Loading...
HomeMy WebLinkAboutWPO201900008 Review Comments WPO VSMP 2019-07-01 pF ALI3,c, Tli Pomo COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 VSMP Permit plan review Project title: Hendy Residence Project file number: WPO201900008 Plan preparer: Shimp Engineering [justin@shimp-engineering.com] Owner or rep.: CPCM Telford Trust [cookbookcrazyl@gmail.com] Plan received date: Feb 14,2019 May 20,2019 Date of comments: March 13,2019 July 1,2019(Rev. 1) Reviewer: David James [djames@albemarle.org] County Code section 17-410 and Virginia Code§62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below.The application may be resubmitted for approval if all of the items below are satisfactorily addressed.The VSMP application content requirements can be found in County Code section 17-401. A.Stormwater Pollution Prevention Plan(SWPPP) The SWPPP content requirements can be found in County Code section 17-405.A SWPPP must contain(1)a PPP,(2)an ESCP,(3)a SWMP,and(4)any TMDL measures necessary. 1. Registration Statement-Fill out sections 8-10. (Rev.1)Please have applicant complete the new registration statement (attached). 2. Include PPP exhibit sheet. (Rev.1)Addressed. 3. (Rev.1)Provide new reduced sized inserts for sections 4 &5. Revise section 5 SWM narrative. C.Pollution Prevention Plan(PPP) The PPP content requirements can be found in County Code section 17-404. 1. Show any proposed clearing/grading activities,paving operations, landscaping operations, E&S controls, staging, stockpile,borrow,fueling,waste disposal,vehicle/equipment washing,concrete washout locations on the PPP.Also,show locations where concentrated stormwater discharges. (Rev.!)Partially addressed. Concentrated water discharges offsite from ditches along bottom of driveway. D. Stormwater Management Plan(SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved,and the reasons are provided in the comments below.The stormwater management plan content requirements can be found in County Code section 17-403. 1. Show Pre-/Post-development drainage map/divide on the plans. (Rev.!)Addressed. 2. Provide SWM Narrative- Include VRRM spreadsheet meeting water quality, and Energy Balance equation meeting water quantity compliance on the plans. (Rev.!)Not all runoff from site will sheet flow. See comment D.10 below. (9VAC25-870-66 DJ 3. Show design detail of proposed SWM detention. (Rev.')Addressed. N/A. 4. Show proposed SWM facility and access easement. (Rev.!)Not addressed; Show the easement for the ELS. 5. Submit a deed&easement plat for Forest/Open Space and SWM facility easements. The deed and plat will need to be recorded prior to plan approval. (Rev.!)Comment still valid. 6. The ditch outfalls will need outlet protection to a natural drainageway or level spreader design to sheet flow. Show that runoff will sheet flow and not re-concentrate again downstream before leaving site. (Rev.!)Addressed. 7. Area of forest/open space to be demarcated (fenced-off)prior to start of construction. Make note of this on sheet 2& on sheet 5. (Rev.!)Addressed. 8. Include this checklist in the plan set. http://www.albemarle.org/upload/images/forms center/departments/Community Develop ment/forms/Engineering and WPO Forms/WPO VSMP Construction Record Drawings Policy 23Mav2014.pdf (Rev.!)Addressed. 9. Design packet-Show property line,LOD,and DA size/number on the pre-/post-drainage maps. (Rev.1)Acknowledged. 10. (Rev.1)The runoff from the channels at the beginning of the driveway must be analyzed to meet water quantity requirement under Part IIB. (9VAC25-870-66A) 11. (Rev.!)ELS design: a. Show LS lip in front of the blind swale. Why are you extending the blind swale so far? b. The LS lip(as shown)discharges into forested space and will need to meet the L= 40' per cfs requirement. c. Include— High Flow Bypass provides safe passage for larger design storms through the filter strip. The bypass channel should accommodate all peak flows greater than the water quality design flow. A Forebay should have a maximum depth of 3 feet and gradually transition to a depth of 1 foot at the level spreader lip (Figure 2). The forebay is sized such that the surface area is 0.2% of the contributing impervious area. (A forebay is not necessary if the concentrated flow is from the outlet of an extended detention basin or similar practice). E. Erosion and Sediment Control Plan(ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved,and the reasons are provided in the comments below.The erosion control plan content requirements can be found in County Code section 17-402. 1. Sheet C3: a. Show the steep slopes,critical overlay on the existing conditions sheet. (Rev.1)Partially addressed.Show legend-hatching/symbols. b. Show rest of existing contours for the site. (Rev.1)Addressed. c. Show WPO buffer. (Rev.1)Addressed. d. Show existing site features(i.e. driveway& building). (Rev.1)Addressed. e. Show location of all existing and proposed utilities and easements with deed hook references. (Rev.1)Addressed. 2. Sheet C4: a. Show ST symbol,drainage area,and design detail. Show a phased plan— `E&SC phase 1' for perimeter controls, `E&SC phase 2' for grading& additional controls based upon your construction sequence. (Rev.1)Addressed. b. Show SF at bottom of graded slope,extend from building along following contour. (Rev.1)Addressed. c. SF should not cut across contours. Remove the SF shown alongside driveway. (Rev.1)Addressed. d. Perimeter controls should be shown,such as diversions. The sediment trap should have diversions leading to it from the disturbs area above. (Rev.1)Addressed. e. Show contours for the ditches you're creating. (Rev.1)Addressed. f. I don't see the need for check dams unless you're in a ditch.Just space out SF every 100'. (Rev.!)Addressed;N/A. g. Provide diversion for clean water with outlet protection. (Rev.!)Addressed;N/A. h. The proposed contour near building pad at end of driveaway has a 306' elevation. Next to it the existing contour is at 312' elevation. Therefore,a retaining wall needs placed there,or grading needs to be adjusted someho, (Rev.1)Addressed; fix reported elevation labels. i. Mud trap ,wn will require an E&St, Show what area is going to it. (Rev.1)Addressed. 3. Driveway appears to exceed grade limit of 16%. Show proposed grading for driveway. {18-4.6.6} Response: The driveway has been regraded,but is now 18%in places. This exception is to be applied for through the building permit process. (Rev.!)TBD,will followup. Sent email to Shawn Maddox/Frank P. to provide feedback. 4. Sheet C6- Show check dam detail. (Rev.1)Acknowledged. 5. Provide low maintenance(not grass)ground cover specified on the plans where grades are steeper than 3:1. Show for 2:1 slope area next to building pad/end of driveway. {DSM, Sect 8A} (Rev.1)Include type of ground cover& legend with hatching symbol for the low maintenance ground cover. 6. Provide OP shape& stone size calcs (see VADEQ ESC HB Spec.3.18). (Rev.1)Addressed. 7. (Rev.1)Sheet C5-You're showing disturbance,structures& improvements in the critical slope areas and this is not allowed unless a waiver is provided. {18-4.2.3} 8. (Rev.1)Sheet C8—Show paved construction entrance detail(DSM,pg. 8).Owner can work with E&SC inspector to determine if stone CE is acceptable. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed.For re-submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval,plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development.One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans.The County's Management Analyst will prepare bond agreement forms,which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified.The agreements will need to be approved and signed by the County Attorney and County Engineer.This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information.The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete,county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval.At this time,the DEQ portion of the application fees will need to be paid directly to the state.For fastest processing,this is done electronically with the emails provided on the application.DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application,they will issue a permit coverage letter.This should be copied to the county. After DEQ coverage is issued,via the coverage letter,the County can hold a pre-construction conference. Applicants will need to complete the request for a pre-construction conference form,and pay the remainder of the application fee.The form identifies the contractor and responsible land disturber,and the fee remaining to be paid.This will be checked by county staff,and upon approval,a pre-construction conference will be scheduled with the County inspector.At the pre-construction conference, should everything proceed satisfactorily,a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforms.asp?department=cdengwpo