HomeMy WebLinkAboutARB202000131 Architectural Drawings 2020-12-07 November 30, 2020 White Gables Phase Two Page 1 of 12 ARB‐2020‐xx: White Gables Phase Two Description: The White Gables site plan amendment will complete the development shown on the original site plan approved in 2003 and will include the construction of three condominium buildings on the east side of the property. The new buildings will have the same footprints as the originally proposed buildings, and will be similar architecturally, but with some variation in detail. Only Pavilion II will be constructed as part of the next phase of development. Parcel ID‐ 06000‐00‐00‐02600 Zoning – Commercial Office Owner ‐ White Gables Charlottesville LC C/O Robinson Dev Group Inc Magisterial District – Samuel Miller Compatibility with Surrounding Area and Entrance Corridor: The site is located on White Gables Lane on the north side of Rt 250, less than a quarter‐mile of the 250 Bypass. Pavilion II is the northern‐most building on the east side, and will be about 535 ft. from the Rt. 250 Entrance Corridor. Pavilion VI will be about 215 ft from the Entrance Corridor. Currently, the building sites are concealed from the Entrance Corridor by the heavily landscaped road frontage, as well as the buildings at 2421 Ivy Rd and 410 White Gables Lane.
November 30, 2020 White Gables Phase Two Page 2 of 12
November 30, 2020 White Gables Phase Two Page 3 of 12 PAVILION II FRONT ELEVATION (PAVILION VI OPPOSITE)
November 30, 2020 White Gables Phase Two Page 4 of 12 ORIGINAL PAVILION II CONCEPT ELEVATION
November 30, 2020 White Gables Phase Two Page 5 of 12 PAVILION II REAR ELEVATION
November 30, 2020 White Gables Phase Two Page 6 of 12 PAVILION II LEFT (NORTH) ELEVATION PAVILION II RIGHT (SOUTH) ELEVATION
November 30, 2020 White Gables Phase Two Page 7 of 12 PAVILION IV FRONT ELEVATION
November 30, 2020 White Gables Phase Two Page 8 of 12 PAVILION IV REAR ELEVATION
November 30, 2020 White Gables Phase Two Page 9 of 12 PAVILION IV LEFT ELEVATION PAVILION IV RIGHT ELEVATION
November 30, 2020 White Gables Phase Two Page 10 of 12 Context – Existing Buildings Pavilion I
November 30, 2020 White Gables Phase Two Page 11 of 12 Pavilion III
November 30, 2020 White Gables Phase Two Page 12 of 12 Pavilion V