Loading...
HomeMy WebLinkAboutSUB201800039 Review Comments Road Plan and Comps. 2018-04-27COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Project: Briarwood Phase 6 - Road Plan Project File Number: SUB201800039 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner: Wendell Wood and Nena Harrell Woodbriar Associates Plan received date: 26 February 2018 Date of comments: 27 April 2018 Reviewer: Matt Wentland Scott, We have reviewed the plans and have the following comments: Engineering 1. A new VSMP plan (not an amendment) will need to be submitted and approved. 2. Provide Deed Book and page numbers for all required off -site easements prior to plan approval. 3. Pipe slopes will need to be less than 20%, with anchor block provided for slopes over 16% County policy and VDOT Drainage Manual). 4. Pipe velocities over 10 fps should be avoided (VDOT DM). 5. Provide HGL calculations and show the HGL on the profiles. 6. Provide a'/2 inch steel plate in storm manholes with drops or 4' or greater (VDOT DM). 7. Provide the design for the riprap at the pipe outlets (VDOT DM). 8. The maximum height of retaining walls located on managed slopes is 6' (18.30.7.5). It appears that reverse slope benches or surface water diversions may also be required. 9. Surveyor verification of the steep slopes will be required prior to VSMP approval. Fire Rescue - Shawn Maddox 1. Cul-de-sac must be a diameter of 96'. 2. Street shall be marked no parking on one side and no parking in the cul-de-sac. 3. A fire flow test will be required before final acceptance. E911 had no objection and VDOT comments were emailed on 4/11/18. Planning comments will be forwarded when they are received. Thank you, Matt Wentland 434.296-5832 -x3458 File: SUB201800039 Briarwood 6 RP comment 04-27-18.doc