30 0 60 0 00 0.20 0.00 Outflow Hydrograph (10-yr Design Storm) 0.0 5.0 10.0 15.0 20.0 25.0 MA Post -Development DA A Outflow Hydrograph (From UGD A's Routings) Time (hrs) Outflow (cfs) 0.0 0.00 0.5 0.03 1.0 0.03 1.5 0.03 2.0 0.03 2.5 0.04 3.0 0.04 3.5 0.04 4.0 0.04 4.5 0.04 5.0 0.04 5.5 0.04 6.0 0.04 6.5 0.05 7.0 0.05 7.5 0.05 8.0 0.05 8.5 0.06 9.0 0.06 9.5 0.07 10.0 0.08 10.5 0.09 11.0 0.10 11.3 0.11 11.6 0.33 11.9 3.00 12.0 2.76 12.1 1.66 12.2 0.75 12.3 0.48 12.4 0.39 12.5 0.32 12.6 0.26 12.7 0.23 12.8 0.21 13.0 0.18 13.2 0.16 13.4 0.14 13.6 0.13 13.8 0.12 14.0 0.12 14.3 0.12 14.6 0.12 15.0 0.11 15.5 0.11 16.0 0.10 16.5 0.09 17.0 0.09 17.5 0.08 18.0 0.07 19.0 0.06 20.0 0.04 22.0 0.04 26.0 0.02 26.5 0.02 27.0 0.02 27.5 0.02 3.50 3.00 2.50 2.00 1.50 1.00 030 o o0 Outflow Hydrograph (100-yr Design Storm) 0.0 5.0 10.0 15.0 20.0 25.0 MA Proposed Riprap Lined Outlet Protection Calculations Below Underground Detention System 'A' S L-cr Vlq 7(�alaz YPRF�E* Chet Qp,cR' ttgan AT Wllo'cR.GAQ\4' S OEtC cTc3 StStCM %S C'v1FAU C-rsC- xNc� is i� NCNZ'Sov t4,A&-JN CS Rzstiz £ 0\0 s \,'a$ cv5 goE�aN t Apr 3.5 dPs EACiAk cF Anh s.,Ac. SMALACrl R 9GS:SGN of \J 7o" "' A\' t2ri7aa4 0,OLV� I?P-aTgt-CTION 6p2EriiC-'R -MAN d�,oESs�+ f�r•� Rr:cPrwE�t]n�a MY Nr+'�vM�. x S S F zcaEn�T p Pam_ Q6.Akc 3.\$-41 M-LN, DUCL'ki QFicRCC?:ieN pYN ^�ileNS AM1E A% FFCtLcv%'% (IAW 00 'a V%A,: \S� `SrlS' - `a�r ,. C�:.A.- OsszGNr OU�`��a QRoS2c�;cN 9rr+�ewilcw ppc4a +) Rar_ As T&LawS: LA = \or Ws `� tb° � Cn`�C 6 � EKG�CE05 PT1N , via q's5%6N A rc W1OiH +� 5TONC- nCcmt� Pf+cF 56v� = i-d,r peu JEsex ILATt INS-\, \'a" ys GP.,EA,NtA cktp-) '- 0.81 rcA vuoY c G, A L 1992 3.18 M rl �� Q J_ 2 3 W W H rLL-� W J i dte o^ a c . 0 0 0 •p n - '�Oy �� r—a—•i C U O. C F W W f py M CO 6 O O ~ F t N O W E QQX Source: USDA-SCS jaa3 -02Fs deidia OSp N O M SS MOM M►,\ Plate 3.18-4 III - 165 1992 3.18 PIPE OUTLET CONDITIONS A A 'IPE OUTLET TO FLAT REA WITH NO DEFINED HANNEL L a 0 % I —I d 7- SECTION A —A FILTER CLOTH KEY IN 6'-9`; RECOMMENDED FOR ENTIRE PERIMETER I 3d0 (MIN.) IPE OUTLET TO WELL - EFINED CHANNEL d SECTION A —A I T FILTER CLOTH KEY IN 6'-0'; RECOMMENDED FOR ENTIRE PERIMETER NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION BASKET, OR CONCRETE, 2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING PLATES 3.18-3 AND 3.18-4. S. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT _ LESS THAN 6 INCHES. Source: Va. DSWC Plate 3.18-1 III - 157 Post -Development Subarea B Inflow Hydrographs Worksheet 5b (Modified for Clarity): Basic watershed Data 1-yr. 24-hr. SCS TR-55 Method Unit Hydrograph for the la/P & Tc Listed Below Subarea Tc (hrs.) Tt (hr.) la / P Am;Q (mi2-in) DA B (Post-Dev.) 0.10 0.10 0.21 0.0004 Time hrs. Inflow (cfs) 0.0 0.00 11.0 0.00 11.3 0.00 11.6 0.00 11.9 0.02 12.0 0.07 12.1 0.21 12.2 0.27 12.3 0.19 12.4 0.11 12.5 0.08 12.6 0.06 12.7 0.05 12.8 0.04 13.0 0.04 13.2 0.03 13.4 0.03 13.6 0.03 13.8 0.02 14.0 0.02 14.3 0.02 14.6 0.02 15.0 0.02 15.5 0.02 16.0 0.01 16.5 0.01 17.0 0.01 17.5 0.01 18.0 0.01 19.0 0.01 20.0 0.01 22.0 0.01 26.0 0.00 0.30 0.25 0.20 0.15 0.10 0.05 0.00 SCS TR-55 Post -Development Unit Hydrograph (DA B Inflow) 0.0 5.0 10.0 15.0 20.0 25.0 30.0 Worksheet 5b (Modified for Clarity): Basic watershed Data 2-yr. 24-hr. SCS TR-55 Method Unit Hydrograph for the la/P & Tc Listed Below Subarea Tc (hrs.) Tt (hr.) la / P Am;Q (mi2-in) DA B (Post-Dev.) 0.10 0.10 0.17 0.0006 Time hrs. Inflow (cfs) 0.0 0.00 11.0 0.00 11.3 0.00 11.6 0.00 11.9 0.02 12.0 0.10 12.1 0.31 12.2 0.39 12.3 0.28 12.4 0.15 12.5 0.11 12.6 0.09 12.7 0.07 12.8 0.06 13.0 0.05 13.2 0.05 13.4 0.04 13.6 0.04 13.8 0.03 14.0 0.03 14.3 0.03 14.6 0.03 15.0 0.02 15.5 0.02 16.0 0.02 16.5 0.02 17.0 0.02 17.5 0.02 18.0 0.02 19.0 0.01 20.0 0.01 22.0 0.01 26.0 0.00 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0.0 SCS TR-55 Post -Development Unit Hydrograph (DA B Inflow) 5.0 10.0 15.0 20.0 25.0 30.0 Worksheet 5b (Modified for Clarity): Basic watershed Data 10-yr. 24-hr. SCS TR-55 Method Unit Hydrograph for the la/P & Tc Listed Below Subarea Tc (hrs.) Tt (hr.) la / P Am•Q (mil -in) DA B (Post-Dev.) 0.10 0.10 0.11 0.0011 Time hrs. Inflow (cfs) 0.0 0.00 11.0 0.00 11.3 0.00 11.6 0.00 11.9 0.04 12.0 0.20 12.1 0.61 12.2 0.78 12.3 0.56 12.4 0.31 12.5 0.22 12.6 0.18 12.7 0.15 12.8 0.12 13.0 0.10 13.2 0.09 13.4 0.08 13.6 0.08 13.8 0.07 14.0 0.06 14.3 0.05 14.6 0.05 15.0 0.05 15.5 0.04 16.0 0.04 16.5 0.04 17.0 0.03 17.5 0.03 18.0 0.03 19.0 0.03 20.0 0.02 22.0 0.02 26.0 0.00 0.90 080 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 a SCS TR-55 Post -Development Unit Hydrograph (DA B Inflow) Worksheet 51b (Modified for Clarity): Basic watershed Data 100-yr. 24-hr. SCS TR-55 Method Unit Hydrograph for the la/P & Tc Listed Belov Subarea Tc (hrs.) Tt (hr.) la / P Am*Q (mi2-in) DA B (Post-Dev.) 0.10 0.10 0.11 0.0019 Time (hrs.) Inflow (cfs) 0.0 0.00 11.0 0.00 11.3 0.00 11.6 0.00 11.9 0.07 12.0 0.33 12.1 1.01 12.2 1.30 12.3 0.92 12.4 0.51 12.5 0.37 12.6 0.29 12.7 0.24 12.8 0.20 13.0 0.17 13.2 0.15 13.4 0.14 13.6 0.12 13.8 0.11 14.0 0.10 14.3 0.09 14.6 0.09 15.0 0.08 15.5 0.07 16.0 0.07 16.5 0.06 17.0 0.06 17.5 0.05 18.0 0.05 19.0 0.04 20.0 0.04 22.0 0.04 26.0 0.00 1.40 SCS TR-55 Post -Development Unit Hydrograph (DA B Inflow) Post -Development Synchronized Subareas A & B Hydrographs The following hydrographs represent the synchronization of Subarea A's outflow hydrographs (from proposed underground detention basin A) and Subarea B's inflow hydrographs. The synchronized storm events represent the inflow hydrographs into proposed detention basin B. Synchronized (Inflow) Unit Hydrograph into Detention Basin'B' (This inflow hydrograph takes into account the upland subarea A's attenutation in Underground Detention System A, and the upland unrouted subarea B.) 1-yr. 24-hr. SCS TR-55 Method Synchronized Unit Hydrograph Time hrs. Inflow s 0.0 0.00 0.5 0.00 1.0 0.01 1.5 0.01 2.0 0.01 2.5 0.01 3.0 0.01 3.5 0.01 4.0 0.01 4.5 0.01 5.0 0.01 5.5 0.01 6.0 0.01 6.5 0.01 7.0 0.01 7.5 0.01 8.0 0.01 8.5 0.01 9.0 0.01 9.5 0.01 10.0 0.02 10.5 0.02 11.0 0.02 11.3 0.03 11.6 0.03 11.9 0.09 12.0 0.15 12.1 0.30 12.2 0.36 12.3 0.28 12.4 0.20 12.5 0.16 12.6 0.15 12.7 0.13 12.8 0.12 13.0 0.11 13.2 0.10 13.4 0.09 13.6 0.08 13.8 0.07 14.0 0.05 14.3 0.04 14.6 0.03 15.0 0.03 15.5 0.03 16.0 0.02 16.5 0.02 17.0 0.02 17.5 0.02 18.0 0.02 19.0 0.02 20.0 0.01 22.0 0.01 26.0 0.00 26.5 0.00 27.0 0.00 27.5 0.00 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 SCS TR-55 Inflow Unit Hydrograph into Detention Basin B (Accounts for Subarea A Attenuation) 0.0 5.0 10.0 15.0 20.0 25.0 30.0 Synchronized (Inflow) Unit Hydrograph into Detention Basin'B' (This inflow hydrograph takes into account the upland subarea A's attenutation in Underground Detention System A, and the upland unrouted subarea B.) 2-yr. 24-hr. SCS TR-55 Method Synchronized Unit Hydrograph Time hrs. Inflow s 0.0 0.00 0.5 0.01 1.0 0.01 1.5 0.01 2.0 0.01 2.5 0.01 3.0 0.01 3.5 0.01 4.0 0.01 4.5 0.01 5.0 0.01 5.5 0.01 6.0 0.01 6.5 0.01 7.0 0.01 7.5 0.01 8.0 0.01 8.5 0.02 9.0 0.02 9.5 0.02 10.0 0.02 10.5 0.03 11.0 0.03 11.3 0.04 11.6 0.04 11.9 0.11 12.0 0.21 12.1 0.42 12.2 0.51 12.3 0.40 12.4 0.27 12.5 0.22 12.6 0.20 12.7 0.18 12.8 0.17 13.0 0.15 13.2 0.14 13.4 0.13 13.6 0.12 13.8 0.11 14.0 0.10 14.3 0.09 14.6 0.08 15.0 0.06 15.5 0.04 16.0 0.04 16.5 0.03 17.0 0.03 17.5 0.03 18.0 0.03 19.0 0.02 20.0 0.02 22.0 0.02 26.0 0.00 26.5 0.00 27.0 0.00 27.5 0.00 0.60 0.50 0.40 0.30 0.20 0.10 0.00 SCS TR-55 Inflow Unit Hydrograph into Detention Basin B (Accounts for Subarea A Attenuation) 0.0 5.0 10.0 15.0 20.0 25.0 30.0 Synchronized (Inflow) Unit Hydrograph into Detention Basin'B' (This inflow hydrograph takes into account the upland subarea A's attenutation in Underground Detention System A, and the upland unrouted subarea B.) 10-yr. 24-hr. SCS TR-55 Method Synchronized Unit Hydrograph Time hrs. Inflow s 0.0 0.00 0.5 0.01 1.0 0.02 1.5 0.02 2.0 0.02 2.5 0.02 3.0 0.02 3.5 0.02 4.0 0.02 4.5 0.02 5.0 0.02 5.5 0.02 6.0 0.02 6.5 0.03 7.0 0.03 7.5 0.03 8.0 0.03 8.5 0.03 9.0 0.03 9.5 0.04 10.0 0.04 10.5 0.05 11.0 0.06 11.3 0.06 11.6 0.08 11.9 0.81 12.0 1.48 12.1 1.36 12.2 1.14 12.3 0.79 12.4 0.49 12.5 0.37 12.6 0.31 12.7 0.27 12.8 0.24 13.0 0.22 13.2 0.20 13.4 0.19 13.6 0.18 13.8 0.17 14.0 0.16 14.3 0.15 14.6 0.14 15.0 0.12 15.5 0.11 16.0 0.09 16.5 0.07 17.0 0.06 17.5 0.06 18.0 0.06 19.0 0.05 20.0 0.04 22.0 0.04 26.0 0.02 26.5 0.01 27.0 0.01 27.5 0.01 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0.00 SCS TR-55 Inflow Unit Hydrograph into Detention Basin B (Accounts for Subarea A Attenuation) 0.0 5.0 10.0 15.0 20.0 25.0 30.0 Synchronized (inflow) Unit Hydrograph into Detention Basin'B' (This inflow hydrograph takes into account the upland subarea A's attenutation in Underground Detention System A, and the upland unrouted subarea B.) 100-yr. 24-hr. SCS TR-55 Method Synchronized Unit Hydrograph Time hrs. Inflow s 0.0 0.00 0.5 0.03 1.0 0.03 1.5 0.03 2.0 0.03 2.5 0.04 3.0 0.04 3.5 0.04 4.0 0.04 4.5 0.04 5.0 0.04 5.5 0.04 6.0 0.04 6.5 0.05 7.0 0.05 7.5 0.05 8.0 0.05 8.5 0.06 9.0 0.06 9.5 0.07 10.0 0.08 10.5 0.09 11.0 0.10 11.3 0.11 11.6 0.33 11.9 3.08 12.0 3.09 12.1 2.67 12.2 2.05 12.3 1.40 12.4 0.90 12.5 0.69 12.6 0.56 12.7 0.47 12.8 0.41 13.0 0.36 13.2 0.31 13.4 0.28 13.6 0.25 13.8 0.24 14.0 0.22 14.3 0.21 14.6 0.20 15.0 0.19 15.5 0.18 16.0 0.16 16.5 0.15 17.0 0.14 17.5 0.13 18.0 0.12 19.0 0.10 20.0 0.08 22.0 0.07 26.0 0.02 26.5 0.02 27.0 0.02 27.5 0.02 3.50 3.00 2.50 2.00 1.50 1.00 0.50 0.00 SCS TR-55 Inflow Unit Hydrograph into Detention Basin B (Accounts for Subarea A Attenuation) 0.0 5.0 10.0 15.0 20.0 25.0 30.0 Post -Development Detention Basin 'B' Routings & Final Subarea A & B Outflows Sleepys- Detention Basin B Routings BasinFlow printout INPUT: Basin: Sleepys- Detention Basin B Routings 5 Contour Areas Elevation(ft) Area(sf) Computed Vol.(cy) 469.00 72.00 0.0 470.00 306.00 6.5 471.00 846.00 27.0 472.00 1493.00 69.8 472.65 1775.00 109.0 Start—Elevation(ft) 4 Outlet Structures Outlet structure 0 Orifice 469.00 Vol.(cy) 0.00 name: Barrel area (sf) 0.785 diameter or depth (in) 12.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 466.190 multiple 1 discharge out of riser Outlet structure 1 Orifice name: Low -Flow Orifice area (sf) 0.009 diameter or depth (in) 1.250 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 469.000 multiple 1 discharge into riser Page 1 Sleepys- Detention Basin B Routings Outlet structure 2 Weir name: Riser diameter (in) 36.000 side angle 0.000 coefficient 3.300 invert (ft) 470.650 multiple 1 discharge into riser transition at (ft) 0.912 orifice coef. 0.500 orifice area (sf) 7.069 Outlet structure 3 Weir name: Emergency Spillway length (ft) 5.000 side angle 75.960 coefficient 3.000 invert (ft) 471.650 multiple 1 discharge through dam Page 2 4 Inflow Hydrographs Hydrograph 0 Curve name: time incr (minlhrs) time limit (minlhrs) file: volume (cy) routed time in hours Hydrograph 1 Curve Sleepys- Detention Basin B Routings 1 year SCS 24-hr Design Storm 0.10 27.50 1yr 24hr SCS TR-55 Post-Dev DA A-B Inflow Hydrograph.txt 80.96 true true name: 2 year SCS 24-hr Design Storm time incr (minlhrs) 0.10 time limit (minlhrs) 27.50 file: 2yr 24hr SCS TR-55 Post-Dev DA A-B Inflow Hydrograph.txt volume (cy) 121.70 routed true time in hours true Hydrograph 2 Curve name: 10 year SCS 24-hr Design Storm time incr (minlhrs) 0.10 time limit (minlhrs) 27.50 file: 10yr 24hr SCS TR-55 Post-Dev DA A-B Inflow Hydrograph.txt volume (cy) 270.81 routed true time in hours true Hydrograph 3 Curve name: 100 year SCS 24-hr Design Storm time incr (minlhrs) 0.10 time limit (minlhrs) 27.50 file: 100yr 24hr SCS TR-55 Post-Dev DA A-B Inflow Hydrograph.txt volume (cy) 535.33 routed true time in hours true Page 3 Sleepys- Detention Basin B Routings OUTPUT: Routing Method: storage -indication Hydrograph 0 Routing Summary of Peaks: 1 year SCS 24-hr Design Storm inflow (cfs) 0.364 at 12.20 (hrs) discharge (cfs) 0.043 at 12.40 (hrs) water level (ft) 470.628 at 12.50 (hrs) storage (cy) 16.977 Hydrograph 1 Routing Summary of Peaks: 2 year SCS 24-hr Design Storm inflow (cfs) 0.508 at 12.20 (hrs) discharge (cfs) 0.102 at 12.30 (hrs) water level (ft) 470.665 at 12.30 (hrs) storage (cy) 17.852 Hydrograph 2 Routing Summary of Peaks: 10 year SCS 24-hr Design Storm inflow (cfs) 1.482 at 12.00 (hrs) discharge (cfs) 1.255 at 12.00 (hrs) water level (ft) 470.765 at 12.00 (hrs) storage (cy) 20.303 Hydrograph 3 Routing Summary of Peaks: 100 year SCS 24-hr Design Storm inflow (cfs) 3.092 at 12.00 (hrs) discharge (cfs) 3.092 at 12.00 (hrs) water level (ft) 470.865 at 12.00 (hrs) storage (cy) 22.985 Thu Jul 09 13:33:50 EDT 2020 Page 4 Water Quality Calculations Using the DEQ Virginia Runoff Reduction Method for New Developments (COMPLIANCE IS MET THROUGH THE BEST MANAGEMENT PRACTICE OF PURCHASING NUTRIENT CREDITS. THE VRRM BOUNDARY IS DEFINED BY THE PROPOSED ESC LIMITS OF DISTURBANCE.) ml u W Q O p S pp O pp O p S 00 O 00 O O O O O W OC Q Q 0 O 0 O 0 O 0 O O O O Y O Q 0' O O O O O O O O O s Fi, s c'888SSx 0000co QQ,os chi a ssssox QoS s o S a E m p 0 o 0 0 0 0 0 0 o 0 0 m 0 O O o O 0 O 0 O 0 m 7 W N a;0000SSSSSx 3 _ o 0 0 6 0 6 0 .;o.:.: o0to N �+ N ^ T.s' Z. T T T N T T T Qi Li 6 NNa 0 uSg 0 0 Q Q two W Q >1 ZC LFCL OW w W Ci C1' 7 N UO xC z :a _O WQ QAL 4? W Qa C Lu d C C z UO Q 19 W O U z z W z z z j W F nFRF Fz Z> W u L W F O g O d O W O F p w O W M N W C O J OJ Or OJ OJ �.a OJ W £ ' W Q u f z W a Q a f u f y f C z W W 0 O z F OO z O z d OD O O N z_ O z Q Z z O z u ' p z_ Q W o � W � C O C i