Loading...
HomeMy WebLinkAboutWPO202000056 VSMP - SWPPP 2020-12-09COUNTY OF ALBEMARLE - Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 i Tel. (434) 296-5832 # Fax (434) 972-4126 F r,�Y114+ Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development Project Name: For Construction Activities At: Dawson xesiaence - T.M. 34-161 Address: (TBD) Foxwood Drive Prepared by: Name: Gregory Gallagher, America's Home Place SWPPP Preparation Date:. November 9, 2020 (This document is to be made publicly available according to 9VAC25-880-70, Part II, section D) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Single Family Residential Albemarle County Erosion and Sediment Control Plan. An erosion and sediment control plan is in place for the overall development, under the operation of the developer. An erosion and sediment control agreement is in place for this lot, and is attached. Please see attached Site Grading Plan. Stormwater Management Plan A stormwater management plan is in place for the overall development, under the operation of the developer. ❑ Details and plans for required stormwater management measures on this lot are attached. ❑ There are no required stormwater management measures on this lot. Please see attached Site Grading Plan. Pollution Prevention Plan. (reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4) A. Sources of Pollutants. Common activities and minimum control and prevention practices Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures Follow Erosion and Sediment Control Clearing, grading, excavating, and un- Land disturbPlan. Dispose of clearing debris at ance area stabilized areas acce t bl d' al ' S d d Paving operations Concrete washout and cement waste Structure construction, stucco, painting, and cleaning Dewatering operations Material delivery and storage Material use during building process Solid waste disposal Sanitary waste p a e ispos sites. ee an mulch, or sod within 7 da s of land clearing Cover storm drain inlets and use drip pans Roads and driveways and absorbentloil dry for all paving machines to limit leaks and spills Direct concrete wash water into a leak - Current location and detail shown on proof container or leak -proof settling basin plan that is designed so that no overflows can Structures Dewatering sites shown on plan Designated area shown on plan Building areas occur Enclose or cover material storage areas. Mix paint indoors in a containment area or in a flat unpaved area. Prevent the discharge of soaps, solvents, detergents and wash water, paint, form release oils and curing compounds. Water shall be filtered, settled or similarly treated prior to discharge as shown on flan. Designated areas for material delivery and storage. Placed near construction entrances, away from waterways and drainage ap s Follow manufacturer's instructions . MSDS's attached. Waste collection area will not receive a substantial amount of runoff from upland areas and does not drain directly to a Current designated container areas on waterway. Containers have lids covered plan before periods of rain, or are in a covered area. Scheduled collection to prevent overfilling. MATERIALS NOT TO BE BURIED ON -SITE Convenient and well -maintained portable sanitary facilities will be provided, and Current locations shown on plan located away from waterways or inlets. Such facilities shall be regularly maintained. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Single Family Residential Albemarle County Pollutant, or Pollutant Location on site Generating Activity Landscaping operations Wash Waters Vehicle and equipment washing Fueling Landscape areas shown on plan Wash areas shown on plan Designated areas and details shown on Fueling station Prevention Practices, Control Measures Apply fertilizers in accordance with manufacturer's recommendations and not during rainfall events To be treated in a sediment basin or better control as specified on plan. Minimize the discharge of pollutants from ui ment and vehicle washing Provide containment and filtering for all wash waters per the plan Provide double walled tanks, a lined containment area, drip pans, and spill prevention and cleanuR materials. Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials present on the site to precipitation and to stormwater. (Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.) B. C. Persons responsible for pollution prevention practices Greg Gallahger - (540) 950-8545 - ggallagher@americashomeplace.com Anthony Mayo - (540) 785-5841 Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Single Family Residential Albemarle County D. Response and reporting practices Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures as follows. Most spills can be cleaned up following manufacturer specifications. Absorbent/oil dry, sealable containers, plastic bags, and shovels/brooms are suggested minimum spill response items that should be available at this location. 1 m Priority: Protect all people 2nd Priority: Protect equipment and property 31 Priority: Protect the environment 1. Check for hazards (flammable material, noxious fumes, cause of spill) — if flammable liquid, turn off engines and nearby electrical equipment. If serious hazards are present leave the area and call 911. LARGE SPILLS ARE LIKELY TO PRESENT A HAZARD. 2. Make Sure the spill area is safe to enter and that it does not pose an immediate threat to health or safety of any person. 3. Stop the spill source. 4. Call co-workers and supervisor for assistance and to make them aware of the spill and potential dangers. 5. If possible, stop spill from entering drains (use absorbent or other material as necessary). 6. Stop spill from spreading (use absorbent or other material) 7. If spilled material has entered a storm sewer; contact locality's storm water department. 8. Clean up spilled material according to manufacturer specifications, for liquid spills use absorbent materials and do not flush area with water. 9. Properly dispose of cleaning materials and used absorbent material according to manufacturer specifications. Emergency Contacts: Normal Working Hours DEQ Valley Regional Office 540-574-7800 Nights, Holidays & Weekends VA Dept. of Emergency Management 804-674-2400 Pollution Prevention Awareness All site personnel and workers will be made aware of the prevention practices and measures contained in this document. Qualified personnel The following personnel are responsible for inspections; Gregory Gallagher (540) 850-8545 or Anthony Mayo - (540) 785-5841 General permit copy A copy of the construction general permit, 9VAC25-880, will be attached to this document on the construction site. The general permit can be found at .1ttp://www.deg.virginia.gov/Programs/Water/StormwaterManagement/V SMPPermits/ConstructionGeneralPermit.aspx Inspection logs Inspections will be conducted on -site, and recorded here, as required by the 9VAC25-880-70, Part II, section B and F of the Construction General Permit. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Single Family Residential Albemarle County Signed Certification (Provide certification according to 9VAC25-870-370. For purposes of plan review and approvals, this certification should be the owner of the property, the same signature as appears on the bonds and applications.) CERTIFICATION "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Owner/Operator Name: Gregory Gallahger Company: Americas's Home Place Title: Co�UST2uLi ?dN �}nrhC —" Signature: Date: /2 - S - 20 zo Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Single Family Residential Albemarle County